Professional Documents
Culture Documents
New Trends of Expanded Design Exams For Ale
New Trends of Expanded Design Exams For Ale
New Trends of Expanded Design Exams For Ale
JANUARY 2013:
Design Objectives:
a. To plan/design a high-density commercial building, marketable and attractive to
small and medium-sized buyers;
b. To plan/design the project in a way that can maximized profits for the Project
Proponent; the ratio of saleable versus non- saleable spaces based on GFA shall be
70:30; and
c. To plan/design a building that shall serve as a landmark in host area.
1. What is the range of Unpaved Surface Area (USA) of the project?
a. 700sqm. c. 650sqm.
b. 400sqm. d. 350sqm.
2. What is the range for the area of roof of the project considering a 1.00 meter
roof eaves with firewall at the west side of the building?
a. 700sqm. c. 800sqm.
b. 300sqm. d. 350sqm.
3. Given that the sidewalk is considered as elevation 0.00 meters, how much is the
elevation difference from the sidewalk to the rear tip of the property with a 3%
slope?
a. 1.35m. c. 1.00m
b. 1.20m. d. 5.35m
4. What is the range of the Total Open Space within Lot (TOSL) of the project?
a. 650 sqm. c. 830 sqm.
b. 700 sqm. d. 750 sqm.
5. What is the range of the Allowable Maximum Volume of the Building (AMVB)
for the project considering the floor to floor height is 3 meters?
a. 15,000 cu.m c. 25,000 cu.m
b. 20,000 cu.m d. 12,000 cu.m
6. What is the range of the Total Gross Floor Area of the building (TGFA) for the
project?
a. 6,500 sqm. c. 8,600 sqm.
b. 1,200 sqm. d. 9,000 sqm.
7. What is the range of the number of tiles to be used in the lobby using 600mm x
600mm floor tiles?
a. 420 pcs. c. 360 pcs.
b. 480 pcs. d. 540 pcs.
10. What is the range of the Percentage of the Site Occupancy (PSO) of the
project?
a. 38% of the Total Lot Area c. 22% of the Total Lot Area
b. 20% of the Total Lot Area d. 30% of the Total Lot Area
Design Objectives:
a. To plan/design a high-densitycommercial building, marketable and attractive to
small and medium-sized buyers;
b. To plan/design the project in a way that can maximized profits for the Project
Proponent; the ratio of saleable versus non-saleable spaces based on GFA shall be
70:30; and
c. To plan/design a building that shall serve as a landmark in host area.
78. BP 344, elevator provision at the building will not exceed or have a total
length of how many meters from the entrance.
a. 60 meters
b. 30 meters
c. 90. Meters
d. 10 meters
79. Which is not part of architecture interior elements
a. Niche
b. Suspended ceiling
c. Marquee
d. Shelves
82. On the ordinary site, where should the foundation of the project rest.
a. Soft to hard
b. Hard
c. Very hard
d. Adobe bedrock
83. When was the architect must orient the structure at the site
a. At the very start of the project setting, schematic design, site planning etc.
b. When it’s necessary
c. Sometimes at final design stage
d. During preparation of project document.
84. When was the architect must used the provision of the rule 7 & rule 8
a. At the very start of the project setting, schematic design, site planning etc.
b. When it’s necessary
c. Sometimes at final design stage
e. During preparation of project document.
85. When was the architect must used the provision of the RA 9514 for the project
a. At the very start of the project setting , schematic design, site planning etc.
b. When it’s necessary
c. Sometimes at final design stage
d. During preparation of project document.
86. When was the architect must used the provision of BP 344, BP220 & PD 957
a. At the very start of the project setting, schematic design, site planning etc.
b. When its necessary
c. Sometimes at final design stage
d. During preparation of project document.
87. When was the architect must apply the minimum basic fee to be pair for both
client and architect.
a. At the very start of the project , schematic design, site planning etc.
b. When its necessary
c. Sometimes at final design stage
d. During preparation of project document.
88. Given the proposed project, slope and orientation, Where should ‘Excavation’
start?
a. In the perimeter walls of each sides
b. After establishing the yards required
c. Right on the property line of the lot
d. Setback provisions from O.F.B.
90. What is the total area of the common single size bed?
a. 2.10 sqm
b. 1.71 sqm
c. 1.90 sqm
d. 2.565 sqm
91. What is the total area of the common double size bed?
a. 2.106 sqm
b. 2.715 sqm
c. 2.905 sqm
d. 2.565 sqm
92. What is the total area of the common king size bed?
a. 2.97 sqm
b. 3.42 sqm
c. 3.94 sqm
d. 2.83 sqm
93. What is the total area of the common night stand table?
a. 0.075 sqm
b. 0.203 sqm
c. 0.305 sqm
d. 0.120 sqm
100. Which of the following should NOT be provided at the basement component
of the project
a. Elevator lobby
b. Covered parking
c. Solid waste storage
d. Enclosures for the electronic equipment
101. Which of the following is not a good keyhole center height for the main door
lockset
a. 1.10 meters
b. 1.06 meters
c. 1.00 meters
d. 0.82 meters
102. Considering the entrance elevation of the project is +2.00 meters from 0.00,
how much depth of the vestibule to allow a disabled person to open the door and
allow his wheelchair to pass through easily
a. 1.70 meters
b. 4.50 meters
c. 3.20 meters
d. 4.00 meters
103. If the elevation of the of the side is +5.00 meters, As-per NBCP PD 1096
what will be the allowable building height limit (BHL) of the project
a. 53 meters
b. 48 meters
c. 45 meters
d. 50 meters
104. Under PD1096, what will be the total rear & side incremental setback of the
project at level 8?
a. 3.60 meters
b. 5.60 meters
c. 1.80 meters
d. 0.30 meters
105. Under NBCP, what will be the total front incremental setback of the project
a. 11.32 meters
b. 9.37 meters
c. 16.32 meters
d. 14.37 meters
106. Under NBCP, what will be the Total Open Space Within Lot (TOSL) of the
project without firewall
a. 200 sqm
b. 400 sqmm
c. 300 sqm
d. 400 sqm
107. Under PD1096, basement can only be constructed if the lot is being serve by
RROW with a minimum width of how meters
a. 15 meters
b. 20 meters
c. 10 meters
d. 30 meters
A Proposed Two-Storey, Single Detached Residential Project Development, R-1,
on a Project Site with ten percent (10%) slope.
Design Objectives:
a. To plan/design the project on an R-1 zoned property.
b. To plan/design a Project that is a closely-knit Residential cluster that will serve
as a model development in the area.
c. To maximize the Client’s profit for the Project Proponent; and
d. The Project shall serve as a Landmark for the area.
3. What type of R-1 foundation should be used if the adjacent lot is sloping
upward
a. Strip footing
b. Retaining wall
c. Isolated footing
d. Trapezoidal footing
4. Under NBCP all inner courts shall be connected to a street or yard shall have a
minimum width of.
a. 2.00 meters
b. 1.20 meters
c. 4.50 meters
d. 5.00 meters
5. Which is not part of architectural interior
a. Chairs
b. Ceiling
c. Lamp shade
d. Walls
6. Which orientation is more ideal for the units within the development?
a. NE - SW
b. West - East
c. NW – SE
d. North - South
9. When was the architect must orient the structure at the site
a. At the very start of the project setting, schematic design, site planning etc.
b. When it’s necessary
c. Sometimes at final design stage
d. During preparation of project document.
10. When was the architect must used the provision of the rule 7 & rule 8
a. At the very start of the project setting, schematic design, site planning etc.
b. When it’s necessary
c. Sometimes at final design stage
a. During preparation of project document.
11. When was the architect must used the provision of the RA 9514 for the project
a. At the very start of the project setting , schematic design, site planning etc.
b. When it’s necessary
c. Sometimes at final design stage
d. During preparation of project document.
12. When was the architect must used the provision of BP 344, BP220 & PD 957
a. At the very start of the project setting, schematic design, site planning etc.
b. When its necessary
c. Sometimes at final design stage
d. During preparation of project document.
13. When was the architect must apply the minimum basic fee to be fair for both
client and architect.
a. At the very start of the project , schematic design, site planning etc.
b. When its necessary
c. Sometimes at final design stage
d. During preparation of project document.
15. For pooled parking for the above development. Which is applicable?
a. 1 slot for every 10 plots
b. 1 slot for every 8 plots
c. 1 slot for every 4 plots
d. 1 slot for every 2 plots
16. What is the total area of the common single size bed?
a. 2.10 sqm
b. 1.71 sqm
c. 1.90 sqm
d. 2.565 sqm
17. What is the total area of the common double size bed?
a. 2.106 sqm
b. 2.715 sqm
c. 2.905 sqm
d. 2.565 sqm
18. What is the total area of the common king size bed?
a. 2.97 sqm
b. 3.42 sqm
c. 3.94 sqm
d. 2.83 sqm
19. What is the total area of the common night stand table?
a. 0.075 sqm
b. 0.203 sqm
c. 0.305 sqm
d. 0.120 sqm