ZXDU48 H002 – Implementation Guideline

July 2020

1
Product Description & General Guideline

ZXDU48 H002
• This power supply system is an outdoor DC power system.
• This power supply system is pole, floor and wall-mounted.
• This power supply system can provides -53.5VDC power for
communications equipment.
• Equipped with three ZXD1500(V5.0) rectifiers, which form a rated
output power of 4.5kW (-48V to -57.6V).
• Dimension : 600 x 600 x 1050 mm
• Equipment/user space 6 RU (equipment compartment)

General guideline :
• Default deployment : Pole MCP & IBC RRU
• Special deployment : Macro roof top with limited access or limited floor load capacity (only with Power
Planning approval)
• To reduce risk of high temperature due to air flow, maximum equipment installed allowed at equipment
compartment : 5 RU
• Free space slots shall be arranged to separate each equipment
New Infill (1) – Guideline

New Infill (End Site)


• BBU (3 RU)
• 1 IDU (1 RU)
• Lithium Battery
IDU • 3 RU free slots (for spacing each equipment)
• No additional DCPDB
BBU • No EISU/Eguard

Power

Battery
New Infill (2) – Guideline

New Infill – directly with 2 MW


• BBU (3 RU)
• 2 IDU (2 RU)
IDU
• Lithium Battery
IDU • Replace MCB w/63A to add DCPDB for 2nd IDU
(at battery compartment)
BBU • 2 RU free slots (for spacing each equipment)
• No EISU/Eguard

Power

Battery
Existing_Upgraded Sites (1) Guideline
Existing H002 with Eguard + AGM battery
• BBU (3 RU)
• 1 IDU (1 RU)
• 1 Eguard (1 RU) – dismantle eguard cover
• 2 RU free slots (for spacing each equipment)
IDU
Upgrade case 1 – add RRU Bisector
BBU
• Replace AGM with Lithium Battery
• Replace MCB w/63A to add DCPDB at battery
Eguard
compartment
• Keep 2 RU free slots (for spacing each equipment)
Power Upgrade case 2 – add 1 IDU
• Replace AGM with Lithium Battery
• Replace Eguard with Dry Contact
• Replace MCB w/63A to add DCPDB at battery
Battery compartment
• Add 1 IDU
• Keep 2 RU free slots (for spacing each equipment)
At non Pole MCP site, additional 1 H002 can be
proposed (on space availability and TP confirmation)
Existing_Upgraded Sites (2) Guideline

Existing H002 w/out Eguard + AGM battery


• BBU (3 RU)
• 1 IDU (1 RU)
• 3 RU free slots (for spacing each equipment)
IDU
Upgrade case 1 – add RRU Bisector
BBU • Replace MCB w/63A to add DCPDB
• Keep 2 RU free slots
Power
Upgrade case 2 – add 1 IDU
• Replace AGM with Lithium Battery
• Replace MCB w/63A to add DCPDB at battery
compartment
Battery
• Add 1 IDU
• Keep 2 RU free slots (for spacing each equipment)
At non Pole MCP site, additional 1 H002 can be
proposed (on space availability and TP confirmation)
Existing_Upgraded Sites (3) Guideline

Existing H002 w/out Eguard + Lithium battery


• BBU (3 RU)
• 1 IDU (1 RU)
IDU • 3 RU free slots

BBU Upgrade case 1 – add RRU Bisector


• Replace MCB w/63A to add DCPDB at battery
compartment
Power

Upgrade case 2 – add 1 IDU


• Replace MCB w/63A to add DCPDB at battery
compartment
• Add 1 IDU
Battery • Keep 2 RU free slots (for spacing each equipment)
At non Pole MCP site, additional 1 H002 can be
proposed (on space availability and TP confirmation)
TERIMA KASIH.