Instalación
Locate the light point near the outlet to a height
12 cm
not allowed to be manipulated by children.
Install fasteners so that the light is fi rm and safe
31 cm 6 cm when being installed. Mount the emergency light.
Plugged into the power grid and if it is the first
time let it charge for 24 hours.
Buttons ON / OFF lights should have must be ON
Parts for these light up when you present a power
failure.
Lead Acid Battery 6V. 4.5 Ah, 10A
If the light switch has a normal and high intensity,
250V fuse. AC
the user must place it on the light level to be
Certificates determined.
If ene rotating light lamps, guiding them to areas
ISO 9001, UL, CE, GS where they should be illuminated evacuation
zones.
Maintenance Initial testing operation by pressing the test
button or by disconnecting the line voltage.
quarterly test; initiate action in emergency Leave connected emergency light.
operation by l to disconnect voltage 220V., Perform a test operation verification every 3
wait at least 1 hour or until the light turns off, months.
then connect again.