Ascon Design Department: Comparision Based On Value Engineered Option
Ascon Design Department: Comparision Based On Value Engineered Option
Project: 2B+G+3+Duplex Residential Development / CENTRE COURT Prepared by Sheik Mohamed Date 18-08-09 Rev 0
Part: Cost comparison between conventional RCC Flat Slab System & Post Tensioned Flat Slab System
Untensioned Reinforcement
2
PT Slab Savings in Steel = 24 kg/m
3
Basic Mesh at bottom 35 kg/m
Slab edge reinforcement 7 kg/m3 Savings in Steel = 72 Dhs/m
2
Pour strip reinforcement 3 kg/m3 (Steel Price including cut, bend & fix @ 3000 dhs /Tons)
3
Reinforcement over pier 14 kg/m
3 2
Reinforcement around anchorages 7 kg/m Total Savings = 89 Dhs/m
Reinforcement for earth quake forces 6 kg/m3
EXPENSES
3
Total 72 kg/m
2 2
For an average slab thickness of 210mm = 15.12 kg/m PT Service charge = 50 Dhs/m
2
RCC Slab Expenses incurred at site due to = 10 Dhs/m
PT Works
3
Reinforcement 150 kg/m
(Steel in RCC slab varies between 140 - 160 kg /m3 ) Total PT Related Expenses = 60 Dhs/m
2
2 2
For an average slab thickness of 260mm = 39 kg/m Net Savings = 29 Dhs/m
2
Assuming an average Floor area = 3000 m
Net Savings per floor = 87,420.00 Dhs
ASCON DESIGN DEPARTMENT
Project: 2B+G+3+Duplex Residential Development / CENTRE COURT Prepared by Sheik Mohamed Date 18-08-09 Rev 0
Part: Cost comparison between conventional RCC Flat Slab System & Post Tensioned Flat Slab System
Assumption
2
Manpower to support PT related activities = 6.25 Dhs / m
2
Purpose Residential Grouting Tendons = 2.25 Dhs / m
Imposed Load 14 kN/m2 Pour strip concrete works = 1.5 Dhs / m
2
PT Slab
2
Untensioned Reinforcement Savings in Steel = 22 kg/m
Basic Mesh at bottom & Top (Incl temperature effects) 35 kg/m 3
Slab edge reinforcement 7 kg/m 3 Savings in Steel = 67 Dhs/m
2
Pour strip reinforcement 3 kg/m 3 (Steel Price including Material, cut, bend & fix @ 3000 dhs /Tons)
Reinforcement over pier 14 kg/m 3
Reinforcement around anchorages 7 kg/m 3 Total Savings = 70.40 Dhs/m
2
2
RCC Slab Expenses incurred at site due to = 10 Dhs/m
PT Works
3
Reinforcement 155 kg/m
(Steel in RCC slab varies between 140 - 160 kg /m 3 ) Total PT Related Expenses = 60 Dhs/m
2
2 2
For the slab thickness of 260mm = 40.3 kg/m Net Savings = 10.40 Dhs/m
2
Assuming average Floor area = 3000 m
PT Slab = 38
RCC Slab = 33
ASCON DESIGN DEPARTMENT
Project: Value Analysis Exercise Prepared by Sheik Mohamed Date 9/3/2009 Rev 0
Part: Cost comparision between conventional RCC Flat Slab system & Post Tensioned Flat Slab System
2
PT Slab Savings in Steel = 29 kg/m
Basic Mesh at bottom & Top (Incl temperature effects) 35 kg/m3
Slab edge reinforcement 7 kg/m3 Savings in Steel = 71 Dhs/m
2
Pour strip reinforcement 3 kg/m3 (Steel Price including cut, bend & fix @ 2500 dhs /Tons)
Reinforcement over pier 14 kg/m3
Reinforcement around anchorages 7 kg/m3 Total Savings = 89 Dhs/m
2
2
RCC Slab Expenses incurred at site due to = 10 Dhs/m
PT Works
3
Reinforcement 155 kg/m
(Steel in RCC slab varies between 140 - 160 kg /m3 )
2
Total PT Related Expenses = 70 Dhs/m
2 2
For an average slab thickness of 300mm = 46.5 kg/m Net Savings = 19 Dhs/m
2
Assuming average Floor area = 2500 m