Environment Aspects & Impacts: Turtle Diagram

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 23

Turtle Diagram

Pickle
Meals

Water
Vessels
Soap oil

Butter milk,
Boiled vegitable

Sambar, Rasam,
1. Soap water spillage 2. Soap
PRABHA ENGINEERS - HOSUR

Land pollution
contaminated water

1. Contaminated water 2. Wastage of


Water Pollution
meals

1. Emission of steam 2.Wastage of


Land Pollution
vegitables

Resource wastage 1. Spillage of Sambar,Rasam,Butter milk


ENVIRONMENT ASPECTS & IMPACTS

Canteen
1. Soap water spillage 2. Soap
Land pollution
contaminated water

Resource wastage Plate washing, Vessles washing, Hand washing 1. Wastage of water
Land pollution
Significant

Water Pollution
Non Significant

Land Pollution

Resource wastage

Land pollution

Resource wastage
EMS / PE / 10001
Revision : 00 / 13.10.2010
1. Wastage of water

Trade effluent

hing
Resource wastage
Resource wastage
ENVIRONMENT ASPECTS & IMPACTS
PRABHA ENGINEERS - HOSUR I EMS / 4.3.1
Revision : 02 / 13.10.2010
EMS / PE / 10001

Environmental Aspect Evaluation Present Control


Sl. Activity / Product /
Environmental Aspects N /A / E Environmental Impacts
No. Service Level 1 Level 2 Level 3 Level 4 Level 5
Input Output L IPC RSP Sc Sv P D Scr S/NS
Eliminate Substitution Engg control OCP PPE

1. Soap water spillage 2. Soap


Soap oil N Land Pollution 2 2 4 4 64 NS X X X OCP PPE
contaminated water

1. Contaminated water
Meals N Water Pollution L IPC 3 2 4 3 72 NS X X X OCP X
2. Wastage of meals

1. Emission of steam 2.Wastage


Boiled vegitable N Land Pollution 1 2 2 2 8 NS X X X OCP X
of vegitables

Trade effluent
Sambar,
Spillage of Sambar, Rasam, Butter
1 Canteen Rasam, Butter N Resource wastage 2 3 1 3 18 NS X X X OCP X
milk
milk, Pickle

1. Soap water spillage


Vessals N Land Pollution L IPC 2 3 2 2 24 NS X X X OCP PPE
2. Soap contaminated water

Water Wastage of water N Depletion of Resource RSP 2 2 4 4 64 NS X X X OCP PPE

LEGEND
N -Normal , A - Abnormal , E - Emergency , L - Legal Concern , IPC - Interested Party Concern , RSP - Resource Saving Potential , Sc - Scale , Sv - Severity , P - Probability, D - Duration , Scr
'S - Significant , NS - Non Significant, OCP - Operation Control Procedure, O,T & P - Objectives, Targets and Programmes.
Hosur
Prabha Engineers

Turtle Diagram

Paint &
Co2 Gas

Chemicals
Electrodes
Raw material
Land pollution
(Hazardous Oil waste
waste) (L)

Noise Generation of
Pollution Noise

Air pollution Emission of


(L) Smoke

Land pollution
Spread of
(Hazardous
Sparks
waste) (L)

Land pollution Spillage of


(Hazardous Paint &
waste) (L) Chemicals

Land pollution
Creation of
(Hazardous
Sludge
waste) (L)
AL Nissan Load Body
ENVIRONMENTAL ASPECT & IMPA
Land pollution
Creation of
(Hazardous
Sludge
waste) (L)

ad Body
resource
Effulient water
Depletion ECT & IMPACT

Land pollution
Generation of
(Hazardous
Empty Drums
waste) (L)

--
--
Scrap
Product
Finished
EMS / PE / 10001
Revision : 00 / 13.10.2010
E
PRABHA ENGINEERS - HOSUR I

Environmental Aspect
Activity / Product /
Sl. No. Environmental Aspects
Service
Input Output

Finished
1 Press Shop Raw material Generation of scrap
product

Power Scrap Utilisation of resource

Cotton cloth Generation of oil waste

Lubrication oil Oil spillage

Generation of Noise

Environmental Aspect
Activity / Product /
Sl. No. Environmental Aspects
Service
Input Output

Finished
AL Nissan Load Body Raw material Generation of scrap
product

Power Scrap Utilisation of resource

Cotton cloth Generation of oil waste

Co2 Gas Generation of smoke

Water Water spillage


Paint &
Generation of Sludge
Chemicals

Electrodes Utilisation of resource

LEGEND
N -Normal , A - Abnormal , E - Emergency , L - Legal Concern , IPC -
'S - Significant , NS - Non Sign
ENVIRONMENT ASPECTS & IMPACTS

Evaluation
N /A / E Environmental Impacts
L IPC RSP Sc Sv P D Scr S/NS

N Depreciation of resource RSP 2 3 3 1 18 NS

N Depreciation of resource RSP 2 3 3 1 18 NS

Land pollution (Hazardous


A L 5 5 3 5 375 S
waste) (L)

Land pollution (Hazardous


A L 5 5 2 5 250 S
waste) (L)

A Air pollution (L) L 2 4 4 1 32 S

Evaluation
N /A / E Environmental Impacts
L IPC RSP Sc Sv P D Scr S/NS

Depreciation of resource RSP 2 3 3 1 18 NS

Depreciation of resource RSP 2 3 3 1 18 NS

Land pollution (Hazardous


L 5 5 3 5 375 S
waste) (L)

Air Pollution (L) L 4 5 3 1 60 S

Depreciation of resource RSP 2 3 3 1 18 NS


Land pollution (Hazardous
L 5 4 3 1 60 S
waste) (L)

Depreciation of resource RSP 2 3 3 1 18 NS

L - Legal Concern , IPC - Interested Party Concern , RSP - Resource Saving Potential , Sc - Scale , Sv - Severity , P - Pro
ignificant , NS - Non Significant, OCP - Operation Control Procedure, O,T & P - Objectives, Targets and Programmes.
EMS / 4.3.1
Revision : 02 / 13.10.2010
EMS / PE / 10001

Present Control
Level 1 Level 2 Level 3 Level 4 Level 5
Eliminate Substitution Engg control OCP PPE

X X Cutting plan X X

X X X X X

X X X OCP PPE

X X X OCP PPE

X X X OCP PPE

Present Control
Level 1 Level 2 Level 3 Level 4 Level 5
Eliminate Substitution Engg control OCP PPE

X X Cutting plan X X

X X X X X

X X X OCP PPE

X X X OCP PPE

X X X X X
X X X OCP PPE

X X X X X

Scale , Sv - Severity , P - Probability, D - Duration , Scr


Targets and Programmes.
PRABHA ENGINEERS - HOSUR I

Environmental Aspect
Sl. Activity / Product /
No. Service
Input Output

1 Press Shop Raw material Finished product

Power Scrap

Cotton cloth

Lubrication oil

LEGEND
N -Normal , A - Abnormal , E - Emergency , L - Legal Concern , IPC -
ENVIRONMENT ASPECTS & IMPACTS

Evaluation
Environmental Aspects N /A / E Environmental Impacts
L IPC RSP Sc

Generation of scrap N Depreciation of resource RSP 2

Utilisation of resource N Depreciation of resource RSP 2

Land pollution (Hazardous


Generation of oil waste A L 5
waste) (L)

Land pollution (Hazardous


Oil spillage A L 5
waste) (L)

Generation of Noise A Air pollution (L) L 2

Abnormal , E - Emergency , L - Legal Concern , IPC - Interested Party Concern , RSP - Resource Saving Potential , Sc - S
'S - Significant , NS - Non Significant, OCP - Operation Control Procedure, O,T & P - Objectiv
S & IMPACTS

Evaluation Present Control


Level 1 Level 2 Level 3
Sv P D Scr S/NS
Eliminate Substitution Engg control

3 3 1 18 NS X X Cutting plan

3 3 1 18 NS X X X

5 3 5 375 S X X X

5 2 5 250 S X X X

4 4 1 32 S X X X

aving Potential , Sc - Scale , Sv - Severity , P - Probability, D - Duration , Scr - Total Score ,


re, O,T & P - Objectives, Targets and Programmes.
EMS / 4.3.1
Revision : 02 / 13.10.2010
EMS / PE / 10001

sent Control
Level 4 Level 5
OCP PPE

X X

X X

OCP PPE

OCP PPE

OCP PPE
ENVIRONMENT ASPECTS & IMPACTS
PRABHA ENGINEERS - HOSUR

Turtle Diagram

Prabha Engineers
Hosur
Generation of

Generation of

Generation of
Utilisation of

Oil spillage
resource

oil waste

Noise
scrap

Raw material

Power

Press Shop
Cotton

Lubrication oil

Depreciation
of resource

Depreciation
of resource

Land pollution
(Hazardous
waste) (L)

Land pollution
Press Shop

(Hazardous
waste) (L)

Air pollution
(L)
EMS / PE / 10001
Revision : 00 / 13.10.2010

Finished
Product

Scrap
--

--
Prabha Engineers Unit I
Hosur
Aspect & Impact Criteria

Marks Scale Severity Probability Duration

1 With in the shed Very low Negligible 1 to 5 Min

2 With in the company Low Very low 6 to 15 Min

3 Company sorrounding Moderate Low 16 to 30 Min

4 1 KM High High 31 to 60 Min

5 Above 1 KM Very High Very High Above 60 Min


Definition of Significant Aspect

Criteria for Significant: Noise, solid waste welding smoke, flue gas emission, painting sludge,
Battery & disposal of electronic components are some of the factors which may lead to
pollution, hence identified as significant.