Working With Tracer in Pega PRPC

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 16

Working with Queue Instruction

Replace branch with Queue.


Run through tracer.
How to Call an Activity from a flow using Utility Shape.

Calling child activity from utility shape.


Save.

Calling the above activity from customer details fl.


Double click on utility shape.
Submit.
Save.

Save.

Tracing utility activity.

Open the tracer beside clipboard.


Click on settings.
Deselect all
Click OK.
Click

Click on clear.
Run the flow.

Maximize tracer.
Requirement:-

Create an activity to fetch all state codes and state names from states table.
Save.

Run the activity , see the clip board for CPTLStates Page.

You might also like