COMPANY PROFILE

PT PRIMA POWER NUSANTARA


OUR COMPANY
PT. Prima Power Nusantara (PPN) is a subsidiary
company of PT. Prima Layanan Nasional Enjiniring
(PLN-E).

Services that PPN may provide including: 99,99%


0,01%

 Design and engineering of Transmission Line


and Substation Projects.
 Procurement and Construction of Transmission (2016)
Line and Substation Projects.
 Testing and commissioning of Transmission Line
and Substation Projects.
 Operation and Maintenance of Trasmission Line
and Substation.
MACHINARIES AND EQUIPMENT

Machine Stringing OMAC 2017


Hiab Crane 8 Ton

Hiab Crane 3 Ton


2 set Accessories Stringing
Forklift
PORTFOLIO PT PPN - GI PROJECT
PROYEK GI PROYEK GI PROYEK GIS
GI 150 kV Plumpang-Gambir GI 150 kV Perdagangan GISTET 500 kV Kembangan
GI 150 kV PLTU Sampit GI 150 kV Kawasan Industri Dumai GIS 150 kV Jatiwaringin
GI 150 kV Rajapaksi (SOGI) GI 150 kV Simpang Empat GIS 150 kV Abadi Guna Papan & Danayasa
GI 150 kV Sampit Kota GI 150 kV PLTU 3 Bangka Belitung GIS 150 kV Grogol
GI 150 kV Puruk Cahu GI 150 kV PLTMG Arun GIS 150 kV Marunda & Penggilingan
GI 150 kV Kota Baru GI 150 kV Puruk Cahu GIS 150 kV Miniatur & Cawang Baru
Gi 150 kV Sambas GI 150 kV Sambas & Singkawang GIS 150 kV Kedinding & Buduran
GI 150 kV Muaralabuh GI 150 kV Semen Indonesia
GI 150 kV Sungai Rumbai GI 150 kV Rajapaksi (SOGI)
GI 150 kV Sarolangun GI 150 kV Wlingi
GI 150 kV Sukadana GI 15O kV PLTP Small Scale Dieng
GI 150 kV BINJAI dan proyek GI lainnya
OUR PROJECT LOCATIONS
PORTFOLIO PT PPN - GI PROJECT
PROYEK GI PROYEK GI PROYEK GIS
GI 150 kV Plumpang-Gambir GI 150 kV Perdagangan GISTET 500 kV Kembangan
GI 150 kV PLTU Sampit GI 150 kV Kawasan Industri Dumai GIS 150 kV Jatiwaringin
GI 150 kV Rajapaksi (SOGI) GI 150 kV Simpang Empat GIS 150 kV Abadi Guna Papan & Danayasa
GI 150 kV Sampit Kota GI 150 kV PLTU 3 Bangka Belitung GIS 150 kV Grogol
GI 150 kV Puruk Cahu GI 150 kV PLTMG Arun GIS 150 kV Marunda & Penggilingan
GI 150 kV Kota Baru GI 150 kV Puruk Cahu GIS 150 kV Miniatur & Cawang Baru
Gi 150 kV Sambas GI 150 kV Sambas & Singkawang GIS 150 kV Kedinding & Buduran
GI 150 kV Muaralabuh GI 150 kV Semen Indonesia
GI 150 kV Sungai Rumbai GI 150 kV Rajapaksi (SOGI)
GI 150 kV Sarolangun GI 150 kV Wlingi
GI 150 kV Sukadana GI 15O kV PLTP Small Scale Dieng
GI 150 kV BINJAI dan proyek GI lainnya
COMPONENTS
SWITCHGEAR TECHNOLOGY
HYBRID SWITCHGEAR
COMPONENTS
ADVANTAGES
Philosophy :
 Pre-assembled
 Pre-tested
 Transportable
 No HV-test on site

Main Features:
 Setiap modul setara dengan 1 bay
 Pengiriman material yang lebih cepat, karena material sudah terkirim
dalam bentuk modul
 Solusi ideal untuk fast-track projects
 Kecepatan pada saat site erection and commissioning, karena modul
sudah sepenuhnya assembly dari pabrik
 Biaya pemeliharaan yang lebih rendah di bandingkan dengan teknologi
konvensional.
CONFIGURATION
HYBRID VS CONVENTIONAL SWITCHGEAR (2)
HYBRID CONVENTIONAL
HYBRID VS CONVENTIONAL SWITCHGEAR (1)
HYBRID CONVENTIONAL

470 m2

1..360 m2

1 : 3
FAST & EASY TRANSPORTABILITY
TRANSPORT CONFIGURATION ERECTION CONFIGURATION
FAST MODULE ERECTION
FINANCIAL COMPARISON
~ TERIMA KASIH ~
DRAWING FOR SINGLE BUSBAR (1)
DRAWING FOR SINGLE BUSBAR (2)

You might also like