Health, Safety Environmental Management System ( SMS )

Job Safety Analysis : Sheet Piling Works


Work activity Hazard Risk Control Measures

Item Persons Remarks

Number Break the job down What could harm What harm could it What can be done to make the job safe responsible

into steps someone? cause?

1 Hauling / Preparation Incompetent Fall exposure to 1. Assign certified / competent rigger's and operator have to do job.

of materials and Rigger's / workers , materials,

equipment Operators and equipment 2. Avoid holding the loads directly, use tagline. Engineer

Unconditioned Injury 3. Proper wearing of PPE should be observed at all times. Foreman

lifting materials and

equipment Death 4. Keep body away from lifting loads. Leadman

Unsecured loads 5. Provide barricades and warning signs. Safety Dept.

DO.13 Sec.15: Workers skill certification .

OSHS Rule 1080: Proper wearing PPE

2 Surveying works (layout) 1. Conduct proper housekeeping Engineer

Machine Failure Fatality, Property Pump operators to supply maintenance checklist and log books,

damage Concrete pump to be set up in accordance with the Code of

Practice, Check the condition of the machine daily.

Hit by a pressurized Fatality ,Head, No persons are allowed to be standing in front of concrete hose.

concrete eye, foot hand,

finger, eye injuries and

other body injury


Health, Safety Environmental Management System ( SMS )

Page 1 of 2
Health, Safety Environmental Management System ( SMS )

3 Placing concrete long hours of time of Back Injury Training on proper working posture. Site Engineer /

shovelling and concreting Maximum 12 hours of work should be observed. Supervisors

work Safety Officer

Exposure to concrete Concrete burns Avoid contact to skin , wash skin clothing

chemicals Sun burn, skin immediately

cancer, eye MSDS for concrete should available.

Damage and / oe Personnel to be trained in the use of hazardous substance e.g.

blindness cement.

Sun protection P.P.E equipment such as sun cream, and sunglasses

to be worn on afternoon works.

Run over by Fatality, Head Truck drivers to be made aware of site entry relevant personel to be

concrete eye,foot, hand, finger, in sight of drivers at all times.

pump or truck eye injuries and other Assign the traffic enforcer to control vehicle going in and out

Struck - by body injury during the activity.

Caught - between

DO.1

SEC. 10.2.4 Certified Operators

a) Only duly certified operators shall be allowed to operate their

designated heavy equipment.

SEC.12 Safety and Health Information

Page 2 of 2