Company Introduction
● Voestalpine Vae Vkn India is a member of the voestalpine Vae Group
which is the global market leader for the railway turnout system solutions.
● Numerous well known references for high speed heavy haul and urban
traffic applications from all over the world.
● It is also engaged in manufacturing highly specialized alloy steel and other
types of special steel castings ranging from 1 kg to 6,000kg.
● It is a RDSO certified class-A foundry and approved supplier for a wide
range of track work products of INDIAN RAILWAYS.
● The company is managed by competent well qualified technical commercial
and managerial professionals merging international and local Indian
expertise.
Company Milestone
1964 - Foundation of Veekay industries by the Indian family Aggarwal-in Batala, Punjab
and Manufacturing switches, Elastic Rail Clips, Nuts and bolts upto 1999 primarily for
Indian Railways.
2000 - Further expansion to Sonepat, Haryana.for manufacturing cast manganese
crossings(CMS)
2001 - Approved vendor from RDSO for CMS crossings.Approval of 4 prototypes of CMS
in record time of 8 months.
2004 - Joint venture with VAE gmbh.
Company Mission
● Continuous Quality-improvement of services and products.
● Introduction of latest technological production processes.
● Reduction of life-cycle costs of products supplied.
● Optimized materials, processes and Designs.
● Supply of high quality products according to latest designs.
● Increase of track-safety through excellence of products.
● Maximum involvement of employees in the decision process.
● New-Technology partner of INDIAN RAILWAYS.
Factory Infrastructure Details
● Total Area of Factory - 20,000m^2
● Power sanctioned (HP) - 3000KVA
● Plan for Expansion - New foundry for small castings with a moulding
capacity of 3 tonne per hour.
● Quality control - Qualities being maintained by predefined Quality
control procedures.
● Inspection - Testing/ Inspection is being done by RDSO(Lucknow).
Products
● Design Department
● Mechanical Maintenance
● Electrical Maintenance
● Quality Control Department
● Quality Assurance Department
● Production Department
● Pattern shop, Moulding, Machine shop,
● CNC Department & Melting Department.
‘
5-S Methodology
Quality control
1. Micrometer
2. Vernier Caliper
3. Steel Scale
4. Steel tape
5. Pressure Gauge
6. Feeler Gauge
7. Right Angle
Physical Laboratory Testing Equipment
I have experienced various things which I haven’t observed during my graduation but
observed them in the company during my industrial training.