Tampak Samping Gudang

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PT.

GATSU INDONESIA

ATAP SPANDEK

3.74

GUDANG
JL. -
Regel C 100 x 50
Kolom I/WF 300 x 150 x 6.5 x 9

Kolom I/WF 300 x 150 x 6.5 x 9


DINDING FIN = GRC DINDING FIN = GRC DINDING FIN = GRC
6.00

DINDING BATA DINDING BATA DINDING BATA


3.00
3.00 3.00 3.00
1.00

12.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.00 7.60
102.60
A B C D E F G H I J K L M N O

EAST ELEVATION -

PT. GATSU INDONESIA

PT. GATSU INDONESIA


83.75

ATAP SPANDEK

3.74
-
Kolom I/WF 300 x 150 x 6.5 x 9

REGEL C 100 x 50

Kolom I/WF 300 x 150 x 6.5 x 9


DINDING FIN = GRC DINDING FIN = GRC DINDING FIN = GRC
6.00 FOR CONSTRUCTION
DINDING BATA DINDING BATA DINDING BATA
3.00 3.00 3.00 3.00

1.00

ARCHITECTURAL
7.60 5.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 12.00
102.60
ELEVATION
O N M L K J I H G F E D C B A
- WEST ELEVATION 1:350
- EAST ELEVATION 1:350

WEST ELEVATION

YAP+ -

AR.01.004 A3

You might also like