No Yes: Total Kpi Days Cost: Cost
No Yes: Total Kpi Days Cost: Cost
KPi
• Trans Engineer
• EME Engineer Opening the project 7 Soil Test 4
• Water Engineer and approving the 1
• Electrical Engineer design plans and
• Survey engineer 1 Updated Site Plan 5
issuing the license 2-3-5-6-7
2018
Procedures for building industrial warehouse licensee
• Structural Engineer KPI 2 with the 21 Obtain a Building Permit 7
• Civil Def Engineer 2 procedure 1
Parallel
• Water Engineer
85% of project 15 Water Connection and 11
• Electrical Engineer 11-12
• Structural Engineer Completion Inspection
(Insp) Request The numbers 3
األرقare
combined with 1 Final inspection-Civil Def 12
No
• Civil Def Engineer the procedure 3
• Telecoms Engineer
• Sewage Engineer KPI 2 Yes 7 Final inspection-Building 13
• Trans Engineer 4 Permit Dept
• EME Engineer Final inspection and
Parallel