SATR-A-2009 Rev 2 - System Lay-Up Report (Certificate)

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005) Rev 2 31-Dec-05

SATR NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO TEST REPORT
System Lay-up Report (Certificate) SATR-A-2009 1-Dec-06 Mech-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Note: This Cert is used for Lay-up Checklists SAIC-A-2018 (Plant Piping & Equipment) & SAIC-L-2124 (Pipelines)
Certificate No. Date:
Equipment: Service Fluid:
System Lay-up Duration: Start - End Date:
Hydro Test Medium: Type of Lay-up:
METHOD OF LAY-UP Actual Pass Fail Remarks
Wet Lay-Up
Minimum residual oxygen scavenger concetration in water
shall be 20 ppm & maximum O2 concentration of 10 ppb
Maintain the system under a positive pressure between 30 to
50 psig using nitrogen, sweet hydrocarbon gas or hydraulic
pressure of the treated water
Use gages to monitor the positive pressure in the system
during lay-up with a scale range not exceeding three times the
target pressure. (Gages must withstand MAOP)

Use gages to monitor the positive pressure in the system


during lay-up with a scale range not exceeding three times the
target pressure. (Gages must withstand MAOP)

Dry Lay-Up
Test water drained from the system until no visible water or
moisture is present.
If sea water was used for testing, remove salt deposits until
sulfates and chlorides on the steel surface reduced to less than
80 mg/msquare.

Dry the system to a dew point of -1°C

Shut in system (positive pressure) not less than 12 hours

Measure Dew Point Temp -1°C or less after Shut-In Period

Shut in system, maintain & monitor during lay-up period.

Inert Gas Lay-Up


Displace the hydrostatic test water with nitrogen or sweet gas
until no water drains out of the system.
Shut in the system at 2-10% of operating pressure but not
exceeding 50 psig with nitrogen or hydrocarbon gas.
Ambient Lay-Up
Test water drained completely until no visible water or moisture
is present.
Valves (400 SS or 13CR trim, etc) tested in-line having cavities
were removed, dried & relubricated per procedure
Cover pipe to prevent ingress of dirt and moisture

Vapor-Phase Corrosion Inhibitor (VCI)


Test water drained completely until no visible water or Volume of System: _______
moisture is present. Amount of VCI Applied: _______

System shut-in to prevent ingress of moisture and debris

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others

Page 1 of 2
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005) Rev 2 31-Dec-05
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
System Lay-up Report (Certificate) SATR-A-2009 1-Dec-06 Mech-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Note: This Cert is used for Lay-up Checklists SAIC-A-2018 (Plant Piping & Equipment) & SAIC-L-2124 (Pipelines)
Quality Record Approved: Name, Organization, T&I Witnessed QC Record Reviewed Work Verified
Name, Sign and Date:
Initials and Date:
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 2 of 2