00
Project Tiltle: Design and Build (DB) for FIFA Readiness Project 6 (FRP 6) for Surface and Ground water Network at
Al Madinat Khalifa and Immigration Underpass Scheme c851/6
Contract No. : C2019/141
Report No. : Date :
Location : Drawing No. :
Description :
Complied
Item / Activity Inspected Refer QC Plan for
SI No.. Remarks
Acceptance Criteria
Petroserv Stantec
1 Pre-Concreting Checklist
1.1 Approved IFC drawings.
1.4 Formworks
1.5 Reinforcements
Comments if any :