Item Name & Description Pe'S Estimate Quantity Unit Official Rate (NRS) Sl. No Category Hierarchy
Item Name & Description Pe'S Estimate Quantity Unit Official Rate (NRS) Sl. No Category Hierarchy
Construction
work
#[45000000]
4.00 > Supplying, placing of hording board 1.00 LS 15,000.00
Site clearance before and after completion
of work including desposing the remaining
Construction construction materials & plants with
work making the site in working condition with
#[45000000] all completeas per drawing and
5.00 > specification. 1.00 LS 100,000.00
Construction
work
#[45000000] E/W in excavation for preparation of site
6.00 > and foundation work with all complete 567.19 m3 383.78
Back filling with ordinary soil by
Construction spreading it in the layer of 15-15 cm,
work sprinkling water and manually compacted
#[45000000] including hauling distance up to 10m,with
7.00 > all complete 283.60 m3 172.50
Construction
work Dry flat brick soling in foundation and
#[45000000] floor including sand filling in joints,
8.00 > leveling, ramming etc.with all complete 773.42 m2 722.20
Construction
work
#[45000000] 38mm thick sal wood fully panneled
18.00 > shutter fixing work with all complete 122.43 m2 16,549.57
Construction
work Earth filling work in the plinth level floor
#[45000000] with watering and proper manually
20.00 > compacted with all complete 459.12 m3 341.90
Construction
work M15 grade( 1:2:4 mix ) PCC work in
#[45000000] structure component for flooring work with
21.00 > all complete 28.73 m3 12,743.94
Construction
work 38mm thick cement concrete (1:2:4) floor
#[45000000] casting, screeding and rubbing with all
22.00 > complete 2,450.86 m2 644.72
Construction
work
#[45000000] Stone masonary with c/s mortar 1:6 for
31.00 > retaining structure 155.00 m3 10,839.45
- 150,000.00 - 150,000.00 -