Revision 

 
Equipment/Materials Requisition 
Waste Heat Recovery Equipment  No  Date  Page 
Requisition No.   2020.01.17 
00257650‐BO11432  PB  1 
 

CLIENT:     LITHIUM NEVADA CORPORATION 

PROJECT: THACKER PASS 
 
 
    SIGNATURE    DATE 
   
 
PREPARED BY :  D. Lyon 
   
 
REVIEWED BY :  Y. Zhou 
   
 
APPROVED BY:  T. Van Daele 
 

ISSUE/REVISION HISTORY 

Issue  Revision 
Revision Details 
Code  No.  By  Rev’d.  App.  Date 
RR  PA  DL  YZ  TVD  2020.01.03  Released for Review 
RQ  PB  DL  YZ  TVD  2020.01.17  Released for Quotation 
             
             
             
             
             
             

Issue Codes:  RC = Released for Construction, RD = Released for Design, RF = Released for Fabrication, RI = Released for Information, RP = Released for 
Purchase, RQ = Released for Quotation, RR = Released for Review and Comments. 

This  Specification  is  the  property  of  EXP  U.S.  Services  Inc.  (EXP).    Information  and  know‐how  herein  are 
confidential and may not be used, reproduced, or revealed to others except in accordance with contract or 
other written permission of EXP. 
   

00257650‐BO11432_ rev PB ‐ Waste Heat Recovery Equipment.docx   Page 1 of 13 
Revision   
Equipment/Materials Requisition 
Waste Heat Recovery Equipment  No  Date  Page 
Requisition No.   2020.01.17 
00257650‐BO11432  PB  2 
 

TABLE OF CONTENTS 
 
1  SCOPE OF WORK ............................................................................................................................. 3 
1.1  Introduction ................................................................................................................................ 3 
1.2  Work Included ............................................................................................................................ 3 
1.3  Work Excluded ............................................................................................................................ 5 
2  TECHNICAL ATTACHMENTS ............................................................................................................. 6 

3  VENDOR DELIVERABLES .................................................................................................................. 7 

4  VENDOR DATA REQUIREMENTS ...................................................................................................... 8 

 
 
 
 
 
 
 

00257650‐BO11432_ rev PB ‐ Waste Heat Recovery Equipment.docx   Page 2 of 13 
Revision   
Equipment/Materials Requisition 
Waste Heat Recovery Equipment  No  Date  Page 
Requisition No.   2020.01.17 
00257650‐BO11432  PB  3 
 

1 Scope of Work 
1.1 Introduction 
Provide  Waste  Heat  Recovery  Equipment,  ancillary  equipment,  and  related  services  as  described 
herein. 

1.2 Work Included 
1.2.1 Engineering and Services 
Design  the  equipment  in  accordance  with  the  Material/Equipment  Specifications,  all  included 
appendices, the applicable codes and standards, reference specifications, equipment data sheets and 
local government regulations, and ensure that the blower is suitable for the duties specified. 
Submit with the tender package a list of all deviations from and exceptions to the specification and all 
reference specifications, codes and standards, and describe each in detail. 
Provide evidence of satisfactory experience in the equipment and associated components design, and 
fabrication for heavy‐duty applications. 
Obtain approval and registration from the appropriate authorities. 
Consult  the  Engineer  for  clarification  wherever  discrepancies  in  the  technical  information  exist 
between the various documents contained in the bid package. 
Corrosion allowances are to be as outlined in the technical specifications. 
The waste heat recovery equipment shall be sized on the basis of 2% heat loss. 
1.2.2 Procurement and Supply 
Supply and  deliver  the Waste Heat  Recovery Equipment  complete with ancillary components, and 
furnish all materials, accessories and services required for the complete testing and commissioning of 
the same. 
Include in the scope of work items, accessories and services that are usual or necessary to complete 
the work, but which may not have been specifically mentioned herein. 
1.2.3 Fabrication 
Fabricate the Waste Heat Recovery Equipment in accordance with the specifications and all included 
appendices, the applicable codes and standards, reference specifications, drawings, equipment data 
sheets and local government regulations. 
   

00257650‐BO11432_ rev PB ‐ Waste Heat Recovery Equipment.docx   Page 3 of 13 
Revision   
Equipment/Materials Requisition 
Waste Heat Recovery Equipment  No  Date  Page 
Requisition No.   2020.01.17 
00257650‐BO11432  PB  4 
 

1.2.4 Shop Assembly 
Equipment is to be shop fabricated to the maximum extent possible.  In this respect Code welding at 
the construction site is to be limited to the risers and downcomers connecting the boiler. 

1.2.5 Verification and Testing During Fabrication 
Submit details of all tests to be carried out during manufacture in the form of an Inspection and Test 
Plan with detailed Vendor/sub‐vendor inspection points shown and test procedures clearly defined. 
Prior  to  shipment,  perform  the  tests  as  defined  by  the  Quality  Assurance  requirements  of  the 
specification. 

1.2.6 Provision of Technical Data, Drawings and Instruction Manuals 
Provide design data, calculations, specifications, shop drawings, General Arrangement 3D Model (for 
import  to  SmartPlant)  catalogue  data  sheets,  installation  and  maintenance  information,  etc.  in 
accordance  with  the  attached  Vendor  Data  Requirements  Schedule  which  forms  part  of  the 
specification. 

1.2.7 Shipment, Packing and Preparation 
Prepare  the  equipment  for  shipment  and  pack  the  equipment  in  accordance  with  the  referenced 
Standard Specification 00257650‐0000‐45EG‐0005 Packing and Shipping. 

1.2.8 Spare Parts, Special Tools and Equipment 
Supply  the  spare  parts  necessary  for  the  installation  and  commissioning  of  the  equipment  in 
accordance with the standard specification 00257650‐0000‐45EG‐0002 Spare Parts. 
 Split the list and price the items individually as follows: 
 Commissioning Spares ‐ Form B 
 Spares required for 24 months of operation – Form A 
 Special tools and equipment for: 
o Installation 
o Commissioning 
o Maintenance 
1.2.9 Alternatives 
The Vendor  may supplement  his base  tender with  alternatives  provided that they offer significant 
advantages  with  respect  to  capital  cost,  operating  cost,  delivery  date,  safety,  quality,  reliability  or 
suitability for a specific service.  However, it is mandatory that the equipment be capable of meeting 
the duty and throughput rate(s) as indicated in the specification. 

 
Complete and return the equipment data sheets with the tender otherwise the tender may not be 
considered. 
 

00257650‐BO11432_ rev PB ‐ Waste Heat Recovery Equipment.docx   Page 4 of 13 
Revision   
Equipment/Materials Requisition 
Waste Heat Recovery Equipment  No  Date  Page 
Requisition No.   2020.01.17 
00257650‐BO11432  PB  5 
 

1.3 Work Excluded 
Equipment foundations will be designed, supplied and installed by Others. 

Equipment anchor bolts will be supplied and installed by Others. 

Equipment access platforms, walkways, handrailing, ladders and stairways will be designed, supplied 
and installed by Others. 

Equipment will be off‐loaded, handled and stored at the site by Others. 

Equipment will be installed at the site by Others. 

Equipment Ocean Freight will be handled by Others. 

Equipment insulation materials and installation by Others. 

Connecting ducting and piping to the equipment by Others. 

 
 
   

00257650‐BO11432_ rev PB ‐ Waste Heat Recovery Equipment.docx   Page 5 of 13 
Revision   
Equipment/Materials Requisition 
Waste Heat Recovery Equipment  No  Date  Page 
Requisition No.   2020.01.17 
00257650‐BO11432  PB  6 
 

2 Technical Attachments 
REQ.  Document No.  Doc.  Document Title 
Rev  Rev. 
  00257650‐0000‐33EG‐0001  PB  QA Requirements 
  00257650‐0000‐40EG‐0001  PB  Vendor Documentation 
  00257650‐0000‐41EG‐0001  PB  Geographic, Climatic and Seismic Data 
  00257650‐0000‐41EG‐0002  PB  Site Utilities 
  00257650‐0000‐45EG‐0002  PB  Spare Parts 
             Form A  PB  2 yr. Operational Spare Parts 
             Form B  PB  Commissioning Spare Parts 
  00257650‐0000‐45EG‐0004  PB  Installation, Operation and Maintenance Manuals 
  00257650‐0000‐45EG‐0005  PB  Packing and Shipping 
  00257650‐0000‐48EG‐0001  PB  Instrumentation Requirements for Packaged Equipment 
       
  Technical Specifications     
  00257650‐1000‐45ES‐0034  PB  Waste Heat Boiler with Steam Drum 
  00257650‐2000‐45ES‐0013  PB  Economizers (and Air Heater) 
  00257650‐2000‐45ES‐0026  PB  Superheaters 
       
  Data Sheets     
  00257650‐1000‐45ED‐0034  PB  Waste Heat Boiler with Steam Drum 
  00257650‐2000‐45ES‐1301  PB  Economizer 3A 
  00257650‐2000‐45ES‐1302  PB  Economizer 3B 
  00257650‐1000‐45ES‐1303  PB  Air Heater 
  00257650‐2000‐45ES‐2601  PB  Superheater 1C 
  00257650‐2000‐45ES‐2602  PB  Superheater 2B 
  00257650‐2000‐45ES‐2603  PB  Superheater 3A 
       
  Drawings     
  00257650‐0000‐49DS‐0001  00  Boiler Feedwater Steam Flow diagram 
       
  Reference Data     
       
       

00257650‐BO11432_ rev PB ‐ Waste Heat Recovery Equipment.docx   Page 6 of 13 
Revision   
Equipment/Materials Requisition 
Waste Heat Recovery Equipment  No  Date  Page 
Requisition No.   2020.01.17 
00257650‐BO11432  PB  7 
 

3 Vendor Deliverables 
 
NOTE: The term Vendor shall be synonymous with Contractor, Supplier or similar terms identified in the Contract. 
REQ.  Item No.  Tag No.  Qty.  Unit  Description 
Rev. 
  1  X342.20  1  Ea  Waste Heat Boiler with Steam Drum 
  2  X342.10  1  Ea  Economizer 3A/3B, Superheater 3A 
  3  X332.03  1  Ea  Air Heater 
  4  X344.01  1  Ea  Superheater 1C 
  5  X344.02  1  Ea  Superheater 2B 
           
  6    1  Ea  Datasheet ‐ Waste Heat Boiler with Steam Drum 
  7    1  Ea  Datasheet ‐ Economizer 3A 
  8    1  Ea  Datasheet ‐ Economizer 3B 
  9    1  Ea  Datasheet ‐ Air Heater  
  10    1  Ea  Datasheet ‐ Superheater 3A 
  11    1  Ea  Datasheet ‐ Superheater 1C 
  12    1  Ea  Datasheet ‐ Superheater 2B 
           
  13    1    3D Model GA ‐ Waste Heat Boiler with Steam Drum 
  14    1    3D Model GA ‐ Economizer 3A/3B, Superheater 3A 
  15    1    3D Model GA ‐ Air Heater 
  16    1    3D Model GA ‐ Superheater 1C 
  17    1    3D Model GA ‐ Superheater 2B 
           
  18    1  Lot  Instrumentation and Controls as specified 
  19    1  Lot  Anchor bolts and setting templates 
  20    1  Lot  Operating spare parts list for 2 years operation, with unit 
cost – Form A 
  21    1  Lot  Commissioning spare parts – Form B 
  22    1  Lot  Vendor data per Section 4.0 – Vendor Data Requirements 
  23    1  Lot  Installation, Operating, and Maintenance Manuals 
  24    1  Lot  Special Tools 
  25    1  Lot  Export Packaging 
           
           
           

00257650‐BO11432_ rev PB ‐ Waste Heat Recovery Equipment.docx   Page 7 of 13 
Revision   
Equipment/Materials Requisition 
Waste Heat Recovery Equipment  No  Date  Page 
Requisition No.   2020.01.17 
00257650‐BO11432  PB  8 
 

4 Vendor Data Requirements 
Notes: 
1.  This  Section  to  be  read  in  conjunction  with  Standard  Specification  00257650‐0000‐40EG‐0001  Vendor 
Documentation. 
2.  Vendor  to  supply  the  Standard  Installation,  Operation  and  Maintenance  Manuals  per  in  the  English 
language in accordance with Specifications 00257650‐0000‐45EG‐0004. 
3.  The term Vendor shall be synonymous with Supplier or similar terms identified in the Requisition. 
Legend: 
AC   As Completed  AWR As and When Requested PTS Prior to Shipment
ARO  After Receipt of Order  E  Electronic Copy (CD‐ROM) WS With Shipment
AS  After Shipment  H  Hard Copy PSF Prior  to  Start  of  Fabrication/ 
Construction 
 
      Number of Copies 
REQ.  Code  Document Description  With  For Review  Final/As Builts 
Rev.  No.  Tender 
E  H  Weeks  E  H  Weeks 
  G.  General               
  G.1  SCHEDULE OF VENDOR DOCUMENT SUBMITTALS  1  1    2 ARO       
  G.2  GENERAL ARRANGEMENT DRAWING  1  1    2 ARO  1  4  2 PTS 
  G.3  GENERAL SHOP, INSTALLATION DRAWING        2 ARO  1  4  2 PTS 
  G.4  3D GENERAL ARRANGEMENT MODEL  1  1           
  G.5  COMMISSIONING INSTRUCTIONS / PROCEDURES    1    2 ARO  1  4  2 PTS 
  G.7  INSTALLATION, OPERATION AND MAINTENANCE 
  1    2 ARO  1  4  2 PTS 
MANUALS 
  G.9  INSTRUCTIONS FOR STORAGE / WAREHOUSING        2 ARO  1  4  2 PTS 
  G.10  SPARE PARTS MANUALS WITH LIST OF 2 YEARS 
1  1    2ARO  1  4  2 PTS 
OPERATING SPARE PARTS (Form A) 
  G.11  LIST OF CONSUMABLES, CHEMICALS, SPARES FOR 
1  1    2ARO  1  4  2 PTS 
START‐UP / COMMISSIONING (Form B) 
  G.12  LIST OF CONSUMABLES & CHEMICALS FOR ONE 
1  1    2 ARO  1  4  2 PTS 
YEAR 
  G.17  ENVIRONMENTAL, EFFLUENT AND EMISSION DATA 
             
LIST 
  G.19  LIST OF AVAILABLE ERECTION EQUIPMENT.               
  G.20  PRODUCTION SCHEDULE & REGULAR UPDATES  1  1    2 ARO       
  G.21  PERMITS ‐ LIST & STATUS    1    2 ARO       
  G.22  PERMITS ‐ COPY    1    2 ARO       
  G.23  LIST OF SPECIAL TOOLS FOR INSTALLATION / 
MAINTENANCE  1  1    2 ARO  1  4  2PTS 

  G.24  LIST OF DEVIATIONS FROM SPECIFICATIONS AND 
1  1           
DATASHEET 

00257650‐BO11432_ rev PB ‐ Waste Heat Recovery Equipment.docx   Page 8 of 13 
Revision   
Equipment/Materials Requisition 
Waste Heat Recovery Equipment  No  Date  Page 
Requisition No.   2020.01.17 
00257650‐BO11432  PB  9 
 

      Number of Copies 
REQ.  Code  Document Description  With  For Review  Final/As Builts 
Rev.  No.  Tender 
E  H  Weeks  E  H  Weeks 
                   
   Q.  QUALITY ASSURANCE/QUALITY CONTROL               
  Q.1  QUALITY MANUAL  1      2 ARO  1  4  2 PTS 
  Q.2  PROJECT QUALITY PLAN    1    3ARO  1  4  2 PTS 
  Q.3  QUALITY SYSTEM REGISTRATION CERTIFICATE  1      2 ARO  1  4  2 PTS 
  Q.4  INSPECTION & TEST PLANS AND PROCEDURES    1    2 ARO  1  4  2 PTS 
  Q.5  QUALITY RECORDS    1    AC  1  4  2 PTS 
  Q.7  QC DOSSIER / CODE DATA BOOKS‐MASTER RECORD  2 PTS 
          4 
BOOK 
  Q.8  WELDING PROCEDURE SPECIFICATIONS    1    2 ARO       
  Q.9  WELDING PROCEDURE QUALIFICATION RECORDS               
  Q.10  WELDER QUALIFICATION RECORDS    1    2 ARO       
  Q.12  WELD MAP          1  4  2 PTS 
  Q.13  NDE PROCEDURES               
  Q.14  NDE REPORTS    1    AC  1  4  2 PTS 
  Q.15  NDE OPERATOR QUALIFICATIONS    1    AC  1  4  2 PTS 
  Q.16  TEST REPORTS (all types)    1    AC  1  4  2 PTS 
  Q.17  PRESSURE TEST CERTIFICATES    1    AC  1  4  2 PTS 
  Q.18  MATERIAL CERTIFICATES          1  4  2 PTS 
  Q.19  INSPECTION REPORTS (ON SUB‐VENDORS)    1    AC  1  4  2 PTS 
  Q.22  PAINTING / GALVANISING INSPECTION REPORTS          1  4  2 PTS 
  Q.23  CONSTRUCTION / INSTALLATION QUALITY 
             
CONTROL PLANS 
  Q.24  EQUIPMENT CALIBRATION CERTIFICATES        4 ARO  1  4  2 PTS 
  Q.26  CERTIFICATES OF CONFORMITY    1    AC  1  4  2 PTS 
  Q.27  NON‐CONFORMITY REPORTS (internal & sub‐ 2 PTS 
  1    AC  1  4 
vendor) 
  Q.29  SHIPPING RELEASES          1  4  2 PTS 
                   
  B.  Architectural               
  B.1  DETAILED SCHEDULE OF VENDOR 
             
DOCUMENTATION SUBMITTALS 
  B.2  DETAILED TECHNICAL SPECIFICATION               
  B.3  DETAILED WORKING DRAWINGS AND GENERAL 
             
LAYOUT DRAWINGS 
  B.10  PRODUCT DATA SHEETS               
  B.11  DETAILED SHOP DRAWINGS & ERECTION 
             
DRAWINGS 
00257650‐BO11432_ rev PB ‐ Waste Heat Recovery Equipment.docx   Page 9 of 13 
Revision   
Equipment/Materials Requisition 
Waste Heat Recovery Equipment  No  Date  Page 
Requisition No.   2020.01.17 
00257650‐BO11432  PB  10 
 

      Number of Copies 
REQ.  Code  Document Description  With  For Review  Final/As Builts 
Rev.  No.  Tender 
E  H  Weeks  E  H  Weeks 
  B.14  SAMPLES               
                     
  C.  Civil               
  C.1  CIVIL DESIGN CALCULATIONS               
  C.2  CONCRETE LAYOUT DRAWINGS               
  C.3  PILING LAYOUT DRAWINGS               
  C.4  CONCRETE DETAIL DRAWINGS               
  C.5  COLUMN LOADING DRAWINGS               
  C.6  REINFORCEMENT DETAIL DRAWINGS               
  C.7  BENDING SCHEDULES               
  C.8  CAST‐IN ITEMS DRAWING / SCHEDULE               
  C.9  DYNAMIC ANALYSIS REPORT               
  C.10  CIVIL SPECIFICATION               
                     
  S.  Structural               
  S.1  DESIGN CALCULATIONS               
  S.2  LAYOUT DRAWINGS               
  S.3  SHOP DETAIL DRAWINGS               
  S.4  BILL OF QUANTITIES               
  S.5  CLADDING AND FIXING DETAILS               
  S.6  EXPANSION JOINT DETAILS               
  S.7  VENTILATOR DETAIL DRAWINGS               
  S.8  DRAWING SHOWING LOCATION AND SIZE OF 
             
FRESH AIR INTAKE LOUVRES 
  S.9  FOUNDATION LOADINGS               
  S.10  FOUNDATION OUTLINE DRAWINGS               
  S.11  PERMISSIBLE EXTERNAL LOADS               
  S.15  CLADDING DATA SHEET               
  S.16  DATA SHEETS ON ALL MATERIALS (INCLUDING 
             
NEOPRENE INSULATION) 
  S.17  SHOP PRE‐ASSEMBLY DETAILS               
  S.18  ERECTION DRAWINGS               
                   
  E.  Electrical               
  E.1  DESIGN CALCULATIONS               
  E.2  DETAILED TECHNICAL SPECIFICATION               

00257650‐BO11432_ rev PB ‐ Waste Heat Recovery Equipment.docx   Page 10 of 13 
Revision   
Equipment/Materials Requisition 
Waste Heat Recovery Equipment  No  Date  Page 
Requisition No.   2020.01.17 
00257650‐BO11432  PB  11 
 

      Number of Copies 
REQ.  Code  Document Description  With  For Review  Final/As Builts 
Rev.  No.  Tender 
E  H  Weeks  E  H  Weeks 
  E.3  MOTOR AND EQUIPMENT LISTS               
  E..4  LIST OF BEARINGS AND SEALS               
  E.5  ELECTRICAL SINGLE LINE DIAGRAMS               
  E.6  SCHEMATIC AND CONTROL DIAGRAMS               
  E.7  GENERAL ARRANGEMENT DRAWINGS               
  E.8  ELECTRIC PLANT LAYOUT               
  E.9  CERTIFIED DIMENSIONAL DRAWINGS               
  E.10  ELECTRICAL EQUIPMENT WEIGHTS               
  E.13  EQUIPMENT DATA SHEETS (COMPLETED)               
  E.14  CABLE SCHEDULES AND ROUTING DRAWINGS               
  E.15  BILL OF QUANTITIES               
  E.16  MOTOR / ALTERNATOR PERFORMANCE AND   
           
OPERATING CURVES 
  E.17  NOISE AND VIBRATION DATA               
  E.18  PERFORMANCE TEST PROCEDURES               
  E.19  PERFORMANCE TEST CERTIFICATES               
  E.20  NOISE AND VIBRATION TEST CERTIFICATES               
  E.21  FACTORY TEST REPORTS AND CERTIFICATES    
           
(of each) 
  E.22  CONSTRUCTION POWER SUPPLY REQUIREMENTS               
  E.23  PROTECTION SETTINGS               
  E.24  CONNECTION DIAGRAMS / LISTS               
                   
  U.  INSTRUMENTATION AND CONTROL SYSTEMS                
  U.1  DETAILED TECHNICAL SPECIFICATION               
  U.2  PROCESS AND INSTRUMENTATION DIAGRAM  1      4 ARO  1  4  2 PTS 
  U.3  AUTOMATION SYSTEM CONFIGURATION               
  U.4  INTERCONNECTION CABLING BLOCK DIAGRAM               
  U.5  CONTROL PANEL LAYOUTS               
  U.6  INSTRUMENT AND CONTROL DEVICE LISTS  1  1    4 ARO  1  4  2 PTS 
  U.7  INSTRUMENT DATA SHEETS    1    4 ARO  1  4  2 PTS 
  U.8  INSTRUMENT CALCULATION REPORTS               
  U.9  INSTRUMENT CALIBRATION REPORTS    1    4 ARO  1  4  2 PTS 
  U.10  I&C SCHEMATICS               
  U.11  INSTRUMENT LOOP DRAWINGS               
  U.12  I&C WIRING AND CONNECTION DIAGRAMS               

00257650‐BO11432_ rev PB ‐ Waste Heat Recovery Equipment.docx   Page 11 of 13 
Revision   
Equipment/Materials Requisition 
Waste Heat Recovery Equipment  No  Date  Page 
Requisition No.   2020.01.17 
00257650‐BO11432  PB  12 
 

      Number of Copies 
REQ.  Code  Document Description  With  For Review  Final/As Builts 
Rev.  No.  Tender 
E  H  Weeks  E  H  Weeks 
  U.13  I&C CABLE LIST               
  U.14  INSTRUMENT LOCATION DRAWINGS    1    4 ARO  1  4  2 PTS 
  U.15  CERTIFIED DIMENSIONAL DRAWINGS    1    4 ARO  1  4  2 PTS 
  U.16  MOUNTING DETAILS    1    4 ARO  1  4  2 PTS 
  U.17  EARTHING DETAILS               
  U.18  FUNCTIONAL LOGIC DIAGRAMS               
  U.19  USER MANUAL    1    4 ARO  1  4  2 PTS 
  U.20  LEVEL 1 FUNCTIONAL SPECIFICATION               
  U.21  LEVEL 2 COMPUTER INTERFACE DATA TABLE               
  U.22  PLC AND OPERATOR INTERFACE DOCUMENTED   
           
PROGRAMME 
  U.23  SHOP TEST / PLATFORM TEST PROGRAMME               
  U.24  SHOP TEST / PLATFORM TEST REPORT               
  U.25  DEMONSTRATION SOFTWARE               
  U.26  SOFTWARE LISTS               
  U.27  I/O SCHEDULES               
                   
  M.  MECHANICAL AND PIPING               
  M.1  DETAILED TECHNICAL SPECIFICATION               
  M.2  DESIGN CALCULATIONS    1    6 ARO       
  M.3  DETAILED EQUIPMENT LIST  1  1    3 ARO  1  4  2 PTS 
  M.4  EQUIPMENT DATA SHEETS  1  1    3 ARO  1  4  2 PTS 
  M.5  GENERAL ARRANGEMENT DRAWINGS  1  1    3 ARO  1  4  2 PTS 
  M.6  DETAILED INSTALLATION & CONSTRUCTION 
  1    3 ARO  1  4  2 PTS 
DRAWINGS 
  M.7  SUB‐UNIT DRAWINGS WITH COMPLETE PARTS 
LISTS OR CROSS SECTIONAL DRAWING AND PART    1    6 ARO  1  4  2 PTS 
LISTS 
  M.8  LIST & LOCATION OF BEARINGS AND SEALS               
  M.9  LUBRICATION SHEETS (Including Frequency)               
  M.10  VENDOR’S NAME PLATE DRAWINGS    2    3 ARO  1  4  2 PTS 
  M.11  EQUIPMENT WEIGHTS  1  1    3 ARO  1  4  2 PTS 
  M.13  FOUNDATION OUTLINE DRAWINGS    1    3 ARO  1  4  2 PTS 
  M.14  PROCESS FLOW DIAGRAM               
  M.15  UTILITIES FLOW DIAGRAMS               
  M.16  CERTIFIED UTILITIES REQUIREMENTS               
  M.17  ROTATING MACHINERY PERFORMANCE AND               

00257650‐BO11432_ rev PB ‐ Waste Heat Recovery Equipment.docx   Page 12 of 13 
Revision   
Equipment/Materials Requisition 
Waste Heat Recovery Equipment  No  Date  Page 
Requisition No.   2020.01.17 
00257650‐BO11432  PB  13 
 

      Number of Copies 
REQ.  Code  Document Description  With  For Review  Final/As Builts 
Rev.  No.  Tender 
E  H  Weeks  E  H  Weeks 
OPERATING CURVES 
  M.18  NOISE AND VIBRATION DATA               
  M.19  PERFORMANCE TEST PROCEDURES               
  M.20  PERFORMANCE TEST CERTIFICATES               
  M.21  NOISE AND VIBRATION TEST CERTIFICATES               
  M.23  ERECTION CONSUMABLES LIST               
  M.25  PIPING LAYOUTS    1    3 ARO  1  4  2 PTS 
  M.26  PIPING ISOMETRICS               
  M.27  MANUFACTURER’S EQUIPMENT BROCHURES 
1      2 ARO  1  4  WS 
AND/OR CATALOGUE 
  M.28  DYNAMIC LOADINGS        2 ARO  1  4  2 PTS 
 
DOCUMENT END 
 
 

00257650‐BO11432_ rev PB ‐ Waste Heat Recovery Equipment.docx   Page 13 of 13 

You might also like