8773-000xx (Letter) 732-740

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

Our Ref.

: 8773/000xx/VC/RW/JW/BS/iw
Your Ref.: KCH-2/PJS/03015/T

27 July 2021

Shui On Construction Company Limited


13/F, New Kowloon Plaza,
38 Tai Kok Tsui Road, Kowloon,
Hong Kong

For the attention of Mr. Harry Chan / Mr. Frankie Chan (BSC)

Dear Sirs,

DESIGN AND CONSTRUCTION OF REDEVELOPMENT OF KWAI CHUNG HOSPITAL


(PHASE 2) AT 3 - 15 KWAI CHUNG HOSPITAL ROAD , NEW TERRITORIES
SUBMISSION OF SHOP DRAWING

Reference is made to your documents regarding the captioned, we would like to return herewith our
comments as tabulated below for your follow up action and necessary coordination for construction.
Drawing Number Description Comment
BS/8213/KCH/AC732 Detail Installation for Sump Pump (SWSP-LG- Refer to attachment
BC-05&06)
BS/8213/KCH/AC733 Detail Installation for Sump Pump (FWSP-LG- Refer to attachment
BC-01&02)
BS/8213/KCH/AC734 Detail Installation for Sump Pump (WWSP-LGM- Refer to attachment
BC-01&02)
BS/8213/KCH/AC735 Detail Installation for Sump Pump (FWSP-LG- Refer to attachment
DE-01&02)
BS/8213/KCH/AC736 Detail Installation for Sump Pump (WWSP-LG- Refer to attachment
DE-03&04)
BS/8213/KCH/AC737 Detail Installation for Sump Pump (LTSP-LG- Refer to attachment
DE-01&02)
BS/8213/KCH/AC738 Detail Installation for Sump Pump (LTSP-LG- Refer to attachment
DE-03&04)
BS/8213/KCH/AC739 Detail Installation for Sump Pump (WWSP-LGM- Refer to attachment
DE-01&02)
BS/8213/KCH/AC740 Detail Installation for Sump Pump (WWSP-LG-F- Refer to attachment
01&02)
Please note that the approval of the above items submitted by you does not relieve you from your
responsibility or necessity of supplying materials and performing works and coordination as required by
the contract and statutory requirement.

Yours faithfully
for J. ROGER PRESTON LIMITED

Victor Cheung
Project Director

Encl.

You might also like