Date- 23-12-19(AMBUJA)
4 Design Batch Weight (D) (kg) 699.00 528.00 681.00 370 167.00 2
No.of
8
cube
20mm 18.83 kg
10mm 14.16 kg
Sand 19.11 kg
Cement 9.99 kg
Water 3.93 kg
Date- 23-12-19(INFRACEM)
4 Design Batch Weight (D) (kg) 699.00 528.00 681.00 370 167.00 2
No.of
8
cube
20mm 18.83 kg
10mm 14.16 kg
Sand 19.11 kg
Cement 9.99 kg
Water 3.93 kg
4 Design Batch Weight (D) (kg) 699 528 340.6 340.6 400 180 4
7 Adjusted Batch Wt. (kg) 699.00 527.97 350.92 348.55 400 161.76
10mm 19.60 kg
Sand 13.03 kg
Dust 12.94 kg
Water 6.01 kg
Consultant's Representative
Government of Chhattisgarh
Public work Department
Project : : AMBIKAPUR MEDICAL COLLAGE
Client : PWD (CG)
CONTRACTOR : DEE VEE PROJECT LTD
Date-
4 Design Batch Weight (D) (kg) 699 528 681 370 167 2
\
Contractor's Representative Pwd Representative
No.of
11
cube
s 20mm 25.97 kg
10mm 19.63 kg
Sand 25.83 kg
Cement 13.74 kg
Water 5.61 kg