Etihad Rail Project ITR No.

: C0303-S02-GQC-IR-34119-00
Civils Package - Stage 2A Activity ID.:
WBS No.:
Inspection and Test Request (ITR) Payment
Milestone ID:

Date: 29-06-2021 Time: 14:30 Re-inspection


Intended Commencement of
Works: Y/N RECEIVED
Date: 30-06-2021 Time: 11:00 Referred ITRs By:

Planned Inspection:
Date: Time:

Signature:

Location of Works: CH: 128 Quality Department


Elements: Earthworks DDL1 Trackworks DDL2 MEP Duct DDL3 Structures DDL4 Other
Other/Specify:
Construction/Production Department

Type of Works: Permanent Temporary Hold


ITR
Other/Specify: Reference Documents Status
Works Carried out by: Contractor Sub-Contractor Type Witness

by Engineer
CODE 1

CODE 2

CODE 3

X - Under
Review
IFC
Document Reference Number Rev.

DWG: C0303-SO2-ECH-DS-61001 AB
Reference Documents:

C0303-SO2-EAC-PM-00017 AC
MS:

MAR: C0303-SO2-GQC-MT-00024 AE

Others:

ITP Doc. No. & Activity Item No: C0303-SO2-GQA-PN-00078/ 3.6 Ad-Hoc: YES NO

Detailed description of works: Inspection and witness for concreting (20M-pole Qty 4 No.) QC Check
CC3/CKT1/P43, CC3/CKT1/P44, CC3/CKT1/P47, CC3/CKT1/P46 Date:

Signature:
Note: approved drawing attached.
Comments:

Inspection / Witness Requested By (PRINT Name): SUKHVINDAR SINGH


Raised NCR (if necessary):
Designation: Project Engineer 6/29/2021 14:30 Signature
NCR No.:

The Work Activity described here has been checked by the Contractor in accordance with Exhibit A - General Conditions (Civils Works), Sections 7.3-7.6 and Appendix 13.0, Section 6.0, where the contractor shall
plan, perform and record all QUALITY CONTROL activities to ensure that all work is performed in accordance with the QMS documentation reviewed by the Engineer and in compliance with the requirements of the
Contract.

This is to certify that the above referenced work/activity has been inspected and/or witnessed by the Engineer.

Comments regarding issue(s) found: Comments for closure:


1 Passed
Engineers QC staff or Site Engineer/Inspector

2 Accepted with Comments


(re-submit)

3 Failed

Note: where the minimum quota of inspection/witness points required to be attend by the Engineer has
been exceeded, the ITR will be declined by the Engineer. Minimum quoto for Earthworks is ≤ 25% and ≤40
for Minor Structures. 100% for all other activities.
4 Cancelled

5 Declined (if necessary) Raised NNC/NCR# Date:


Print Name:

Key: Circle Selection above. define expected Time and Date Signature:

Inspection/Witness Conducted or Declined By (Print Name):


Designation: Date: Time: Signature

Comments (confirm initial coding above or revise accordingly with explanation): Print Name & Designation Signature
R.E.'s Comments

C0303-S02-GQA-WX-00006-02 1 of 4 15-Oct-2019
DDL - 1 FOR Earth works
·         Permanent way including all track components.
·         Permanent and temporary highway, access and maintenance road works.
·         Surface and sub-surface drainage.
·         Sand mitigation as required.
·         Set-out sidings and turnouts as specified.
·         Cable containment and under track crossing conduit.

DDL -2 FOR Track works

·         Topographical survey;


·         Preparation of Sub-ballast
·         Bottom ballast by 2 layers
·         Rail/ Track laying;
·         Tail welding using flash-butt welding;
·         Sleepers laying together with fasteners
·         Fitting fastening parts;
·         Top ballast 1st layer
·         Raising rails to the project height by unloading ballast;
·         Tampering and levelling by regulator
·         Top ballast 2nd layer
·         Profiling, levelling, compacting and stabilizing;
·         Survey and control of rail position;
·         Adjustment of internal rail stresses and establishment of long welded rail;
·         Bearer and Turnouts laying;
·         ATW (Aluminothermic Welding) and Welding Testing/Geometrical checking
·         DTS (Dynamic Track Stabilizer)
·         Distressing
·         Rail Inspection by machine.
·         Grinding of rails.
OR Earth works DDL -3 FOR Structures
y including all track components. ·         Pre-Construction
d temporary highway, access and maintenance road works. ·         Excavation
b-surface drainage. ·         Utility Protection System
n as required. ·         Railway Structures
and turnouts as specified. ·         Under Bridges
ment and under track crossing conduit. ·         Over Bridges
·         Underpass
·         Animal Culverts (Reptiles
·         Drainage Culverts
*Line-side civil works like access roads,
·         Permanent Way

DDL -4 FOR MEP DUCTS


·         Enabling works
Sub-ballast ·         Man holes
by 2 layers ·         Ducting

ing flash-butt welding;


g together with fasteners Note: CF to be DD - 00
CF 01
CF01 ( SB to Ch 0+000 UKB & From Ch 0+000
the project height by unloading ballast; CF02
d levelling by regulator CF02 ( Ch 30+000 GMA to Ch 70+000 GMA)
CF03
ling, compacting and stabilizing; CF03 ( Ch 70+000 GMA to Ch 105+000 GMA)
ntrol of rail position; CF04
internal rail stresses and establishment of long welded rail; CF04 ( Ch 105+000 GMA to Ch 1.007+000 GM
nouts laying;
thermic Welding) and Welding Testing/Geometrical checking
Track Stabilizer)

by machine.
OR Structures
·         Pre-Construction
·         Excavation
·         Utility Protection System
·         Railway Structures
·         Under Bridges
·         Over Bridges
·         Underpass
·         Animal Culverts (Reptiles small mammals)
·         Drainage Culverts
e civil works like access roads, fencing and gates etc.
·         Permanent Way

OR MEP DUCTS
·         Enabling works
·         Man holes
·         Ducting

h 0+000 UKB & From Ch 0+000 Ch 30+000 GMA)

000 GMA to Ch 70+000 GMA)

000 GMA to Ch 105+000 GMA)

+000 GMA to Ch 1.007+000 GMB)