The document outlines the payment schedule for a total construction cost of Rs. 79,02,301/- to be released in eight installments at different stages of construction. The stages include foundation level, stilt floor level, first floor level, second floor level, third floor level, plastering/flooring/tiles work, wooden work, and finishing work. The payment amount for each stage is Rs. 10,00,000/- except for wooden work (Rs. 9,62,421/-) and finishing work (Rs. 9,39,880/-).
The document outlines the payment schedule for a total construction cost of Rs. 79,02,301/- to be released in eight installments at different stages of construction. The stages include foundation level, stilt floor level, first floor level, second floor level, third floor level, plastering/flooring/tiles work, wooden work, and finishing work. The payment amount for each stage is Rs. 10,00,000/- except for wooden work (Rs. 9,62,421/-) and finishing work (Rs. 9,39,880/-).
The document outlines the payment schedule for a total construction cost of Rs. 79,02,301/- to be released in eight installments at different stages of construction. The stages include foundation level, stilt floor level, first floor level, second floor level, third floor level, plastering/flooring/tiles work, wooden work, and finishing work. The payment amount for each stage is Rs. 10,00,000/- except for wooden work (Rs. 9,62,421/-) and finishing work (Rs. 9,39,880/-).
A Manual of Elementary Geometrical Drawing Involving Three Dimensions: In Five Divisions, Div. I. Elementary Projections Div. II. Details of Constructions in Masonry Wood, and Metal Div. III. Rudimentary Exercises in Shades and Shadows Div. IV. Isometrical Drawing Div. V. Elementary Structural Drawing