Contents Page
SCOPE 2
CODES 2
WHITE WASHING 3
COLOUR WASHING 3
CEMENT PAINT 5
INSULATING PAINT 11
MODE OF MEASUREMENT 12
Applicable Revision:
Prepared: Checked: Approved:
Server : \\KUMUS671\REFER\CIVIL\PRIVATE\DOCS\STDTENDER\PART2
File Name : TSP9.DOC
DOC NO.:
CI-UCH-016-09
SECTION-9
TECHNICAL SPECIFICATIONS Rev. :R0
Uhde India Limited PAINTING Page :2
9.1 SCOPE
1) IS: 101 Methods of test for ready mixed paints and enamels.
2) IS:158 Specification for ready mixed paint, brushing, bituminous black, lead
free, Acid alkali and heat resisting.
7) IS:2074 Specification for Ready mixed paint, air drying, red oxide – zinc
chrome, priming.
8) IS:2338(I&II) Code of practice for fin-ishing of wood & wood based materials.
10) IS:2345 Code of practice for painting concrete, masonry & Plaster surface.
13) IS:5411 Specification for Plastic emulsion Paint : Part I – for interior use.
14) IS:6278 Code of Practice for White washing and Colour washing
This shall include providing and applying 3 coats of white wash to plastered
surface with all labour, material, plant, tools, scaffolding, etc.
The white wash shall be applied with smooth brushes and not by any other
rough equipment. Best approved quality of lime slacked in conformation to
IS:1635 shall be used. Required amount of glue and indigo shall be added to
produce solution, which, after properly filtering through a fine cloth, will not stick
to the fingers when rubbed after drying. Before any lime wash is applied to a
surface, it is required that all loose material and dirt shall be removed by a
brush and sand paper. Lime putty shall be used to make good all holes and
irregularities of surface of minor repairs, which, should be left dry before
applying the second coat.
Doors, windows, floors etc. and such other parts of building shall be protected
from being splashed upon. Splashing and dropping if any, shall be removed by
the contractor at his own cost and the surfaces cleaned.
The surface to be colour washed shall be first treated with a priming coat of
white wash. Minimum three coats of colour shall be applied and the colour
shall be of even tint or shade over the whole surface.
DOC NO.:
CI-UCH-016-09
SECTION-9
TECHNICAL SPECIFICATIONS Rev. :R0
Uhde India Limited PAINTING Page :4
The finished dry surface shall not be powdery and shall not come off on the
hand when rubbed.
9.3.1 Material
Material for oil bound distemper shall be of approved make and manufacturer.
A sealed tin ready mixed distemper of selected make shall be opened in
presence of Engineer.
Application of putty should be started only after approval of surface area by the
Engineer. It should be applied on the whole surface to make the surface
smooth. No lumps should be allowed to dry completely.
After drying, the surface should be scraped with sand/emery paper till smooth
surface is obtained.
If no proper smoothness is obtained again apply primer, putty, etc. and repeat
the process as mentioned above, till the surface is perfect smooth as per
instructions.
DOC NO.:
CI-UCH-016-09
SECTION-9
TECHNICAL SPECIFICATIONS Rev. :R0
Uhde India Limited PAINTING Page :5
After application of first coat of putty, the surface shall be allowed to dry for 24
hours. sand papering shall then be done to give smooth surface.
Subsequent applications of putty and sand papering shall be done till the
Engineer is satisfied about final surface, which should be absolutely even,
levelled and smooth.
9.3.5 On the surface so prepared, two coats of oil bound distemper of selected
shade shall be applied only after inspection by the Engineer. A horizontal and
vertical travel of brush together will be considered as one coat of paint. Each
coat of paint shall be applied only after inspection of Engineer. No brush marks
shall be visible on the surface at the end of final coat. Final surface shall be
smooth, even or roller finish and uniform in colour and texture.
The surface is to be thoroughly cleaned and rubbed down and all loose
particles and dust etc. be removed. Before applying first coat, surface should
be watered thoroughly and shall be allowed to drain off. Second coat shall be
started after 24 hours of first coat. The entire surface shall then be cured for
seven days.
Surface preparation, primer and putty application shall be as per clause 9.3.2,
9.3.3, 9.3.4.
Concrete surface shall be thoroughly cleaned with wire brush and 3 coats of
coal tar epoxy paint shall be applied. Successive coats shall be applied only
after the first coat has dried. Usually, the paint will be supplied by
manufacturers in 2 packs. The base and hardener shall be mixed as per
manufacturer's specification.
No primer paint is necessary. The min dry film thickness (DFT) of each coat
shall be 100 microns.
Concrete surface shall be thoroughly cleaned with wire brush and 3 coats of
Chlorinated Rubber pint shall be applied as per manufacturer's specifications.
Primer as recommended by manufacturer shall be applied.
Surface shall be thoroughly cleaned with wire brush and 3 coats of epoxy
based paint shall be applied as per manufacturer’s specifications.
DOC NO.:
CI-UCH-016-09
SECTION-9
TECHNICAL SPECIFICATIONS Rev. :R0
Uhde India Limited PAINTING Page :7
Aluminium based heat resistant painting shall conform to IS:2339. The paint
comes in compact dual containers with the paste and the medium separately.
The two shall be mixed together to proper consistency before use.
9.10.1 Scope
The surface so prepared, shall be wiped with clean rags before application of
primer or paint.
The sand blasting of the surface shall be carried out by compressed air and
blasting gun. Clean screened sand of uniform size shall be used for blasting
purpose.
For sand blasting, the surface shall be made free from mill scale, rust, grease,
oil or other foreign material and shall appear to have foreign white base metal
roughened texture to form good adhesion of the primer coating, conforming to
Swedish Standards "Sa 2 ½".
Compressed air should be free from moisture and oil. The sand blasted
surface shall be applied with 1st coat primer within 3 to 4 hours or before any
trace of oxidation appears on the cleaned surface.
Chemical cleaning shall be adopted when a surface free from oil, grease, rust,
etc. is required and sand blasting or mechanical scrapping and cleaning is not
possible. Special chemical cleaners of approved manufacturer shall be used
as per manufacturer's specifications. The chemical is first diluted in water and
then applied liberally with rag or brush. Allow the solution to remain in contact
with surface for 1 to 5 minutes as required, do not allow the solution to dry up, if
DOC NO.:
CI-UCH-016-09
SECTION-9
TECHNICAL SPECIFICATIONS Rev. :R0
Uhde India Limited PAINTING Page :9
it is dried up apply more solution. The solution is then wiped off with a clean
cotton rag or by rubbing with dry saw-dust. If any greasy spot are left after 1st
application, second application may follow for these spots only.
Engineer's approval of the surface preparation before applying 1st coat of paint
or primer will be necessary and his decision in the matter shall be final and
binding to the contractor.
Primer shall be one coat of zinc dust pigment with ethylsilicate binder - 75
microns DFT.
The intermediate coat shall be Micacions Iron oxide pigment with epoxy resin
binder - 100 micron DFT.
Each final coat shall be Interpigment with Acrylic resin base alliphatic
polyurethane binder - 35 micron DFT each coat.
DOC NO.:
CI-UCH-016-09
SECTION-9
TECHNICAL SPECIFICATIONS Rev. :R0
Uhde India Limited PAINTING Page :10
All the painting materials brought to site for the purpose of application shall be
accompanied by the manufacturer's test certificates. In case such certificates
are not available, the Engineer may direct the contractor to have the materials
tested in accordance with relevant IS specifications or as specified in the tender
at outside laboratories and all costs there of shall be borne by the contractor.
The work will be subject to inspection by the Engineer at all times. In particular,
following staged inspection will be performed and contractor shall offer the
work for inspection and approval at every stage before proceeding with the next
stage:
a) Surface preparation
b) Primer application
c) Each coat of paint
The contractor shall provide for the purposes of inspection, Elcometer, access,
ladders, lighting, and any other necessary items at his cost.
If with specified number of coats specified Dry Film Thickness (D.F.T) is not
obtained, contractor will have to apply additional coat to achieve the required
DFT without any extra cost. However, specified number of coats have to be
applied even if required DFT is obtained with lesser number of coats.
DOC NO.:
CI-UCH-016-09
SECTION-9
TECHNICAL SPECIFICATIONS Rev. :R0
Uhde India Limited PAINTING Page :11
9.12.1 The Varnish used shall be generally spirit varnish obtained from shellac, Gun
Arabic, Resin and Amber.
The prepared wood work shall be applied with a coat of thin clear qlue. This
shall be allowed to dry and rubbed down with fine sand paper. A second coat
of thin clean glue with necessary quantity of staining colour shall then be
applied and allowed to dry. Varnish shall be laid on in thin coats over this sur-
face. The application shall be with a polishing pad and not with a brush.
Primer coat:
Final coat:
Two coats of approved paint, each coat 100 microns DFT shall be applied
Primer coat
Final coat
Two coats of approved paint, each coat 100 microns DFT shall be applied.
2
The payment shall be on M . basis of finished area and deductions for
openings shall be made as per clauses given under plastering item. The rate
shall include all materials, surface preparation, labour, tools and tackles,
scaffolding, cleaning stairs, etc. complete as specified and as per relevant IS
Codes.
The payment shall be on M.T basis. The rate shall include for surface
preparation, primer, paints, labour, tools and tackles, scaffolding, etc complete
as specified and as per relevant IS Codes.
END