Professional Documents
Culture Documents
3. job-safety Sheet piling 钢板桩工作安全分析
3. job-safety Sheet piling 钢板桩工作安全分析
Number Break the job down What could harm What harm could it What can be done to make the job safe responsible
1 Hauling / Preparation Incompetent Fall exposure to 1. Assign certified / competent rigger's and operator have to do job.
equipment Operators and equipment 2. Avoid holding the loads directly, use tagline. Engineer
Unconditioned Injury 3. Proper wearing of PPE should be observed at all times. Foreman
Machine Failure Fatality, Property Pump operators to supply maintenance checklist and log books,
Hit by a pressurized Fatality ,Head, No persons are allowed to be standing in front of concrete hose.
Page 1 of 2
Health, Safety Environmental Management System ( SMS )
3 Placing concrete long hours of time of Back Injury Training on proper working posture. Site Engineer /
Exposure to concrete Concrete burns Avoid contact to skin , wash skin clothing
blindness cement.
Run over by Fatality, Head Truck drivers to be made aware of site entry relevant personel to be
pump or truck eye injuries and other Assign the traffic enforcer to control vehicle going in and out
Caught - between
DO.1
Page 2 of 2