Download as pdf or txt
Download as pdf or txt
You are on page 1of 31

DUDEK ROOF DETAILS

Number Name
R01 – 100 Increase house with Dudek I-beams
R02 – 100 Installation of Dudek truss, type 1
R02 – 200 Installation of Dudek truss, type 2
R03 – 100 Flat roofs, DIB walls
R03 – 200 Flat roofs, timber walls
R04 – 100 Roofs with small angle α≤10°, DIB walls
R04 – 200 Roofs with small angle α≤10°, up lift loads, DIB walls
R04 – 300 Roofs with small angle α≤10°, timber walls
R04 – 400 Roofs with small angle α≤10°, up lift loads, timber walls
R05 – 100 Roofs with small angle and overhang α≤10°, DIB walls
R05 – 200 Roofs with small angle and overhang α≤10°, timber walls
R06 – 100 Reinforcements in I-Beams truss, α≤10°, DIB walls
R06 – 200 Reinforcements in I-Beams truss, 20°<α<45°, DIB walls
R06 – 300 Reinforcements in I-Beams truss, α≤10°, timber walls
R06 – 400 Reinforcements in I-Beams truss, 20°<α<45°, timber walls
R06 – 500 Cut in I-Beams truss on end support
R06 – 600 Cut in I-Beams truss on intermediate support, continuous beam
R06 – 700 Cut in I-Beams truss on intermediate support, discontinued beam
R07 – 100 Details of I-Beams connections 1/2
R07 – 200 Details of I-Beams connections 2/2
R08 – 100 Roof with overhang, DIB walls 1/3
R08 – 200 Roof with overhang, DIB walls 2/3
R08 – 300 Roof with overhang, DIB walls 3/3
R09 – 100 Roof with overhang, timber walls 1/3
R09 – 200 Roof with overhang, timber walls 2/3
R09 – 300 Roof with overhang, timber walls 3/3
R10 – 100 Connections to corner rafter, convex corner 1/2
R10 – 200 Connections to corner rafter, convex corner 2/2
R10 – 300 Connections to corner rafter, concave corner 1/2
R10 – 400 Connections to corner rafter, concave corner 2/2

ver. 2, 07.04.2016
DUDEK BUILDING SYSTEM No.
R01-100
Date
Roof Structure 07.04.2016
www.dudek-group.pl
Tel. +48 77 421 12 599 Increase house with Dudek I-beams
ibeams@dudek-hh.pl Sign

By replacing existing framework constructions


with DIB I-beams can increase the living space
in a simple and safe way.
DIB roof truss has major advantages for raising the roof.
With DIB roof truss can installation of a new roof above the existing roof closed.
This eliminates the risk of precipitation during the construction period.
DUDEK BUILDING SYSTEM No.
R02-100
Date
Roof Structure 07.04.2016
www.dudek-group.pl
Tel. +48 77 421 12 599 Installation of Dudek truss, type 1
ibeams@dudek-hh.pl Sign

DETAIL A

RAFTER, DIB BEAM RAFTER, DIB BEAM

PART B PART A

DIB BEAM
PART C

REINFORCED SUPPORT REINFORCED SUPPORT


ROOF SUPPORT ROOF SUPPORT ROOF SUPPORT

DETAIL A

PART B

PART A
STEEL ROOF CONNECTOR

STEEL NAIL PLATE


STEEL NAIL PLATE

PART C
REINFORCEMENT REINFORCEMENT

STEEL NAIL PLATE STEEL NAIL PLATE


DUDEK BUILDING SYSTEM No.
R02-200
Date
Roof Structure 07.04.2016
www.dudek-group.pl
Tel. +48 77 421 12 599 Installation of Dudek truss, type 2
ibeams@dudek-hh.pl Sign

DETAIL A

RAFTER, DIB BEAM RAFTER, DIB BEAM

PART B PART D PART A

PART E PART F

DIB BEAM
PART C

REINFORCED SUPPORT REINFORCED SUPPORT


ROOF SUPPORT ROOF SUPPORT ROOF SUPPORT

DETAIL A PART E PART F


PART D

STEEL ROOF CONNECTOR


PART B PART A

STEEL NAIL PLATE


STEEL NAIL PLATE

PART C
REINFORCEMENT REINFORCEMENT

STEEL NAIL PLATE STEEL NAIL PLATE


DUDEK BUILDING SYSTEM No.
R03-100
Date
Roof Structure 07.04.2016
www.dudek-group.pl
Tel. +48 77 421 12 599 Flat roofs, DIB walls
ibeams@dudek-hh.pl Sign

RAFTER, DIB BEAM


If necessary increase
ROOF SHEATING
bearing capacity,
use detail R06-100. FIRE RESISTANT INSULATION

SOLUTION SOLUTION
A, B, C, D A, B, C, D

A B C D

min 45 mm

DIB BEAM WITH RIM BOARD, REINFORCED DIB BEAM, REINFORCED DIB BEAM,
SUPPORTED ON DIB WALL SUPPORTED ON DIB WALL SCREWED TO TIMBER STUDS

DIB BEAM,SUPPORTED METAL HANGER METAL HANGER


ON DIB WALL
DUDEK BUILDING SYSTEM No.
R03-200
Date
Roof Structure 07.04.2016
www.dudek-group.pl
Tel. +48 77 421 12 599 Flat roofs, timber walls
ibeams@dudek-hh.pl Sign

RAFTER, DIB BEAM


If necessary increase
ROOF SHEATING
bearing capacity,
use detail R06-200. FIRE RESISTANT INSULATION

SOLUTION SOLUTION
A, B, C, D A, B, C, D

A B C D

min 45 mm

DIB BEAM WITH RIM BOARD,


REINFORCED DIB BEAM, REINFORCED DIB BEAM,
SUPPORTED ON TIMBER WALL
SUPPORTED ON TIMBER WALL SCREWED TO TIMBER STUDS

DIB BEAM,SUPPORTED METAL HANGER METAL HANGER


ON TIMBER WALL
DUDEK BUILDING SYSTEM No.
R04-100
Date
Roof Structure 07.04.2016
www.dudek-group.pl
Tel. +48 77 421 12 599
ibeams@dudek-hh.pl Sign

DIB RIM BOARD


RAFTER, DIB BEAM If necessary increase
bearing capacity,
DETAIL B
use details R06-100.

DIB RIM BOARD


DETAIL A

ROOF A
END BEARING WALL

NGLE
INTERMEDIATE BEARING WALL
TIMBER PIECE
CUTTED AT AN ANGLE
END BEARING WALL

DETAIL B
DETAIL A
INTERMEDIATE
BEARING WALL RIM BOARD,
INSTALLED TO FLANGES

RAFTER, DIB BEAM

INSTALLING BY
4 NAILS/SCREWS

TIMBER PIECE
CUTTED AT AN ANGLE
DUDEK BUILDING SYSTEM No.
R04-200
Date
Roof Structure 07.04.2016
www.dudek-group.pl
Tel. +48 77 421 12 599
ibeams@dudek-hh.pl DIB walls Sign

A B
UP LIFT CAPACITY 1,5 kN UP LIFT CAPACITY 5 kN

RIM BOARD, RIM BOARD,


INSTALLED TO FLANGES INSTALLED TO FLANGES

METAL PURLIN ANCHOR,


TO PREVENT UP LIFT LOADS

2 SCREWS 6,0x120 TIMBER PIECE


TIMBER PIECE
CUTTED AT AN ANGLE 4 NAILS CNA 4,0 CUTTED AT AN ANGLE

C
UP LIFT CAPACITY 9 kN

min. 6
0 mm
RIM BOARD,
INSTALLED TO FLANGES

METAL STRIP, TO PREVENT


UP LIFT LOADS - NP20/40/1200
min. 60 mm

TIMBER PIECE
CUTTED AT AN ANGLE

8 NAILS CNA 4,0


DUDEK BUILDING SYSTEM No.
R04-300
Date
Roof Structure 07.04.2016
www.dudek-group.pl
Tel. +48 77 421 12 599
ibeams@dudek-hh.pl Sign

DIB RIM BOARD


RAFTER, DIB BEAM If necessary increase
bearing capacity,
DETAIL B
use details R06-100.

DIB RIM BOARD


DETAIL A

ROOF A
END BEARING WALL

NGLE
INTERMEDIATE BEARING WALL
TIMBER PIECE
CUTTED AT AN ANGLE
END BEARING WALL

DETAIL B
DETAIL A
INTERMEDIATE
BEARING WALL RIM BOARD,
INSTALLED TO FLANGES

RAFTER, DIB BEAM

INSTALLING BY
4 NAILS/SCREWS

TIMBER PIECE
CUTTED AT AN ANGLE
DUDEK BUILDING SYSTEM No.
R04-400
Date
Roof Structure 07.04.2016

Sign
timber walls

A B
UP LIFT CAPACITY 1,5 kN UP LIFT CAPACITY 5 kN

RIM BOARD, RIM BOARD,


INSTALLED TO FLANGES INSTALLED TO FLANGES

METAL PURLIN ANCHOR,


TO PREVENT UP LIFT LOADS

2 SCREWS 6,0x120 TIMBER PIECE


TIMBER PIECE
CUTTED AT AN ANGLE 4 NAILS CNA 4,0 CUTTED AT AN ANGLE

C
UP LIFT CAPACITY 9 kN

min. 6
0 mm
RIM BOARD,
INSTALLED TO FLANGES

METAL STRIP, TO PREVENT


UP LIFT LOADS - NP20/40/1200
min. 60 mm

TIMBER PIECE
CUTTED AT AN ANGLE

8 NAILS CNA 4,0


DUDEK BUILDING SYSTEM No.
R05-100
Date
Roof Structure 07.04.2016
www.dudek-group.pl
Tel. +48 77 421 12 599
ibeams@dudek-hh.pl DIB walls Sign

DETAIL C
REINFORCEMENT

RAFTER, DIB BEAM


If necessary increase
DETAIL B bearing capacity,
use details R06-100.

DETAIL A

ROOF A
END BEARING WALL

REINFORCEMENT DETAIL C INTERMEDIATE BEARING WALL NGLE


REINFORCED SUPPORT
25

50 END BEARING WALL

25 BEARING WALL
OR MAIN BEAM
25

400

DETAIL A
OPTIONAL:
METAL PURLIN ANCHOR,
TO PREVENT UP LIFT LOADS

INTERMEDIATE
DETAIL B
BEARING WALL

RAFTER, DIB BEAM

TIMBER PIECE
CUTTED AT AN ANGLE

INSTALLING BY
4 NAILS/SCREWS
DUDEK BUILDING SYSTEM No.
R05-200
Date
Roof Structure 07.04.2016

Sign
timber walls

DETAIL C
REINFORCEMENT

RAFTER, DIB BEAM


If necessary increase
DETAIL B bearing capacity,
use details R06-200.

DETAIL A

ROOF A
END BEARING WALL

REINFORCEMENT DETAIL C INTERMEDIATE BEARING WALL NGLE


REINFORCED SUPPORT
25

50 END BEARING WALL

25 BEARING WALL
OR MAIN BEAM
25

400

DETAIL A
OPTIONAL:
METAL PURLIN ANCHOR,
TO PREVENT UP LIFT LOADS

INTERMEDIATE
DETAIL B
BEARING WALL

RAFTER, DIB BEAM

TIMBER PIECE
CUTTED AT AN ANGLE

INSTALLING BY
4 NAILS/SCREWS
DUDEK BUILDING SYSTEM No.
R06-100
Date
Roof Structure 07.04.2016

DIB walls Sign

REINFORCEMENT
DIB BEAM
REINFORCEMENT
DIB BEAM
DIB RIM BOARD

SOLID TIMBER
SOLID TIMBER

STUD SOLID TIMBER SOLID TIMBER


SOLID TIMBER

STUD
SOLID TIMBER

DIB 47 DIB 72
GAP 6mm

18mm 30mm

NAILS 2,8x60(80)
RING NAILS 2,5x40(60) Dudek I-Beams, bearing capacity [kN]
SCREWS 4,0<D<5,0x40(60) End bearing Intermediate bearing
[mm] 45 98 130 98 148
Type NS S NS S NS S NS S NS S
DIB 47
200 - 500 7,93 11,83 11,23 13,97 14,27 17,40 14,80 18,84 18,92 22,97
DIB 72
200 - 500 12,15 15,57 17,16 18,29 19,26 22,03 22,68 28,66 27,56 33,42
Bearing capacity calculated according to short-term during class.
kmod = 0,9 and ym = 1,25
NS - Without reinforcement
S - With reinforcement

MAX. GAP 1mm


DUDEK BUILDING SYSTEM No.
R06-200
Date
Roof Structure 07.04.2016

Sign
DIB walls

A B
REINFORCEMENT REINFORCEMENT TABLE 1
Bearing capacity, bottom end [kN]
Type of I-Beam
DIB RIM BOARD Beam height DIB 47 DIB 72
200 12,3 14,3
220 12,3 14,7
250 12,7 15,3
300 13,0 16,1
350 13,2 17,0
400 13,5 17,8
450 13,8 18,7
500 14,1 19,5
Bearing capacity calculated according
to short-term during class.
kmod = 0,9 and ym = 1,25

FILLER
C NAILS 2,8x60(80)
RING NAILS 2,5x40(60)
SCREWS 4,0<D<5,0x40(60)
25
52
52

25 50 50 50 50 25
52
25
36

TABLE 2
Bearing capacity, top end [kN]
250 250 Type of I-Beam
Pitch Length DIB 47 DIB 72
support
REINFORCEMENT 20 41 6,4 7,5
25 51 7,2 8,4
27 60 7,9 9,1
30 67 8,4 9,7
35 77 8,9 10,3
40 84 9,3 10,8
45 94 9,9 11,4
25
50 50

Bearing capacity calculated according


50 50 50 50 50 to short-term during class.
kmod = 0,9 and ym = 1,25
25
25

500

BEARING WALL
OR MAIN BEAM
DUDEK BUILDING SYSTEM No.
R06-300
Date
Roof Structure 07.04.2016

timber walls Sign

REINFORCEMENT
DIB BEAM
REINFORCEMENT
DIB BEAM
DIB RIM BOARD

SOLID TIMBER
SOLID TIMBER

STUD SOLID TIMBER SOLID TIMBER


SOLID TIMBER

STUD
SOLID TIMBER

DIB 47 DIB 72
GAP 6mm

18mm 30mm

NAILS 2,8x60(80) Dudek I-Beams, bearing capacity [kN]


End bearing Intermediate bearing
RING NAILS 2,5x40(60) [mm] 45 98 130 98 148
SCREWS 4,0<D<5,0x40(60) Type NS S NS S NS S NS S NS S
DIB 47
200 - 500 7,93 11,83 11,23 13,97 14,27 17,40 14,80 18,84 18,92 22,97
DIB 72
200 - 500 12,15 15,57 17,16 18,29 19,26 22,03 22,68 28,66 27,56 33,42
Bearing capacity calculated according to short-term during class.
kmod = 0,9 and ym = 1,25
NS - Without reinforcement
S - With reinforcement

MAX. GAP 1mm


DUDEK BUILDING SYSTEM No.
R06-400
Date
Roof Structure 07.04.2016

Sign
timber walls

A B
REINFORCEMENT REINFORCEMENT TABLE 1
Bearing capacity, bottom end [kN]
Type of I-Beam
DIB RIM BOARD Beam height DIB 47 DIB 72
200 12,3 14,3
220 12,3 14,7
250 12,7 15,3
300 13,0 16,1
350 13,2 17,0
400 13,5 17,8
450 13,8 18,7
500 14,1 19,5
Bearing capacity calculated according
to short-term during class.
kmod = 0,9 and ym = 1,25

FILLER
C NAILS 2,8x60(80)
RING NAILS 2,5x40(60)
25

SCREWS 4,0<D<5,0x40(60)
52
52

25 50 50 50 50 25
52
25
36

TABLE 2
Bearing capacity, top end [kN]
250 250 Type of I-Beam
Pitch Length DIB 47 DIB 72
support
REINFORCEMENT 20 41 6,4 7,5
25 51 7,2 8,4
27 60 7,9 9,1
30 67 8,4 9,7
35 77 8,9 10,3
40 84 9,3 10,8
45 94 9,9 11,4
25
50 50

Bearing capacity calculated according


50 50 50 50 50 to short-term during class.
kmod = 0,9 and ym = 1,25
25
25

500

BEARING WALL
OR MAIN BEAM
DUDEK BUILDING SYSTEM No.
R06-500
Date
Roof Structure 07.04.2016

Cut in I-Beams truss on end support


Sign

DIB 47 DIB 72
GAP 6mm

REINFORCEMENT

25
25 18mm 30mm

H
25

max
25 . H
25
h/4

/2
REINFORCEMENT NAILS 2,8x60(80)
H>2
25

RING NAILS 2,5x40(60)


50

25
25

25 SCREWS 4,0<D<5,0x40(60)
b
h
h/4

25 200
Total lenght
25

b
TABLE 1
d

25 Beam Bearing Max. dimensions


200 height capacity [kN] (min. 50 mm)
Total lenght DIB 47/DIB 72 d b [mm]
200 6,0 H/4 100
220 6,0 H/4 100
250 8,1 H/4 150
300 9,3 H/4 200
350 10,2 H/4 200
400 10,8 H/2 200
450 11,5 H/2 200
For DIB < 250 use 3 rows of nails 500 11,8 H/2 200
Bearing capacity calculated according
to short-term during class.
kmod = 0,9 and ym = 1,25
H<2

REINFORCEMENT
50

TABLE 2
25

25 Placement of nails
h

25
h/2 /2 25

Beam height h/2 h/4


200 28 X
h

220 38 X
250 X 27
b 300 X 39
350 X 52
d

400 X 64
450 X 77
500 X 89
DUDEK BUILDING SYSTEM No.
R06-600
Date
Roof Structure 07.04.2016
Cut in I-Beams truss on intermediate support,
continuous beam Sign

DIB 47 DIB 72
GAP 6mm

REINFORCEMENT

18mm 30mm
25

25 NAILS 2,8x60(80)
25
25
RING NAILS 2,5x40(60)
50 250 SCREWS 4,0<D<5,0x40(60)
b
25

250

Total lenght = 500 + b

Beam height Length Capacity, roof angle 0 - 45°


[mm] support [mm]
Moment [kNm] Shear Bearing
capacity capacity
[kN] [kN]
200 70 0,9 4,8 15,5
100 0,5 3,0 21,9
220 70 1,1 7,0 15,5
100 0,9 4,5 21,9
250 70 1,6 10,3 15,5
100 1,3 7,4 21,9
300 70 2,2 14,8 15,5
100 2,0 13,6 21,9
150 1,5 7,9 32,8
350 70 2,9 16,9 15,5
100 2,7 16,2 21,9
150 2,4 13,8 32,8
400 70 3,5 17,7 15,5
100 3,3 17,3 21,9
150 3,2 16,7 32,8
200 3,1 14,1 34,5
450 70 4,3 18,5 15,5
100 4,2 18,0 21,9
150 3,9 17,4 32,8
200 3,6 16,8 34,5
500 70 4,9 19,9 15,5
100 4,8 18,9 21,9
150 4,6 18,4 32,8
200 4,4 17,6 34,5
Capacities calculated according
to short-term during class.
kmod = 0,9 and ym = 1,25 (shear ym = 1,3)
For constructions in service class 2
shall shear capacity multiplied by the factor 0,78
DUDEK BUILDING SYSTEM No.
R06-700
Date
Roof Structure 07.04.2016
Cut in I-Beams truss on intermediate support,
discontinued beam Sign

DIB 47 DIB 72
GAP 6mm

REINFORCEMENT

18mm 30mm
REINFORCEMENT

25 NAILS 2,8x60(80)
RING NAILS 2,5x40(60)
25
SCREWS 4,0<D<5,0x40(60)

b1 b2
b

200 200 TABLE 1


Total lenght Total lenght Bearing capacity of I-beam
on support b1
Beam Bearing max.
height capacity [kN] dimension
ADDITIONAL (min. 50 mm)
REINFORCEMENT DIB 47/DIB 72 b1 [mm]
200 6,0 100
220 6,0 100
250 8,1 150
300 9,3 200
350 10,2 200
400 10,8 200
ADDITIONAL REINFORCEMENT 450 11,5 200
500 11,8 200
Bearing capacity calculated according
to short-term during class.
kmod = 0,9 and ym = 1,25
400
TABLE 2
Bearing capacity of I-beam
on support b2
Bearing capacity, bottom end [kN]
Type of I-Beam
Beam height DIB 47 DIB 72
200 12,3 14,3
220 12,3 14,7
250 12,7 15,3
300 13,0 16,1
350 13,2 17,0
400 13,5 17,8
450 13,8 18,7
500 14,1 19,5
Bearing capacity calculated according
to short-term during class.
kmod = 0,9 and ym = 1,25
DUDEK BUILDING SYSTEM No.
R07-100
Date
Roof Structure 07.04.2016

Details of I-Beams connections 1/2


Sign

MAIN BEAM
A B RAFTER, DIB BEAM
MAIN BEAM

RAFTER, DIB BEAM

ANGLE BRACKET

REINFORCEMENT

REINFORCEMENT TABLE 1
DIB type Shear
capacity [kN]
200 7,2
220 8,2
250 9,5
REINFORCEMENT
300 11,9
350 14,3
400 16,6
RAFTER, DIB BEAM 450 18,7
500 18,7
Shear capacity calculated according
to short-term during class.
kmod = 0,9 and ym = 1,3
For constructions in service class 2
shall shear capacity
multiplied by the factor 0,78
REINFORCEMENT

TABLE 2
Quantity of nail/screws
Beam Roof Minimum Maximum
height angle
200-220 0-25 6 10
35 6 11
45 6 13
250-300 0-25 8 15
35 8 16
45 8 18
350-400 0-25 8 20
35 8 21
45 8 25
450-500 0-25 8 22
35 8 24
45 8 27
DUDEK BUILDING SYSTEM No.
R07-200
Date
Roof Structure 07.04.2016

Details of I-Beams connections 2/2


Sign

A-A
RAFTER, DIB BEAM

STEEL ANGLE CONNECTOR

REINFORCEMENT
A

DIB 47 DIB 72
1,5 GAP 6mm
H
25

25
25

18mm 30mm

NAILS 2,8x60(80)
RING NAILS 2,5x40(60)
H

SCREWS 4,0<D<5,0x40(60)

TABLE 1 TABLE 2
DIB type Shear Beam Roof Qty of
capacity [kN] height angle nails/screws
200 9,9 200-220 0-25 6
220 10,8 35 6
250 12,6 45 10
300 14,8 250-400 0-25 8
350 17,3 35 10
400 19,2 45 17
450 20,1 450-500 0-25 10
500 20,9 35 11
Shear capacity calculated according 45 18
to short-term during class.
kmod = 0,9 and ym = 1,3
For constructions in service class 2
shall shear capacity multiplied by the factor 0,78
DUDEK BUILDING SYSTEM No.
R08-100
Date
Roof Structure 07.04.2016

Roof with overhang, DIB walls 1/3


Sign

SCREWS min. 5,0x90 mm


50
. 1
min

A
SOLID TIMBER

STEEL NAIL PLATE


RAFTER, DIB BEAM

REINFORCEMENT,
SEE DET. R06-200

SOLID TIMBER
DIB SOLE PLATE
Roof angle
< 25° > 25°
SOLID TIMBER Qty of screws 6 4
DIB STUD Lenght A 1050 750
max. 700 mm
roof angle min. 15°
DUDEK BUILDING SYSTEM No.
R08-200
Date
Roof Structure 07.04.2016

Roof with overhang, DIB walls 2/3


Sign

SCREWS D min. 4,0 mm

g
rhan
x ove
SCREWS D min. 4,0 mm 1.5

SOLID TIMBER
REINFORCEMENT

RAFTER, DIB BEAM

REINFORCEMENT,
SEE DET. R06-200

SOLID TIMBER
DIB SOLE PLATE
max. 600 mm

DIB STUD
DUDEK BUILDING SYSTEM No.
R08-300
Date
Roof Structure 07.04.2016

Roof with overhang, DIB walls 3/3


Sign

RAFTER, DIB BEAM

REINFORCEMENT,
SEE DETAIL R06-600

SOLID TIMBER
DIB SOLE PLATE
max. 700-800 mm

DIB STUD
DUDEK BUILDING SYSTEM No.
R09-100
Date
Roof Structure 07.04.2016

Roof with overhang, timber walls 1/3


Sign

SCREWS min. 5,0x90 mm


50
i n . 1
m

A
SOLID TIMBER

STEEL NAIL PLATE


RAFTER, DIB BEAM

REINFORCEMENT,
SEE DET. R06-400

SOLID TIMBER
SOLID TIMBER
Roof angle
< 25° > 25°
SOLID TIMBER Qty of screws 6 4
Lenght A 1050 750
SOLID TIMBER
max. 700 mm
roof angle min. 15°
DUDEK BUILDING SYSTEM No.
R09-200
Date
Roof Structure 07.04.2016

Roof with overhang, timber walls 2/3


Sign

SCREWS D min. 4,0 mm

g
rhan
x ove
SCREWS D min. 4,0 mm 1.5

SOLID TIMBER
REINFORCEMENT

RAFTER, DIB BEAM

REINFORCEMENT,
SEE DET. R06-400

SOLID TIMBER
SOLID TIMBER
max. 600 mm

SOLID TIMBER
DUDEK BUILDING SYSTEM No.
R09-300
Date
Roof Structure 07.04.2016

Roof with overhang, timber walls 3/3


Sign

RAFTER, DIB BEAM

REINFORCEMENT,
SEE DETAIL R06-600

SOLID TIMBER
SOLID TIMBER
max. 700-800 mm

SOLID TIMBER
DUDEK BUILDING SYSTEM No.
R10-100
Date
Roof Structure 07.04.2016
Connections to corner rafter,
convex corner 1/2 Sign

RAFTER, DIB BEAM

SOLUTION A,B,C

EV. RAFTER, DOUBLE DIB BEAM

RAFTER, DIB BEAM

REINFORCEMENT

FILLER

Qty of screws Bearing capacity


ca [kN]
.
40 4 3,9
mm 6 5,8
8 7,8
Bearing capacity calculated according
to short-term during class.
kmod = 0,9 and ym = 1,25

A
min. c/c 25 mm

50

NAILS/SCREWS
DUDEK BUILDING SYSTEM No.
R10-200
Date
Roof Structure 07.04.2016
Connections to corner rafter,
convex corner 2/2 Sign

NAIL PLATE

13

NAIL PLATE

STEEL SKEWABLE
135
57

ANGLE CONNECTOR
SIMPSON TYPE LS
°

57 57
57

STEEL SKEWABLE
57

ANGLE CONNECTOR
57

45°
DUDEK BUILDING SYSTEM No.
R10-300
Date
Roof Structure 07.04.2016
Connections to corner rafter,
concave corner 1/2 Sign

RAFTER, DIB BEAM

SOLUTION A,B,C

EV. RAFTER, DOUBLE DIB BEAM


RAFTER, DIB BEAM

Qty of screws Bearing capacity


[kN]
REINFORCEMENT 4 3,9
FILLER 6 5,8
8 7,8
Bearing capacity calculated according
to short-term during class.
mm kmod = 0,9 and ym = 1,25
50
.
ca

A
min. c/c 25 mm

50

NAILS/SCREWS
DUDEK BUILDING SYSTEM No.
R10-400
Date
Roof Structure 07.04.2016
Connections to corner rafter,
concave corner 2/2 Sign

PERFORATED PLATE

135°

PERFORATED PLATE

C
45°
57

57

STEEL SKEWABLE
ANGLE CONNECTOR
SIMPSON TYPE LS
57 57
57

°
135
57

STEEL SKEWABLE
ANGLE CONNECTOR

You might also like