LOVE GREEN AND CLEAN

Subject: 20 KW OFF-GRID Solar System Proposal

Dear Sir,

This refers to your inquiry for requirement of solar system for your site. Please find attached
proposal for Off-Grid solution for your site.

Burraq Star Solution® is a complete energy services and industrial equipment company with
Registered Engineers. Our trained and qualified Engineers will be available to provide complete backup
support at your step.We look forward to serving you at our best.

Best Regards:

Engr. Akhtar Ali


Director
LOVE GREEN AND CLEAN

July 15th , 2021 Our Ref No: OFFG003

QUOTATION: 20 KW OFF-GRID

Item Watt Detail Qty Unit Price Total


Solar Panels Longi/Jinko//
Tier 1 Mono Perc 20,520 535-540 38 25,500 969,000
Solar Inverter Inverex Nitrox 05KW 04 150000 600,000
TX 2500 230AH 08 40,000 320,000
Phoenix Tubular Batteries
Galvanized 14 Gauge L2 19 5000 95,000
Mounting Structure for Solar Panels
Structure
DC Cables (Imported) As Per Standard 1Job 103,000 103,000
DB Box, (clopal) Switch Gear, DC
Breaker, SPD, (Schneider), Cable As Per Standard 1Job 143,000 143,000
Trays and Accessories.
Earthing & Installation Charges Labor, Technical Support 1Job 100,000
Transportation Charges Actual will be charged +/-5,000
Total
23,30,000
Amount

PKR
Net Payable
23,30,000

Product and Workmanship Warranty


Product Warranty
Solar Panel 12 Years
Inverter 5 Years
Batteries 1 year

Page 2/2
TERMS AND CONDITIONS FOR QUOTATION:

VALIDITY 15 days from this offer.

PAYMENT TERMS & Order will be confirmed upon:


ORDER 50% advance with firm purchase order
CONFIRMATION 40% at the time of material delivery
10% after successful installation
DUTIES, TAXES & Price Quoted is based on current exchange rate and with all duties & Taxes are considered
DEVALUATION as per current Pakistan Taxes laws. If there is any change in duties, taxes and exchange rates
etc. then it will be applied as per Govt. Laws pertaining to the time of award of job.

• Load for testing at site. System Availability, Load Application&


CUSTOMER Maintenance as per principal’s recommendation.
RESPONSIBILITY • Cleaning of PV modules as per recommendation of manufacturer’s will
becustomer responsibility.
• Voltage stabilization from AC grid/AC input of inverter will be
customer’sresponsibility.
• Providing of shade free area will be customer’s responsibility.
• DB should be near to inverter; otherwise All AC/DC losses will be
customer’sresponsibility, Client will provide the AC wiring for inputs and
output.
• Client will provide all the civil Works Services if needed.
• KE & NEPRA charges will be paid separately by Customer.

DELIVERY & For Non Stock Item(s):


INSTALLATION 12 week(s) after order confirmation. For
TIME Stock Item(s):
1 week after order confirmation, subject to prior sales. Standard
Installation Time:
2-4 week(s) after delivery of goods at site

Note: In case of further queries, please feel free to contact undersigned

Engr. Akhtar Ali

For: Burraq Star Solution

Page 3/3