Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Preformed Line Products has been manufacturing Installation of the system is simplified by provision

integrated substation bus systems since 2000. of a marked up site layout drawing with all bar
PLP’s long history in supplying quality high voltage locations clearly noted. Our product range caters
hardware and fittings provided a solid foundation to all standard tube sizes including 80, 100, 125,
for advancement into substation system supply. 160 and 200mm diameters with wall sections from
3 to 12 mm.
Our engineering team have helped design
turnkey substation packages and components Customers can be well assured the manufacturing
ranging from 22kV to 500kV. Their involvement in quality and engineering backup synonymous with
the process from design and estimation, right up PLP products applies equally to substations.
to final manufacture, guarantees a high quality
engineered product. BUS FITTINGS
Bolted Type
PLP substation fittings are designed with the
installation contractor in mind. As much work as Welded Type
practical is completed in house prior to shipping to Compression Type
site. Fully prefabricated systems have been installed
which eliminated the need for on site welding, the OVERHEAD & LANDING SPAN FITTINGS
fully bolted system having obvious advantages.

Double Conductor Double Conductor Busbar End Palm Post Insulator Aluminium Flexible
Run Palm Tap Run Bolted Tee (Capped) Mounted Parallel Connector
Spacer

Aluminium Busbar Socket Busbar Support Turnbuckles Electrical Jointing


Compression Casting Assembly Clevis/Clevis Compound
Terminal

ph: +62-21-8934866 id.sales@preformed.asia 7

You might also like