Par Flow Chart: THE Accountables

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PAR FLOW CHART

SUPERVISOR
SITE TOOL
KEEPER
(REGULAR)
THE
ACCOUNTABLES
ENCODING OF
GATE PASS
AND PAR

WAREHOUSE STAFF SITE TOOL KEEPER


POWER ZAVER SUPERVISOR (REGULAR)
WAREHOUSE

MAKE A LIST OF SUBMIT TO THE PZ PZ WAREHOUSE TOOL KEEPER


THE WAREHOUSE STAFF
TOOLS NEEDED WAREHOUSE TOOL KEEPER WILL CHECK AND LIST ALL THE
WILL ASSIST THE
TO START THE PREPARED ITEMS FOR GATE PASS
ACCOUNTABLE
PREPARATION AND PAR.
(ONE AT A TIME).

PHOTOCOPY OF SITE TOOL KEEPER


SUPERVISOR
GATE PASS (REGULAR)

THE WAREHOUSE GATE PASS


WAREHOUSE MANAGER SIGNING OF GATE PASS APPROVED
MANAGEMENT OFFICE FOR
WILL EXPLAIN THE PAR SIGNING
ACCOUNTABILITY
AGREEMENT
BEFORE SIGNING

NEEDED SOME
CORRECTIONS
KEYS AND LOCK WILL BE GIVEN TO
REVIEW THE PAR PHOTOCOPY OF THE ACCOUNTABLE AND ITEMS ARE
BEFORE SIGNING SIGNING OF PAR PAR STORED SAFELY UNTIL MOBILIZATION

SITE TOOL KEEPER


SUPERVISOR (REGULAR)

MOBILIZATION TO SITE

SITE
THE ACCOUNTABLE MUST
BE PRESENT ON SITE FOR
CHECKING THEIR TOOLS

You might also like