Professional Documents
Culture Documents
View Ift - PQ - Reoi - RFP Notice Details 586420
View Ift - PQ - Reoi - RFP Notice Details 586420
View Ift - PQ - Reoi - RFP Notice Details 586420
Organization : Bangladesh Water Development Board Procuring Entity Name : Nawabganj O&M Division
(BWDB)
Procuring Entity Code : Procuring Entity District : Chapai Nawabganj
Particular Information :
Project Code : 224313300 Project Name : Protection of Charbagdanga and
Shajahanpur Area in Sadar Upazila of
Chapainawabganj District from the
erosion of the Padma River
Description : Rehabilitation of Bank Revetment work on the left bank of the Padma River at Bakhar Ali from Km. 6.612 to Km. 7.062 = 450.00 m
in connection with "Protection of Charbagdanga and Shajahanpur area in sadar Upazilla of Chapainawabganj District from the
erosion of the Padma River" under Nawabganj O&M Division BWDB, Chapainawabganj during the FY 2021-2022 & 2022-2023 .
Category : Construction work for water projects; Works for complete or part construction and civil engineering work;
Submission :
2) TIN number.
3) VAT Registration.
4) Nationality.
1. In case of Working Certificate/Performance Certificate/Payment Certificate; Name of works, planned Commencement &
Completion date and also Actual Completion date should be mentioned /Writen down on the certificate. It is better to submite the
certificate guided by CPTU.
2. The work of the package may be totally dropped, decreased or increased as per field condition/design/administrative
approval/budget allocation for which no claim will be entertained for cancellation of the tender/Issuance of work order.
3. Payment will be made subject to the availability of fund. No claim in this regard will be entertained.
4. Continuation of work could not be hampered by the bidder showing the cause of insufficient Budget Provision & Fund Allocation.
5. If the Tenderer(s) submit(s) any false/incorrect or forged certificate, the tender will be outright rejected and action as per PPR-
2008 will be initiated.
6. The Procuring entity reserves the right to accept or reject any or all Tenders without assigning any reason whatsoever.
7. Letter of Commitment for Banks Undertaking for Line of Credit must be submitted in the specific form PW3-7. Otherwise Tender
will be non-responsive.(Letter of Commitment enclosed in General Specification).
Brief Description of Works : Rehabilitation of Bank Revetment work on the left bank of the Padma River at Bakhar Ali from Km. 6.612 to Km. 7.062 = 450.00 m
in connection with "Protection of Charbagdanga and Shajahanpur area in sadar Upazilla of Chapainawabganj District from the
erosion of the Padma River" Project under Nawabganj O&M Division BWDB, Chapainawabganj during the FY 2021-2022 & 2022-
2023.
Evaluation Type : Lot wise
Tender/Proposal
security Completion
Lot No. Identification of Lot Location Start Date
(Amount in Date
BDT)
RHWP- Rehabilitation of Bank Revetment work on the left bank of the Padma River at Bakhar Ali Chapainawabganj 4800000 02-Dec-2021 31-May-2023
02/Lot- from Km. 6.612 to Km. 7.062 = 450.00 m in connection with "Protection of Charbagdanga Sadar
02 and Shajahanpur area in sadar Upazilla of Chapainawabganj District from the erosion of
the Padma River�????�???�??�?�¢??�????�???�??�?�¢?? under
Nawabganj O&M Division BWDB, Chapainawabganj during the FY 2021-2022 & 2022-
2023 .
The procuring entity reserves the right to accept or reject all Tenders/Proposals / Pre-Qualifications / EOIs
Note: Bank will update the payment transactions only at the end of the day, so the tenderers should make sure the securities and other payments are made at least
one day before the submission date.
Amendment / Corrigendum Text : Corrigendum in Tender last selling and submission date.
Document last selling date & time 25/07/2021 17:30 28/07/2021 17:30
TDS/PDS--C. Qualification The required average annual construction turnover shall be greater The required average annual construction turnover shall be greater
Criteria-- than Tk 2400.00 (Twenty four thousand) Lakh over the last 5 (Five) than Tk 2400.00 (Twenty four hundred) Lakh over the last 5 (Five)
years. years.
years counting backward from the date of publication of IFT in the years counting backward from the date of publication of IFT in the
newspaper] newspaper]
The minimum amount of liquid assets or working capital or credit The minimum amount of liquid assets or working capital or credit
facilities of the Tenderer shall be Tk 500.00 (Five hundred) Lakh. facilities of the Tenderer shall be Tk 500.00 (Five hundred) Lakh.
Letter of Commitment for Bank’s Undertaking for Line of Credit must Letter of Commitment for Bank’s Undertaking for Line of Credit must
be submitted in the specific form PW3-7 (Enclosed in General be submitted in the specific form PW3-7 (Enclosed in General
Specification). Specification).
2) TIN number.
2) TIN number.
3) VAT Registration.
3) VAT Registration.
4) Nationality.
4) Nationality.
6) Work plan, Statement of work method, equipment & Personnel 6) Work plan, Statement of work method, equipment & Personnel
B) Special Instruction:
B) Special Instruction:
3. Payment will be made subject to the availability of fund. No claim in 3. Payment will be made subject to the availability of fund. No claim
this regard will be entertained.
in this regard will be entertained.
4. Continuation of work could not be hampered by the bidder showing 4. Continuation of work could not be hampered by the bidder showing
the cause of insufficient Budget Provision & Fund Allocation.
the cause of insufficient Budget Provision & Fund Allocation.
5. If the Tenderer(s) submit(s) any false/incorrect or forged certificate, 5. If the Tenderer(s) submit(s) any false/incorrect or forged certificate,
the tender will be outright rejected and action as per PPR-2008 will be the tender will be outright rejected and action as per PPR-2008 will
initiated.
be initiated.
6. The Procuring entity reserves the right to accept or reject any or all 6. The Procuring entity reserves the right to accept or reject any or all
Tenders without assigning any reason whatsoever.
Tenders without assigning any reason whatsoever.
7. Letter of Commitment for Banks Undertaking for Line of Credit 7. Letter of Commitment for Banks Undertaking for Line of Credit
must be submitted in the specific form PW3-7. Otherwise Tender will must be submitted in the specific form PW3-7. Otherwise Tender will
be non-responsive.(Letter of Commitment enclosed in General be non-responsive.(Letter of Commitment enclosed in General
Specification).
Specification).
9. Latest circular of CPTU & CPC of BWDB will be followed. 9. Latest circular of CPTU & CPC of BWDB will be followed.
Brief Description of Goods,Works Rehabilitation of Bank Revetment work on the left bank of the Padma Rehabilitation of Bank Revetment work on the left bank of the Padma
or Service River at Bakhar Ali from Km. 6.612 to Km. 7.062 = 450.00 m in River at Bakhar Ali from Km. 6.612 to Km. 7.062 = 450.00 m in
connection with "Protection of Charbagdanga and Shajahanpur area connection with "Protection of Charbagdanga and Shajahanpur area
in sadar Upazilla of Chapainawabganj District from the erosion of the in sadar Upazilla of Chapainawabganj District from the erosion of the
Padma River" Project under Nawabganj O&M Division BWDB, Padma River" Project under Nawabganj O&M Division BWDB,
Chapainawabganj during the FY 2021-2022 & 2022-2023. Chapainawabganj during the FY 2021-2022 & 2022-2023.
TDS/PDS--C. Qualification The minimum number of years of general experience of the Tenderer The minimum number of years of general experience of the Tenderer
Criteria-- in the construction works as Prime Contractor or Subcontractor or in the construction works as Prime Contractor or Subcontractor or
Management Contractor shall be 5 (Five) years. Management Contractor shall be 5 (Five) years.
years counting backward from the date of publication of IFT in the years counting backward from the date of publication of IFT in the
newspaper newspaper
The minimum specific experience as a Prime Contractor or The minimum specific experience as a Prime Contractor or
Subcontractor or Management Contractor in construction works of at Subcontractor or Management Contractor in construction works of at
least 1 (one) contract(s) of similar nature, complexity and least 1 (one) contract(s) of similar nature, complexity and
methods/construction technology successfully completed within the methods/construction technology successfully completed within the
last 5 (five) years, each with a value of at least Tk.1150.00 (Eleven last 5 (five) years, each with a value of at least Tk.1150.00 (Eleven
hundred fifty) Lakh hundred fifty) Lakh.
years counting backward from the date of publication of IFT in the The contractor must have similar experince in contruction in any of
newspaper
the following activities
Save As PDF