BOQ-Phase 2 Slope Protection CC
BOQ-Phase 2 Slope Protection CC
BOQ-Phase 2 Slope Protection CC
0 / 10 July 2017
[Bidder's Logo]
BILLS OF QUANTITIES
PRELIMINARIES Php -
Company Name :
Authorized Representative :
(Signature over Printed Name)
Position :
QS-011 / Rev. 0 / 10 July 2017
[Bidder's Logo]
BILLS OF QUANTITIES
01 DIVISION 03 - CONCRETE of -
02 DIVISION 04 - MASONRY of -
03 DIVISION 09 – FINISHES of -
04 DIVISION 31 - EARTHWORKS of -
05 BILL OF PRELIMINARIES of -
SUMMARY / PAGE 1 OF 1
Page 3 of 26
QS-009 / Rev. 0 / 10 July 2017
SUMMARY / PAGE 1 OF 1
Page 4 of 26
QS-011 / Rev. 0 / 10 July 2017
DIVISION 03 - CONCRETE
03 00 00 Concrete
03 11 00 Concrete Forming
B to retaining wall m² -
03 21 00 Reinforcement Bars
D to retaining wall kg -
To Collection Php -
03 00 00 Concrete (Cont'd.)
03 31 00 Structural Concrete
3000 psi
F to retaining wall mᶟ
Perforated Pipe
To Collection Php -
Others
H ____________________ item
I ____________________ item
J ____________________ item
To Collection Php -
TO COLLECTION Page 1 of 4 -
Page 2 of 4 -
Page 3 of 4 -
DIVISION 04 - MASONRY
04 00 00 Masonry
04 20 00 Unit Masonry
150mm thick
To Collection Php -
Others
B ____________________ item
C ____________________ item
D ____________________ item
To Collection Php -
TO COLLECTION Page 1 of 3 -
Page 2 of 3 -
DIVISION 09 – FINISHES
09 00 00 Finishes
09 24 00 Cement Plastering
To Collection Php -
Others
B ____________________ item
C ____________________ item
D ____________________ item
To Collection Php -
TO COLLECTION Page 1 of 3 -
Page 2 of 3 -
DIVISION 31 - EARTHWORKS
31 00 00 Earthwork
31 10 00 Site clearing
31 20 00 Earth Moving
C Structural excavation m3 -
D Trimming works m2 -
To Collection Php -
31 35 00 Slope Protection
To Collection Php -
To Collection Php -
Others
____________________ item
____________________ item
____________________ item
To Collection Php -
TO COLLECTION Page 1 of 5 -
Page 2 of 5 -
Page 3 of 5 -
Page 4 of 5 -
PRELIMINARIES
A Mobilization/Demobilization item -
E Security item -
To Collection Php -
Others
NOTES:
1. Refer to Preliminaries - Terms and
Conditions
2. Fixed and time related costs together with
allowances for mobilization costs and
demobilization costs shall be validated prior to
issuance of the first progress billing.
To Collection Php -
TO COLLECTION Page 1 of 3 -
Page 2 of 3 -