QS-011 / Rev.

0 / 10 July 2017

[Bidder's Logo]

BILLS OF QUANTITIES

Project : IDESIA DASMARIÑAS

Location : BRGY. SAN AGUSTIN, DASMARIÑAS, CAVITE

Client : P.A. PROPERTIES - HANKYU HANSHIN


`
BILL SUMMARY OF COSTS

PHASE 2 SLOPE PROTECTION WORKS

PRELIMINARIES Php -

BILLS OF QUANTITIES Php -

NET BID PRICE Php -

VALUE ADDED TAX (12 %) Php INCLUDED

TOTAL BID PRICE Php -

Company Name :

Authorized Representative :
(Signature over Printed Name)

Position :
QS-011 / Rev. 0 / 10 July 2017

BILL SUMMARY OF COSTS


QS-009 / Rev. 0 / 10 July 2017

[Bidder's Logo]

BILLS OF QUANTITIES

Project : IDESIA DASMARIÑAS

Location : BRGY. SAN AGUSTIN, DASMARIÑAS, CAVITE

Client : P.A. PROPERTIES - HANKYU HANSHIN

SUMMARY OF COSTS PER DIVISION

PHASE 2 SLOPE PROTECTION WORKS

Bill Page Amount

01 DIVISION 03 - CONCRETE of -

02 DIVISION 04 - MASONRY of -

03 DIVISION 09 – FINISHES of -

04 DIVISION 31 - EARTHWORKS of -

05 BILL OF PRELIMINARIES of -

To Bill Summary of Costs Php -

This document contains ___ pages


including this Summary Page

SUMMARY / PAGE 1 OF 1

Page 3 of 26
QS-009 / Rev. 0 / 10 July 2017
SUMMARY / PAGE 1 OF 1

Page 4 of 26
QS-011 / Rev. 0 / 10 July 2017

[Bidder's Logo] BILLS OF QUANTITIES


NOVEMBER 2020
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Others Total

DIVISION 03 - CONCRETE

03 00 00 Concrete

03 11 00 Concrete Forming

Supply, fabrication, installation, stripping and/or


leaving of formworks with the actual surface in
contact with the concrete, including provision of
block-outs, chamfered edges, notching, and
overlaps, necessary greasing and/or coating with
form oil, all necessary hardware, fixing
accessories, scaffolding, shoring, staging, usage
of plant, equipment and tools.

A to CHB perimeter wall footing m² -

B to retaining wall m² -

03 21 00 Reinforcement Bars

Supply, fabrication and installation of reinforcing


bars including all necessary splices, dowels,
haunches, control joints, chair bars, spacers, all
necessary hardwares and fixing accessories,
usage of tools and equipment to complete the
works.

(ASTM Grade 40) deformed round bars

C to CHB perimeter wall footing kg -

D to retaining wall kg -

975 - IDESIA DASMA


PHASE 2 SLOPE PROTECTION WORKS DIVISION 3 - CONCRETE
PAGE 5 OF 26
QS-011 / Rev. 0 / 10 July 2017

[Bidder's Logo] BILLS OF QUANTITIES


NOVEMBER 2020
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Others Total

To Collection Php -

03 00 00 Concrete (Cont'd.)

03 31 00 Structural Concrete

Supply, delivery and placing of concrete


including necessary expansion joints,
contraction joints, construction joints, grouting,
vibrating hammering, tamping, consolidating,
curing, hardening, wetting, sealing, brooming
and scratching, protecting, sampling, provision of
necessary extended chutes, and mixing boards
usage of equipment and tools.

3000 psi

E to CHB perimeter wall footing mᶟ -

F to retaining wall mᶟ

Perforated Pipe

Supply, delivery and installation of 150mm Ø


perforated PVC pipe wrapped with filter cloth,
gravel and 75mm Ø PVC drains including
sundries, usage of tools and equipments
necessary to complete the works in accordance
to scope and with compliance to design
requirements.

G along perimeter wall m -

975 - IDESIA DASMA


PHASE 2 SLOPE PROTECTION WORKS DIVISION 3 - CONCRETE
PAGE 6 OF 26
QS-011 / Rev. 0 / 10 July 2017

[Bidder's Logo] BILLS OF QUANTITIES


NOVEMBER 2020
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Others Total

To Collection Php -

Others

Allow for any other items for which the 


Contractor requires payment to comply in all
respect with the provisions of the relevant 
conditions of Contract, the Particular 
Specifications and Drawings and which are  not
in the rates contained in these Bills of 
Quantities. Details of each item shall be 
inserted below.

H ____________________ item

I ____________________ item

J ____________________ item

975 - IDESIA DASMA


PHASE 2 SLOPE PROTECTION WORKS DIVISION 3 - CONCRETE
PAGE 7 OF 26
QS-011 / Rev. 0 / 10 July 2017

[Bidder's Logo] BILLS OF QUANTITIES


NOVEMBER 2020
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Others Total

To Collection Php -

TO COLLECTION Page 1 of 4 -

Page 2 of 4 -

Page 3 of 4 -

DIVISION 03 - CONCRETE To Summary Php -

975 - IDESIA DASMA


PHASE 2 SLOPE PROTECTION WORKS DIVISION 3 - CONCRETE
PAGE 8 OF 26
QS-011 / Rev. 0 / 10 July 2017

[Bidder's Logo] BILLS OF QUANTITIES


NOVEMBER 2020
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Others Total

DIVISION 04 - MASONRY

04 00 00 Masonry

04 20 00 Unit Masonry

04 22 00 Concrete Unit Masonry

Supply and installation of concrete masonry unit


including lintel beams and stiffener columns,
joint sealer, sand mortar, ties, reinforcing steel
and use of tools and equipment to complete the
work in accordance with the drawings and
specifications.

150mm thick

A to CHB perimeter wall m2

975 - IDESIA DASMA


PHASE 2 SLOPE PROTECTION WORKS DIVISION 4 - MASONRY
PAGE 9 OF 26
QS-011 / Rev. 0 / 10 July 2017

[Bidder's Logo] BILLS OF QUANTITIES


NOVEMBER 2020
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Others Total

To Collection Php -

Others

Allow for any other items for which the 


Contractor requires payment to comply in all
respect with the provisions of the relevant 
conditions of Contract, the Particular 
Specifications and Drawings and which are  not
in the rates contained in these Bills of 
Quantities. Details of each item shall be 
inserted below.

B ____________________ item

C ____________________ item

D ____________________ item

975 - IDESIA DASMA


PHASE 2 SLOPE PROTECTION WORKS DIVISION 4 - MASONRY
PAGE 10 OF 26
QS-011 / Rev. 0 / 10 July 2017

[Bidder's Logo] BILLS OF QUANTITIES


NOVEMBER 2020
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Others Total

To Collection Php -

TO COLLECTION Page 1 of 3 -

Page 2 of 3 -

DIVISION 04 - MASONRY To Summary Php -

975 - IDESIA DASMA


PHASE 2 SLOPE PROTECTION WORKS DIVISION 4 - MASONRY
PAGE 11 OF 26
QS-011 / Rev. 0 / 10 July 2017

[Bidder's Logo] BILLS OF QUANTITIES


NOVEMBER 2020
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Others Total

975 - IDESIA DASMA


PHASE 2 SLOPE PROTECTION WORKS DIVISION 4 - MASONRY
PAGE 12 OF 26
QS-011 / Rev. 0 / 10 July 2017

[Bidder's Logo] BILLS OF QUANTITIES


NOVEMBER 2020
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Others Total

DIVISION 09 – FINISHES

09 00 00 Finishes

09 24 00 Cement Plastering

Supply and application of 25mm thick Portland


cement plastered in plain, smooth finish on
vertical / horizontal concrete and/ or masonry
units including fiber, bonding compound, corner
beads, casing beads, control and scaffolding
and all necessary fixing accessories as per
Architect's specification, usage of tools and
equipment to complete the work.

A to CHB perimeter wall m²

975 - IDESIA DASMA


PHASE 2 SLOPE PROTECTION WORKS DIVISION 9 - FINISHES
PAGE 13 OF 26
QS-011 / Rev. 0 / 10 July 2017

[Bidder's Logo] BILLS OF QUANTITIES


NOVEMBER 2020
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Others Total

To Collection Php -

Others

Allow for any other items for which the 


Contractor requires payment to comply in all
respect with the provisions of the relevant 
conditions of Contract, the Particular 
Specifications and Drawings and which are  not
in the rates contained in these Bills of 
Quantities. Details of each item shall be 
inserted below.

B ____________________ item

C ____________________ item

D ____________________ item

975 - IDESIA DASMA


PHASE 2 SLOPE PROTECTION WORKS DIVISION 9 - FINISHES
PAGE 14 OF 26
QS-011 / Rev. 0 / 10 July 2017

[Bidder's Logo] BILLS OF QUANTITIES


NOVEMBER 2020
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Others Total

To Collection Php -

TO COLLECTION Page 1 of 3 -

Page 2 of 3 -

DIVISION 09 – FINISHES To Summary Php -

975 - IDESIA DASMA


PHASE 2 SLOPE PROTECTION WORKS DIVISION 9 - FINISHES
PAGE 15 OF 26
QS-011 / Rev. 0 / 10 July 2017

[Bidder's Logo] BILLS OF QUANTITIES


NOVEMBER 2020
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Others Total

975 - IDESIA DASMA


PHASE 2 SLOPE PROTECTION WORKS DIVISION 9 - FINISHES
PAGE 16 OF 26
QS-011 / Rev. 0 / 10 July 2017

[Bidder's Logo] BILLS OF QUANTITIES


NOVEMBER 2020
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Others Total

DIVISION 31 - EARTHWORKS

31 00 00 Earthwork

31 05 00 Common Work Results for


Earthwork

31 05 16 Aggregates for Earthwork

Aggregate base course shall include spreading,


compacting, levelling, use of plant, tools,
equipment, and all necessary items and fixing
accessories to complete the works as required
by the specifications.

A 100mm thick gravel bedding m3 -

31 10 00 Site clearing

31 11 00 Clearing and grubbing

Clearing and grubbing shall perform as


described regardless of character of material
encountered, within the limits of work, to the
lines, grades, and depths indicated as
prescribed

B Clearing and grubbing m2 -

31 20 00 Earth Moving

31 23 00 Excavation and Fill

Excavation shall perform as described


regardless of character of material encountered,
within the limits of work, to the lines, grades,
and depths indicated as prescribed.

C Structural excavation m3 -

D Trimming works m2 -

975 - IDESIA DASMA


PHASE 2 SLOPE PROTECTION WORKS DIVISION 31 - EARTHWORK
PAGE 17 OF 26
QS-011 / Rev. 0 / 10 July 2017

[Bidder's Logo] BILLS OF QUANTITIES


NOVEMBER 2020
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Others Total

To Collection Php -

31 23 00 Excavation and fill (cont'd)

Backfill materials shall be consist of approved


site excavated materials and shall be free from
brush, roots and other unsuitable materials
which would be determined to compaction
requirements.

E Borrowed fill and compaction m3 -

31 35 00 Slope Protection

Supply and installation of geotextiles including


all accessories, tools and equipments needed to
complete the works as per specifications.

F Geotextiles by Maccaferri lot -

Supply and installation of geomats including all


accessories, tools and equipments needed to
complete the works as per specifications.

G Geomat by Maccaferri lot -

Supply and installation of geogrid including all


accessories, tools and equipments needed to
complete the works as per specifications.

H Geogrid by Maccaferri lot -

Supply and installation of gabion walls including


all accessories, tools and equipments needed to
complete the works as per specifications.

I Gabion Walls by Maccaferri lot -

975 - IDESIA DASMA


PHASE 2 SLOPE PROTECTION WORKS DIVISION 31 - EARTHWORK
PAGE 18 OF 26
QS-011 / Rev. 0 / 10 July 2017

[Bidder's Logo] BILLS OF QUANTITIES


NOVEMBER 2020
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Others Total

To Collection Php -

31 23 00 Excavation and fill (cont'd)

31 35 00 Slope Protection (cont'd)

Supply and installation of terramesh including all


accessories, tools and equipments needed to
complete the works as per specifications.

J Terramesh by Maccaferri lot -

Supply and installation of soil bags including all


accessories, tools and equipments needed to
complete the works as per specifications.

K Soil Bag by Maccaferri lot -

975 - IDESIA DASMA


PHASE 2 SLOPE PROTECTION WORKS DIVISION 31 - EARTHWORK
PAGE 19 OF 26
QS-011 / Rev. 0 / 10 July 2017

[Bidder's Logo] BILLS OF QUANTITIES


NOVEMBER 2020
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Others Total

To Collection Php -

Others

Allow for any other items for which the 


Contractor requires payment to comply in all
respect with the provisions of the relevant 
conditions of Contract, the Particular 
Specifications and Drawings and which are  not
in the rates contained in these Bills of 
Quantities. Details of each item shall be 
inserted below.

____________________ item

____________________ item

____________________ item

975 - IDESIA DASMA


PHASE 2 SLOPE PROTECTION WORKS DIVISION 31 - EARTHWORK
PAGE 20 OF 26
QS-011 / Rev. 0 / 10 July 2017

[Bidder's Logo] BILLS OF QUANTITIES


NOVEMBER 2020
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Others Total

To Collection Php -

TO COLLECTION Page 1 of 5 -

Page 2 of 5 -

Page 3 of 5 -

Page 4 of 5 -

DIVISION 31 - EARTHWORKS To Summary Php -

975 - IDESIA DASMA


PHASE 2 SLOPE PROTECTION WORKS DIVISION 31 - EARTHWORK
PAGE 21 OF 26
QS-011 / Rev. 0 / 10 July 2017

[Bidder's Logo] BILLS OF QUANTITIES


NOVEMBER 2020
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Others Total

975 - IDESIA DASMA


PHASE 2 SLOPE PROTECTION WORKS DIVISION 31 - EARTHWORK
PAGE 22 OF 26
QS-011 / Rev. 0 / 10 July 2017

[Bidder's Logo] BILL OF PRELIMINARIES


NOVEMBER 2020

Item Description Unit Quantity Rate Amount

PRELIMINARIES

Supply of all materials, labor and equipment


necessary for the execution of the project but
not limited to the following:

A Mobilization/Demobilization item -

B Temporary Power and Light item -

C Water for the Works item -

D Temporary Telecommunications item -

E Security item -

F Barracks and Staff house item

G Storage, Workshops and Offices item -

H Environmental Health and Safety (EHS) item

I Reference Points (Line and Grade Survey) mo.

K Bonds and Insurances item


Surety Bond
Warranty Bond
Contractor's All Risk Insurance

L Material Testing item

M As-built Drawings item

975 - IDESIA DASMA


PHASE 2 SLOPE PROTECTION WORKS BILL OF PRELIMINARIES
PAGE 23 OF 26
QS-011 / Rev. 0 / 10 July 2017

[Bidder's Logo] BILL OF PRELIMINARIES


NOVEMBER 2020

Item Description Unit Quantity Rate Amount

To Collection Php -

Others

Allow other items for which the contractor


requires payment to comply with all respect
with the provisions of the relevant conditions
of the contract

NOTES:
1. Refer to Preliminaries - Terms and
Conditions
2. Fixed and time related costs together with
allowances for mobilization costs and
demobilization costs shall be validated prior to
issuance of the first progress billing.

975 - IDESIA DASMA


PHASE 2 SLOPE PROTECTION WORKS BILL OF PRELIMINARIES
PAGE 24 OF 26
QS-011 / Rev. 0 / 10 July 2017

[Bidder's Logo] BILL OF PRELIMINARIES


NOVEMBER 2020

Item Description Unit Quantity Rate Amount

To Collection Php -

TO COLLECTION Page 1 of 3 -

Page 2 of 3 -

Preliminaries To Summary Php -

975 - IDESIA DASMA


PHASE 2 SLOPE PROTECTION WORKS BILL OF PRELIMINARIES
PAGE 25 OF 26
QS-011 / Rev. 0 / 10 July 2017

[Bidder's Logo] BILL OF PRELIMINARIES


NOVEMBER 2020

Item Description Unit Quantity Rate Amount

975 - IDESIA DASMA


PHASE 2 SLOPE PROTECTION WORKS BILL OF PRELIMINARIES
PAGE 26 OF 26