C8516-CLT-QMT-0003 Rev.00Inspection Checklist For Concreting Works

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

CONCRETING - INSPECTION CHECKLIST Form No: C851/6-CLT-QMT-0003 Rev.

00

Project Tiltle: Design and Build (DB) for FIFA Readiness Project 6 (FRP 6) for Surface and Ground water Network at
Al Madinat Khalifa and Immigration Underpass Scheme c851/6
Contract No. : C2019/141
Report No. : Date :
Location : Drawing No. :
Description :

Complied
Item / Activity Inspected Refer QC Plan for
SI No.. Remarks
Acceptance Criteria
Petroserv Stantec

1 Pre-Concreting Checklist
1.1 Approved IFC drawings.

1.2 Approved Method Statement for Concreting Works.

1.3 Approved Mix Design

1.4 Formworks

a. Survey acceptance, elevation


b. Position,Line & Level
c. Chamfers
d. Tightness
e. Embedments
f. Struts and Bracings
g. Construction Joints
h. Cleaned and oiled
i. Surface Quality
j. Safety protection

1.5 Reinforcements

a. Size, Number & Spacing


b. Lap length
c. Alignment/plumbness
d. Ties/strirrups
e. Spacers, chairs, covers
f. Embedments
g. Cleanliness
g. Rebar wire secured

2 During Concrete Placement

a. Concrete grade as per approved IFC/ shop drawing


b. Slump, temperature, and cube samples
c. Compaction
d. Finish level as per approved IFC/ shop drawing
e. Estimetd concrete volume
f. Concrete pouring record
3 Post-Concreting Checklist

a. Check if the initial protection to exposed surface is


adequate or not.
b. Removal of formwork within time and strength
requirements are as per Method Statement.
c. No damage or shift in position for embedded items
observed or made good accordingly.
d. No defects observed on surface or made good accordingly.

e. Curing method is applied as per Method Statement.

f. All tie rod holes are filled with approved mortar.

g. All critical items such as finished level, alignment &


verticality, visually checked and are correct

4 Repair of Concrete Surface Defect (If any)


a. Material used for repair is approved and compatible

b. Surface preparation and treatment completed.

c. Repair Works done and completed according to the repair


procedure. ✘

d. The completed repair works is accepted by the GEC.

Comments if any :

Works Accepted / Rejected / Rework


INSPECTED VERIFIED / APPROVED
Signature :
Name & Designation :
Date :
PETROSERV LIMITED Stantec