1 – project
Introduction
As part of the Managing safely course, you have to complete a project and have it
assessed. You will be expected to carry out a risk assessment based on your own work
environment. You need to record the results on the attached sheets and submit them for
marking. Do not submit any additional material in support of your project work as only the
six parts of the A4 project will be assessed. The project can be word processed or hand
written.
31 May 2021
There is a two week time limit for the return of the project. Your project must be completed
and returned by
Instructions
Please read all of the instructions before starting work on your project.
The project is broken down into a number of parts. Please complete each section as
detailed below.
Record a brief description of all the work tasks within your work environment including:
MS Project
Pack version 3.1
description/labelled sketch of the location(s)
people who work in or visit the area on a regular basis or from time to time. (Think
about the different groups of people who may be in the area and how often they
may be there.)
permanent and temporary items of equipment and substances
activities carried out within your work environment
Record a brief description of three location hazards that may arise in your work
environment. For example, car park, stairs, uneven floor. For each of these hazards
please include:
Record a brief description of three hazards that may arise from equipment or substances
used. For each of these hazards please include:
Part 4 – a hazard checklist of the activities carried out within your work environment
Record a brief description of three hazards that may arise from within your work
environment. For each of these hazards please include:
Note: for the purpose of this exercise all three activity hazards that you are
assessing on part 4 must require a risk assessment.
Please carry out a risk assessment on all three of the activity hazards you have listed on
part 4. Please make sure you include:
MS Project
Pack version 3.1
a description of the work activity
a description of the hazard, hazardous event and expected consequence – in
relation to the work activity
the number and occupation of people affected – in relation to the work activity
an assessment of risk (please use the 5 x 5 matrix) – in relation to the work activity
Note: for the purpose of this exercise all three activity hazards that you are
assessing on part 5 must require risk controls.
Please complete the risk control form for all three activity hazards you have listed on part
5. Please make sure you include:
a description of the work activity and risk level from the risk assessment
existing risk controls
any further risk controls required - in relation to the work activity
the residual risk (please use the 5 x 5 matrix) - in relation to the work activity
a description of the type of monitoring required and how often - in relation to the
residual risk
Note: where you have large numbers of hazards in your work environment you will not
have space to record them all. In these circumstances, select a representative sample of
hazards for the purposes of this project and record only these. Remember that only three
hazards are required for parts 2, 3, and 4.
Each part has a maximum number of marks which can be awarded and details are given
in the table below.
1 18
2 16
3 16
4 13
5 30
6 30
Total 123
Minimum mark 62
Finally, before returning your project check that your name, the end of course date, the
name of your company, the site name and the name of your training provider are recorded
on the first sheet.
MS Project
Pack version 3.1
Please also ensure that you sign each sheet to confirm that the work you submit is your
own.
Please note: the small square boxes in the bottom right hand corner of each section
on parts 2 to 6 are for the markers use only.
Marks
allocated
DIAGRAM
MS Project
Pack version 3.1
22 . Anchor fluke 23. Anchor light davit 24. Open rail
25. Hand rail stanchion 26. Hand rail 27. Anchor recess
28 . Bow chock 29 . Bell mouth of hawse pipe 30. Deck Flange hawse pipe
A description of the people who work in or visit the area on a regular basis or
from time to time and how often they’re there
Depending on the type of ship. i.e either a cruise ship, cargo vessel ship, or a fishing boat,
different kind of people may work as well as walk around the ship. A citable example are
those who Ship Deck are essential or related to their work station/location (Deck Crew)
First Officer
Quarter Master
Manages the deck staff on duties performed daily such as attending to ropes, maintenance
and tenders.
Able Seaman
MS Project
Pack version 3.1
Able Seaman is one of the Deckhands responsible for the general cleaning, painting and
maintenance of the ship.
Bosun
The Bosun assists the Safety Officer with assigned duties. Marks
allocated
Safety Officer
In this role you delegate and oversee safety drills. The safety drills include abandon ship
procedures, fire drills and maintenance of the ship's tenders. In addition this role is
responsible for instructing the crew on safety issues and drills.
Security Officer
The security officer is in charge of all security issues during embarkation and
disembarkment. This position is responsible for making decisions about suspicious
luggage, passengers, crew members etc.
Staff Captain
This is the Captain's executive officer, in charge of the medical and deck department's
safety and order. After the Captain the Chief Officer is second in command in the decision
making process. This role assists the Captain with all duties including the overall welfare of
the crew and passengers on board the ship.
MS Project
Pack version 3.1
a. Ropes (Wind Control And Navigation System)
b. Life Guards (Safety)
c. Buckets And Paints (For Good House Keeping On Deck)
d. Life Rah (Safety Boats)
e. Anchor (Ship Ducking)
f. Sawdust (Safety Measure To Arrest Spilled Oil On Deck Surface)
g. Detergent
h. Water Pump/ Fire Wash
i. Master Vab (To Transfer Oil Through Pumps And Pipes)
j. Under Ground Storage Tank
A description of the activities carried out within your work environment
Please sign to confirm that this is your own work:_ Hizbullah Chandio__
MS Project
Pack version 3.1
Hazard Checklist: locations(s) Part 2
The location(s) you manage
Company: Dawlance Department: Research and Development Site name: Quaidabad Karachi
Description of the Description of the hazard Number and occupation of Risk assessment
Location (in relation to the location) people affected recommended?
(in relation to the location) (If no, please explain)
* * *
* Yes No
DG room Area For space Diesel Drum containment not No one
provided could cause spillage during
transferring the material.
* * *
* Yes No
Electrical substation Area Entrance near gate uneven slipping Unaware personnel onboard could either
tripping hazard. fall or get injured
2-3
* * *
MS Project
Please sign to confirm that this is your own work: Hizbullah Chandio Pack version 3.1
Hazard Checklist: equipment and substances Part 3
Permanent and temporary pieces of equipment and substances used in the work environment
Company: Dawlance Department: Research and Development Site name: Quaidabad Karachi
Description of the Description of the hazard Number and occupation of Risk assessment
equipment/substances (in relation to the equipment/substance) people affected recommended?
(in relation to the equipment/substance) (If no, please explain)
* Yes No
Storage of Samples room Mixing of incompatible samples Spillage 20 Number of staff working in chemical
and Mixing of incompatible samples may labs for 8 hrs day.
cause chemical reaction leading to injury
or fire hazard.
It is observed that If the manual sensor of Every day 50 staff members using this * Yes No
Research and Development lift are not working any object like lift for 2nd to 3rd floor lab purpose.
Building Lift clothing could become stuck and trapped
in between the door
MS Project
Please sign to confirm that this is your own work: Hizbullah Chandio Pack version 3.1
Hazard Checklist: activities Part 4
Activities carried out within your work environment
Company: Dawlance Department: Research and Development Site name: Quaidabad Karachiyt
Note: For the purpose of this exercise, all three activity hazards must require a risk assessment.
Description of the Description of the hazard Number and occupation of Risk assessment
Work activity (in relation to the work activity) people affected recommended?
(in relation to the work activity)
2 Welders not used flame To avoid back flame to avoid backfire 2 people one of the employee always
√ Yes No
arrestor to oxygen and and explosion back fire flame burn back present at DG shed most at risk are those
acetylene hose Welding work into the blow pipe could cause explosion. using portable and mobile oxy-fuel gas
at DG shed. systems for welding, heating or cutting
purpose.
2 Staff removing the material They are not using the Scoop there is 2 People earlier affected by doing this
√ Yes No
with bypassing the interlock chances of finger pinch point hazard in activity. Some might happen injury to
system kneader screw. others in future
MS Project
Please sign to confirm that this is your own work: Hizbullah Chandio Pack version 3.1
Risk assessment form Part 5
Company: Dawlance Department: R&D Site name: Quaidabad Karachi
Note: For the purpose of this exercise, all three activity hazards must require risk controls.
Work Hazard, hazardous event and People Assessment of risk Are risk controls
(in relation to the work activity)
activity expected consequence affected Likelihood Consequence Risk required?
(in relation to the work activity) (in relation to the work X =
level level level
activity)
Occupation:
4 Scaffolding
worker
Hazard Falling from height
incompatible works presence Hit by 8
4 Porable
the event
4 Major
Injury
√ Yes No
falling objects Struck by falling might resulting in 16
objects Number: occur at disability
8 some time
Occupation:
2 welder not
used flame
Hazard back fire flame burn back
into the blow pipe could cause 5
3 Possible 3 Injury
requires
9 √ Yes No
arrestor to explosion in DG shed. Doctors or
Oxygen and Number: Hospital
acetylene 5 attendance
Occupation:
Kneader
removing
Hazard pinch injury to finger and
hand while working on kneader 9
3 Possible 4 Injury
resulting in
√ Yes No
scraping the entanglement hazards. disability. 12
material with Number:
bypassing the 9
interlock
Date: 31 May 2021 Time: 7:00 AM Review period: Date of next review: