Inspection for: Topographic Control Doc No.

KPC065-CHL-L640-001
Defect ID: Work Area:

Contract Number: KPC2001-0000-PRC-CN-065 Checklist Number:

Project Name: Rectification of 38 right of way (RoW) Category 1 Defect along the pipeline along the pipeline

Contractor: K1 GROUP

Subcontractor: N.A

Work Items/activities to be verified Reference Yes No Comments

Verify the area is cleared and grubbed.


satisfactorily in accordance with SOW and required Scope of work
specifications.

Check adequate manpower, Hand tools and supervision


Method statement
ready for work.
Topographic Control

Verify safety pre-cautions are in place. Risk assessment

Check that adequate surveying of natural ground points


Design drawings
is taken before commencing work.

Check that as built of pipeline, FOC and underground


Design drawings
utilities are properly taken.

Check control points, slopes, and direction of flow that


Design drawings
as per drawings or not?

Check health, safety, and environment situation at site


Risk assessment
before commencing of work.

Final Inspection Scope of work

Comments:

K1 Group KPC - CCD Engineer KPC- O&M Engineer

Name: Name: Name:

Date: Date: Date:

Sign: Sign: Sign:

1|Page