Hazard Indentificaction and Risk Assessment: Name of Project:-Documents No

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

HAZA

Name of Project:-
Documents No:-
Type of Activity/Condition: : Confined space

Consequence /
Type of Hazards
Impact
I P R (IxP)
Entry inot Confined Space Suffocation, Fatality

1 2 2

2 4 8

5 4 20

Grinding work in side of Serious incident /


the tank. accident.
Suffocating, 5 4 20
Fire during
welding / cutting

Insufficient
ventilation
4 3 12

coating and Painting Serious personal


inside the excavated pit. injuries 4 3 12
Without PPE's
work was going on.

Fire
Can
FOR :- cause electrocution
HAZARD INDENTIFICACTION AND RISK ASSESSMEN

*Assessmen
Inherent risk (with no controls)
Current control measures(P)

Before enter in confined space tool box meeting provided. Before


enter in confined space permit system must be followed. Air
monitoring & proper ventilation must be checked. Proper
PPE's must be used.
One life line holder always stand out of the tank and continuous communicate with
the person who enter in confined space.

User to monitor his equipment, sparks, hot off-cuts, hot spots and the work area –
Cease work if changing circumstances introduce secondary hazards.
Proper PPE's like welding glass, safety shoes, hand gloves, apron etc must be
wear. Fire extinguisher must be provide near the tank area.
Exhaust fan must be provided for control heat stress.

In case of fire breaks out shout Fire… Fire…Fire


Keep buckets full of send / water and keep fire extinguisher near hazardous area.
Maintain good housekeeping and first aid.

Wipe off spills immediately. Don't lay wires under carpets, mats, or doorways. Use only full
insulated wires or cables. Do not allow open or bare connections provide. All connection
through ELCB.

Before Start the work Permit system must be follow up.


User to monitor his equipment, sparks, hot off-cuts, hot spots and the work area – Cease work if
changing circumstances introduce secondary hazards. Proper PPE's
like welding glass, safety shoes, hand gloves, apron etc must be wear.
Fire extinguisher must be provide near the tank area. Exhaust fan must
be provided for control heat stress.

Permit system must be follow. Proper PPE's like


Dust Mask, Hand Gloves, Safety goggles must be wear.

As above.
Full face hood with air compressor or SCBA must be used as a breathing air to avoid
suffocation.
ISK ASSESSMENT

*Assessment
s) Residual risk (after control as
Current control measures( I) I P R (IxP)
Maintain compliance integrity through supervisory monitoring,
regular inspection and coverage in HSSE meetings and toolbox talks.
Before start the job in side the tank air monitoring and permit
must be done.
1 2 2

Maintain compliance integrity through supervisory monitoring,


regular inspection and coverage in HSSE meetings and toolbox talks.
Before start the job in side the tank air monitoring and permit
must be done.
1 3 3

Ensure usage of proper fire extinguisher for specified fires. Do


not attempt to extinguisher oil / electric fires with water. Use DCP,
Co2 extinguisher and sand instead. 3 2 6

Proper ventilation must be provided.


5 3 15

Before Start the work Permit system must be follow up.


Grinders shall be fitted with safety shields and other PPE's like
Dust mast, Hand gloves, Ear plug etc must be wear.
4 2 8

Don't wear loose clothing while working in a confined space.


For control skin irritation hand gloves, canister mask & safety 4 2 8
goggles must be wear.
During painting work only 24V flameproof lamp fittings must be used.
Only for illumination & before start the job all electrical equipments & 4 2 8
cable must be checked.
FOR :-
Residual risk (after control assessment )
Risk
Category Future control measures

low

Medium

Medium

High Risk

Medium

Medium

Medium

FOR :-