ABSTRACT

Change of Scope

Sl. Description COS Amount Remarks


Structure Approaches Total

A COS Notice Letter No.EGIS/TL/PE/GRIL/PKG-4/075, dt. 18.03.2019

1 Upgradation of PUP to LVUP (4.3 m) at km 134+655 (134+638)


1a LVUP (4.3 m) at km 134+655 18,936,801.0 68,177,681.0 87,114,482.0 Under COS
1b Box Culvert at Ch.134+240 61,282.0 -1,932.0 59,350.0 Under COS
1c Box Culvert at Ch.134+815 217,579.0 -6,252.0 211,327.0 Under COS
1d Box Culvert at Ch.135+180 161,272.0 -6,364.0 154,908.0 Under COS
1e PUP at km 134+655 12,622,516.0 49,607,818.0 62,230,334.0 As per Sch-B of CA
1f Variation Amount 6,754,418.0 18,555,315.0 25,309,733.0 26164389
2 Upgradation of PUP to LVUP (4.3 m) at km 137+375
2a LVUP (4.3 m) at km 137+375 19,157,577.0 60,508,190.0 79,665,767.0 Under COS
2b PUP at km 137+375 11,139,690.0 43,342,771.0 54,482,461.0 As per Sch-B of CA
2c Variation Amount 8,017,887.0 17,165,419.0 25,183,306.0
3 Upgradation of PUP to LVUP (4.3 m) at km 143+065
3a LVUP (4.3 m) at km 143+065 24,181,832.0 67,308,753.0 91,490,585.0 Under COS
3b PUP at km 143+065 12,696,362.0 65,033,104.0 77,729,466.0 As per Sch-B of CA
3c Variation Amount 11,485,470.0 2,275,649.0 13,761,119.0

4 Upgradation of BOX to PUP at km 162+050 Withdrawn


5 Additional LVUP (3.5 m) at km 122+650
5a LVUP (3.5m) at km 122+650 18,926,969.0 83,757,296.0 102,684,265.0 Under COS
5b Box Culvert at Ch.122+450 339,590.0 -9,345.0 330,245.0 Under COS
5c MCW as per Sch-B at the Location of LVUP 7,435.0 57,292,720.0 57,300,155.0 As per Sch-B of CA
5d Variation Amount 19,259,124.0 26,455,231.0 45,714,355.0

5-i Additional LVUP (4.5 m) at km 0+318


5-ia LVUP (3.5m) at km 0+318 36,420,569.0 17,868,001.0 54,288,570.0 Under COS
5-ib MCW as per Sch-B at the Location of LVUP - 14,043,086.0 14,043,086.0 As per Sch-B of CA
5-ic Variation Amount 36,420,569.0 3,824,915.0 40,245,484.0

6 Additional Box Culvert at Km.137+850 11,540,991.0 -327,457.0 11,213,534.0 Under COS


7 Additional Box Culvert at Km.138+300 8,777,688.0 44,953.0 8,822,641.0 Under COS
8 Additional Syphon at Km.138+385 1,306,414.0 113,012.0 1,419,426.0 Under COS
9 Additional Box Culvert at Km.140+415 859,127.0 -4,725.0 854,402.0 Under COS
10 Additional Box Culvert at Km.140+450 5,560,430.0 -169,622.0 5,390,808.0 Under COS

11 Additional LVUP (3.5 m) at km 153+316


11a LVUP (3.5m) at km 153+316 17,682,837.0 58,377,735.0 76,060,572.0 Under COS
11b Box Culvert at Ch.152+680 59,194.0 -2,333.0 56,861.0 Under COS
11c Box Culvert at Ch.153+180 473,278.0 -13,663.0 459,615.0 Under COS
11d Box Culvert at Ch.153+680 36,900.0 -535.0 36,365.0 Under COS
11e MCW as per Sch-B at the Location of LVUP - 31,433,792.0 31,433,792.0 As per Sch-B of CA
11f Variation Amount 18,252,209.0 26,927,412.0 45,179,621.0

12 Additional Box Culvert at Km.160+220 7,424,985.0 -172,063.0 7,252,922.0 Under COS

13 Additional LVUP (4.3 m) at km 162+400


13a LVUP (4.3 m) at km 162+400 25,440,597.0 66,783,479.0 92,224,076.0 Under COS
13b Box Culvert at Ch.162+520 393,294.0 -8,218.0 385,076.0 Under COS
13c MCW as per Sch-B at the Location of LVUP 7,752.0 45,172,650.0 45,180,402.0 As per Sch-B of CA
13d Variation Amount 25,826,139.0 21,602,611.0 47,428,750.0

B Net Value of Work under Change of Scop 161,485,451.0 116,290,650.0 277,776,101.0

C Add Design/Drawing Charges @ 2% of [B] 5,555,522.0


D Add GST @ 12% on B + C 33,999,795.0
E Add Labour Cess @ 1% on B + C +D 3,173,314.0

F Gross Value of Work under COS = [ B + C + D + E] 320,504,732.0


BILL OF QUANTITY (COS) LVUP at km 0+318
MCW as per Sch-B at Variation due to New
Dependant
LVUP Location LVUP at km 122+650
BOQ Ref. RA (Additional)
Description Unit Rate (Rs.)
Item No Item No
Quantity Amount Quantity Amount Quantity Amount

Structure Work

6.01 a Excavation for Structures in Ordinary Soil


upto 3 m depth (By Mechanical Means)
Earth work in excavation of foundation of structures Cum 63.00 12.01 I-B 3,177.756 200,199.0 - - 3,177.756 200,199.0
as per drawing and technical specification.

6.02 a Providing and laying PCC for leveling course


below foundation & approach slab Cum 7943.00 12.04 (i) 32.270 256,321.0 - - 32.270 256,321.0
PCC Grade M-10
6.02 b Providing and laying PCC for leveling course
below foundation & approach slab 12.08 A
Cum 8093.00
(ii)
134.664 1,089,836.0 - - 134.664 1,089,836.0
PCC Grade M-15
6.02 c Plain/Reinforced cement concrete in sub-
structure complete as per drawing and Technical 13.50 A
Specifications. Cum 8903.00
(p) - - - -
PCC Grade M-15
6.20 c Structural Cement Concrete in Open
Foundation for piers, abutments, wing walls,
retaining walls etc including formwork, 12.08 G-
excluding reinforcement complete as per Cum 8687.00
(ii)
- - - - - -
drawing & Technical Specification.
RCC Grade M-30

6.20 d Structural Cement Concrete in Open


Foundation for piers, abutments, wing walls,
retaining walls etc including formwork, 12.08 H-
excluding reinforcement complete as per Cum 8787.00
(ii)
346.584 3,045,434.0 - - 346.584 3,045,434.0
drawing & Technical Specification.
RCC Grade M-35

6.22 c Structural Cement Concrete in Substructure for


piers, abutments, wing walls, retaining walls,
etc. including formwork, excluding 13.05 G-
reinforcement complete as per drawing & Cum 9233.00
(p) II 158.639 1,464,714.0 - - 158.639 1,464,714.0
Technical Specification.
RCC Grade M-30

6.22 d Structural Cement Concrete in Substructure for


piers, abutments, wing walls, retaining walls,
etc. including formwork, excluding 13.05 H-
reinforcement complete as per drawing & Cum 9384.00
(p) II
304.663 2,858,958.0 - - 304.663 2,858,958.0
Technical Specification.
RCC Grade M-35

6.25 c RCC in Superstructure for Slab, T-Beams,


diaphragm etc. including formwork, excluding
reinforcement complete as per drawing & Cum 14.01 D-I
10070.00
(i)-(p) 283.570 2,855,550.0 - - 283.570 2,855,550.0
Technical Specification.
RCC Grade M-35
6.30 a Providing and fixing in position TMT Fe 500
grade reinforcement complete as per drawing
and Technical Specification. MT 52137.00 12.40 47.566 2,479,949.0 - - 47.566 2,479,949.0
In Foundation
BILL OF QUANTITY (COS) LVUP at km 0+318
MCW as per Sch-B at Variation due to New
Dependant
LVUP Location LVUP at km 122+650
BOQ Ref. RA (Additional)
Description Unit Rate (Rs.)
Item No Item No
Quantity Amount Quantity Amount Quantity Amount
6.30 b Providing and fixing in position TMT Fe 500
grade reinforcement complete as per drawing
and Technical Specification. MT 52304.00 13.06 51.837 2,711,282.0 - - 51.837 2,711,282.0
In Sub structure
6.30 c Providing and fixing in position TMT Fe 500
grade reinforcement complete as per drawing
and Technical Specification. MT 53736.00 14.02 117.169 6,296,193.0 - - 117.169 6,296,193.0
In Super structure
6.42 a Providing and fixing in position Expansion
Joints complete as per drawings and Technical
Specifications Section 2600 or as directed by Lm 135.00 14.18 (ii) 64.016 8,642.0 - - 64.016 8,642.0
Engineer.
Compressible Fibre Board
6.45 Providing and laying in position Reinforced
Cement Concrete grade M-30 in approach
slabs including reinforcement complete as per Cum 11248.00 14.11 53.794 605,075.0 - - 53.794 605,075.0
drawings and Technical Specifications.
6.47 Providing and laying in position for Reinforced
Cement Concrete M-40 grade crash barrier
excluding reinforcement, complete as per Cum 14.01 E-II
10179.00
(i)-(p)
330.499 3,364,149.0 - - 330.499 3,364,149.0
drawings and Technical Specifications.

6.52 Providing weep holes in abutments, retaining


wall or any other earth retaining structure
complete as per drawings and Technical Nos 606.00 13.08 A 172.000 104,232.0 - - 172.000 104,232.0
Specifications
6.53 Providing and fixing in position drainage
spouts complete as per drawings and Technical
Specifications Clause 2705 or as directed by Nos 3951.00 14.09 4.000 15,804.0 - - 4.000 15,804.0
Engineer.
6.60 b Providing and laying Filter Media behind
abutment, retaining wall and return wall. Sqm 227.00 13.10 A 269.608 61,201.0 - - 269.608 61,201.0
Geo-Composite Sheet
6.90 a Construction of Reinforced Earth Walls
including supply of all components with precast
panels, reinforcing element, capping beam Sqm 2695.00 7.05 3,340.642 9,003,030.0 - - 3,340.642 9,003,030.0
complete as per Technical Specifications 3100.

9.20.B Laying 1200mm Dia Reinforced Cement


Concrete Pipe NP3 / Prestressed Concrete Pipe Mtr 10003.00 9.20.B - - - -
on First Class Bedding in Single Row .

Sub Total "A" 36,420,569.0 - 36,420,569.0

Structure Approaches

2.02 Providing and Construction of Embankment


with approved materials from borrow areas Cum 227.00 3.16 51,006.768 11,578,536.0 42,253.027 9,591,437.0 8,753.741 1,987,099.0
BILL OF QUANTITY (COS) LVUP at km 0+318
MCW as per Sch-B at Variation due to New
Dependant
LVUP Location LVUP at km 122+650
BOQ Ref. RA (Additional)
Description Unit Rate (Rs.)
Item No Item No
Quantity Amount Quantity Amount Quantity Amount
2.05 Providing and Construction of Subgrade with
approved materials from borrow areas Cum 269.00 3.18 333.597 89,738.0 580.417 156,132.0 -246.820 -66,394.0
complete as per Technical Specification.
2.12 Filling with approved material for
construction of RE Wall complete as per Cum 288.00 3.18 (i) 16,703.210 4,810,524.0 - - 16,703.210 4,810,524.0
technical specifications .
3.01 Providing and Constructions of Granular Sub-
base, Complete as per Technical Specification
Clause 401. Cum 3440.00 4.02 (i) - - 282.504 971,814.0 -282.504 -971,814.0
Sub-base cum Drainage layer
3.04 Providing and Construction of Wet Mix
Macadam (WMM) base with approved material
complete as per Technical Specification Cum 4374.00 4.12 93.617 409,481.0 286.477 1,253,050.0 -192.860 -843,569.0

3.19 Compacting Original Ground: Compacting


original ground supporting embankment Cum 38.00 3.19 - - - - -
3.22 Turfing with Sods
Furnishing and laying of the live sods of
perennial turf forming grass on embankment Sqm 30.00 3.22 - - 374.768 11,243.0 -374.768 -11,243.0
slope, verges or other locations shown on the
drawing

- - - -
4.01 Providing and applying primer coat with
bitumen emulsion on prepared surface of
granular Base at the rate of 0.70 to 1.0 kg/sqm Sqm 27.00 5.01 1,073.319 28,980.0 1,059.391 28,604.0 13.928 376.0
complete as per Technical Specification
4.02 a Providing and applying Tack Coat with
bitumen emulsion complete as per Technical
Specification Sqm 10.00 5.02 (a) 614.250 6,143.0 1,059.391 10,594.0 -445.141 -4,451.0
@ 0.25 to 0.30 kg per sqm on Granular
Surface
4.02 b Providing and applying Tack Coat with
bitumen emulsion complete as per Technical
Specification Sqm 9.00 5.02 (b) 614.250 5,528.0 - - 614.250 5,528.0
@ 0.20 to 0.30 kg per sqm on Bituminous
Surface
4.04 c Providing and laying Dense Graded
Bituminous Macadam (DBM) course complete
as per Technical Specification Cum 11228.00 5.06 (i) - - - - - -
Grading - 1, Bitumen (VG-40 grade)
4.04 d Providing and laying Dense Graded
Bituminous Macadam (DBM) course complete
as per Technical Specification Cum 11250.00 5.06 (ii) 30.712 345,510.0 105.939 1,191,814.0 -75.227 -846,304.0
Grading - 2, Bitumen (VG-40 grade)
4.05 b Providing and laying Bituminous Concrete
(BC) wearing course complete as per Technical
Specification. Cum 12433.00 5.08 (i) 41.380 514,478.0 52.970 658,576.0 -11.590 -144,098.0
Grading - 2, Bitumen (VG-40 grade)
- - - -
- -
BILL OF QUANTITY (COS) LVUP at km 0+318
MCW as per Sch-B at Variation due to New
Dependant
LVUP Location LVUP at km 122+650
BOQ Ref. RA (Additional)
Description Unit Rate (Rs.)
Item No Item No
Quantity Amount Quantity Amount Quantity Amount
7.03 b Plain Cement Concrete in Drain, Kerb etc
including formwork, complete as per drawing & 12.08 B
Technical Specification. Cum 7462.00
(ii)
4.055 30,258.0 - - 4.055 30,258.0
PCC Grade M-20
8.23 A Providing & Fixing Metal Beam Crash Barrier
(Type-A, "W" Beam) Lm 1674.00 8.23 A - - - - - -
13.10 Brick masonry work in 1:3 in substructure
complete Excludlng pointing and plastsrlng, as Cum 7041.00 13.10 - - - - -
per drawing and Technlcal Specificatlon
15.04 C Providing and laying Geocell on slopes covered
with Concrete for erosion protection complete
as per drawing and Technical specifications. Sqm 874.00 15.04 C - - 76.000 66,424.0 -76.000 -66,424.0

15.04 D Providing and laying Geocell on slopes covered


with Turfing for erosion protection complete as
per drawing and Technical specifications. Sqm 194.00 15.04 D - - - - - -

15.15 Construction of drainage chute on embankment


slopes of approaches of bridges in cement Lm 2721.00 15.15 - - 38.000 103,398.0 -38.000 -103,398.0
concrete M-20
8.13 Road Marking with Hot Applied Thermoplastic
Compound with Reflectorising Glass Beads on
Bituminous Surface Sqm 436.78 8.13 29.550 12,907.0 - - 29.550 12,907.0

15.40 Providing and laying Pitching on slopes laid


over prepared filter media including boulder
apron laid dry in front of toe of embankment Cum 3636.00 15.4 - - - - -
complete as per drawing and Technical
specifications
15.50 Providing and laying Filter material
underneath pitching in slopes complete as per Cum 5708.00 15.50 - - - - -
drawing and Technical specification
8.02 Painting Two Coats on New Concrete Surfaces
Sqm 46.00 8.08 780.822 35,918.0 - - 780.822 35,918.0
8.03 Providing and fixing of retro- reflectorised
cautionary, mandatory and informatory sign as
per IRC :67 made of high intensity grade
sheeting vide clause 801.3, fixed over
aluminium sheeting, 1.5 mm thick supported on
a mild steel angle iron post 75 mm x 75 mm x 6
mm firmly fixed to the ground by means of Each 2215.00 8.04 - - - - -
properly designed foundation with M15 grade
cement concrete 45 cm x 45 cm x 60 cm, 60 cm
below ground level as per approved drawing

16.11 Flexible Apron: Construction of flexible apron 1


m thick comprising of loose stone boulders
weighing not less than 40 kg beyond curtain Cum 3013.84 16.11 - -
wall.
8.27 Providing and fixing lighting for LVUP,
including all lifts and leads of material and
manpower complete as per work order issued. Each 128894.00 8.27 - - - - -
BILL OF QUANTITY (COS) LVUP at km 0+318
MCW as per Sch-B at Variation due to New
Dependant
LVUP Location LVUP at km 122+650
BOQ Ref. RA (Additional)
Description Unit Rate (Rs.)
Item No Item No
Quantity Amount Quantity Amount Quantity Amount

Sub Total "B" 17,868,001.0 14,043,086.0 3,824,915.0

TOTAL A+B 54,288,570 14,043,086.0 40,245,484.0


Quantity - LVUP at km 134+655 (134+638)
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

Inputs
LVUP - 1 x 10.50 x 4.30 m Cell a b b-lhs b-rhs c d e fo
Skew (deg) = 0.00 1.000 10.500 7.270 7.270 7.270 0.000 0.550 0.650 0.550
Skew (rad) = 0.00 10.500 0.000 0.550

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 22.750 22.750 21.250 3.000 21.250 LHS RHS LCW RCW
0.000 22.750 22.750 21.250 3.000 21.250 92.157 92.157 100.943 100.943

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 93.157 95.514

Calculation
1 Excavation for Structure
Exc. for Raft LCW 1.000 22.850 11.800 1.100 296.593

Exc. for Raft RCW 1.000 22.850 11.800 1.100 296.593


593.186 Cum 6.01 a

2 Levelling Course - PCC


Below Box Raft
Raft LCW 1.000 22.850 11.800 0.100 26.963
Raft RCW 1.000 22.850 11.800 0.100 26.963
53.926 Cum 6.02 a

Below Approach Slab LHS 2.000 21.550 3.350 0.150 21.658


RHS 2.000 21.550 3.350 0.150 21.658

Footpath (in Opening) B/S 4.000 22.750 1.500 0.150 20.475


63.791 Cum 6.02 b

3 Box Structure - Conc.


Raft - Box Str
Raft LCW 1.000 22.750 11.600 0.650 171.535

Raft RCW 1.000 22.750 11.600 0.650 171.535


343.070 Cum 6.20 d

Wall - Box Str


Wall (Outer) LCW 2.000 22.750 0.550 7.270 181.932
Wall (Inner) LCW 0.000 22.750 0.000 7.270 0.000
Haunch (Bottom) LCW 2.000 22.750 0.450 0.075 1.536
Median Wall LCW 2.000 1.500 0.550 0.550 0.908
Haunch (Top) LCW 2.000 21.250 0.450 0.075 1.434 185.810 Cum 6.22 d

Wall (Outer) RCW 2.000 22.750 0.550 7.270 181.932


Wall (Inner) RCW 0.000 22.750 0.000 7.270 0.000
Haunch (Bottom) RCW 2.000 22.750 0.450 0.075 1.536
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

Median Wall RCW 2.000 1.500 0.550 0.550 0.908


Haunch (Top) RCW 2.000 21.250 0.450 0.075 1.434 185.810 Cum 6.22 d

Bracket LCW 2.000 21.250 0.450 0.300 5.738


RCW 2.000 21.250 0.450 0.300 5.738 11.476 Cum 6.22 d

Slab - Box Str


Slab LCW 1.000 21.250 11.600 0.550 135.575

Slab RCW 1.000 21.250 11.600 0.550 135.575


271.150 Cum 6.25 c

4 RCC Crash Barrier - Conc.


Box Str + Approach Slab
RCC CB (Outer Edge) B/S 2.000 18.600 0.317 11.789
RCC CB (Median Edge) B/S 2.000 18.600 0.317 11.789
RCC CB (Closure) B/S 2.000 3.000 0.317 1.901

25.479 Cum 6.470

5 Approach Slab
Approach Slab LHS 2.000 21.250 3.500 0.300 44.625
RHS 2.000 21.250 3.500 0.300 44.625 89.250 Cum 6.450

6 Reinforcement
Rnf Box Structure
Rnf Box - Foundation LHS 1.000 16.665 16.665
Rnf RHS 1.000 16.665 16.665 33.330 MT 6.30 a
Rnf
Rnf Box - Substructure LHS 1.000 23.016 23.016
Rnf RHS 1.000 23.016 23.016 46.032 MT 6.30 b
Rnf
Rnf Box - Super Structure LHS 1.000 14.191 14.191
Rnf RHS 1.000 14.191 14.191 28.382 MT 6.30 c
Rnf
Rnf RCC Crash Barrier
Rnf RCC CB (Outer Edge) B/S 2.000 18.600 0.043 1.600
Rnf RCC CB (Median Edge) B/S 2.000 18.600 0.043 1.600
Rnf RCC CB (Closure) B/S 2.000 3.000 0.043 0.258
Rnf
Rnf 3.458 MT 6.30 c
Rnf
7 Drainage Spout
LHS 3.000 3.000
RHS 3.000 3.000 6.000 Nos 6.530

8 Weep Holes
LHS 154.000 154.000
RHS 154.000 154.000 308.000 Nos 6.520

9 Fibre Board
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

Box & Median Wall Med 2.000 8.086 0.550 8.895


CB Med 4.000 0.317 1.268
Approach Slab B/S 4.000 21.250 0.300 25.500
Box Raft Med 1.000 11.600 0.650 7.540 43.203 Sqm
172.812 Rm 6.42 a
10 Filter Media - Geocomposite
LHS 2.000 22.750 8.436 383.838
RHS 2.000 22.750 8.436 383.838 767.676 Sqm 6.60 b

11 RE Wall
Return Wall LHS 2 17.724 5.134 6.267 181.97
2 2.000 2.000 6.267 8.00
RHS 2 17.724 5.134 6.267 181.97
2 2.000 2.000 6.267 8.00 379.949 Sqm 6.90 a

Levelling Pad BHS 4 17.724 0.350 0.150 3.722


BHS 4 2.000 0.350 0.150 0.420 4.142 Cum 6.02 b

Excavation BHS 4 17.724 6.000 1.000 425.37


BHS 4 2.000 6.000 1.000 48.000 473.371 Cum 6.01 a

12 BC
Wearing Coat above Str. B/S 2.000 18.600 20.250 0.050 37.665

Connecting LSR & RSR B/S 1.000 109.250 7.000 0.030 22.943 60.608 Cum 4.05 b
L-SR- 7.00 m, L-SR- 3.75m width BC
13 DBM
Connecting LSR & RSR B/S 1.000 109.250 7.000 0.050 38.238
L-SR- 7.00 m, L-SR- 3.75m width DBM 38.238 Cum 4.04 d

14 Prime Coat
Wearing Coat above Str. B/S 2.000 18.600 20.250 753.300
Connecting LSR & RSR B/S 1.000 109.250 7.000 764.750
1518.050 Sqm 4.010

15 Tack Coat - Bituminous Surface


Connecting LSR & RSR B/S 1.000 109.250 7.000 764.750
764.750 Sqm 4.02 b

16 Tack Coat - Granular Surface


Connecting LSR & RSR B/S 1.000 109.250 7.000 764.750
764.750 Sqm 4.02 a

17 WMM
Connecting LSR & RSR B/S 1.000 108.750 7.300 0.150 119.081
L-SR- 7.25 m, L-SR- 4.00m width WMM 119.081 Cum 3.040

18 GSB

GSB in Flared Portion in Str


B/S 4.000 56.250 2.475 0.200 111.375
Approach of MCW
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

Granular Shoulder in Flared


Portion in Str Approach of B/S 4.000 56.250 2.275 0.400 204.750
MCW

Connecting LSR & RSR B/S 1.000 101.060 10.500 0.175 185.698
L-SR- 10.22 m, L-SR- 8.72m width GSB 501.823 Cum 3.010

19 Sub Grade
Subgrade in Flared Portion in
B/S 4.000 56.250 2.975 0.500 334.688
Str Approach of MCW

Connecting LSR & RSR B/S 1.000 98.260 10.500 0.500 515.865
L-SR- 11.62 m, L-SR- 10.12m width Subgrade
Shoulder of LSR & RSR B/S 2.000 52.760 1.000 0.230 24.270
874.823 Cum 2.050

20 Embankment
Embankment Qty as per
B/S km. 134+180 to 135+320 247592.404
Revised Profile
247592.404 Cum 2.020

21 Drainage Chute
In Geocell Area LHS 20.000 14.360 287.200
RHS 18.000 13.920 250.560 537.760 Lm 15.150

In Turfing Area LHS 37.000 10.280 380.360


RHS 39.000 10.350 403.650 784.010 Lm 15.150

22 Geocell with Concrete filling along Chute Drain


In Geocell Area LHS 20.000 14.360 2.000 574.400
RHS 18.000 13.920 2.000 501.120

In Turfing Area LHS 37.000 10.280 2.000 760.720


RHS 39.000 10.350 2.000 807.300 2643.540 Sqm 15.04 C

23 Geocell covered with fine grass


Geocell Area (Total) LHS 1.000 5701.998 5701.998
RHS 1.000 5002.777 5002.777
Less for Chute Drain & Geocell with Concrete
LHS 20.000 14.360 -2.600 -746.720
RHS 18.000 13.920 -2.600 -651.456 9306.599 Sqm 15.04 D

24 Turfing with Sods


Turfing Area (Total) LHS 1.000 7518.054 7518.054
RHS 1.000 7985.545 7985.545
Less for Chute Drain & Geocell with Concrete
LHS 37.000 10.280 -2.600 -988.936
RHS 39.000 10.350 -2.600 -1049.490 13465.173 Sqm 3.220

25 Qty - Misc work

Metal Beam Crash barrier B/S 2.000 18.600 37.200 Rm 8.23 A


Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

k Kerb
Along LVUP Footpath B/S 4.000 22.750 0.109 9.892 9.892 Cum 7.03 b
Qty - Embankment Slope Protection in the Approaches of LVUP at km 134+655 (wrt Revised Profile)
GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area)
FRL at
Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope
LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS
Edge Width Edge Width

H= K= L= N= R= S=
A B C D E F G J = H-C M = L-D P Q
E+Fx17 √J2+(2xJ)2 E+Gx17 √M2+(2xM)2 Avg.PxB Avg.QxB

134+180 94.185 94.251 98.736 -2.50% -2.50% 98.311 4.126 9.226 98.311 4.060 9.078 Turfing Turfing - -
134+190 10 94.210 94.236 98.703 -2.50% -2.50% 98.278 4.068 9.096 98.278 4.042 9.038 Turfing Turfing 91.61 90.58
134+200 10 94.205 94.220 98.670 -2.50% -2.50% 98.245 4.040 9.034 98.245 4.025 9.000 Turfing Turfing 90.65 90.19
134+210 10 94.120 94.199 98.658 -2.50% -2.50% 98.233 4.113 9.197 98.233 4.034 9.020 Turfing Turfing 91.15 90.10
134+220 10 94.233 94.177 98.645 -2.50% -2.50% 98.220 3.987 8.915 98.220 4.043 9.040 Turfing Turfing 90.56 90.30
134+230 10 94.189 94.173 98.653 -2.50% -2.50% 98.228 4.039 9.031 98.228 4.055 9.067 Turfing Turfing 89.73 90.54
134+240 10 94.108 94.169 98.661 -2.50% -2.50% 98.236 4.128 9.230 98.236 4.067 9.094 Turfing Turfing 91.31 90.81
134+250 10 94.109 94.167 98.689 -2.50% -2.50% 98.264 4.155 9.291 98.264 4.097 9.161 Turfing Turfing 92.61 91.28
134+260 10 94.120 94.165 98.717 -2.50% -2.50% 98.292 4.172 9.329 98.292 4.127 9.228 Turfing Turfing 93.10 91.95
134+270 10 94.015 94.162 98.766 -2.50% -2.50% 98.341 4.326 9.673 98.341 4.179 9.345 Turfing Turfing 95.01 92.86
134+280 10 94.055 94.158 98.815 -2.50% -2.50% 98.390 4.335 9.693 98.390 4.232 9.463 Turfing Turfing 96.83 94.04
134+290 10 94.044 94.137 98.885 -2.50% -2.50% 98.460 4.416 9.874 98.460 4.323 9.667 Turfing Turfing 97.84 95.65
134+300 10 94.020 94.116 98.954 -2.50% -2.50% 98.529 4.509 10.082 98.529 4.413 9.868 Turfing Turfing 99.79 97.67
134+310 10 93.922 94.070 99.033 -2.50% -2.50% 98.608 4.686 10.478 98.608 4.538 10.147 Turfing Turfing 102.80 100.08
134+320 10 93.905 94.023 99.111 -2.50% -2.50% 98.686 4.781 10.691 98.686 4.663 10.427 Turfing Turfing 105.84 102.87
134+330 10 93.849 94.012 99.190 -2.50% -2.50% 98.765 4.916 10.993 98.765 4.753 10.628 Turfing Turfing 108.42 105.27
134+340 10 93.879 94.001 99.268 -2.50% -2.50% 98.843 4.964 11.100 98.843 4.842 10.827 Turfing Turfing 110.46 107.28
134+350 10 93.901 93.992 99.347 -2.50% -2.50% 98.922 5.021 11.227 98.922 4.930 11.024 Turfing Turfing 111.64 109.25
134+360 10 93.871 93.982 99.425 -2.50% -2.50% 99.000 5.129 11.469 99.000 5.018 11.221 Turfing Turfing 113.48 111.22
134+370 10 93.935 93.952 99.504 -2.50% -2.50% 99.079 5.144 11.502 99.079 5.127 11.464 Turfing Turfing 114.86 113.43
134+380 10 93.879 93.921 99.582 -2.50% -2.50% 99.157 5.278 11.802 99.157 5.236 11.708 Turfing Turfing 116.52 115.86
134+390 10 93.793 93.940 99.661 -2.50% -2.50% 99.236 5.443 12.171 99.236 5.296 11.842 Turfing Turfing 119.86 117.75
134+400 10 93.926 93.958 99.739 -2.50% -2.50% 99.314 5.388 12.048 99.314 5.356 11.976 Turfing Turfing 121.09 119.09
134+410 10 93.815 93.950 99.818 -2.50% -2.50% 99.393 5.578 12.473 99.393 5.443 12.171 Turfing Turfing 122.60 120.74
134+420 10 93.810 93.942 99.896 -2.50% -2.50% 99.471 5.661 12.658 99.471 5.529 12.363 Turfing Turfing 125.66 122.67
134+430 10 93.805 93.938 99.975 -2.50% -2.50% 99.550 5.745 12.846 99.550 5.612 12.549 Turfing Turfing 127.52 124.56
134+440 10 93.800 93.934 100.053 -2.50% -2.50% 99.628 5.828 13.032 99.628 5.694 12.732 Turfing Turfing 129.39 126.41
GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area)
FRL at
Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope
LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS
Edge Width Edge Width

H= K= L= N= R= S=
A B C D E F G J = H-C M = L-D P Q
E+Fx17 √J2+(2xJ)2 E+Gx17 √M2+(2xM)2 Avg.PxB Avg.QxB

134+450 10 93.791 93.937 100.130 -2.50% -2.50% 99.705 5.914 13.224 99.705 5.768 12.898 Turfing Turfing 131.28 128.15
134+460 10 93.801 93.939 100.207 -2.50% -2.50% 99.782 5.981 13.374 99.782 5.843 13.065 Turfing Turfing 132.99 129.82
134+470 10 93.791 93.951 100.278 -2.50% -2.50% 99.853 6.062 13.555 99.853 5.902 13.197 Geocell Turfing 134.65 131.31
134+480 10 93.735 93.963 100.348 -2.50% -2.50% 99.923 6.188 13.837 99.923 5.960 13.327 Geocell Turfing 136.96 132.62
134+490 10 93.753 93.943 100.411 -2.50% -2.50% 99.986 6.233 13.937 99.986 6.043 13.513 Geocell Geocell 138.87 134.20
134+500 10 93.839 93.923 100.474 -2.50% -2.50% 100.049 6.210 13.886 100.049 6.126 13.698 Geocell Geocell 139.12 136.05
134+510 10 93.852 93.940 100.530 -2.50% -2.50% 100.105 6.253 13.982 100.105 6.165 13.785 Geocell Geocell 139.34 137.42
134+520 10 93.855 93.957 100.586 -2.50% -2.50% 100.161 6.306 14.101 100.161 6.204 13.873 Geocell Geocell 140.41 138.29
134+530 10 93.854 93.948 100.635 -2.50% -2.50% 100.210 6.356 14.212 100.210 6.262 14.002 Geocell Geocell 141.57 139.37
134+540 10 93.858 93.939 100.683 -2.50% -2.50% 100.258 6.400 14.311 100.258 6.319 14.130 Geocell Geocell 142.62 140.66
134+550 10 93.876 93.913 100.724 -2.50% -2.50% 100.299 6.423 14.362 100.299 6.386 14.280 Geocell Geocell 143.37 142.05
134+560 10 94.032 93.886 100.764 -2.50% -2.50% 100.339 6.307 14.103 100.339 6.453 14.429 Geocell Geocell 142.33 143.54
134+570 10 94.121 93.872 100.798 -2.50% -2.50% 100.373 6.252 13.980 100.373 6.501 14.537 Geocell Geocell 140.41 144.83
134+580 10 94.159 93.858 100.832 -2.50% -2.50% 100.407 6.248 13.971 100.407 6.549 14.644 Geocell Geocell 139.75 145.90
134+590 10 93.842 94.132 100.858 -2.50% -2.50% 100.433 6.591 14.738 100.433 6.301 14.089 Geocell Geocell 143.54 143.67
134+600 10 93.806 94.405 100.884 -2.50% -2.50% 100.459 6.653 14.877 100.459 6.054 13.537 Geocell Geocell 148.07 138.13
134+610 10 93.473 94.505 100.903 -2.50% -2.50% 100.478 7.005 15.664 100.478 5.973 13.356 Geocell Geocell 152.70 134.47
134+620 10 93.725 94.605 100.922 -2.50% -2.50% 100.497 6.772 15.143 100.497 5.892 13.175 Geocell Geocell 154.03 132.66
134+630 10 93.420 94.860 100.968 -2.50% -2.50% 100.543 7.123 15.928 100.543 5.683 12.708 Geocell Geocell 155.35 129.41
134+632 2.2 93.449 94.916 100.963 -2.50% -2.50% 100.538 7.089 15.851 100.538 5.622 12.571 Geocell Geocell 34.96 27.81
134+634 1.8 93.461 94.939 100.961 -2.50% -2.50% 100.536 7.075 15.819 100.536 5.597 12.515
134+638 4 93.526 95.063 100.949 -2.50% -2.50% 100.524 100.524
LVUP at km 134+638 LVUP at km 134+638
134+640 2 93.553 95.114 100.944 -2.50% -2.50% 100.519 100.519
134+642 2 93.556 95.024 100.945 -2.50% -2.50% 100.520 6.964 15.571 100.520 5.496 12.289
134+644 1.8 93.559 94.944 100.946 -2.50% -2.50% 100.521 6.962 15.566 100.521 5.577 12.471
134+650 6.2 93.570 94.666 100.949 -2.50% -2.50% 100.524 6.954 15.550 100.524 5.858 13.099 Geocell Geocell 96.46 79.27
134+660 10 93.979 94.218 100.953 -2.50% -2.50% 100.528 6.549 14.644 100.528 6.310 14.110 Geocell Geocell 150.97 136.04
134+670 10 94.111 94.224 100.950 -2.50% -2.50% 100.525 6.414 14.342 100.525 6.301 14.089 Geocell Geocell 144.93 141.00
134+680 10 94.030 94.230 100.946 -2.50% -2.50% 100.521 6.491 14.514 100.521 6.291 14.067 Geocell Geocell 144.28 140.78
GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area)
FRL at
Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope
LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS
Edge Width Edge Width

H= K= L= N= R= S=
A B C D E F G J = H-C M = L-D P Q
E+Fx17 √J2+(2xJ)2 E+Gx17 √M2+(2xM)2 Avg.PxB Avg.QxB

134+690 10 94.086 94.226 100.935 -2.50% -2.50% 100.510 6.424 14.365 100.510 6.284 14.051 Geocell Geocell 144.39 140.59
134+700 10 94.105 94.221 100.924 -2.50% -2.50% 100.499 6.394 14.297 100.499 6.278 14.038 Geocell Geocell 143.31 140.45
134+710 10 94.117 94.202 100.906 -2.50% -2.50% 100.481 6.364 14.230 100.481 6.279 14.040 Geocell Geocell 142.64 140.39
134+720 10 94.115 94.183 100.888 -2.50% -2.50% 100.463 6.348 14.195 100.463 6.280 14.043 Geocell Geocell 142.12 140.41
134+730 10 94.080 94.166 100.863 -2.50% -2.50% 100.438 6.358 14.217 100.438 6.272 14.025 Geocell Geocell 142.06 140.34
134+740 10 94.045 94.149 100.837 -2.50% -2.50% 100.412 6.367 14.237 100.412 6.263 14.004 Geocell Geocell 142.27 140.15
134+750 10 94.000 94.067 100.804 -2.50% -2.50% 100.379 6.379 14.264 100.379 6.312 14.114 Geocell Geocell 142.51 140.59
134+760 10 93.985 93.985 100.771 -2.50% -2.50% 100.346 6.361 14.224 100.346 6.361 14.224 Geocell Geocell 142.44 141.69
134+770 10 93.817 93.890 100.731 -2.50% -2.50% 100.306 6.489 14.510 100.306 6.416 14.347 Geocell Geocell 143.67 142.85
134+780 10 93.721 93.795 100.691 -2.50% -2.50% 100.266 6.545 14.635 100.266 6.471 14.470 Geocell Geocell 145.73 144.08
134+790 10 93.716 93.777 100.644 -2.50% -2.50% 100.219 6.503 14.541 100.219 6.442 14.405 Geocell Geocell 145.88 144.37
134+800 10 93.733 93.758 100.596 -2.50% -2.50% 100.171 6.438 14.396 100.171 6.413 14.340 Geocell Geocell 144.69 143.72
134+810 10 93.750 93.769 100.541 -2.50% -2.50% 100.116 6.366 14.235 100.116 6.347 14.192 Geocell Geocell 143.15 142.66
134+820 10 93.742 93.780 100.486 -2.50% -2.50% 100.061 6.319 14.130 100.061 6.281 14.045 Geocell Geocell 141.82 141.19
134+830 10 93.753 93.795 100.425 -2.50% -2.50% 100.000 6.247 13.969 100.000 6.205 13.875 Geocell Geocell 140.49 139.60
134+840 10 93.742 93.809 100.363 -2.50% -2.50% 99.938 6.196 13.855 99.938 6.129 13.705 Geocell Geocell 139.12 137.90
134+850 10 93.712 93.819 100.302 -2.50% -2.50% 99.877 6.165 13.785 99.877 6.058 13.546 Geocell Geocell 138.20 136.26
134+860 10 93.717 93.829 100.240 -2.50% -2.50% 99.815 6.098 13.636 99.815 5.986 13.385 Geocell Turfing 137.11 134.66
134+870 10 93.711 93.841 100.178 -2.50% -2.50% 99.753 6.042 13.510 99.753 5.912 13.220 Geocell Turfing 135.73 133.02
134+880 10 93.717 93.852 100.116 -2.50% -2.50% 99.691 5.974 13.358 99.691 5.839 13.056 Turfing Turfing 134.34 131.38
134+890 10 93.689 93.872 100.054 -2.50% -2.50% 99.629 5.940 13.282 99.629 5.757 12.873 Turfing Turfing 133.20 129.65
134+900 10 93.767 93.891 99.992 -2.50% -2.50% 99.567 5.800 12.969 99.567 5.676 12.692 Turfing Turfing 131.26 127.83
134+910 10 93.796 93.927 99.931 -2.50% -2.50% 99.506 5.710 12.768 99.506 5.579 12.475 Turfing Turfing 128.69 125.84
134+920 10 93.867 93.962 99.869 -2.50% -2.50% 99.444 5.577 12.471 99.444 5.482 12.258 Turfing Turfing 126.19 123.67
134+930 10 93.982 93.991 99.807 -2.50% -2.50% 99.382 5.400 12.075 99.382 5.391 12.055 Turfing Turfing 122.73 121.56
134+940 10 93.984 94.019 99.745 -2.50% -2.50% 99.320 5.336 11.932 99.320 5.301 11.853 Turfing Turfing 120.03 119.54
134+950 10 94.020 94.021 99.684 -2.50% -2.50% 99.259 5.239 11.715 99.259 5.238 11.713 Turfing Turfing 118.23 117.83
134+960 10 94.047 94.022 99.622 -2.50% -2.50% 99.197 5.150 11.516 99.197 5.175 11.572 Turfing Turfing 116.15 116.42
134+970 10 94.072 94.035 99.560 -2.50% -2.50% 99.135 5.063 11.321 99.135 5.100 11.404 Turfing Turfing 114.19 114.88
GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area)
FRL at
Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope
LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS
Edge Width Edge Width

H= K= L= N= R= S=
A B C D E F G J = H-C M = L-D P Q
E+Fx17 √J2+(2xJ)2 E+Gx17 √M2+(2xM)2 Avg.PxB Avg.QxB

134+980 10 94.074 94.047 99.498 -2.50% -2.50% 99.073 4.999 11.178 99.073 5.026 11.238 Turfing Turfing 112.50 113.21
134+990 10 94.064 94.075 99.436 -2.50% -2.50% 99.011 4.947 11.062 99.011 4.936 11.037 Turfing Turfing 111.20 111.38
135+000 10 94.116 94.103 99.374 -2.50% -2.50% 98.949 4.833 10.807 98.949 4.846 10.836 Turfing Turfing 109.34 109.37
135+010 10 94.142 94.106 99.313 -2.50% -2.50% 98.888 4.746 10.612 98.888 4.782 10.693 Turfing Turfing 107.10 107.64
135+020 10 94.189 94.109 99.251 -2.50% -2.50% 98.826 4.637 10.369 98.826 4.717 10.548 Turfing Turfing 104.91 106.20
135+030 10 94.142 94.116 99.189 -2.50% -2.50% 98.764 4.622 10.335 98.764 4.648 10.393 Turfing Turfing 103.52 104.70
135+040 10 94.122 94.123 99.127 -2.50% -2.50% 98.702 4.580 10.241 98.702 4.579 10.239 Turfing Turfing 102.88 103.16
135+050 10 94.135 94.114 99.066 -2.50% -2.50% 98.641 4.506 10.076 98.641 4.527 10.123 Turfing Turfing 101.59 101.81
135+060 10 94.146 94.105 99.004 -2.50% -2.50% 98.579 4.433 9.912 98.579 4.474 10.004 Turfing Turfing 99.94 100.63
135+070 10 94.154 94.113 98.942 -2.50% -2.50% 98.517 4.363 9.756 98.517 4.404 9.848 Turfing Turfing 98.34 99.26
135+080 10 94.165 94.121 98.880 -2.50% -2.50% 98.455 4.290 9.593 98.455 4.334 9.691 Turfing Turfing 96.74 97.69
135+090 10 94.177 94.087 98.818 -2.50% -2.50% 98.393 4.216 9.427 98.393 4.306 9.629 Turfing Turfing 95.10 96.60
135+100 10 94.164 94.052 98.756 -2.50% -2.50% 98.331 4.167 9.318 98.331 4.279 9.568 Turfing Turfing 93.73 95.98
135+110 10 94.159 94.051 98.695 -2.50% -2.50% 98.270 4.111 9.192 98.270 4.219 9.434 Turfing Turfing 92.55 95.01
135+120 10 94.184 94.050 98.633 -2.50% -2.50% 98.208 4.024 8.998 98.208 4.158 9.298 Turfing Turfing 90.95 93.66
135+130 10 94.176 94.059 98.571 -2.50% -2.50% 98.146 3.970 8.877 98.146 4.087 9.139 Turfing Turfing 89.38 92.18
135+140 10 94.146 94.067 98.509 -2.50% -2.50% 98.084 3.938 8.806 98.084 4.017 8.982 Turfing Turfing 88.41 90.61
135+150 10 94.087 94.078 98.452 -2.50% -2.50% 98.027 3.940 8.810 98.027 3.949 8.830 Turfing Turfing 88.08 89.06
135+160 10 94.039 94.088 98.394 -2.50% -2.50% 97.969 3.930 8.788 97.969 3.881 8.678 Turfing Turfing 87.99 87.54
135+170 10 93.979 94.107 98.351 -2.50% -2.50% 97.926 3.947 8.826 97.926 3.819 8.540 Turfing Turfing 88.07 86.09
135+180 10 93.958 94.126 98.307 -2.50% -2.50% 97.882 3.924 8.774 97.882 3.756 8.399 Turfing Turfing 88.00 84.69
135+190 10 94.017 94.127 98.279 -2.50% -2.50% 97.854 3.837 8.580 97.854 3.727 8.334 Turfing Turfing 86.77 83.66
135+200 10 94.044 94.127 98.251 -2.50% -2.50% 97.826 3.782 8.457 97.826 3.699 8.271 Turfing Turfing 85.18 83.03
135+210 10 94.035 94.102 98.238 -2.50% -2.50% 97.813 3.778 8.448 97.813 3.711 8.298 Turfing Turfing 84.52 82.85
135+220 10 94.015 94.076 98.225 -2.50% -2.50% 97.800 3.785 8.464 97.800 3.724 8.327 Turfing Turfing 84.56 83.13
135+230 10 94.040 94.062 98.228 -2.50% -2.50% 97.803 3.763 8.414 97.803 3.741 8.365 Turfing Turfing 84.39 83.46
135+240 10 94.045 94.048 98.230 -2.50% -2.50% 97.805 3.760 8.408 97.805 3.757 8.401 Turfing Turfing 84.11 83.83
135+250 10 94.005 94.048 98.248 -2.50% -2.50% 97.823 3.818 8.537 97.823 3.775 8.441 Turfing Turfing 84.73 84.21
GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area)
FRL at
Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope
LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS
Edge Width Edge Width

H= K= L= N= R= S=
A B C D E F G J = H-C M = L-D P Q
E+Fx17 √J2+(2xJ)2 E+Gx17 √M2+(2xM)2 Avg.PxB Avg.QxB

135+260 10 94.011 94.047 98.265 -2.50% -2.50% 97.840 3.829 8.562 97.840 3.793 8.481 Turfing Turfing 85.50 84.61
135+270 10 94.032 94.043 98.298 -2.50% -2.50% 97.873 3.841 8.589 97.873 3.830 8.564 Turfing Turfing 85.75 85.23
135+280 10 94.032 94.038 98.330 -2.50% -2.50% 97.905 3.873 8.660 97.905 3.867 8.647 Turfing Turfing 86.25 86.06
135+290 10 94.035 94.017 98.378 -2.50% -2.50% 97.953 3.918 8.761 97.953 3.936 8.801 Turfing Turfing 87.11 87.24
135+300 10 94.014 93.995 98.425 -2.50% -2.50% 98.000 3.986 8.913 98.000 4.005 8.955 Turfing Turfing 88.37 88.78
135+310 10 94.017 93.985 98.488 -2.50% -2.50% 98.063 4.046 9.047 98.063 4.078 9.119 Turfing Turfing 89.80 90.37
135+320 10 94.024 93.975 98.551 -2.50% -2.50% 98.126 4.102 9.172 98.126 4.151 9.282 Turfing Turfing 91.10 92.00

Geocell Area (Total) 5702.00 5002.78


Turfing Area (Total) 7518.05 7985.55

No. of Chute Drain in Geocell Area 20 18


No. of Chute Drain in Turfing Area 37 39

Avg. Length of Chute Drain in Geocell Area 14.36 13.92


Avg Length of Chute Drain in Turfing Area 10.28 10.35
Quantity - BOX Culvert at km 134+240
Inputs
BC - 1 x 2 x 2 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 2.000 2.000 0.00 0.30 0.25
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.848 0.848 0.848 0.000 0.848 LHS RHS LCW
0.000 0.848 0.848 0.848 0.000 0.848 98.661
e GL
LCW RCW Avg
-4.40% 4.40% 94.137
New FRL 98.661 Dwg
Old FRL 98.237 Pnp
Diff Ht 0.424
Total Length 1.696

Inv Lvl 93.894 Dwg


Box top Slab lvl 96.144 Dwg
Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

1 Excavation for Structure


Exv for Raft LCW 1 0.848 2.700 0.343 0.79

Exv for Raft RCW 1 0.848 2.700 0.343 0.79


1.57 Cum

2 Levelling Course - PCC


Below Box Raft
Raft LCW 1 0.848 2.700 0.100 0.229
Raft RCW 1 0.848 2.700 0.100 0.229
0.458 Cum

3 Box Structure - Conc.


Raft - Box Str
Raft LCW 1 0.848 2.500 0.300 0.636
0.636 Cum
Raft RCW 1 0.848 2.500 0.300 0.636
0.636 Cum

Wall - Box Str


Wall (Outer) LCW 2 0.848 0.250 2.000 0.848
Haunch (Bottom) LCW 2 0.848 0.150 0.075 0.019
Haunch (Top) LCW 2 0.848 0.150 0.075 0.019 0.886 Cum

Wall (Outer) RCW 2 0.848 0.250 2.000 0.848


Quantity - BOX Culvert at km 134+240
Inputs
BC - 1 x 2 x 2 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 2.000 2.000 0.00 0.30 0.25
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.848 0.848 0.848 0.000 0.848 LHS RHS LCW
0.000 0.848 0.848 0.848 0.000 0.848 98.661
e GL
LCW RCW Avg
-4.40% 4.40% 94.137
New FRL 98.661 Dwg
Old FRL 98.237 Pnp
Diff Ht 0.424
Total Length 1.696

Inv Lvl 93.894 Dwg


Box top Slab lvl 96.144 Dwg
Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

Haunch (Bottom) RCW 2 0.848 0.150 0.075 0.019


Haunch (Top) RCW 2 0.848 0.150 0.075 0.019 0.886 Cum

Slab - Box Str


Slab LCW 1 0.848 2.500 0.250 0.530
0.530 Cum
Slab RCW 1 0.848 2.500 0.250 0.530
0.530 Cum

4 Reinforcement
Box Structure CA COS
Box - Foundation BHS 1 4.006 4.137 0.131
0.131 MT

Box - Substructure BHS 1 4.154 4.294 0.140


0.140 MT

Box - Super Structure BHS 1 3.542 3.656 0.114


0.114 MT

5 Less Difference Embankment Quantity of Box Culvert

Embankment Qty of Box B/S -1 1.696 2.500 2.007 -8.510


-8.510 Cum
t.slab
0.25
0.250

FRL
RCW
98.661

BOQ
Item No.

6.01 a

6.02 b

6.20 c

6.20 c

6.22 c
t.slab
0.25
0.250

FRL
RCW
98.661

BOQ
Item No.

6.22 c

6.22 c

6.22 c

6.30 a

6.30 b

6.30 c

2.02
Quantity - BOX Culvert at km 134+815
Inputs
BC - 1 x 2 x 2 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 2.000 2.000 0.00 0.35 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 2.618 2.618 2.618 0.000 2.618 LHS RHS LCW
0.000 2.618 2.618 2.618 0.000 2.618 100.514

e GL
LCW RCW Avg
-4.40% 4.40% 93.753

New FRL 100.514 Dwg


Old FRL 99.205 pnp 99.181 820 pnp
Diff Ht 1.309 99.276 800
Total Length 5.236 0.095 0.00475
0.07125
Inv Lvl 93.477 Dwg 99.205
Box top Slab lvl 95.777 Dwg

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

1 Excavation for Structure


Exv for Raft LCW 1 2.618 2.800 0.377 2.76

Exv for Raft RCW 1 2.618 2.800 0.377 2.76


5.52 Cum

2 Levelling Course - PCC


Below Box Raft
Raft LCW 1 2.618 2.800 0.100 0.733
Raft RCW 1 2.618 2.800 0.100 0.733
1.466 Cum

3 Box Structure - Conc.


Raft - Box Str
Raft LCW 1 2.618 2.600 0.350 2.382
2.382 Cum
Raft RCW 1 2.618 2.600 0.350 2.382
2.382 Cum

Wall - Box Str


Wall (Outer) LCW 2 2.618 0.300 2.000 3.142
Haunch (Bottom) LCW 2 2.618 0.150 0.075 0.059
Quantity - BOX Culvert at km 134+815
Inputs
BC - 1 x 2 x 2 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 2.000 2.000 0.00 0.35 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 2.618 2.618 2.618 0.000 2.618 LHS RHS LCW
0.000 2.618 2.618 2.618 0.000 2.618 100.514

e GL
LCW RCW Avg
-4.40% 4.40% 93.753

New FRL 100.514 Dwg


Old FRL 99.205 pnp 99.181 820 pnp
Diff Ht 1.309 99.276 800
Total Length 5.236 0.095 0.00475
0.07125
Inv Lvl 93.477 Dwg 99.205
Box top Slab lvl 95.777 Dwg

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

Haunch (Top) LCW 2 2.618 0.150 0.075 0.059 3.260 Cum

Wall (Outer) RCW 2 2.618 0.300 2.000 3.142


Haunch (Bottom) RCW 2 2.618 0.150 0.075 0.059
Haunch (Top) RCW 2 2.618 0.150 0.075 0.059 3.260 Cum

Slab - Box Str


Slab LCW 1 2.618 2.600 0.300 2.042
2.042 Cum
Slab RCW 1 2.618 2.600 0.300 2.042
2.042 Cum

4 Reinforcement
Box Structure CA COS
Box - Foundation BHS 1 4.243 4.615 0.372
0.372 MT

Box - Substructure BHS 1 6.382 6.956 0.574


0.574 MT

Box - Super Structure BHS 1 3.535 3.845 0.310


0.310 MT
Quantity - BOX Culvert at km 134+815
Inputs
BC - 1 x 2 x 2 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 2.000 2.000 0.00 0.35 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 2.618 2.618 2.618 0.000 2.618 LHS RHS LCW
0.000 2.618 2.618 2.618 0.000 2.618 100.514

e GL
LCW RCW Avg
-4.40% 4.40% 93.753

New FRL 100.514 Dwg


Old FRL 99.205 pnp 99.181 820 pnp
Diff Ht 1.309 99.276 800
Total Length 5.236 0.095 0.00475
0.07125
Inv Lvl 93.477 Dwg 99.205
Box top Slab lvl 95.777 Dwg

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

5 Less Difference Embankment Quantity of Box Culvert

Embankment Qty of Box B/S -1 5.236 2.600 2.023 -27.544


-27.544 Cum
t.slab
0.30
0.300

FRL
RCW
100.514

BOQ
Item No.

6.01 a

6.02 b

6.20 c

6.20 c
t.slab
0.30
0.300

FRL
RCW
100.514

BOQ
Item No.

6.22 c

6.22 c

6.22 c

6.22 c

6.30 a

6.30 b

6.30 c
t.slab
0.30
0.300

FRL
RCW
100.514

BOQ
Item No.

2.02
Quantity - BOX Culvert at km 135+180
Input .Details
BC - 1 x 3 x 3 Cell a b H W c b.slab wall t.slab
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.30 0.30
Skew (rad) = 0.00 1.00 0.000 0.300

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 1.368 1.368 1.368 0.000 1.368 LHS RHS LCW RCW
0.000 1.368 1.368 1.368 0.000 1.368 98.307 98.307

e GL C/s Road
LCW RCW Avg FRL
-4.40% 4.40% 94.047 0.000

New FRL 98.307 ref DWG


Old FRL 97.623 ref P&P
Diff Ht 0.684
Total Length 2.736

Inv Lvl 93.594 ref DWG


Box top Slab lvl 96.894
Sl. BOQ
Description Side No. Length Width Depth Quantity Sub Total Unit Item No.
No.

1 Excavation for Structure


Exv for Raft LCW 1 1.368 3.800 0.553 2.88

Exv for Raft RCW 1 1.368 3.800 0.553 2.88


5.75 Cum 6.01 a
1 Levelling Course - PCC
Below Box Raft
Raft LCW 1 1.368 3.800 0.100 0.520
Raft RCW 1 1.368 3.800 0.100 0.520
1.040 Cum 6.02 b
2 Box Structure - Conc.
Raft - Box Str
Raft LCW 1 1.368 3.600 0.300 1.477
1.477 Cum 6.20 c
Raft RCW 1 1.368 3.600 0.300 1.477
1.477 Cum 6.20 c

Wall - Box Str


Wall (Outer) LCW 2 1.368 0.300 3.000 2.462
Haunch (Bottom) LCW 2 1.368 0.150 0.075 0.031
Haunch (Top) LCW 2 1.368 0.150 0.075 0.031 2.524 Cum 6.22 c

Wall (Outer) RCW 2 1.368 0.300 3.000 2.462


Haunch (Bottom) RCW 2 1.368 0.150 0.075 0.031
Haunch (Top) RCW 2 1.368 0.150 0.075 0.031 2.524 Cum 6.22 c

Slab - Box Str


Slab LCW 1 1.368 3.600 0.300 1.477
1.477 Cum 6.22 c
Slab RCW 1 1.368 3.600 0.300 1.477
1.477 Cum 6.22 c

3 Reinforcement
Box Structure CA COS
Box - Foundation BHS 1 5.715 6.040 0.325
0.325 MT 6.30 a

Box - Substructure BHS 1 7.358 7.770 0.412


0.412 MT 6.30 b

Box - Super
BHS 1 4.886 5.155 0.269
Structure
0.269 MT 6.30 c

4 Less Difference Embankment Quantity of Box Culvert

Embankment Qty of
B/S -1 2.736 3.600 2.847 -28.037
Box
Sl. BOQ
Description Side No. Length Width Depth Quantity Sub Total Unit Item No.
No.

-28.0 Cum 2.02


Quantity - PUP at km 134+655
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

Inputs
PUP - 1 x 7.00 x 3.00 m Cell a b b-lhs b-rhs c d e fo
Skew (deg) = 0.00 1 7.00 6.027 6.027 6.027 0.00 0.40 0.55 0.55
Skew (rad) = 0.00 7.00 0.000 0.550

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 22.750 22.750 21.250 3.000 21.250 LHS RHS LCW RCW
0.000 22.750 22.750 21.250 3.000 21.250 92.257 92.257 99.550 99.550

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 93.157 95.514 OK Checked
Calculation
1 Excavation for Structure
Exv for Raft LCW 1 22.850 8.300 1.000 189.66

Exv for Raft RCW 1 22.850 8.300 1.000 189.66


379.31 Cum 6.01 a

2 Levelling Course - PCC


Below Box Raft
Raft LCW 1 22.850 8.300 0.100 18.966
Raft RCW 1 22.850 8.300 0.100 18.966
37.932 Cum 6.02 a

Below Approach Slab LHS 2 21.550 3.350 0.150 21.658


RHS 2 21.550 3.350 0.150 21.658
43.316 Cum 6.02 b

3 Box Structure - Conc.


Raft - Box Str
Raft LCW 1 22.750 8.100 0.550 101.351

Raft RCW 1 22.750 8.100 0.550 101.351


202.702 Cum 6.20 d

Wall - Box Str


Wall (Outer) LCW 2 22.750 0.550 6.027 150.826
Wall (Inner) LCW 0 22.750 0.000 6.027 0.000
Haunch (Bottom) LCW 2 22.750 0.450 0.150 3.071
Median Wall LCW 2 1.500 0.550 0.400 0.660
Haunch (Top) LCW 2 21.250 0.450 0.150 2.869 157.426 Cum 6.22 d

Wall (Outer) RCW 2 22.750 0.550 6.027 150.826


Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

Wall (Inner) RCW 0 22.750 0.000 6.027 0.000


Haunch (Bottom) RCW 2 22.750 0.450 0.150 3.071
Median Wall RCW 2 1.500 0.550 0.400 0.660
Haunch (Top) RCW 2 21.250 0.450 0.150 2.869 157.426 Cum 6.22 d

Bracket LCW 2 21.250 0.450 0.300 5.738


RCW 2 21.250 0.450 0.300 5.738 11.476 Cum 6.22 d

Slab - Box Str


Slab LCW 1 21.250 8.100 0.400 68.850

Slab RCW 1 21.250 8.100 0.400 68.850


137.700 Cum 6.25 c

4 RCC Crash Barrier - Conc.


Box Str + Approach
Slab
RCC CB (Outer Edge) B/S 2 15.100 0.317 9.570
RCC CB (Median Edge) B/S 2 15.100 0.317 9.570
RCC CB (Closure) B/S 2 3.000 0.317 1.901

21.041 Cum 6.47

5 Approach Slab
Approach Slab LHS 2 21.250 3.500 0.300 44.625
RHS 2 21.250 3.500 0.300 44.625 89.250 Cum 6.45

6 Reinforcement
Rnf Box Structure
Rnf Box - Foundation LHS 1 7.793 7.793
Rnf RHS 1 7.793 7.793 15.586 MT 6.30 a
Rnf
Rnf Box - Substructure LHS 1 13.349 13.349
Rnf RHS 1 13.349 13.349 26.698 MT 6.30 b
Rnf
Rnf Box - Super Structure LHS 1 9.924 9.924
Rnf RHS 1 9.924 9.924 19.848 MT 6.30 c
Rnf
Rnf RCC Crash Barrier
Rnf RCC CB (Outer Edge) B/S 2 15.100 0.047 1.419
Rnf RCC CB (Median Edge) B/S 2 15.100 0.047 1.419
Rnf RCC CB (Closure) B/S 2 3.000 0.047 0.282
Rnf
Rnf 3.120 MT 6.30 c
Rnf
7 Drainage Spout
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

LHS 3 3.00
RHS 3 3.00 6.00 Nos 6.53

8 Weep Holes
LHS 100 100.00
RHS 100 100.00 200.00 Nos 6.52
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

9 Fibre Board
Box & Median Wall Med 2 6.693 0.550 7.36
CB Med 8 0.317 2.54
Approach Slab B/S 4 21.250 0.300 25.50
Box Raft Med 1 8.100 0.550 4.46 39.852 Sqm
159.408 Rm 6.42 a
10 Filter Media - Geocomposite
LHS 2 22.750 6.577 299.25
RHS 2 22.750 6.577 299.25 598.508 Sqm 6.60 b

11 RE Wall
Return Wall LHS 2 13.784 4.437 4.874 122.33
2 2.000 2.000 4.874 8.00
RHS 2 13.784 4.437 4.874 122.33
2 2.000 2.000 4.874 8.00 260.652 Sqm 6.90 a

Levelling Pad BHS 4 13.784 0.350 0.150 2.895


BHS 4 2.000 0.350 0.150 0.420 3.315 Cum 6.02 b

Excavation BHS 4 13.784 6.000 1.000 330.83


BHS 4 2.000 6.000 1.000 48.000 378.825 Cum 6.01 a

12 BC
Wearing Coat above Str. B/S 2 15.100 20.250 0.050 30.578

Connecting LSR & RSR B/S 1 109.250 6.200 0.030 20.321 50.899 Cum 4.05 b
L-SR- 7.00 m, L-SR- 3.75m width BC
13 DBM
Connecting LSR & RSR B/S 1 109.250 6.200 0.050 33.868 33.868 Cum 4.04 d
L-SR- 7.00 m, L-SR- 3.75m width DBM

14 Prime Coat
Wearing Coat above Str. B/S 2 15.100 20.250 611.550
Connecting LSR & RSR B/S 1 109.250 6.200 677.350
1288.90 Sqm 4.01

15 Tack Coat - Bituminous Surface


Connecting LSR & RSR B/S 1 109.250 6.200 677.35
677.35 Sqm 4.02 b
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

16 Tack Coat - Granular Surface


Connecting LSR & RSR B/S 1 109.250 6.200 677.35
677.35 Sqm 4.02 a

17 WMM
Connecting LSR & RSR B/S 1 108.750 6.200 0.150 101.14 101.14 Cum 3.04
L-SR- 7.25 m, L-SR- 4.00m width WMM

18 GSB

GSB in Flared Portion in Str


B/S 4 56.250 1.875 0.200 84.38
Approach of MCW
Granular Shoulder in Flared
Portion in Str Approach of B/S 4 56.250 1.875 0.400 168.75
MCW

Connecting LSR & RSR B/S 1 101.060 7.000 0.175 123.80


L-SR- 10.22 m, L-SR- 8.72m width GSB
376.92 Cum 3.01

19 Sub Grade
Subgrade in Flared Portion
B/S 4 56.250 1.875 0.500 210.94
in Str Approach of MCW

Connecting LSR & RSR B/S 1 98.260 7.000 0.500 343.91


L-SR- 11.62 m, L-SR- 10.12m width Subgrade
Shoulder of LSR & RSR B/S 2 Subgrade 1.000 0.230 0.46 555.31 Cum 2.05

20 Embankment
Embankment Qty as per
B/S km. 134+180 to 135+320 179037.1
Initial Profile
179037.1 Cum 2.02

21 Drainage Chute
In Geocell Area LHS 0 0.00 0.00
RHS 0 0.00 0.00 0.00 Lm 15.15

In Turfing Area LHS 57 9.43 537.51


RHS 57 9.14 520.98 1058.49 Lm 15.15

22 Geocell with Concrete filling along Chute Drain


In Geocell Area LHS 0 0.00 2.00 0.00
RHS 0 0.00 2.00 0.00
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

In Turfing Area LHS 57 9.43 2.00 1075.02


RHS 57 9.14 2.00 1041.96 2116.98 Sqm 15.04 C

23 Geocell covered with fine grass


Geocell Area (Total) LHS 1 0.00 0.00
RHS 1 0.00 0.00
Less for Chute Drain & Geocell with Concrete
LHS 0 0.00 -2.600 0.00
RHS 0 0.00 -2.600 0.00 0.00 Sqm 15.04 D

24 Turfing with Sods


Turfing Area (Total) LHS 1 10584.82 10584.82
RHS 1 10341.40 10341.40
Less for Chute Drain & Geocell with Concrete
LHS 57 9.43 -2.600 -1397.53
RHS 57 9.14 -2.600 -1354.55 18174.15 Sqm 3.22

25 Qty - Pavment Layers of MCW & Misc work as per original scope but reduced due to upgradation of LVUP
a BC - MCW B/S 2 3.500 15.000 0.050 5.25
5.25 Cum 4.05 b

b DBM Gr-1 - MCW B/S 2 3.500 15.000 0.100 10.50


10.50 Cum 4.04 c

c Prime Coat - MCW B/S 2 3.500 15.000 105.00


105.00 Sqm 4.01

Tack Coat (Bituminous


d B/S 2 3.500 15.000 105.00
Surface) - MCW
105.00 Sqm 4.02 b

Tack Coat (Granular


e B/S 2 3.500 15.000 105.00
Surface) - MCW
105.00 Sqm 4.02 a

f WMM B/S 2 3.500 16.185 0.250 28.32


28.32 Cum 3.04

g GSB B/S 2 3.500 20.040 0.200 28.06


28.06 Cum 3.01
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

h Subgrade B/S 2 3.500 20.775 0.500 72.71


72.71 Cum 3.01

j Metal Beam Crash barrier B/S 0 3.500 0.00


Median side 0.00 Lm 8.23 A

k Kerb
Median Kerb (I-Sec) B/S 2 3.500 0.055 0.385
Outer Kerb (L-Sec) B/S 2 3.500 0.1087 0.761
Along PUP Footpath B/S 4 22.750 0.1087 9.892 11.038 Cum 7.03 b
Quantity - LVUP at km 137+333
Inputs
LVUP - 1 x 10.50 x 4.30 m Cell a b b-lhs b-rhs c d e
Skew (deg) = 19.00 1 10.50 6.75 6.75 6.75 0.00 0.55 0.65
Skew (rad) = 0.33 11.11 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 22.750 22.750 21.250 3.000 21.250 LHS RHS LCW
0.000 24.061 24.061 22.474 3.173 22.474 92.922 92.922 101.187

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 94.886 95.674

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

1 Excavation for Structure


Exv for Raft LCW 1 24.161 11.800 2.064 588.45

Exv for Raft RCW 1 24.161 11.800 2.064 588.45


1176.89 Cum

2 Levelling Course - PCC


Below Box Raft
Raft LCW 1 24.161 11.800 0.100 28.510
Raft RCW 1 24.161 11.800 0.100 28.510
57.020 Cum

Below Approach Slab LHS 2 22.774 3.350 0.150 22.888


RHS 2 22.774 3.350 0.150 22.888

Footpath (in Opening) B/S 4 24.061 1.500 0.150 21.655


67.431 Cum

3 Box Structure - Conc.


Raft - Box Str
Raft LCW 1 24.061 11.600 0.650 181.420
181.420 Cum
Raft RCW 1 24.061 11.600 0.650 181.420
181.420 Cum

Wall - Box Str


Wall (Outer) LCW 2 24.061 0.550 6.750 178.653
Wall (Inner) LCW 0 24.061 0.000 6.750 0.000
Haunch (Bottom) LCW 2 24.061 0.450 0.075 1.624
Median Wall LCW 2 1.500 0.550 0.550 0.908
Haunch (Top) LCW 2 22.474 0.450 0.075 1.517 182.702 Cum

Wall (Outer) RCW 2 24.061 0.550 6.750 178.653


Wall (Inner) RCW 0 24.061 0.000 6.750 0.000
Haunch (Bottom) RCW 2 24.061 0.450 0.075 1.624
Median Wall RCW 2 1.500 0.550 0.550 0.908
Haunch (Top) RCW 2 22.474 0.450 0.075 1.517 182.702 Cum

Bracket LCW 2 22.474 0.450 0.300 6.068


RCW 2 22.474 0.450 0.300 6.068 12.136 Cum

Slab - Box Str


Slab LCW 1 22.474 11.600 0.550 143.384
143.384 Cum
Slab RCW 1 22.474 11.600 0.550 143.384
143.384 Cum

4 RCC Crash Barrier - Conc.


Box Str + Approach
Slab
RCC CB (Outer Edge) B/S 2 19.268 0.317 12.212
RCC CB (Median Edge) B/S 2 19.268 0.317 12.212
RCC CB (Closure) B/S 2 3.173 0.317 2.011

26.435 Cum

5 Approach Slab
Approach Slab LHS 2 22.474 3.309 0.300 44.620
RHS 2 22.474 3.309 0.300 44.620 89.240 Cum
6 Reinforcement
Rnf Box Structure
Rnf Box - Foundation LHS 1 16.581 16.581
Rnf RHS 1 16.581 16.581 33.162 MT
Rnf
Rnf Box - Substructure LHS 1 25.368 25.368
Rnf RHS 1 25.368 25.368 50.736 MT
Rnf
Rnf Box - Super Structure LHS 1 13.723 13.723
Rnf RHS 1 13.723 13.723 27.446 MT
Rnf
Rnf RCC Crash Barrier
Rnf RCC CB (Outer Edge) B/S 2 19.268 0.041 1.580
Rnf RCC CB (Median Edge) B/S 2 19.268 0.041 1.580
Rnf RCC CB (Closure) B/S 2 3.173 0.041 0.260
Rnf
Rnf 3.420 MT
Rnf
7 Drainage Spout
LHS 3 3.00
RHS 3 3.00 6.00 Nos

8 Weep Holes
LHS 168 168.00
RHS 168 168.00 336.00 Nos
9 Fibre Board
Box & Median Wall Med 2 7.565 0.582 8.801
CB Med 8 0.317 2.535
Approach Slab B/S 4 22.474 0.300 26.969
Box Raft Med 1 12.268 0.650 7.974 46.279 Sqm
185.116 Rm
10 Filter Media - Geocomposite
LHS 2 24.061 7.915 380.89
RHS 2 24.061 7.915 380.89 761.772 Sqm

11 RE Wall
Return Wall LHS 2 13.438 4.376 4.752 117.60
2 2.000 2.000 4.752 8.00
RHS 2 13.438 4.376 4.752 117.60
2 2.000 2.000 4.752 8.00 251.204 Sqm

Levelling Pad BHS 4 13.438 0.350 0.150 2.822


BHS 4 2.000 0.350 0.150 0.420 3.242 Cum

Excavation BHS 4 13.438 6.000 1.000 322.50


BHS 4 2.000 6.000 1.000 48.000 370.504 Cum

12 Embankment
Embankment Qty as per
B/S km. 137+000 to 137+670 217696.1
Revised Profile
217696.1 Cum

13 Sub Grade
Subgrade in Flared Portion
B/S 4 75.000 1.875 0.500 281.25
in Str Approach of MCW

Connecting LSR & RSR B/S 1 107.105 10.500 0.500 562.30


Shoulder of LSR & RSR B/S 2 58.983 1.000 0.230 27.13
870.68 Cum

14 GSB

GSB in Flared Portion in


B/S 4 75.000 1.875 0.200 112.50
Str Approach of MCW
Granular Shoulder in
Flared Portion in Str B/S 4 75.000 1.875 0.400 225.00
Approach of MCW

Connecting LSR & RSR B/S 1 107.105 10.500 0.175 196.81


534.31 Cum
15 WMM
Connecting LSR & RSR B/S 1 115.295 7.300 0.150 126.25
126.25 Cum

16 Prime Coat
Wearing Coat above Str. B/S 2 19.672 20.250 796.71
Connecting LSR & RSR B/S 1 115.545 7.000 808.82
1605.52 Sqm

17 Tack Coat - Granular Surface


Connecting LSR & RSR B/S 1 115.545 7.000 808.82
808.82 Sqm
18 DBM
Connecting LSR & RSR B/S 1 115.545 7.000 0.050 40.44
40.44 Cum

19 Tack Coat - Bituminous Surface


Connecting LSR & RSR B/S 1 115.545 7.000 808.82
808.82 Sqm

20 BC
Wearing Coat above Str. B/S 2 19.672 20.250 0.050 39.84

Connecting LSR & RSR B/S 1 115.545 7.000 0.030 24.26 64.10 Cum

21 Drainage Chute
In Geocell Area LHS 19 18.95 360.05
RHS 19 19.00 361.00 721.05 Lm

In Turfing Area LHS 14 9.54 133.56


RHS 14 9.60 134.40 267.96 Lm

22 Geocell with Concrete filling along Chute Drain


In Geocell Area LHS 19 18.95 2.00 720.10
RHS 19 19.00 2.00 722.00

In Turfing Area LHS 14 9.54 2.00 267.12


RHS 14 9.60 2.00 268.80 1978.02 Sqm
23 Geocell covered with fine grass
Geocell Area (Total) LHS 1 7356.90 7356.90
RHS 1 7182.79 7182.79
Less for Chute Drain & Geocell with Concrete
LHS 19 18.95 -2.60 -936.13
RHS 19 19.00 -2.60 -938.60 12664.95 Sqm

24 Turfing with Sods


Turfing Area (Total) LHS 1 2570.35 2570.35
RHS 1 2681.64 2681.64
Less for Chute Drain & Geocell with Concrete
LHS 14 9.54 -2.600 -347.26
RHS 14 9.60 -2.600 -349.44 4555.29 Sqm

25 Qty - Misc work

Metal Beam Crash barrie B/S 2.000 19.268 38.535 Rm

k Kerb
Along LVUP Footpath B/S 4 24.061 0.1087 10.462 10.462 Cum
fo
0.55
0.582

FRL
RCW
101.187

BOQ
Item No.

6.01 a

6.02 a

6.02 b

6.20 d

6.20 d
6.22 d

6.22 d

6.22 d

6.25 c

6.25 c

6.47

6.45
6.30 a

6.30 b

6.30 c

6.30 c

6.53

6.52
6.42 a

6.60 b

6.90 a

6.02 b

6.01 a

2.02

2.05

3.01
3.04

4.01

4.02 a
4.04 d

4.02 b

4.05 b

15.15

15.15

15.04 C
15.04 D

3.22

8.23 A

7.03 b
Quantity - PUP at km 137+333
Inputs
PUP - 1 x 7.00 x 3.00 m Cell a b b-lhs b-rhs c d e fo
Skew (deg) = 0.00 1 7.00 5.438 5.438 5.438 0.00 0.40 0.50 0.50
Skew (rad) = 0.00 7.00 0.000 0.500

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 22.750 22.750 21.250 3.000 21.250 LHS RHS LCW RCW
0.000 22.750 22.750 21.250 3.000 21.250 93.072 93.072 99.726 99.726

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 94.886 95.674

Sl. BOQ Item


Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

1 Excavation for Structure


Exv for Raft LCW 1 22.850 8.200 1.914 358.63

Exv for Raft RCW 1 22.850 8.200 1.914 358.63


717.25 Cum 6.01 a

2 Levelling Course - PCC


Below Box Raft
Raft LCW 1 22.850 8.200 0.100 18.737
Raft RCW 1 22.850 8.200 0.100 18.737
37.474 Cum 6.02 a

Below Approach Slab LHS 2 21.550 3.350 0.150 21.658


RHS 2 21.550 3.350 0.150 21.658
43.316 Cum 6.02 b

3 Box Structure - Conc.


Raft - Box Str
Raft LCW 1 22.750 8.000 0.500 91.000
91.000 Cum 6.20 d
Raft RCW 1 22.750 8.000 0.500 91.000
91.000 Cum 6.20 d

Wall - Box Str


Wall (Outer) LCW 2 22.750 0.500 5.438 123.715
Wall (Inner) LCW 0 22.750 0.000 5.438 0.000
Haunch (Bottom) LCW 2 22.750 0.450 0.150 3.071
Median Wall LCW 2 1.500 0.500 0.400 0.600
Haunch (Top) LCW 2 21.250 0.450 0.150 2.869 130.255 Cum 6.22 d
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

Wall (Outer) RCW 2 22.750 0.500 5.438 123.715


Wall (Inner) RCW 0 22.750 0.000 5.438 0.000
Haunch (Bottom) RCW 2 22.750 0.450 0.150 3.071
Median Wall RCW 2 1.500 0.500 0.400 0.600
Haunch (Top) RCW 2 21.250 0.450 0.150 2.869 130.255 Cum 6.22 d

Bracket LCW 2 21.250 0.450 0.300 5.738


RCW 2 21.250 0.450 0.300 5.738 11.476 Cum 6.22 d

Slab - Box Str


Slab LCW 1 21.250 8.000 0.400 68.000
68.000 Cum 6.25 c
Slab RCW 1 21.250 8.000 0.400 68.000
68.000 Cum 6.25 c

4 RCC Crash Barrier - Conc.


Box Str + Approach
Slab
RCC CB (Outer Edge) B/S 2 15.000 0.317 9.507
RCC CB (Median Edge) B/S 2 15.000 0.317 9.507
RCC CB (Closure) B/S 2 3.000 0.317 1.901

20.915 Cum 6.47

5 Approach Slab
Approach Slab LHS 2 21.250 3.500 0.300 44.625
RHS 2 21.250 3.500 0.300 44.625 89.250 Cum 6.45
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

6 Reinforcement
Rnf Box Structure
Rnf Box - Foundation LHS 1 8.030 8.030
Rnf RHS 1 8.030 8.030 16.060 MT 6.30 a
Rnf
Rnf Box - Substructure LHS 1 10.211 10.211
Rnf RHS 1 10.211 10.211 20.422 MT 6.30 b
Rnf
Rnf Box - Super Structure LHS 1 8.331 8.331
Rnf RHS 1 8.331 8.331 16.662 MT 6.30 c
Rnf
Rnf RCC Crash Barrier
Rnf RCC CB (Outer Edge) B/S 2 15.000 0.047 1.410
Rnf RCC CB (Median Edge) B/S 2 15.000 0.047 1.410
Rnf RCC CB (Closure) B/S 2 3.000 0.047 0.282
Rnf
Rnf 3.102 MT 6.30 c
Rnf
7 Drainage Spout
LHS 3 3.00
RHS 3 3.00 6.00 Nos 6.53

8 Weep Holes
LHS 102 102.00
RHS 102 102.00 204.00 Nos 6.52
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

9 Fibre Board
Box & Median Wall Med 2 6.104 0.500 6.10
CB Med 8 0.317 2.54
Approach Slab B/S 4 21.250 0.300 25.50
Box Raft Med 1 8.000 0.500 4.00 38.139 Sqm
152.556 Rm 6.42 a
10 Filter Media - Geocomposite
LHS 2 22.750 5.938 270.18
RHS 2 22.750 5.938 270.18 540.358 Sqm 6.60 b

11 RE Wall
Return Wall LHS 2 9.392 3.661 3.321 68.76
2 2.000 2.000 3.321 8.00
RHS 2 9.392 3.661 3.321 68.76
2 2.000 2.000 3.321 8.00 153.530 Sqm 6.90 a

Levelling Pad BHS 4 9.392 0.350 0.150 1.972


BHS 4 2.000 0.350 0.150 0.420 2.392 Cum 6.02 b
`
Excavation BHS 4 9.392 6.000 1.000 225.42
BHS 4 2.000 6.000 1.000 48.000 273.420 Cum 6.01 a

12 Embankment
Embankment Qty as per
B/S km. 137+000 to 137+670 149416.4
Initial Profile
149416.4 Cum 2.02

13 Sub Grade
Subgrade in Flared Portion
B/S 4 75.000 1.875 0.500 281.25
in Str Approach of MCW

Connecting LSR & RSR B/S 1 45.500 7.000 0.500 159.25


B/S 1 61.250 10.500 0.500 321.56
Shoulder of LSR & RSR B/S 2 61.250 1.000 0.230 28.18 790.24 Cum 2.05

14 GSB

GSB in Flared Portion in Str


B/S 4 75.000 1.875 0.200 112.50
Approach of MCW
Granular Shoulder in Flared
Portion in Str Approach of B/S 4 75.000 1.875 0.400 225.00
MCW

Connecting LSR & RSR B/S 1 45.500 7.000 0.175 55.74


1 61.250 10.500 0.175 112.55 505.79 Cum 3.01
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

15 WMM
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

Connecting LSR & RSR B/S 1 108.750 7.000 0.150 114.19


114.19 Cum 3.04

16 Prime Coat
Wearing Coat above Str. B/S 2 15.000 20.250 607.50
Connecting LSR & RSR B/S 1 109.250 6.200 677.35
1284.85 Sqm 4.01
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

17 Tack Coat - Granular Surface


Connecting LSR & RSR B/S 1 109.250 6.200 677.35
677.35 Sqm 4.02 a

18 DBM
Connecting LSR & RSR B/S 1 109.250 6.200 0.050 33.87
33.87 Cum 4.04 d

19 Tack Coat - Bituminous Surface


Connecting LSR & RSR B/S 1 109.250 6.200 677.35
677.35 Sqm 4.02 b

20 BC
Wearing Coat above Str. B/S 2 15.000 20.250 0.050 30.38

Connecting LSR & RSR B/S 1 109.250 6.200 0.030 20.32 50.70 Cum 4.05 b

21 Drainage Chute
In Geocell Area LHS 12 15.64 187.68
RHS 12 15.59 187.08 374.76 Lm 15.15

In Turfing Area LHS 21 9.73 204.33


RHS 21 9.58 201.18 405.51 Lm 15.15

22 Geocell with Concrete filling along Chute Drain


In Geocell Area LHS 12 15.64 2.00 375.36
RHS 12 15.59 2.00 374.16
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

In Turfing Area LHS 21 9.73 2.00 408.66


RHS 21 9.58 2.00 402.36 1560.54 Sqm 15.04 C

23 Geocell covered with fine grass


Geocell Area (Total) LHS 1 3733.32 3733.32
RHS 1 3712.87 3712.87
Less for Chute Drain & Geocell with Concrete
LHS 12 15.64 -2.60 -487.97
RHS 12 15.59 -2.60 -486.41 6471.81 Sqm 15.04 D

24 Turfing with Sods


Turfing Area (Total) LHS 1 4048.18 4048.18
RHS 1 4002.68 4002.68
Less for Chute Drain & Geocell with Concrete
LHS 21 9.73 -2.60 -531.26
RHS 21 9.58 -2.60 -523.07 6996.54 Sqm 3.22

25 Qty - Pavment Layers of MCW & Misc work as per original scope but reduced due to upgradation of LVUP
a BC - MCW B/S 2 4.672 15.000 0.050 7.01
7.01 Cum 4.05 b

Tack Coat (Bituminous


b B/S 0 4.672 15.000 0.00
Surface) - MCW
0.00 Sqm 4.02 b

c DBM Gr-1 - MCW B/S 2 4.672 15.000 0.100 14.02


14.02 Cum 4.04 c

d Prime Coat - MCW B/S 2 4.672 15.000 140.15


140.15 Sqm 4.01

Tack Coat (Granular


e B/S 2 4.672 15.000 140.15
Surface) - MCW
140.15 Sqm 4.02 a

f WMM B/S 2 4.672 16.185 0.250 37.81


37.81 Cum 3.04

g GSB B/S 2 4.672 20.040 0.200 37.45


37.45 Cum 3.01

h Subgrade B/S 2 4.672 20.775 0.500 97.06


97.06 Cum 3.01
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

j Metal Beam Crash barrier B/S 0 4.268 0.00


0.00 Lm 8.23 A

k Kerb
Median Kerb (I-Sec) B/S 2 4.268 0.055 0.469
Outer Kerb (L-Sec) B/S 2 4.268 0.1087 0.928
Along PUP Footpath B/S 4 22.750 0.1087 9.892 11.289 Cum 7.03 b
Qty - Embankment Slope Protection in the Approaches of LVUP at km 137+375 (wrt Revised Profile)
GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area)
FRL at
Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope
LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS
Edge Width Edge Width

H= K= L= N= R= S=
A B C D E F G J = H-C M = L-D P Q
E+Fx17 √J2+(2xJ)2 E+Gx17 √M2+(2xM)2 Avg.PxB Avg.QxB

137+000 94.306 94.240 97.834 -2.50% -2.50% 97.409 3.103 6.939 97.409 3.169 7.086 Turfing Turfing - -
137+010 10 94.199 94.218 97.839 -2.50% -2.50% 97.414 3.215 7.189 97.414 3.196 7.146 Turfing Turfing 70.64 71.16
137+020 10 94.196 94.196 97.843 -2.50% -2.50% 97.418 3.222 7.205 97.418 3.222 7.205 Turfing Turfing 71.97 71.76
137+030 10 94.182 94.231 97.868 -2.50% -2.50% 97.443 3.261 7.292 97.443 3.212 7.182 Turfing Turfing 72.48 71.93
137+040 10 94.212 94.265 97.892 -2.50% -2.50% 97.467 3.255 7.278 97.467 3.202 7.160 Turfing Turfing 72.85 71.71
137+050 10 94.192 94.215 97.938 -2.50% -2.50% 97.513 3.321 7.426 97.513 3.298 7.375 Turfing Turfing 73.52 72.67
137+060 10 94.099 94.164 97.984 -2.50% -2.50% 97.559 3.460 7.737 97.559 3.395 7.591 Turfing Turfing 75.81 74.83
137+070 10 94.117 94.185 98.050 -2.50% -2.50% 97.625 3.508 7.844 97.625 3.440 7.692 Turfing Turfing 77.91 76.42
137+080 10 94.144 94.206 98.116 -2.50% -2.50% 97.691 3.547 7.931 97.691 3.485 7.793 Turfing Turfing 78.88 77.42
137+090 10 94.145 94.199 98.203 -2.50% -2.50% 97.778 3.633 8.124 97.778 3.579 8.003 Turfing Turfing 80.28 78.98
137+100 10 94.182 94.191 98.290 -2.50% -2.50% 97.865 3.683 8.235 97.865 3.674 8.215 Turfing Turfing 81.80 81.09
137+110 10 94.152 94.168 98.398 -2.50% -2.50% 97.973 3.821 8.544 97.973 3.805 8.508 Turfing Turfing 83.90 83.62
137+120 10 94.147 94.144 98.506 -2.50% -2.50% 98.081 3.934 8.797 98.081 3.937 8.803 Turfing Turfing 86.70 86.56
137+130 10 94.137 94.141 98.631 -2.50% -2.50% 98.206 4.069 9.099 98.206 4.065 9.090 Turfing Turfing 89.48 89.47
137+140 10 94.109 94.138 98.756 -2.50% -2.50% 98.331 4.222 9.441 98.331 4.193 9.376 Turfing Turfing 92.70 92.33
137+150 10 94.140 94.149 98.883 -2.50% -2.50% 98.458 4.318 9.655 98.458 4.309 9.635 Turfing Turfing 95.48 95.06
137+160 10 94.196 94.159 99.009 -2.50% -2.50% 98.584 4.388 9.812 98.584 4.425 9.895 Turfing Turfing 97.34 97.65
137+170 10 94.164 94.170 99.136 -2.50% -2.50% 98.711 4.547 10.167 98.711 4.541 10.154 Turfing Turfing 99.90 100.24
137+180 10 94.157 94.180 99.262 -2.50% -2.50% 98.837 4.680 10.465 98.837 4.657 10.413 Turfing Turfing 103.16 102.84
137+190 10 94.126 94.179 99.389 -2.50% -2.50% 98.964 4.838 10.818 98.964 4.785 10.700 Turfing Turfing 106.41 105.57
137+200 10 94.126 94.177 99.515 -2.50% -2.50% 99.090 4.964 11.100 99.090 4.913 10.986 Turfing Turfing 109.59 108.43
137+210 10 94.093 94.200 99.642 -2.50% -2.50% 99.217 5.124 11.458 99.217 5.017 11.218 Turfing Turfing 112.79 111.02
137+220 10 94.098 94.222 99.768 -2.50% -2.50% 99.343 5.245 11.728 99.343 5.121 11.451 Turfing Turfing 115.93 113.35
137+230 10 94.113 94.165 99.895 -2.50% -2.50% 99.470 5.357 11.979 99.470 5.305 11.862 Turfing Turfing 118.53 116.57
137+240 10 94.124 94.108 100.021 -2.50% -2.50% 99.596 5.472 12.236 99.596 5.488 12.272 Turfing Turfing 121.07 120.67
137+250 10 94.105 94.131 100.148 -2.50% -2.50% 99.723 5.618 12.562 99.723 5.592 12.504 Turfing Turfing 123.99 123.88
137+260 10 94.121 94.153 100.274 -2.50% -2.50% 99.849 5.728 12.808 99.849 5.696 12.737 Turfing Turfing 126.85 126.20
137+270 10 94.040 94.157 100.401 -2.50% -2.50% 99.976 5.936 13.273 99.976 5.819 13.012 Turfing Turfing 130.41 128.74
GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area)
FRL at
Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope
LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS
Edge Width Edge Width

H= K= L= N= R= S=
A B C D E F G J = H-C M = L-D P Q
E+Fx17 √J2+(2xJ)2 E+Gx17 √M2+(2xM)2 Avg.PxB Avg.QxB

137+280 10 94.070 94.160 100.527 -2.50% -2.50% 100.102 6.032 13.488 100.102 5.942 13.287 Geocell Turfing 133.81 131.49
137+290 10 94.050 94.148 100.654 -2.50% -2.50% 100.229 6.179 13.817 100.229 6.081 13.598 Geocell Geocell 136.52 134.42
137+300 10 94.079 94.136 100.780 -2.50% -2.50% 100.355 6.276 14.034 100.355 6.219 13.906 Geocell Geocell 139.25 137.52
137+310 10 94.087 94.143 100.907 -2.50% -2.50% 100.482 6.395 14.300 100.482 6.339 14.174 Geocell Geocell 141.67 140.40
137+320 10 94.087 94.149 101.033 -2.50% -2.50% 100.608 6.521 14.581 100.608 6.459 14.443 Geocell Geocell 144.41 143.09
137+327 7.2 94.107 94.341 101.124 -2.50% -2.50% 100.699 6.592 14.740 100.699 6.358 14.216 Geocell Geocell 105.56 103.17
137+329 1.8 94.112 94.389 101.147 -2.50% -2.50% 100.722 6.610 14.780 100.722 6.333 14.160
137+330 1 94.115 94.416 101.160 -2.50% -2.50% 100.735 100.735
LVUP at km 137+333 LVUP at km 137+333
137+333 3 94.112 94.496 101.197 -2.50% -2.50% 100.772 100.772
137+337 4 94.107 94.603 101.248 -2.50% -2.50% 100.823 6.716 15.017 100.823 6.220 13.909
137+339 1.8 94.105 94.651 101.271 -2.50% -2.50% 100.846 6.741 15.073 100.846 6.195 13.853
137+340 1.2 94.104 94.683 101.286 -2.50% -2.50% 100.861 6.757 15.109 100.861 6.178 13.814 Geocell Geocell 18.11 16.60
137+350 10 94.145 94.405 101.413 -2.50% -2.50% 100.988 6.843 15.301 100.988 6.583 14.720 Geocell Geocell 152.05 142.67
137+360 10 94.184 94.127 101.539 -2.50% -2.50% 101.114 6.930 15.496 101.114 6.987 15.623 Geocell Geocell 153.99 151.72
137+370 10 94.219 94.132 101.666 -2.50% -2.50% 101.241 7.022 15.702 101.241 7.109 15.896 Geocell Geocell 155.99 157.60
137+380 10 94.054 94.136 101.792 -2.50% -2.50% 101.367 7.313 16.352 101.367 7.231 16.169 Geocell Geocell 160.27 160.33
137+390 10 94.162 94.142 101.919 -2.50% -2.50% 101.494 7.332 16.395 101.494 7.352 16.440 Geocell Geocell 163.74 163.04
137+400 10 94.173 94.148 102.045 -2.50% -2.50% 101.620 7.447 16.652 101.620 7.472 16.708 Geocell Geocell 165.23 165.74
137+410 10 94.159 94.146 102.172 -2.50% -2.50% 101.747 7.588 16.967 101.747 7.601 16.996 Geocell Geocell 168.10 168.52
137+420 10 94.151 94.143 102.298 -2.50% -2.50% 101.873 7.722 17.267 101.873 7.730 17.285 Geocell Geocell 171.17 171.41
137+430 10 94.113 94.124 102.425 -2.50% -2.50% 102.000 7.887 17.636 102.000 7.876 17.611 Geocell Geocell 174.51 174.48
137+440 10 94.122 94.104 102.551 -2.50% -2.50% 102.126 8.004 17.897 102.126 8.022 17.938 Geocell Geocell 177.67 177.75
137+450 10 94.122 94.051 102.678 -2.50% -2.50% 102.253 8.131 18.181 102.253 8.202 18.340 Geocell Geocell 180.40 181.39
137+460 10 94.123 93.997 102.804 -2.50% -2.50% 102.379 8.256 18.461 102.379 8.382 18.743 Geocell Geocell 183.21 185.42
137+470 10 94.127 93.982 102.931 -2.50% -2.50% 102.506 8.379 18.736 102.506 8.524 19.060 Geocell Geocell 185.99 189.02
137+480 10 94.135 93.966 103.057 -2.50% -2.50% 102.632 8.497 19.000 102.632 8.666 19.378 Geocell Geocell 188.68 192.19
137+490 10 93.890 93.970 103.184 -2.50% -2.50% 102.759 8.869 19.832 102.759 8.789 19.653 Geocell Geocell 194.16 195.15
137+500 10 93.893 93.974 103.310 -2.50% -2.50% 102.885 8.992 20.107 102.885 8.911 19.926 Geocell Geocell 199.69 197.89
137+510 10 93.880 93.972 103.437 -2.50% -2.50% 103.012 9.132 20.420 103.012 9.040 20.214 Geocell Geocell 202.63 200.70
137+520 10 93.883 93.969 103.563 -2.50% -2.50% 103.138 9.255 20.695 103.138 9.169 20.503 Geocell Geocell 205.57 203.58
GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area)
FRL at
Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope
LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS
Edge Width Edge Width

H= K= L= N= R= S=
A B C D E F G J = H-C M = L-D P Q
E+Fx17 √J2+(2xJ)2 E+Gx17 √M2+(2xM)2 Avg.PxB Avg.QxB

137+530 10 93.950 94.343 103.690 -2.50% -2.50% 103.265 9.315 20.829 103.265 8.922 19.950 Geocell Geocell 207.62 202.26
137+540 10 93.925 94.717 103.816 -2.50% -2.50% 103.391 9.466 21.167 103.391 8.674 19.396 Geocell Geocell 209.98 196.73
137+550 10 93.902 95.012 103.941 -2.50% -2.50% 103.516 9.614 21.498 103.516 8.504 19.016 Geocell Geocell 213.32 192.06
137+560 10 93.907 95.307 104.069 -2.50% -2.50% 103.644 9.737 21.773 103.644 8.337 18.642 Geocell Geocell 216.35 188.29
137+570 10 93.899 94.736 104.195 -2.50% -2.50% 103.770 9.871 22.072 103.770 9.034 20.201 Geocell Geocell 219.22 194.21
137+580 10 93.922 94.165 104.321 -2.50% -2.50% 103.896 9.974 22.303 103.896 9.731 21.759 Geocell Geocell 221.87 209.80
137+590 10 94.100 94.023 104.442 -2.50% -2.50% 104.017 9.917 22.175 104.017 9.994 22.347 Geocell Geocell 222.39 220.53
137+600 10 94.070 93.881 104.563 -2.50% -2.50% 104.138 10.068 22.513 104.138 10.257 22.935 Geocell Geocell 223.44 226.41
137+610 10 94.193 93.858 104.677 -2.50% -2.50% 104.252 10.059 22.493 104.252 10.394 23.242 Geocell Geocell 225.03 230.89
137+620 10 94.099 93.834 104.790 -2.50% -2.50% 104.365 10.266 22.955 104.365 10.531 23.548 Geocell Geocell 227.24 233.95
137+630 10 94.181 93.738 104.897 -2.50% -2.50% 104.472 10.291 23.011 104.472 10.734 24.002 Geocell Geocell 229.83 237.75
137+640 10 94.257 93.642 105.003 -2.50% -2.50% 104.578 10.321 23.078 104.578 10.936 24.454 Geocell Geocell 230.45 242.28
137+650 10 94.107 93.535 105.102 -2.50% -2.50% 104.677 10.570 23.635 104.677 11.142 24.914 Geocell Geocell 233.57 246.84
137+660 10 94.154 93.428 105.201 -2.50% -2.50% 104.776 10.622 23.752 104.776 11.348 25.375 Geocell Geocell 236.93 251.45
137+670 10 94.266 93.358 105.293 -2.50% -2.50% 104.868 10.602 23.707 104.868 11.510 25.737 Geocell Geocell 237.29 255.56

Geocell Area (Total) 7356.90 7182.79


Turfing Area (Total) 2570.35 2681.64

No. of Chute Drain in Geocell Area 19 19


No. of Chute Drain in Turfing Area 14 14

Avg. Length of Chute Drain in Geocell Area 18.95 19


Avg Length of Chute Drain in Turfing Area 9.54 9.6
Quantity - LVUP at km 143+063
Inputs
LVUP - 1 x 10.50 x 4.30 Cell a b b-lhs b-rhs c d e
Skew (deg) = 16.00 1 10.50 7.841 8.585 7.097 0.00 0.55 0.70
Skew (rad) = 0.28 10.92 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 22.750 22.750 21.250 3.000 21.250 LHS RHS LCW
0.000 23.667 23.667 22.106 3.121 22.106 92.576 92.576 101.717

e GL C/s Road
LCW RCW Avg FRL
7.00% -7.00% 93.576 95.210

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

1 Excavation for Structure


Exv for Raft LCW 1 23.767 12.100 1.100 316.34

Exv for Raft RCW 1 23.767 12.100 1.100 316.34


632.68 Cum
Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

2 Levelling Course - PCC


Below Box Raft
Raft LCW 1 23.767 12.100 0.100 28.758
Raft RCW 1 23.767 12.100 0.100 28.758
57.516 Cum

Below Approach LHS 2 22.406 3.350 0.150 22.518


Slab RHS 2 22.406 3.350 0.150 22.518

Footpath B/S 4 23.667 1.500 0.150 21.300


66.336 Cum

3 Box Structure - Conc.


Raft - Box Str
Raft LCW 1 23.667 11.900 0.700 197.146
197.146 Cum
Raft RCW 1 23.667 11.900 0.700 197.146
197.146 Cum

Wall - Box Str


Wall (Outer) LCW 2 23.667 0.700 8.585 284.454
Wall (Inner) LCW 0 23.667 0.000 8.585 0.000
Haunch (Bottom) LCW 2 23.667 0.450 0.075 1.598
Median Wall LCW 2 1.500 0.700 0.550 1.155
Haunch (Top) LCW 2 22.106 0.450 0.075 1.492 288.699 Cum

Wall (Outer) RCW 2 23.667 0.700 7.097 235.151


Wall (Inner) RCW 0 23.667 0.000 7.097 0.000
Haunch (Bottom) RCW 2 23.667 0.450 0.075 1.598
Median Wall RCW 2 1.500 0.700 0.550 1.155
Haunch (Top) RCW 2 22.106 0.450 0.075 1.492 239.396 Cum

Bracket LCW 2 22.106 0.450 0.300 5.969


RCW 2 22.106 0.450 0.300 5.969 11.938 Cum

Slab - Box Str


Slab LCW 1 22.106 11.900 0.550 144.684
144.684 Cum
Slab RCW 1 22.106 11.900 0.550 144.684
144.684 Cum

4 RCC Crash Barrier - Conc.


Box Str + Approach
Slab
Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

RCC CB (Outer Edge) B/S 2 19.662 0.317 12.462


RCC CB (Median Edge) B/S 2 19.662 0.317 12.462
RCC CB (Closure) B/S 2 3.121 0.317 1.978

26.902 Cum

5 Approach Slab
Approach Slab LHS 2 22.106 3.500 0.300 46.423
RHS 2 22.106 3.500 0.300 46.423 92.846 Cum

6 Reinforcement
Rnf Box Structure
Rnf Box - Foundation LHS 1 17.336 17.336
Rnf RHS 1 17.114 17.114 34.450 MT
Rnf
Rnf Box - Substructure LHS 1 39.845 39.845
Rnf RHS 1 36.400 36.400 76.245 MT
Rnf
Rnf Box - Super Structure LHS 1 19.758 19.758
Rnf RHS 1 19.552 19.552 39.310 MT
Rnf
Rnf RCC Crash Barrier
Rnf RCC CB (Outer Edge) B/S 2 19.662 0.041 1.612
Rnf CC CB (Median Edge) B/S 2 19.662 0.041 1.612
Rnf RCC CB (Closure) B/S 2 3.121 0.041 0.256
Rnf
Rnf 3.480 MT
Rnf
7 Drainage Spout
LHS 3 3.00
RHS 3 3.00 6.00 Nos

8 Weep Holes
LHS 256 256.00
RHS 188 188.00 444.00 Nos
Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

9 Fibre Board
Box & Median Wall Med 2 8.391 0.728 12.22
CB Med 8 0.317 2.54
Approach Slab B/S 4 22.106 0.300 26.53
Box Raft Med 1 12.380 0.700 8.67 49.949 Sqm
199.796 Rm
10 Filter Media - Geocomposite
LHS 2 23.667 9.285 439.50
RHS 2 23.667 7.797 369.06 808.559 Sqm

11 RE Wall
Return Wall LHS 2 24.472 6.327 8.653 309.65
2 2.000 2.000 8.653 8.00
RHS 2 24.472 6.327 8.653 309.65
2 2.000 2.000 8.653 8.00 635.306 Sqm

Levelling Pad BHS 4 24.472 0.350 0.150 5.139


BHS 4 2.000 0.350 0.150 0.420 5.559 Cum

Excavation BHS 4 24.472 6.000 1.000 587.33


BHS 4 2.000 6.000 1.000 48.000 635.325 Cum

12 Embankment
Embankment Qty as per
B/S km. 142+500 to 143+300 240447.3
Revised Profile
240447.3 Cum

13 Sub Grade
Subgrade in Flared
Portion in Str Approach B/S 4 75.000 1.875 0.500 281.25
of MCW

Connecting LSR & RSR B/S 1 115.715 10.500 0.500 607.50


Shoulder of LSR & RSR B/S 2 68.381 1.000 0.230 31.46
920.21 Cum

14 GSB

GSB in Flared Portion in


B/S 4 75.000 1.875 0.200 112.50
Str Approach of MCW

Granular Shoulder in
Flared Portion in Str B/S 4 75.000 1.875 0.400 225.00
Approach of MCW
Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

Connecting LSR & RSR B/S 1 115.715 10.500 0.175 212.63


550.13 Cum

15 WMM
Connecting LSR & RSR B/S 1 120.685 7.300 0.150 132.15
132.15 Cum

16 Prime Coat
Wearing Coat above Str. B/S 2 19.662 20.250 796.30
Connecting LSR & RSR B/S 1 120.935 7.000 846.55
1642.84 Sqm

17 Tack Coat - Granular Surface


Connecting LSR & RSR B/S 1 120.935 7.000 846.55
846.55 Sqm
Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

18 DBM
Connecting LSR & RSR B/S 1 120.935 7.000 0.050 42.33
42.33 Cum

19 Tack Coat - Bituminous Surface


Connecting LSR & RSR B/S 1 120.935 7.000 846.55
SQ 846.55 Sqm

20 BC
Wearing Coat above Str. B/S 2 19.662 20.250 0.050 39.82

Connecting LSR & RSR B/S 1 120.935 7.000 0.030 25.40 65.21 Cum

21 Drainage Chute
In Geocell Area LHS 34 18.64 633.76
RHS 16 15.81 252.96 886.72 Lm

In Turfing Area LHS 6 11.13 66.78


RHS 23 10.71 246.33 313.11 Lm

22 Geocell with Concrete filling along Chute Drain


In Geocell Area LHS 34 18.64 2.00 1267.52
RHS 16 15.81 2.00 505.92

In Turfing Area LHS 6 11.13 2.00 133.56


RHS 23 10.71 2.00 492.66 2399.66 Sqm
Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

23 Geocell covered with fine grass


Geocell Area (Total) LHS 1 12561.75 12561.75
RHS 1 5193.40 5193.40
Less for Chute Drain & Geocell with Concrete
LHS 34 18.64 -2.60 -1647.78
RHS 16 15.81 -2.60 -657.70 15449.68 Sqm

24 Turfing with Sods


Turfing Area (Total) LHS 1 1216.66 1216.66
RHS 1 4928.82 4928.82
Less for Chute Drain & Geocell with Concrete
LHS 6 11.13 -2.60 -173.63
RHS 23 10.71 -2.60 -640.46 5331.39 Sqm

25 Qty - Misc work

Metal Beam Crash barr B/S 2.000 19.662 39.323 Rm

k Kerb
Along LVUP
B/S 4 23.667 0.1087 10.290 10.290 Cum
Footpath
fo
0.70
0.728

FRL
RCW
101.717

BOQ Item
No.

6.01 a
BOQ Item
No.

6.02 a

6.02 b

6.20 d

6.20 d

6.22 d

6.22 d

6.22 d

6.25 c

6.25 c
BOQ Item
No.

6.47

6.45

6.30 a

6.30 b

6.30 c

6.30 c

6.53

6.52
BOQ Item
No.

6.42 a

6.60 b

6.90 a

6.02 b

6.01 a

2.02

2.05
BOQ Item
No.

3.01

3.04

4.01

4.02 a
BOQ Item
No.

4.04 d

4.02 b

4.05 b

15.15

15.15

15.04 C
BOQ Item
No.

15.04 D

3.22

8.23 A

7.03 b
Quantity - PUP at km 143+065
Inputs
PUP - 1 x 7.00 x 3.00 m Cell a b b-lhs b-rhs c d e
Skew (deg) = 0.00 1 7.00 5.956 6.700 5.212 0.00 0.40 0.50
Skew (rad) = 0.00 7.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 22.750 22.750 21.250 3.000 21.250 LHS RHS LCW
0.000 22.750 22.750 21.250 3.000 21.250 92.726 92.726 99.632

e GL C/s Road
LCW RCW Avg FRL
7.00% -7.00% 93.576 95.210

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

1 Excavation for Structure


Exv for Raft LCW 1 22.850 8.200 0.950 178.00

Exv for Raft RCW 1 22.850 8.200 0.950 178.00


356.00 Cum
Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

2 Levelling Course - PCC


Below Box Raft
Raft LCW 1 22.850 8.200 0.100 18.737
Raft RCW 1 22.850 8.200 0.100 18.737
37.474 Cum

Below Approach Slab LHS 2 21.550 3.350 0.150 21.658


RHS 2 21.550 3.350 0.150 21.658
43.316 Cum

2 Box Structure - Conc.


Raft - Box Str
Raft LCW 1 22.750 8.000 0.500 91.000
91.000 Cum
Raft RCW 1 22.750 8.000 0.500 91.000
91.000 Cum

Wall - Box Str


Wall (Outer) LCW 2 22.750 0.500 6.700 152.425
Wall (Inner) LCW 0 22.750 0.000 6.700 0.000
Haunch (Bottom) LCW 2 22.750 0.450 0.150 3.071
Median Wall LCW 2 1.500 0.500 0.400 0.600
Haunch (Top) LCW 2 21.250 0.450 0.150 2.869 158.965 Cum

Wall (Outer) RCW 2 22.750 0.500 5.212 118.573


Wall (Inner) RCW 0 22.750 0.000 5.212 0.000
Haunch (Bottom) RCW 2 22.750 0.450 0.150 3.071
Median Wall RCW 2 1.500 0.500 0.400 0.600
Haunch (Top) RCW 2 21.250 0.450 0.150 2.869 125.113 Cum

Bracket LCW 2 21.250 0.450 0.300 5.738


RCW 2 21.250 0.450 0.300 5.738 11.476 Cum

Slab - Box Str


Slab LCW 1 21.250 8.000 0.400 68.000
68.000 Cum
Slab RCW 1 21.250 8.000 0.400 68.000
68.000 Cum

3 RCC Crash Barrier - Conc.


Box Str + Approach
Slab
RCC CB (Outer Edge) B/S 2 15.000 0.317 9.507
RCC CB (Median Edge) B/S 2 15.000 0.317 9.507
RCC CB (Closure) B/S 2 3.000 0.317 1.901
Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

20.915 Cum

4 Approach Slab
Approach Slab LHS 2 21.250 3.500 0.300 44.625
RHS 2 21.250 3.500 0.300 44.625 89.250 Cum

5 Reinforcement
Rnf Box Structure
Rnf Box - Foundation LHS 1 8.188 8.188
Rnf RHS 1 7.793 7.793 15.981 MT
Rnf
Rnf Box - Substructure LHS 1 15.085 15.085
Rnf RHS 1 12.144 12.144 27.229 MT
Rnf
Rnf Box - Super Structure LHS 1 11.286 11.286
Rnf RHS 1 10.687 10.687 21.973 MT
Rnf
Rnf RCC Crash Barrier
Rnf RCC CB (Outer Edge) B/S 2 15.000 0.041 1.230
RnfRCC CB (Median Edge) B/S 2 15.000 0.041 1.230
Rnf RCC CB (Closure) B/S 2 3.000 0.041 0.246
Rnf
Rnf 2.706 MT
Rnf
6 Drainage Spout
LHS 3 3.00
RHS 3 3.00 6.00 Nos

7 Weep Holes
LHS 162 162.00
RHS 96 96.00 258.00 Nos
Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

8 Fibre Board
Box & Median Wall Med 2 6.356 0.500 6.36
CB Med 8 0.317 2.54
Approach Slab B/S 4 21.250 0.300 25.50
Box Raft Med 1 8.000 0.500 4.00 34.391 Sqm
137.564 Rm
9 Filter Media - Geocomposite
LHS 2 22.750 7.200 327.60
RHS 2 22.750 5.712 259.90 587.496 Sqm

10 RE Wall
Return Wall LHS 2 18.406 5.254 6.509 193.42
2 2.000 2.000 6.509 8.00
RHS 2 18.406 5.254 6.509 193.42
2 2.000 2.000 6.509 8.00 402.840 Sqm

Levelling Pad BHS 4 18.406 0.350 0.150 3.865


BHS 4 2.000 0.350 0.150 0.420 4.285 Cum

Excavation BHS 4 18.406 6.000 1.000 441.75


BHS 4 2.000 6.000 1.000 48.000 489.745 Cum

11 Embankment
Embankment Qty as per
B/S km. 142+500 to 143+300 230308.0
Initial Profile
230308.0 Cum

12 Sub Grade
Subgrade in Flared Portion
B/S 4 75.000 1.875 0.500 281.25
in Str Approach of MCW

Connecting LSR & RSR B/S 1 45.500 7.000 0.500 159.25


B/S 1 65.530 10.500 0.500 344.03
Shoulder of LSR & RSR B/S 2 65.530 1.000 0.230 30.14 814.68 Cum

13 GSB

GSB in Flared Portion in


B/S 4 75.000 1.875 0.200 112.50
Str Approach of MCW
Granular Shoulder in
Flared Portion in Str B/S 4 75.000 1.875 0.400 225.00
Approach of MCW

Connecting LSR & RSR B/S 1 45.500 7.000 0.175 55.74


1 65.530 10.500 0.175 120.41 513.65 Cum
Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

14 WMM
Connecting LSR & RSR B/S 1 116.000 6.200 0.150 107.88
107.88 Cum

15 Prime Coat
Wearing Coat above Str. B/S 2 15.000 20.250 607.50
Connecting LSR & RSR B/S 1 116.250 6.200 720.75
1328.25 Sqm
16 Tack Coat - Granular Surface
Connecting LSR & RSR B/S 1 116.250 6.200 720.75
720.75 Sqm

17 DBM
Connecting LSR & RSR B/S 1 116.250 6.200 0.050 36.04
36.04 Cum

18 Tack Coat - Bituminous Surface


Connecting LSR & RSR B/S 1 116.250 6.200 720.75
720.75 Sqm

19 BC
Wearing Coat above Str. B/S 2 15.000 20.250 0.050 30.38

Connecting LSR & RSR B/S 1 116.250 6.200 0.030 21.62 52.00 Cum

20 Drainage Chute
In Geocell Area LHS 34 18.14 616.76
RHS 15 15.56 233.40 850.16 Lm

In Turfing Area LHS 6 11.11 66.66


RHS 25 10.37 259.25 325.91 Lm

21 Geocell with Concrete filling along Chute Drain


In Geocell Area LHS 34 18.14 2.00 1233.52
RHS 15 15.56 2.00 466.80

In Turfing Area LHS 6 11.11 2.00 133.32


RHS 25 10.37 2.00 518.50 2352.14 Sqm

22 Geocell covered with fine grass


Geocell Area (Total) LHS 1 12103.94 12103.94
RHS 1 4569.64 4569.64
Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

Less for Chute Drain & Geocell with Concrete


LHS 34 18.14 -2.60 -1603.58
RHS 15 15.56 -2.60 -606.84 14463.16 Sqm

23 Turfing with Sods


Turfing Area (Total) LHS 1 1326.26 1326.26
RHS 1 5180.91 5180.91
Less for Chute Drain & Geocell with Concrete
LHS 6 11.11 -2.60 -173.32
RHS 25 10.37 -2.60 -674.05 5659.80 Sqm

24 Qty - Pavment Layers of MCW & Misc work as per original scope but reduced due to upgradation of LVUP
a BC - MCW B/S 2 4.662 15.000 0.050 6.99
6.99 Cum

b DBM Gr-1 - MCW B/S 2 4.662 15.000 0.100 13.99


13.99 Cum

c Prime Coat - MCW B/S 2 4.662 15.000 139.85


139.85 Sqm

Tack Coat (Bituminous


d B/S 2 4.662 15.000 139.85
Surface) - MCW
139.85 Sqm

Tack Coat (Granular


e B/S 2 4.662 15.000 139.85
Surface) - MCW
139.85 Sqm

f WMM B/S 2 4.662 16.180 0.250 37.71


37.71 Cum

g GSB B/S 2 4.662 20.040 0.200 37.37


37.37 Cum

h Subgrade B/S 2 4.662 20.775 0.500 96.85


96.85 Cum

j etal Beam Crash barrier B/S 0 4.662 0.00


0.00 Lm

k Kerb
Median Kerb (I-Sec) B/S 2 4.662 0.055 0.513
Outer Kerb (L-Sec) B/S 2 4.662 0.1087 1.013
Along PUP Footpath B/S 4 22.750 0.1087 9.892 11.418 Cum
fo
0.50
0.500

FRL
RCW
99.632

BOQ
Item No.

6.01 a
BOQ
Item No.

6.02 a

6.02 b

6.20 d

6.20 d

6.22 d

6.22 d

6.22 d

6.25 c

6.25 c
BOQ
Item No.

6.47

6.45

6.30 a

6.30 b

6.30 c

6.30 c

6.53

6.52
BOQ
Item No.

6.42 a

6.60 b

6.90 a

6.02 b

6.01 a

2.02

2.05

3.01
BOQ
Item No.

3.04

4.01

4.02 a

4.04 d

4.02 b

4.05 b

15.15

15.15

15.04 C
BOQ
Item No.

15.04 D

3.22

radation of LVUP

4.05 b

4.04 c

4.01

4.02 b

4.02 a

3.04

3.01

3.01

8.23 A

7.03 b
Qty - Embankment Slope Protection in the Approaches of LVUP at km 143+063 (wrt Revised Profile)
GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area)
FRL at
Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope
LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS
Edge Width Edge Width

H= K= L= N= R= S=
A B C D E F G J = H-C M = L-D P Q
E+Fx17 √J2+(2xJ)2 E+Gx17 √M2+(2xM)2 Avg.PxB Avg.QxB

142+500 92.121 90.673 95.602 7.00% -7.00% 96.792 4.671 10.445 94.412 3.739 8.361 Turfing Turfing - -
142+510 10 92.130 90.707 95.668 7.00% -7.00% 96.858 4.728 10.572 94.478 3.771 8.432 Turfing Turfing 105.08 83.96
142+520 10 92.138 90.740 95.734 7.00% -7.00% 96.924 4.786 10.702 94.544 3.804 8.506 Turfing Turfing 106.37 84.69
142+530 10 92.146 90.775 95.818 7.00% -7.00% 97.008 4.862 10.872 94.628 3.853 8.616 Turfing Turfing 107.87 85.61
142+540 10 91.739 90.810 95.902 7.00% -7.00% 97.092 5.353 11.970 94.712 3.902 8.725 Turfing Turfing 114.21 86.70
142+550 10 91.467 90.845 96.004 7.00% -7.00% 97.194 5.727 12.806 94.814 3.969 8.875 Turfing Turfing 123.88 88.00
142+560 10 92.937 90.880 96.106 7.00% -7.00% 97.296 4.359 9.747 94.916 4.036 9.025 Turfing Turfing 112.77 89.50
142+570 10 92.989 90.916 96.225 7.00% -7.00% 97.415 4.426 9.897 95.035 4.119 9.210 Turfing Turfing 98.22 91.18
142+580 10 93.061 90.951 96.343 7.00% -7.00% 97.533 4.472 10.000 95.153 4.202 9.396 Turfing Turfing 99.48 93.03
142+590 10 93.026 90.987 96.465 7.00% -7.00% 97.655 4.629 10.351 95.275 4.288 9.588 Turfing Turfing 101.75 94.92
142+600 10 92.005 91.023 96.587 7.00% -7.00% 97.777 5.772 12.907 95.397 4.374 9.781 Turfing Turfing 116.29 96.84
142+610 10 91.977 91.424 96.709 7.00% -7.00% 97.899 5.922 13.242 95.519 4.095 9.157 Turfing Turfing 130.74 94.69
142+620 10 91.957 91.825 96.831 7.00% -7.00% 98.021 6.064 13.560 95.641 3.816 8.533 Geocell Turfing 134.01 88.45
142+630 10 91.904 91.969 96.953 7.00% -7.00% 98.143 6.239 13.951 95.763 3.794 8.484 Geocell Turfing 137.55 85.08
142+640 10 91.925 92.113 97.075 7.00% -7.00% 98.265 6.340 14.177 95.885 3.772 8.434 Geocell Turfing 140.64 84.59
142+650 10 91.930 92.112 97.197 7.00% -7.00% 98.387 6.457 14.438 96.007 3.895 8.709 Geocell Turfing 143.08 85.72
142+660 10 91.919 92.111 97.319 7.00% -7.00% 98.509 6.590 14.736 96.129 4.018 8.985 Geocell Turfing 145.87 88.47
142+670 10 91.895 92.106 97.441 7.00% -7.00% 98.631 6.736 15.062 96.251 4.145 9.269 Geocell Turfing 148.99 91.27
142+680 10 91.873 92.101 97.563 7.00% -7.00% 98.753 6.880 15.384 96.373 4.272 9.552 Geocell Turfing 152.23 94.11
142+690 10 91.846 92.098 97.685 7.00% -7.00% 98.875 7.029 15.717 96.495 4.397 9.832 Geocell Turfing 155.51 96.92
142+700 10 91.824 92.094 97.807 7.00% -7.00% 98.997 7.173 16.039 96.617 4.523 10.114 Geocell Turfing 158.78 99.73
142+710 10 91.802 92.099 97.929 7.00% -7.00% 99.119 7.317 16.361 96.739 4.640 10.375 Geocell Turfing 162.00 102.45
142+720 10 91.779 92.104 98.051 7.00% -7.00% 99.241 7.462 16.686 96.861 4.757 10.637 Geocell Turfing 165.23 105.06
142+730 10 91.920 92.150 98.173 7.00% -7.00% 99.363 7.443 16.643 96.983 4.833 10.807 Geocell Turfing 166.64 107.22
142+740 10 92.085 92.195 98.295 7.00% -7.00% 99.485 7.400 16.547 97.105 4.910 10.979 Geocell Turfing 165.95 108.93
142+750 10 92.229 92.254 98.417 7.00% -7.00% 99.607 7.378 16.498 97.227 4.973 11.120 Geocell Turfing 165.22 110.50
142+760 10 92.520 92.312 98.539 7.00% -7.00% 99.729 7.209 16.120 97.349 5.037 11.263 Geocell Turfing 163.09 111.92
142+770 10 92.910 92.341 98.661 7.00% -7.00% 99.851 6.941 15.521 97.471 5.130 11.471 Geocell Turfing 158.20 113.67
GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area)
FRL at
Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope
LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS
Edge Width Edge Width

H= K= L= N= R= S=
A B C D E F G J = H-C M = L-D P Q
E+Fx17 √J2+(2xJ)2 E+Gx17 √M2+(2xM)2 Avg.PxB Avg.QxB

142+780 10 93.635 92.369 98.783 7.00% -7.00% 99.973 6.338 14.172 97.593 5.224 11.681 Geocell Turfing 148.46 115.76
142+790 10 93.450 92.388 98.905 7.00% -7.00% 100.095 6.645 14.859 97.715 5.327 11.912 Geocell Turfing 145.15 117.96
142+800 10 92.409 92.407 99.027 7.00% -7.00% 100.217 7.808 17.459 97.837 5.430 12.142 Geocell Turfing 161.59 120.27
142+810 10 92.416 92.434 99.149 7.00% -7.00% 100.339 7.923 17.716 97.959 5.525 12.354 Geocell Turfing 175.88 122.48
142+820 10 92.508 92.461 99.271 7.00% -7.00% 100.461 7.953 17.783 98.081 5.620 12.567 Geocell Turfing 177.50 124.61
142+830 10 92.531 92.498 99.393 7.00% -7.00% 100.583 8.052 18.005 98.203 5.705 12.757 Geocell Turfing 178.94 126.62
142+840 10 92.534 92.535 99.515 7.00% -7.00% 100.705 8.171 18.271 98.325 5.790 12.947 Geocell Turfing 181.38 128.52
142+850 10 93.284 92.620 99.637 7.00% -7.00% 100.827 7.543 16.867 98.447 5.827 13.030 Geocell Turfing 175.69 129.88
142+860 10 93.408 92.704 99.759 7.00% -7.00% 100.949 7.541 16.862 98.569 5.865 13.115 Geocell Turfing 168.64 130.72
142+870 10 93.637 92.999 99.881 7.00% -7.00% 101.071 7.434 16.623 98.691 5.692 12.728 Geocell Turfing 167.43 129.21
142+880 10 93.764 93.293 100.003 7.00% -7.00% 101.193 7.429 16.612 98.813 5.520 12.343 Geocell Turfing 166.17 125.35
142+890 10 93.770 93.420 100.125 7.00% -7.00% 101.315 7.545 16.871 98.935 5.515 12.332 Geocell Turfing 167.41 123.38
142+900 10 93.776 93.546 100.247 7.00% -7.00% 101.437 7.661 17.131 99.057 5.511 12.323 Geocell Turfing 170.01 123.27
142+910 10 93.764 93.710 100.365 7.00% -7.00% 101.555 7.791 17.421 99.175 5.465 12.220 Geocell Turfing 172.76 122.72
142+920 10 93.767 93.874 100.482 7.00% -7.00% 101.672 7.905 17.676 99.292 5.418 12.115 Geocell Turfing 175.49 121.68
142+930 10 93.670 93.870 100.592 7.00% -7.00% 101.782 8.112 18.139 99.402 5.532 12.370 Geocell Turfing 179.08 122.43
142+940 10 93.768 93.866 100.702 7.00% -7.00% 101.892 8.124 18.166 99.512 5.646 12.625 Geocell Turfing 181.52 124.97
142+950 10 93.725 93.894 100.804 7.00% -7.00% 101.994 8.269 18.490 99.614 5.720 12.790 Geocell Turfing 183.28 127.08
142+960 10 93.637 93.922 100.906 7.00% -7.00% 102.096 8.459 18.915 99.716 5.794 12.956 Geocell Turfing 187.03 128.73
142+970 10 93.708 93.804 101.001 7.00% -7.00% 102.191 8.483 18.969 99.811 6.007 13.432 Geocell Geocell 189.42 131.94
142+980 10 93.728 93.685 101.095 7.00% -7.00% 102.285 8.557 19.134 99.905 6.220 13.908 Geocell Geocell 190.51 136.70
142+990 10 93.705 93.700 101.182 7.00% -7.00% 102.372 8.667 19.380 99.992 6.292 14.069 Geocell Geocell 192.57 139.89
143+000 10 93.402 93.715 101.269 7.00% -7.00% 102.459 9.057 20.252 100.079 6.364 14.230 Geocell Geocell 198.16 141.50
143+010 10 93.515 93.773 101.349 7.00% -7.00% 102.539 9.024 20.178 100.159 6.386 14.280 Geocell Geocell 202.15 142.55
143+020 10 93.605 93.831 101.428 7.00% -7.00% 102.618 9.013 20.154 100.238 6.407 14.326 Geocell Geocell 201.66 143.03
143+030 10 93.629 93.865 101.500 7.00% -7.00% 102.690 9.061 20.261 100.310 6.445 14.411 Geocell Geocell 202.07 143.69
143+040 10 93.690 93.898 101.571 7.00% -7.00% 102.761 9.071 20.283 100.381 6.483 14.496 Geocell Geocell 202.72 144.54
143+050 10 93.695 93.986 101.635 7.00% -7.00% 102.825 9.130 20.415 100.445 6.459 14.443 Geocell Geocell 203.49 144.70
143+057 7.05 93.711 94.048 101.680 7.00% -7.00% 102.870 9.159 20.480 100.490 6.442 14.405 Geocell Geocell 144.16 101.69
143+060 2.95 93.718 94.074 101.699 7.00% -7.00% 102.889 LVUP at km 143+063 100.509 LVUP at km 143+063
GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area)
FRL at
Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope
LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS
Edge Width Edge Width

H= K= L= N= R= S=
A B C D E F G J = H-C M = L-D P Q
E+Fx17 √J2+(2xJ)2 E+Gx17 √M2+(2xM)2 Avg.PxB Avg.QxB

143+061 0.95 93.716 94.081 101.704 7.00% -7.00% 102.894 LVUP at km 143+063 100.514 LVUP at km 143+063
143+063 2.05 93.713 94.095 101.716 7.00% -7.00% 102.906 LVUP at km 143+063 100.526 LVUP at km 143+063
143+065 2 93.710 94.110 101.727 7.00% -7.00% 102.917 LVUP at km 143+063 100.537 LVUP at km 143+063
143+069 3.95 93.703 94.138 101.750 7.00% -7.00% 102.940 LVUP at km 143+063 100.560 LVUP at km 143+063
143+069 0.1 93.703 94.138 101.750 7.00% -7.00% 102.940 9.237 20.655 100.560 6.422 14.359 Geocell Geocell 1.03 0.72
143+070 0.95 93.701 94.145 101.756 7.00% -7.00% 102.946 9.245 20.672 100.566 6.421 14.358 Geocell Geocell 19.63 13.64
143+080 10 93.655 94.216 101.812 7.00% -7.00% 103.002 9.347 20.901 100.622 6.406 14.324 Geocell Geocell 207.87 143.41
143+090 10 93.673 93.990 101.861 7.00% -7.00% 103.051 9.378 20.970 100.671 6.681 14.939 Geocell Geocell 209.35 146.32
143+100 10 93.692 93.764 101.910 7.00% -7.00% 103.100 9.408 21.037 100.720 6.956 15.554 Geocell Geocell 210.03 152.47
143+110 10 93.698 93.784 101.951 7.00% -7.00% 103.141 9.443 21.115 100.761 6.977 15.601 Geocell Geocell 210.76 155.78
143+120 10 93.679 93.804 101.992 7.00% -7.00% 103.182 9.503 21.249 100.802 6.998 15.648 Geocell Geocell 211.82 156.25
143+130 10 93.671 93.800 102.026 7.00% -7.00% 103.216 9.545 21.343 100.836 7.036 15.733 Geocell Geocell 212.96 156.91
143+140 10 93.620 93.796 102.059 7.00% -7.00% 103.249 9.629 21.531 100.869 7.073 15.816 Geocell Geocell 214.37 157.74
143+150 10 93.526 93.733 102.085 6.88% -6.88% 103.253 9.727 21.750 100.916 7.183 16.062 Geocell Geocell 216.41 159.39
143+160 10 93.399 93.670 102.110 6.54% -6.54% 103.222 9.823 21.965 100.998 7.328 16.386 Geocell Geocell 218.58 162.24
143+170 10 93.332 93.693 102.129 6.21% -6.21% 103.184 9.852 22.030 101.073 7.380 16.502 Geocell Geocell 219.97 164.44
143+180 10 93.297 93.716 102.147 5.88% -5.88% 103.146 9.849 22.023 101.148 7.432 16.618 Geocell Geocell 220.26 165.60
143+190 10 93.257 93.721 102.158 5.54% -5.54% 103.100 9.843 22.010 101.215 7.494 16.757 Geocell Geocell 220.16 166.88
143+200 10 93.342 93.725 102.168 5.21% -5.21% 103.053 9.711 21.714 101.283 7.558 16.900 Geocell Geocell 218.62 168.29
143+210 10 93.402 93.703 102.171 4.88% -4.88% 103.000 9.598 21.462 101.342 7.639 17.081 Geocell Geocell 215.88 169.91
143+220 10 93.209 93.681 102.174 4.54% -4.54% 102.946 9.737 21.773 101.402 7.721 17.265 Geocell Geocell 216.17 171.73
143+230 10 93.296 93.716 102.169 4.21% -4.21% 102.884 9.588 21.439 101.454 7.738 17.303 Geocell Geocell 216.06 172.84
143+240 10 93.346 93.751 102.164 3.88% -3.88% 102.823 9.477 21.191 101.505 7.754 17.338 Geocell Geocell 213.15 173.21
143+250 10 93.369 93.681 102.152 3.54% -3.54% 102.754 9.385 20.985 101.550 7.869 17.596 Geocell Geocell 210.88 174.67
143+260 10 93.386 93.611 102.140 3.21% -3.21% 102.685 9.299 20.793 101.595 7.984 17.853 Geocell Geocell 208.89 177.24
143+270 10 93.389 93.679 102.120 2.88% -2.88% 102.608 9.219 20.614 101.631 7.952 17.781 Geocell Geocell 207.04 178.17
143+280 10 93.405 93.747 102.099 2.54% -2.54% 102.531 9.126 20.406 101.667 7.920 17.710 Geocell Geocell 205.10 177.45
143+290 10 93.423 93.642 102.072 2.21% -2.50% 102.447 9.024 20.178 101.647 8.005 17.900 Geocell Geocell 202.92 178.05
143+300 10 93.455 93.536 102.044 1.88% -2.50% 102.363 8.908 19.919 101.619 8.083 18.074 Geocell Geocell 200.49 179.87
GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area)
FRL at
Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope
LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS
Edge Width Edge Width

H= K= L= N= R= S=
A B C D E F G J = H-C M = L-D P Q
E+Fx17 √J2+(2xJ)2 E+Gx17 √M2+(2xM)2 Avg.PxB Avg.QxB

Geocell Area (Total) 12561.75 5193.40


Turfing Area (Total) 1216.66 4928.82

No. of Chute Drain in Geocell Area 34 16


No. of Chute Drain in Turfing Area 6 23

Avg. Length of Chute Drain in Geocell Area 18.64 15.81


Avg Length of Chute Drain in Turfing Area 11.13 10.71
Quantity - LVUP at km 122+638
Inputs
LVUP - 1 x 10.50 x 3.50 m Cell a b b-lhs b-rhs c d e fo
Skew (deg) = 13.00 1 10.50 6.59 6.06 7.12 0.00 0.55 0.60 0.60
Skew (rad) = 0.23 10.78 0.000 0.616

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 22.750 22.750 21.250 3.000 21.250 LHS RHS LCW RCW
0.000 23.348 23.348 21.809 3.079 21.809 96.090 96.090 103.879 103.879

e GL C/s Road
LCW RCW Avg FRL
-5.00% 5.00% 97.090 98.623

Sl. BOQ Item


Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

1 Excavation for Structure


Exv for Raft LCW 1 23.448 11.900 1.100 306.93

Exv for Raft RCW 1 23.448 11.900 1.100 306.93


613.87 Cum 6.01 a

2 Levelling Course - PCC


Below Box Raft
Raft LCW 1 23.448 11.900 0.100 27.903
Raft RCW 1 23.448 11.900 0.100 27.903
55.806 Cum 6.02 a

Below Approach Slab LHS 2 22.109 3.350 0.150 22.220


RHS 2 22.109 3.350 0.150 22.220

Footpath B/S 4 23.348 1.500 0.150 21.013


65.453 Cum 6.02 b

3 Box Structure - Conc.


Raft - Box Str
Raft LCW 1 23.348 11.700 0.600 163.903
163.903 Cum 6.20 d
Raft RCW 1 23.348 11.700 0.600 163.903
163.903 Cum 6.20 d

Wall - Box Str


Wall (Outer) LCW 2 23.348 0.600 6.060 169.787
Wall (Inner) LCW 0 23.348 0.000 6.060 0.000
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

Haunch (Bottom) LCW 2 23.348 0.450 0.075 1.576


Median Wall LCW 2 1.540 0.600 0.550 1.016
Haunch (Top) LCW 2 21.809 0.450 0.075 1.472 173.851 Cum 6.22 d

Wall (Outer) RCW 2 23.348 0.600 7.120 199.485


Wall (Inner) RCW 0 23.348 0.000 7.120 0.000
Haunch (Bottom) RCW 2 23.348 0.450 0.075 1.576
Median Wall RCW 2 1.540 0.600 0.550 1.016
Haunch (Top) RCW 2 21.809 0.450 0.075 1.472 203.549 Cum 6.22 d

Bracket LCW 2 21.809 0.450 0.300 5.888


RCW 2 21.809 0.450 0.300 5.888 11.776 Cum 6.22 d

Slab - Box Str


Slab LCW 1 21.809 11.700 0.550 140.341
140.341 Cum 6.25 c
Slab RCW 1 21.809 11.700 0.550 140.341
140.341 Cum 6.25 c

4 RCC Crash Barrier - Conc.


Box Str + Approach
Slab
RCC CB (Outer Edge) B/S 2 19.192 0.317 12.164
RCC CB (Median Edge) B/S 2 19.192 0.317 12.164
RCC CB (Closure) B/S 2 3.079 0.317 1.951

26.279 Cum 6.47

5 Approach Slab
Approach Slab LHS 2 21.809 3.500 0.300 45.799
RHS 2 21.809 3.500 0.300 45.799 91.598 Cum 6.45
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

6 Reinforcement
Rnf Box Structure
Rnf Box - Foundation LHS 1 15.961 15.961
Rnf RHS 1 15.832 15.832 31.793 MT 6.30 a
Rnf
Rnf Box - Substructure LHS 1 23.702 23.702
Rnf RHS 1 21.725 21.725 45.427 MT 6.30 b
Rnf
Rnf Box - Super Structure LHS 1 17.832 17.832
Rnf RHS 1 17.472 17.472 35.304 MT 6.30 c
Rnf
Rnf RCC Crash Barrier
Rnf RCC CB (Outer Edge) B/S 2 19.192 0.046 1.754
Rnf RCC CB (Median Edge) B/S 2 19.192 0.046 1.754
Rnf RCC CB (Closure) B/S 2 3.079 0.046 0.281
Rnf
Rnf 3.789 MT 6.30 c
Rnf
7 Drainage Spout
LHS 3 3.00
RHS 3 3.00 6.00 Nos 6.53
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

8 Weep Holes
LHS 140 140.00
RHS 188 188.00 328.00 Nos 6.52

9 Fibre Board
Box & Median Wall Med 2 7.123 0.632 9.01
CB Med 4 0.317 1.27
Approach Slab B/S 4 21.809 0.300 26.17
Box Raft Med 1 12.008 0.600 7.21 43.650 Sqm
174.600 Rm 6.42 a
10 Filter Media - Geocomposite
LHS 2 23.348 7.439 347.37
RHS 2 23.348 7.439 347.37 694.744 Sqm 6.60 b

11 RE Wall
Return Wall LHS 2 13.358 4.362 4.724 116.53
2 2.000 2.000 4.724 8.00
RHS 2 13.358 4.362 4.724 116.53
2 2.000 2.000 4.724 8.00 249.062 Sqm 6.90 a

Levelling Pad BHS 4 13.358 0.350 0.150 2.805


BHS 4 2.000 0.350 0.150 0.420 3.225 Cum 6.02 b

Excavation BHS 4 13.358 6.000 1.000 320.60


BHS 4 2.000 6.000 1.000 48.000 368.597 Cum 6.01 a

12 Embankment
Embankment Qty as per
B/S km. 122+200 to 123+150 302682.5
Revised Profile
302682.5 Cum 2.02

13 Sub Grade
Subgrade in Flared Portion
B/S 4 75.000 1.875 0.500 281.25
in Str Approach of MCW

Connecting LSR & RSR B/S 1 118.808 10.500 0.500 623.74


Shoulder of LSR & RSR B/S 2 72.112 1.000 0.230 33.17
938.16 Cum 2.05

14 GSB

GSB in Flared Portion in Str


B/S 4 75.000 1.875 0.200 112.50
Approach of MCW
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

Granular Shoulder in Flared


Portion in Str Approach of B/S 4 75.000 1.875 0.400 225.00
MCW

Connecting LSR & RSR B/S 1 118.808 10.500 0.175 218.31


555.81 Cum 3.01

15 WMM
Connecting LSR & RSR B/S 1 118.808 7.300 0.150 130.10
130.10 Cum 3.04

16 Prime Coat
Wearing Coat above Str. B/S 2 19.192 20.250 777.27
Connecting LSR & RSR B/S 1 119.308 7.000 835.16
1612.43 Sqm 4.01

17 Tack Coat - Granular Surface


Connecting LSR & RSR B/S 1 119.308 7.000 835.16
835.16 Sqm 4.02 a

18 DBM
Connecting LSR & RSR B/S 1 119.308 7.000 0.050 41.76
41.76 Cum 4.04 d
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

19 Tack Coat - Bituminous Surface


Connecting LSR & RSR B/S 1 119.308 7.000 835.16
835.16 Sqm 4.02 b

20 BC
Wearing Coat above Str. B/S 2 19.192 20.250 0.050 38.86

Connecting LSR & RSR B/S 1 119.308 7.000 0.030 25.06 63.92 Cum 4.05 b

21 Drainage Chute
In Geocell Area LHS 46 16.72 769.12
RHS 28 15.70 439.60 1208.72 Lm 15.15

In Turfing Area LHS 1 13.05 13.05


RHS 19 12.57 238.83 251.88 Lm 15.15
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

22 Geocell with Concrete filling along Chute Drain


In Geocell Area LHS 46 16.72 2.00 1538.24
RHS 28 15.70 2.00 879.20

In Turfing Area LHS 1 13.05 2.00 26.10


RHS 19 12.57 2.00 477.66 2921.20 Sqm 15.04 C

23 Geocell covered with fine grass


Geocell Area LHS 1 15312.92 15312.92
RHS 1 8562.94 8562.94
Less for Chute Drain & Geocell with Concrete
LHS 46 16.72 -2.60 -1999.71
RHS 28 15.70 -2.60 -1142.96 20733.18 Sqm 15.04 D

24 Turfing with Sods


Turfing Area LHS 1 130.51 130.51
RHS 1 4806.80 4806.80
Less for Chute Drain & Geocell with Concrete
LHS 1 13.05 -2.60 -33.93
RHS 19 12.57 -2.60 -620.96 4282.42 Sqm 3.22

25 Qty - Misc work

Metal Beam Crash barrier B/S 2.000 19.192 38.384 Rm 8.23 A

k Kerb
Along LVUP Footpath B/S 4 23.348 0.1087 10.152 10.152 Cum 7.03 b

26 Pavement Marking: Lane/Edge


Pedestrian Crossing (Cross
7 3.00 0.5 10.50
Road)
Pedestrian Crossing (Service
6 3.00 0.5 9.00
Road)
Edge Line LHS 1 119.31 0.15 17.90
Edge Line RHS 1 119.31 0.15 17.90
Centre Line PCL 20 3.00 0.10 6.00 61.29 Sqm 8.13
27 Kerb and Crash Barrier Painting
Painting on Kerb LHS 4 23.348 0.789 73.686

Painting on Crash Barrier 2 41.463 2.483 205.904


MCW 279.590 Sqm 8.02
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

28 Retro-Reflectorised Traffic Signs


Retro-Reflectorised Traffic Signs 2 2 2.000 Each 8.03

Providing and fixing lighting for LVUP, including all lifts and leads of
29
material and manpower complete as per work order issued.
LVUP Electrical works 1 1 1.000 Each 8.27
Quantity - MCW as per Sch-B at the Location of LVUP at km 122+650
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

1 Embankment
Embankment Qty as per
B/S km. 122+250 to 123+150 211382.4
Initial Profile
211382.4 Cum 2.02

2 Sub Grade

Subgrade - MCW B/S 2 12.192 20.700 0.500 252.37


252.37 Cum 2.05

3 GSB

GSB - MCW B/S 2 15.692 20.000 0.200 125.54

125.54 Cum 3.01

4 WMM
WMM - MCW B/S 2 19.192 16.050 0.250 154.02
154.02 Cum 3.04

5 Prime Coat
Prime Coat - MCW B/S 2 19.192 15.000 575.76
575.76 Sqm 4.01

6 Tack Coat - Granular Surface


Tack Coat - MCW B/S 2 19.192 15.000 575.76
575.76 Sqm 4.02 a

7 DBM
DBM - MCW B/S 2 19.192 15.000 0.100 57.58
57.58 Cum 4.04 d

8 Tack Coat - Bituminous Surface


Tack Coat - MCW B/S 2 0.000 15.000 0.00
0.00 Sqm 4.02 b

9 BC
BC - MCW B/S 2 19.192 15.000 0.050 28.79
28.79 Cum 4.05 b

10 Drainage Chute
In Geocell Area LHS 18 16.19 291.42
RHS 12 16.14 193.68 485.10 Lm 15.15
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

In Turfing Area LHS 30 11.16 334.80


RHS 36 8.97 322.92 657.72 Lm 15.15

11 Geocell with Concrete filling along Chute Drain


In Geocell Area LHS 18 16.19 2.00 582.84
RHS 12 16.14 2.00 387.36

In Turfing Area LHS 30 11.16 2.00 669.60


RHS 36 8.97 2.00 645.84 2285.64 Sqm 15.04 C

12 Geocell covered with fine grass


Geocell Area LHS 1 5647.04 5647.04
RHS 1 3853.04 3853.04
Less for Chute Drain & Geocell with Concrete
LHS 18 16.19 -2.60 -757.69
RHS 12 16.14 -2.60 -503.57 8238.82 Sqm 15.04 D

13 Turfing with Sods


Turfing Area LHS 1 6682.96 6682.96
RHS 1 6325.32 6325.32
Less for Chute Drain & Geocell with Concrete
LHS 30 11.16 -2.60 -870.48
RHS 36 8.97 -2.60 -839.59 11298.21 Sqm 3.22

14 Qty - Misc work as per original scope

i Metal Beam Crash barrier

Median Edge B/S 0 19.192 0.00 0.00 Lm 8.23 A

ii Kerb
Median Kerb (I-Sec) B/S 2 19.192 0.055 2.111
Outer Kerb (L-Sec) B/S 2 19.192 0.1087 4.172
6.283 Cum 7.03 b

iii Median Drain


PCC 1 11.700 0.800 0.100 0.936 0.936 Cum 6.02 a

Raft 1 11.700 0.600 0.125 0.878


Wall 2 11.700 0.400 0.125 1.170
2.048 Cum 7.03 b

iv Painting on Kerb
Median Kerb (I-Sec) 2 19.192 0.273 10.479 10.479 Cum 8.02
Outer Kerb (L-Sec) 2 19.192 0.789 30.285 30.285 Cum 8.02
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.
Qty - Embankment Slope Protection in the Approaches of LVUP at km 122+650 (wrt Revised Profile)
GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area)
FRL at
Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope
LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS
Edge Width Edge Width

H= K= L= N= R= S=
A B C D E F G J = H-C M = L-D P Q
E+Fx17 √J2+(2xJ)2 E+Gx17 √M2+(2xM)2 Avg.PxB Avg.QxB

122+200 98.156 97.429 104.409 -2.50% -2.50% 103.984 5.828 13.032 103.984 6.555 14.657 Turfing Geocell - -
122+210 10 98.017 97.405 104.287 -2.50% -2.50% 103.862 5.845 13.070 103.862 6.457 14.438 Turfing Geocell 130.51 145.48
122+220 10 97.367 97.381 104.164 -2.50% -2.50% 103.739 6.372 14.248 103.739 6.358 14.217 Geocell Geocell 136.59 143.28
122+230 10 97.328 97.379 104.054 -2.50% -2.50% 103.629 6.301 14.089 103.629 6.250 13.975 Geocell Geocell 141.69 140.96
122+240 10 97.292 97.376 103.943 -2.50% -2.50% 103.518 6.226 13.922 103.518 6.142 13.734 Geocell Geocell 140.06 138.55
122+250 10 97.257 97.353 103.846 -2.50% -2.50% 103.421 6.164 13.783 103.421 6.068 13.568 Geocell Geocell 138.52 136.51
122+260 10 97.262 97.329 103.748 -2.50% -2.50% 103.323 6.061 13.553 103.323 5.994 13.403 Geocell Turfing 136.68 134.86
122+270 10 97.263 97.294 103.663 -2.50% -2.50% 103.238 5.975 13.361 103.238 5.944 13.291 Geocell Turfing 134.57 133.47
122+280 10 97.271 97.259 103.578 -2.18% -2.50% 103.208 5.937 13.276 103.153 5.894 13.179 Geocell Turfing 133.18 132.35
122+290 10 97.132 97.265 103.506 -1.84% -2.50% 103.193 6.061 13.553 103.081 5.816 13.005 Geocell Turfing 134.14 130.92
122+300 10 97.055 97.271 103.434 -1.51% -2.50% 103.178 6.123 13.691 103.009 5.738 12.831 Geocell Turfing 136.22 129.18
122+310 10 96.947 97.236 103.375 -1.18% -2.50% 103.175 6.228 13.926 102.950 5.714 12.777 Geocell Turfing 138.09 128.04
122+320 10 96.959 97.201 103.315 -0.84% -2.50% 103.172 6.213 13.893 102.890 5.689 12.721 Geocell Turfing 139.10 127.49
122+330 10 96.957 97.170 103.268 -0.51% -2.50% 103.181 6.224 13.917 102.843 5.673 12.685 Geocell Turfing 139.05 127.03
122+340 10 96.972 97.139 103.220 -0.18% -2.50% 103.190 6.218 13.904 102.795 5.656 12.647 Geocell Turfing 139.11 126.66
122+350 10 96.984 97.121 103.186 0.16% -2.50% 103.212 6.228 13.926 102.761 5.640 12.611 Geocell Turfing 139.15 126.29
122+360 10 96.894 97.102 103.151 0.49% -2.50% 103.235 6.341 14.179 102.726 5.624 12.576 Geocell Turfing 140.53 125.94
122+370 10 96.902 97.095 103.130 0.83% -2.50% 103.270 6.368 14.239 102.705 5.610 12.544 Geocell Turfing 142.09 125.60
122+380 10 96.660 97.087 103.108 1.16% -2.50% 103.305 6.645 14.859 102.683 5.596 12.513 Geocell Turfing 145.49 125.29
122+390 10 96.727 97.090 103.099 1.49% -2.50% 103.352 6.625 14.814 102.674 5.584 12.486 Geocell Turfing 148.36 125.00
122+400 10 96.817 97.092 103.089 1.83% -2.50% 103.399 6.582 14.718 102.664 5.572 12.459 Geocell Turfing 147.66 124.73
122+410 10 96.942 97.106 103.093 2.16% -2.50% 103.459 6.517 14.572 102.668 5.562 12.437 Geocell Turfing 146.45 124.48
122+420 10 97.041 97.119 103.096 2.49% -2.50% 103.520 6.479 14.487 102.671 5.552 12.415 Geocell Turfing 145.30 124.26
122+430 10 97.052 97.142 103.112 2.83% -2.83% 103.592 6.540 14.624 102.632 5.490 12.276 Geocell Turfing 145.56 123.45
122+440 10 97.132 97.165 103.128 3.16% -3.16% 103.665 6.533 14.608 102.591 5.426 12.133 Geocell Turfing 146.16 122.05
122+450 10 97.067 97.182 103.157 3.49% -3.49% 103.751 6.684 14.946 102.563 5.381 12.032 Geocell Turfing 147.77 120.83
122+460 10 97.062 97.198 103.186 3.83% -3.83% 103.836 6.774 15.147 102.536 5.338 11.936 Geocell Turfing 150.47 119.84
GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area)
FRL at
Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope
LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS
Edge Width Edge Width

H= K= L= N= R= S=
A B C D E F G J = H-C M = L-D P Q
E+Fx17 √J2+(2xJ)2 E+Gx17 √M2+(2xM)2 Avg.PxB Avg.QxB

122+470 10 97.166 97.164 103.224 4.16% -4.16% 103.931 6.765 15.127 102.517 5.353 11.970 Geocell Turfing 151.37 119.53
122+480 10 97.070 97.129 103.262 4.49% -4.49% 104.026 6.956 15.554 102.498 5.369 12.005 Geocell Turfing 153.41 119.88
122+490 10 97.066 97.128 103.301 4.83% -4.83% 104.121 7.055 15.775 102.481 5.353 11.970 Geocell Turfing 156.65 119.88
122+500 10 97.066 97.127 103.340 5.00% -5.00% 104.190 7.124 15.930 102.490 5.363 11.992 Geocell Turfing 158.53 119.81
122+510 10 97.117 97.121 103.379 5.00% -5.00% 104.229 7.112 15.903 102.529 5.408 12.093 Geocell Turfing 159.16 120.42
122+520 10 97.094 97.115 103.418 5.00% -5.00% 104.268 7.174 16.042 102.568 5.453 12.193 Geocell Turfing 159.72 121.43
122+530 10 97.079 97.109 103.457 5.00% -5.00% 104.307 7.228 16.162 102.607 5.498 12.294 Geocell Turfing 161.02 122.44
122+540 10 97.115 97.103 103.496 5.00% -5.00% 104.346 7.231 16.169 102.646 5.543 12.395 Geocell Turfing 161.66 123.44
122+550 10 97.052 97.099 103.535 5.00% -5.00% 104.385 7.333 16.397 102.685 5.586 12.491 Geocell Turfing 162.83 124.43
122+560 10 97.092 97.095 103.574 5.00% -5.00% 104.424 7.332 16.395 102.724 5.629 12.587 Geocell Turfing 163.96 125.39
122+570 10 97.103 97.082 103.613 5.00% -5.00% 104.463 7.360 16.457 102.763 5.681 12.703 Geocell Turfing 164.26 126.45
122+580 10 97.124 97.068 103.652 5.00% -5.00% 104.502 7.378 16.498 102.802 5.734 12.822 Geocell Turfing 164.78 127.62
122+590 10 97.085 97.060 103.691 5.00% -5.00% 104.541 7.456 16.672 102.841 5.781 12.927 Geocell Turfing 165.85 128.74
122+600 10 97.043 97.052 103.730 5.00% -5.00% 104.580 7.537 16.853 102.880 5.828 13.032 Geocell Turfing 167.63 129.79
122+610 10 97.036 97.091 103.769 5.00% -5.00% 104.619 7.583 16.956 102.919 5.828 13.032 Geocell Turfing 169.05 130.32
122+620 10 97.047 97.129 103.808 5.00% -5.00% 104.658 7.611 17.019 102.958 5.829 13.034 Geocell Turfing 169.87 130.33
122+632 12.15 97.046 97.109 103.847 5.00% -5.00% 104.697 7.651 17.108 102.997 5.888 13.166 Geocell Turfing 207.32 159.17
122+638 5.85 97.049 97.099 103.867 5.00% -5.00% 104.717
122+644 5.85 97.052 97.088 103.886 5.00% -5.00% 104.736 LVUP at km 122+638 LVUP at km 122+638
122+650 6.15 97.536 97.091 103.925 5.00% -5.00% 104.775
122+660 10 97.030 97.094 103.964 5.00% -5.00% 104.814 7.784 17.406 103.114 6.020 13.461 Geocell Geocell 87.03 67.31
122+670 10 97.048 97.092 104.003 5.00% -5.00% 104.853 7.805 17.453 103.153 6.061 13.553 Geocell Geocell 174.29 135.07
122+680 10 97.044 97.089 104.042 5.00% -5.00% 104.892 7.848 17.549 103.192 6.103 13.647 Geocell Geocell 175.01 136.00
122+690 10 97.072 97.081 104.082 5.00% -5.00% 104.932 7.860 17.575 103.232 6.151 13.754 Geocell Geocell 175.62 137.00
122+700 10 97.070 97.073 104.121 5.00% -5.00% 104.971 7.901 17.667 103.271 6.198 13.859 Geocell Geocell 176.21 138.07
122+710 10 97.084 97.076 104.160 5.00% -5.00% 105.010 7.926 17.723 103.310 6.234 13.940 Geocell Geocell 176.95 138.99
122+720 10 97.089 97.079 104.199 5.00% -5.00% 105.049 7.960 17.799 103.349 6.270 14.020 Geocell Geocell 177.61 139.80
122+730 10 97.067 97.068 104.238 5.00% -5.00% 105.088 8.021 17.936 103.388 6.320 14.132 Geocell Geocell 178.67 140.76
GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area)
FRL at
Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope
LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS
Edge Width Edge Width

H= K= L= N= R= S=
A B C D E F G J = H-C M = L-D P Q
E+Fx17 √J2+(2xJ)2 E+Gx17 √M2+(2xM)2 Avg.PxB Avg.QxB

122+740 10 97.087 97.057 104.277 5.00% -5.00% 105.127 8.040 17.978 103.427 6.370 14.244 Geocell Geocell 179.57 141.88
122+750 10 97.062 97.079 104.316 5.00% -5.00% 105.166 8.104 18.121 103.466 6.387 14.282 Geocell Geocell 180.50 142.63
122+760 10 97.058 97.100 104.355 5.00% -5.00% 105.205 8.147 18.217 103.505 6.405 14.322 Geocell Geocell 181.69 143.02
122+770 10 97.085 97.198 104.394 5.00% -5.00% 105.244 8.159 18.244 103.544 6.346 14.190 Geocell Geocell 182.31 142.56
122+780 10 97.090 97.295 104.433 5.00% -5.00% 105.283 8.193 18.320 103.583 6.288 14.060 Geocell Geocell 182.82 141.25
122+790 10 97.074 97.326 104.472 5.00% -5.00% 105.322 8.248 18.443 103.622 6.296 14.078 Geocell Geocell 183.82 140.69
122+800 10 97.059 97.356 104.511 5.00% -5.00% 105.361 8.302 18.564 103.661 6.305 14.098 Geocell Geocell 185.04 140.88
122+810 10 97.099 97.222 104.550 5.00% -5.00% 105.400 8.301 18.562 103.700 6.478 14.485 Geocell Geocell 185.63 142.92
122+820 10 97.093 97.088 104.589 5.00% -5.00% 105.439 8.346 18.662 103.739 6.651 14.872 Geocell Geocell 186.12 146.79
122+830 10 97.126 97.111 104.628 5.00% -5.00% 105.478 8.352 18.676 103.778 6.667 14.908 Geocell Geocell 186.69 148.90
122+840 10 97.134 97.133 104.667 5.00% -5.00% 105.517 8.383 18.745 103.817 6.684 14.946 Geocell Geocell 187.10 149.27
122+850 10 97.125 97.143 104.706 4.98% -4.98% 105.553 8.428 18.846 103.859 6.716 15.017 Geocell Geocell 187.95 149.82
122+860 10 97.120 97.152 104.745 4.65% -4.65% 105.536 8.416 18.819 103.955 6.803 15.212 Geocell Geocell 188.32 151.15
122+870 10 97.164 97.162 104.784 4.32% -4.32% 105.518 8.354 18.680 104.050 6.888 15.402 Geocell Geocell 187.49 153.07
122+880 10 97.130 97.171 104.823 3.98% -3.98% 105.500 8.370 18.716 104.146 6.975 15.597 Geocell Geocell 186.98 154.99
122+890 10 97.120 97.158 104.862 3.65% -3.65% 105.483 8.363 18.700 104.242 7.084 15.840 Geocell Geocell 187.08 157.18
122+900 10 97.157 97.144 104.901 3.32% -3.32% 105.465 8.308 18.577 104.337 7.193 16.084 Geocell Geocell 186.39 159.62
122+910 10 97.169 97.130 104.940 2.98% -2.98% 105.447 8.278 18.510 104.433 7.303 16.330 Geocell Geocell 185.44 162.07
122+920 10 97.141 97.115 104.979 2.65% -2.65% 105.430 8.289 18.535 104.529 7.414 16.578 Geocell Geocell 185.23 164.54
122+930 10 97.150 97.115 105.018 2.32% -2.50% 105.412 8.262 18.474 104.593 7.478 16.721 Geocell Geocell 185.05 166.50
122+940 10 97.133 97.115 105.057 1.98% -2.50% 105.394 8.261 18.472 104.632 7.517 16.809 Geocell Geocell 184.73 167.65
122+950 10 97.150 97.095 105.095 1.65% -2.50% 105.376 8.226 18.394 104.670 7.575 16.938 Geocell Geocell 184.33 168.73
122+960 10 97.099 97.074 105.133 1.32% -2.50% 105.357 8.258 18.465 104.708 7.634 17.070 Geocell Geocell 184.30 170.04
122+970 10 97.094 97.067 105.168 0.98% -2.50% 105.335 8.241 18.427 104.743 7.676 17.164 Geocell Geocell 184.46 171.17
122+980 10 97.087 97.060 105.203 0.65% -2.50% 105.314 8.227 18.396 104.778 7.718 17.258 Geocell Geocell 184.12 172.11
122+990 10 97.119 97.050 105.234 0.32% -2.50% 105.288 8.169 18.266 104.809 7.759 17.350 Geocell Geocell 183.31 173.04
123+000 10 97.120 97.040 105.265 -0.02% -2.50% 105.262 8.142 18.206 104.840 7.800 17.441 Geocell Geocell 182.36 173.96
123+010 10 97.095 97.058 105.292 -0.35% -2.50% 105.233 8.138 18.197 104.867 7.809 17.461 Geocell Geocell 182.02 174.51
GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area)
FRL at
Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope
LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS
Edge Width Edge Width

H= K= L= N= R= S=
A B C D E F G J = H-C M = L-D P Q
E+Fx17 √J2+(2xJ)2 E+Gx17 √M2+(2xM)2 Avg.PxB Avg.QxB

123+020 10 97.084 97.076 105.319 -0.68% -2.50% 105.203 8.119 18.155 104.894 7.818 17.482 Geocell Geocell 181.76 174.72
123+030 10 97.124 97.101 105.342 -1.02% -2.50% 105.169 8.045 17.989 104.917 7.816 17.477 Geocell Geocell 180.72 174.79
123+040 10 97.142 97.125 105.365 -1.35% -2.50% 105.136 7.994 17.875 104.940 7.815 17.475 Geocell Geocell 179.32 174.76
123+050 10 97.105 97.147 105.385 -1.68% -2.50% 105.098 7.993 17.873 104.960 7.813 17.470 Geocell Geocell 178.74 174.73
123+060 10 97.102 97.168 105.404 -2.02% -2.50% 105.061 7.959 17.797 104.979 7.811 17.466 Geocell Geocell 178.35 174.68
123+070 10 97.122 97.141 105.419 -2.35% -2.50% 105.020 7.898 17.660 104.994 7.853 17.560 Geocell Geocell 177.29 175.13
123+080 10 97.167 97.113 105.434 -2.50% -2.50% 105.009 7.842 17.535 105.009 7.896 17.656 Geocell Geocell 175.98 176.08
123+090 10 97.119 97.191 105.445 -2.50% -2.50% 105.020 7.901 17.667 105.020 7.829 17.506 Geocell Geocell 176.01 175.81
123+100 10 97.103 97.268 105.456 -2.50% -2.50% 105.031 7.928 17.728 105.031 7.763 17.359 Geocell Geocell 176.97 174.32
123+110 10 97.101 97.213 105.464 -2.50% -2.50% 105.039 7.938 17.750 105.039 7.826 17.499 Geocell Geocell 177.39 174.29
123+120 10 97.115 97.158 105.471 -2.50% -2.50% 105.046 7.931 17.734 105.046 7.888 17.638 Geocell Geocell 177.42 175.69
123+130 10 97.118 97.161 105.475 -2.50% -2.50% 105.050 7.932 17.736 105.050 7.889 17.640 Geocell Geocell 177.35 176.39
123+140 10 97.121 97.163 105.478 -2.50% -2.50% 105.053 7.932 17.736 105.053 7.890 17.643 Geocell Geocell 177.37 176.42
123+150 10 97.154 97.164 105.478 -2.50% -2.50% 105.053 7.899 17.663 105.053 7.889 17.640 Geocell Geocell 177.00 176.42

Geocell Area (Total) 15312.92 8562.94


Turfing Area (Total) 130.51 4806.80

No. of Chute Drain in Geocell Area 46 28


No. of Chute Drain in Turfing Area 1 19

Avg. Length of Chute Drain in Geocell Area 16.72 15.7


Avg Length of Chute Drain in Turfing Area 13.05 12.57
Quantity - BOX Culvert at km 122+450
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 2.000 2.000 0.00 0.35 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 4.027 4.027 4.027 0.000 4.027 LHS RHS LCW
0.000 4.027 4.027 4.027 0.000 4.027 103.157

e GL C/s Road
LCW RCW Avg FRL
-4.40% 4.40% 97.134 0.000

New FRL 103.154


Old FRL 101.141
Diff Ht 2.014
Total Length 8.054

Inv Lvl 96.800


Box top Slab lvl 99.100

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

1 Excavation for Structure


Exv for Raft LCW 1 4.027 2.800 0.434 4.89

Exv for Raft RCW 1 4.027 2.800 0.434 4.89


9.79 Cum
2 Levelling Course - PCC
Below Box Raft
Raft LCW 1 4.027 2.800 0.100 1.128
Raft RCW 1 4.027 2.800 0.100 1.128
2.256 Cum

3 Box Structure - Conc.


Raft - Box Str
Raft LCW 1 4.027 2.600 0.350 3.665
3.665 Cum
Raft RCW 1 4.027 2.600 0.350 3.665
3.665 Cum

Wall - Box Str


Wall (Outer) LCW 2 4.027 0.300 2.000 4.832
Haunch (Bottom) LCW 2 4.027 0.150 0.075 0.091
Haunch (Top) LCW 2 4.027 0.150 0.075 0.091 5.014 Cum
Quantity - BOX Culvert at km 122+450
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 2.000 2.000 0.00 0.35 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 4.027 4.027 4.027 0.000 4.027 LHS RHS LCW
0.000 4.027 4.027 4.027 0.000 4.027 103.157

e GL C/s Road
LCW RCW Avg FRL
-4.40% 4.40% 97.134 0.000

New FRL 103.154


Old FRL 101.141
Diff Ht 2.014
Total Length 8.054

Inv Lvl 96.800


Box top Slab lvl 99.100

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

Wall (Outer) RCW 2 4.027 0.300 2.000 4.832


Haunch (Bottom) RCW 2 4.027 0.150 0.075 0.091
Haunch (Top) RCW 2 4.027 0.150 0.075 0.091 5.014 Cum

Slab - Box Str


Slab LCW 1 4.027 2.600 0.300 3.141
3.141 Cum
Slab RCW 1 4.027 2.600 0.300 3.141
3.141 Cum

4 Reinforcement
Box Structure CA COS
Box - Foundation LHS 1 2.156 2.442 0.286
RHS 1 1.889 2.178 0.289 0.575 MT

Box - Substructure LHS 1 3.238 3.680 0.442


RHS 1 2.823 3.279 0.456 0.898 MT

Box - Super Structure LHS 1 2.032 2.303 0.271


RHS 1 1.777 2.055 0.278 0.549 MT

5 Less Difference Embankment Quantity of Box Culvert


Quantity - BOX Culvert at km 122+450
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 2.000 2.000 0.00 0.35 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 4.027 4.027 4.027 0.000 4.027 LHS RHS LCW
0.000 4.027 4.027 4.027 0.000 4.027 103.157

e GL C/s Road
LCW RCW Avg FRL
-4.40% 4.40% 97.134 0.000

New FRL 103.154


Old FRL 101.141
Diff Ht 2.014
Total Length 8.054

Inv Lvl 96.800


Box top Slab lvl 99.100

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

Embankment Qty of Box B/S -1 8.054 2.600 1.966 -41.169


-41.2 Cum
t.slab
0.30
0.300

FRL
RCW
103.157

BOQ
Item No.

6.01 a

6.02 b

6.20 c

6.20 c

6.22 c
t.slab
0.30
0.300

FRL
RCW
103.157

BOQ
Item No.

6.22 c

6.22 c

6.22 c

6.30 a

6.30 b

6.30 c
t.slab
0.30
0.300

FRL
RCW
103.157

BOQ
Item No.

2.02
Quantity - LVUP at km 0+318 (Ramp-01 Ch-122+500)
Inputs
LVUP - 1 x 10.50 x 3.50 m Cell a b b-lhs b-rhs c d e fo
Skew (deg) = 56.87 1 10.50 6.16 6.070 6.245 0.00 0.90 1.10 0.90
Skew (rad) = 0.99 19.21 0.000 1.647

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 7.000 7.000 7.000 0.000 7.000 LHS RHS LCW RCW
0.000 12.808 12.808 12.808 0.000 12.808 96.014 96.014 104.222 104.222

e GL C/s Road
LCW RCW Avg FRL
-2.50% 2.50% 97.414 98.609

Sl. BOQ Item


Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

1 Excavation for Structure


Exv for Raft LCW 1 12.908 12.500 1.500 242.03

Exv for Raft RCW 1 12.908 12.500 1.500 242.03


484.05 Cum 6.01 a

2 Levelling Course - PCC


Below Raft
Raft LCW 1 12.908 12.500 0.100 16.135
Raft RCW 1 12.908 12.500 0.100 16.135
32.270 Cum 6.02 a

Below Approach Slab LHS 2 13.108 6.129 0.150 24.104


RHS 2 13.108 6.129 0.150 24.104

Footpath above raft B/S 0 12.808 1.335 0.150 0.000


PCC Friction Slab for Precast CB 1 447.186 1.875 0.075 62.886
111.094 Cum 6.02 b

3 Box Structure - Conc.


Raft - Box Str
Raft LCW 1 12.808 12.300 1.100 173.292
173.292 Cum 6.20 d
Raft RCW 1 12.808 12.300 1.100 173.292
173.292 Cum 6.20 d

Wall - Box Str


Wall (Outer) LCW 2 12.808 0.900 6.070 139.940
Wall (Inner) LCW 0 12.808 0.000 6.070 0.000
Haunch (Bottom) LCW 2 12.808 0.900 0.150 3.458
Median Wall LCW 0 0.000 0.900 0.900 0.000
Haunch (Top) LCW 2 12.808 0.900 0.150 3.458 146.856 Cum 6.22 d

Wall (Outer) RCW 2 12.808 0.900 6.245 143.975


Wall (Inner) RCW 0 12.808 0.000 6.245 0.000
Haunch (Bottom) RCW 2 12.808 0.900 0.150 3.458
Median Wall RCW 0 0.000 0.900 0.900 0.000
Haunch (Top) RCW 2 12.808 0.900 0.150 3.458 150.891 Cum 6.22 d
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

Bracket LCW 2 12.808 0.450 0.300 3.458


RCW 2 12.808 0.450 0.300 3.458 6.916 Cum 6.22 d

Slab - Box Str


Slab LCW 1 12.808 12.300 0.900 141.785
141.785 Cum 6.25 c
Slab RCW 1 12.808 12.300 0.900 141.785
141.785 Cum 6.25 c

4 RCC Crash Barrier - Conc.


Box Str + Approach
Slab
RCC CB (Outer Edge) B/S 2 35.313 0.3170 22.388

Precast CB above RE Wall B/S 1 447.186 0.6890 308.111 330.499 Cum 6.47

Friction Slab for Precast CB B/S 1 447.186 1.290 0.275 158.639 158.639 Cum 6.22 c

5 Approach Slab
Approach Slab LHS 2 12.808 3.500 0.300 26.897
RHS 2 12.808 3.500 0.300 26.897 53.794 Cum 6.45

6 Reinforcement
Rnf Box Structure
Rnf Box - Foundation BHS 1 47.566 47.566
Rnf 47.566 MT 6.30 a
Rnf
Rnf Box - Substructure BHS 1 51.837 51.837
Rnf 51.837 MT 6.30 b
Rnf
Rnf Box - Super Structure BHS 1 42.870 42.870
Rnf 42.870 MT 6.30 c
Rnf
Rnf RCC Crash Barrier
Rnf RCC CB (Outer Edge) B/S 2 35.313 0.048 3.357

Rnf recast CB above RE Wall B/S 1 447.186 0.159 70.942


Rnf
Rnf 74.299 MT 6.30 c
Rnf
7 Drainage Spout
LHS 4 4.00
RHS 0 0.00 4.00 Nos 6.53

8 Weep Holes
LHS 84 84.00
RHS 88 88.00 172.00 Nos 6.52

9 Fibre Board
Box & Median Wall Med 0 6.511 1.647 0.00
CB Med 2 0.317 0.63
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

Approach Slab B/S 4 12.808 0.300 15.37


Box Raft Med 0 22.505 1.100 0.00 16.004 Sqm
64.016 Rm 6.42 a
10 Filter Media - Geocomposite
LHS 2 12.808 5.263 134.80
RHS 2 12.808 5.263 134.80 269.608 Sqm 6.60 b

11 RE Wall
Return Wall LHS 0 16.225 6 0.00
0 18.225 2 0.00
RHS 0 17.626 6 0.00
0 19.626 2 0.00
RE Wall in Ramp-1 LHS 1 Ch.0+200 to Ch.0+482 1951.50
RHS 1 Ch.0+231 to Ch.0+422 1389.14
3340.642 Sqm 6.90 a

Levelling Pad LHS 0 18.225 0.350 0.150 0.00


RHS 0 19.626 0.350 0.150 0.000
evelling pad PCC for RE Wall B/S 1 448.951 0.350 0.150 23.570 23.570 Cum 6.02 b

Excavation LHS 0 18.225 6.000 1.000 0.00


RHS 0 19.626 6.000 1.000 0.000
B/S 1 448.951 6.000 1 2693.706 2693.706 Cum 6.01 a

12 Embankment
Embankment Qty as per
B/S km. 0+100 to 0+487.5 67307.87
Revised Profile
Pavement above LVUP Raft B/S 1 25.616 10.500 1.495 402.11 67710.0 Cum 2.02
RE Fill Quantity Less -16703.2 Cum 2.02

RE Fill Quantity : 16703.210 Cum 2.12

13 Sub Grade
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

Subgrade in Flared Portion


B/S 4 0.000 0.000 0.500 0.00
in Str Approach of MCW

Filling below Footpath B/S 0 12.808 1.335 0.200 0.00

Earthen Shoulder LSR &


B/S 2 32.884 1.750 0.230 26.47
RSR
Pavement above LVUP Raft B/S 1 25.616 10.500 0.500 134.48
Connecting LSR & RSR B/S 1 32.884 10.500 0.500 172.64 333.60 Cum 2.05

14 GSB

GSB in Flared Portion in Str


B/S 4 0.000 0.000 0.200 0.00
Approach of MCW
Granular Shoulder in Flared
Portion in Str Approach of B/S 4 0.000 0.000 0.400 0.00
MCW

Pavement above LVUP Raft B/S 0 25.616 10.500 0.175 0.00


Connecting LSR & RSR B/S 0 32.884 10.500 0.175 0.00 0.00 Cum 3.01

15 WMM
Pavement above LVUP Raft B/S 1 25.616 10.500 0.150 40.35
Connecting LSR & RSR B/S 1 32.884 10.800 0.150 53.27 93.62 Cum 3.04
Connecting LSR & RSR B/S 0 212.702 10.800 0.150 0.00
0.00 Cum 3.04

16 Prime Coat
Wearing Coat above Str. B/S 2 35.313 6.500 459.07
Pavement above LVUP Raft B/S 1 25.616 10.500 268.97
Connecting LSR & RSR B/S 1 32.884 10.500 345.28 1073.32 Sqm 4.01
Connecting LSR & RSR B/S 0 212.702 7.000 0.00
0.00 Sqm 4.01

17 Tack Coat - Granular Surface


Pavement above LVUP Raft B/S 1 25.616 10.500 268.97
Connecting LSR & RSR B/S 1 32.884 10.500 345.28 614.25 Sqm 4.02 a
Connecting LSR & RSR B/S 1 212.702 6.500 0.00
0.00 Sqm 4.02 a

18 DBM
Pavement above LVUP Raft B/S 1 25.616 10.500 0.050 13.45
Connecting LSR & RSR B/S 1 32.884 10.500 0.050 17.26 30.71 Cum 4.04 d
Connecting LSR & RSR B/S 0 212.702 10.500 0.050 0.00
0.00 Cum 4.04 d

19 Tack Coat - Bituminous Surface


Pavement above LVUP Raft B/S 1 25.616 10.500 268.97
Connecting LSR & RSR B/S 1 32.884 10.500 345.28 614.25 Sqm 4.02 b
Connecting LSR & RSR B/S 0 212.702 10.500 0.00
0.00 Sqm 4.02 b

20 BC
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

Wearing Coat above Str. B/S 2 35.313 6.500 0.050 22.95

Connecting LSR & RSR B/S 0 212.702 7.000 0.030 0.00 0.00 Cum 4.05 b
Pavement above LVUP Raft B/S 1 25.616 10.500 0.030 8.07
Connecting LSR & RSR B/S 1 32.884 10.500 0.030 10.36 41.38 Cum 4.05 b

21 Drainage Chute
In Geocell Area LHS 0 0.00 0.00
RHS 0 0.00 0.00 0.00 Lm 15.15

In Turfing Area LHS 1 0.00 0.00


RHS 0 0.00 0.00 0.00 Lm 15.15

22 Geocell with Concrete filling along Chute Drain


In Geocell Area LHS 0 0.00 2.00 0.00
RHS 0 0.00 2.00 0.00

In Turfing Area LHS 1 0.00 2.00 0.00


RHS 0 0.00 2.00 0.00
0.00 Sqm 15.04 C
23 Geocell covered with fine grass
Geocell Area LHS 1 0.00 0.00
RHS 1 0.00 0.00
Less for Chute Drain & Geocell with Concrete
LHS 0 0.00 -2.60 0.00
RHS 0 0.00 -2.60 0.00
0.00 Sqm 15.04 D
24 Qty - Misc work

k Kerb
Along LVUP Wall B/S 2 12.808 0.1583 4.055 4.055 Cum 7.03 b

25 Pavement Marking: Lane/Edge


Pedestrian Crossing
B/S 6 3.000 0.500 9.000
(Service Road)
Edge Line LHS 1 58.500 0.150 8.775
Edge Line RHS 1 58.500 0.150 8.775
Centre Line PCL 10 3.000 0.100 3.000 29.550 Sqm 8.13
26 Kerb and Crash Barrier Painting
Painting on Kerb LHS 2 12.808 0.789 20.211

Painting on RCC Crash Barrier 2 35.313 1.025 72.392


Painting on Precast CB 1 447.186 1.539 688.219
780.822 Sqm 8.02
Turfing of Old profile
Slope Offset RHS LHS
Offset Offset
Chainage OGL FRL length length Remarks
RHS LHS RHS LHS RHS LHS RHS BT Egde LHS BT Egde
RL RL Height Width Slope Length Height Width Slope
0 97.161 103.101 -0.025 0.025 5.75 5.75 -0.144 0.144 102.957 103.245 5.796 11.5925 12.961 6.084 12.1675 13.604 Chaiange
20 97.169 102.9 -0.025 0.025 5.75 5.75 -0.144 0.144 102.756 103.044 5.587 11.1745 12.493 5.875 11.7495 13.136 0+100
40 97.187 102.699 -0.025 0.025 5.75 5.75 -0.144 0.144 102.555 102.843 5.368 10.7365 12.004 5.656 11.3115 12.647 0+220
60 97.207 102.499 -0.025 0.025 5.75 5.75 -0.144 0.144 102.355 102.643 5.148 10.2965 11.512 5.436 10.8715 12.155 0+440
80 97.155 102.335 -0.025 0.025 5.75 5.75 -0.144 0.144 102.191 102.479 5.036 10.0725 11.261 5.324 10.6475 11.904
100 97.119 102.223 -0.025 0.025 5.75 5.75 -0.144 0.144 102.079 102.367 4.960 9.9205 11.091 5.248 10.4955 11.734
120 97.117 102.163 -0.025 -0.065 5.75 5.75 -0.144 -0.374 102.019 101.789 4.902 9.8045 10.962 4.672 9.3445 10.447
140 97.145 102.155 0.065 -0.065 5.75 5.75 0.374 -0.374 102.529 101.781 5.384 10.7675 12.038 4.636 9.2725 10.367 ###
160 97.149 102.198 0.065 -0.065 5.75 5.75 0.374 -0.374 102.572 101.824 5.423 10.8455 12.126 4.675 9.3505 10.454 ###
180 97.326 102.258 0.065 -0.065 5.75 5.75 0.374 -0.374 102.632 101.884 5.306 10.6115 11.864 4.558 9.1165 10.193
200 97.35 102.318 0.065 -0.065 5.75 5.75 0.374 -0.374 102.692 101.944 5.342 10.6835 11.945 4.594 9.1885 10.273
220 97.897 102.374 0.065 -0.065 5.75 5.75 0.374 -0.374 102.748 102.000 4.851 9.7015 10.847 4.103 8.2065 9.175 ###
240 97.373 102.401 0.065 -0.065 5.75 5.75 0.374 -0.374 102.775 102.027 5.402 10.8035 12.079 4.654 9.3085 10.407
260 97.4 102.394 0.065 -0.065 5.75 5.75 0.374 -0.374 102.768 102.020 5.368 10.7355 12.003 4.620 9.2405 10.331
280 97.333 102.352 0.065 -0.065 5.75 5.75 0.374 -0.374 102.726 101.978 5.393 10.7855 12.059 4.645 9.2905 10.387
300 97.268 102.277 0.065 -0.065 5.75 5.75 0.374 -0.374 102.651 101.903 5.383 10.7655 12.036 4.635 9.2705 10.365
320 97.209 102.172 0.065 -0.065 5.75 5.75 0.374 -0.374 102.546 101.798 5.337 10.6735 11.933 4.589 9.1785 10.262
340 97.243 102.062 0.065 -0.065 5.75 5.75 0.374 -0.374 102.436 102.436 5.193 10.3855 11.611 5.193 10.3855 11.611
360 97.257 101.922 0.07 0.07 5.75 5.75 0.403 0.403 102.325 101.520 5.068 10.135 11.331 4.262 8.525 9.531
380 97.292 101.842 0.07 0.07 5.75 5.75 0.403 0.403 102.245 101.440 4.953 9.905 11.074 4.148 8.295 9.274
388.243 97.307 101.797 0.07 0.07 5.75 5.75 0.403 0.403 102.200 101.395 4.893 9.785 10.940 4.088 8.175 9.140
Total 246.170 SQM Total 227.398 SQM
Quantity - MCW as per Sch-B at the Location of LVUP at km 0+318
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

1 Embankment
Embankment Qty as per
B/S km. 0+000 to 0+388.4 42253.0
Initial Profile
42253.0 Cum 2.02

2 Sub Grade

Subgrade - MCW B/S 2 28.313 20.500 0.500 580.42


580.42 Cum 2.05

3 GSB

GSB - MCW B/S 2 35.313 20.000 0.200 282.50

282.50 Cum 3.01

4 WMM
WMM - MCW B/S 2 35.313 16.225 0.250 286.48
286.48 Cum 3.04

5 Prime Coat
Prime Coat - MCW B/S 2 35.313 15.000 1059.39
1059.39 Sqm 4.01

6 Tack Coat - Granular Surface


Tack Coat - MCW B/S 2 35.313 15.000 1059.39
1059.39 Sqm 4.02 a

7 DBM
DBM - MCW B/S 2 35.313 15.000 0.100 105.94
105.94 Cum 4.04 d

8 Tack Coat - Bituminous Surface


Tack Coat - MCW B/S 0 35.313 15.000 0.00
0.00 Sqm 4.02 b

9 BC
BC - MCW B/S 2 35.313 15.000 0.050 52.97
52.97 Cum 4.05 b

10 Drainage Chute
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

In Geocell Area LHS 0 0.00 0.00


RHS 0 0.00 0.00 0.00 Lm 15.15

In Turfing Area LHS 1 19.00 19.00


RHS 1 19.00 19.00 38.00 Lm 15.15

11 Geocell with Concrete filling along Chute Drain


In Geocell Area LHS 0 0.00 2.00 0.00
RHS 0 0.00 2.00 0.00

In Turfing Area LHS 1 19.00 2.00 38.00


RHS 1 19.00 2.00 38.00 76.00 Sqm 15.04 C

12 Geocell covered with fine grass


Geocell Area LHS 1 0.00 0.00
RHS 1 0.00 0.00
Less for Chute Drain & Geocell with Concrete
LHS 0 0.00 -2.60 0.00
RHS 0 0.00 -2.60 0.00 0.00 Sqm 15.04 D

13 Turfing with Sods


Turfing Area LHS 1 227.40 227.40
RHS 1 246.17 246.17
Less for Chute Drain & Geocell with Concrete
LHS 1 19.00 -2.60 -49.40
RHS 1 19.00 -2.60 -49.40 374.77 Sqm 3.22
Quantity - BOX Culvert at km 137+850
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.45 0.45
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 41.250 41.250 41.250 0.000 41.250 LHS RHS LCW
0.000 41.250 41.250 41.250 0.000 41.250 105.827

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 93.967 0.000

Inv Lev 93.20


FL 92.925
depth 1.042
Top slab level 96.650
2.683

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

1 Excavation for Structures


Below Box Raft
Raft LCW 1 40.400 4.300 1.042 181.016
Raft RCW 1 40.400 4.300 1.042 181.016
Shear Key BHS 2 4.100 0.950 0.675 5.258
U-Trough BHS 0 9.000 4.300 1.042 0.000
367.290 Cum

2 Levelling Course - PCC


Below Box Raft
Raft LCW 1 40.200 4.100 0.100 16.482
Raft RCW 1 40.200 4.100 0.100 16.482
Shear Key BHS 2 1.461 4.100 0.100 1.198
U-TROUGH 0 9.000 3.600 0.100 0.000
34.162 Cum
3 Box Structure - Conc.
Raft - Box Str
Raft LCW 1 41.250 3.900 0.450 72.394
72.394 Cum
Raft RCW 1 41.250 3.900 0.450 72.394
72.394 Cum
Shear Key LCW 2 3.900 0.750 0.675 3.949
3.949 Cum
Quantity - BOX Culvert at km 137+850
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.45 0.45
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 41.250 41.250 41.250 0.000 41.250 LHS RHS LCW
0.000 41.250 41.250 41.250 0.000 41.250 105.827

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 93.967 0.000

Inv Lev 93.20


FL 92.925
depth 1.042
Top slab level 96.650
2.683

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

Wall - Box Str


Wall (Outer) LCW 2 41.250 0.450 3.000 111.375
Haunch (Bottom) LCW 2 41.250 0.150 0.075 0.928
Haunch (Top) LCW 2 41.250 0.150 0.075 0.928 113.231 Cum

Wall (Outer) RCW 2 41.250 0.450 3.000 111.375


Haunch (Bottom) RCW 2 41.250 0.150 0.075 0.928
Haunch (Top) RCW 2 41.250 0.150 0.075 0.928 113.231 Cum

Slab - Box Str


Slab LCW 1 41.250 3.900 0.450 72.394
72.394 Cum
Slab RCW 1 41.250 3.900 0.450 72.394
72.394 Cum
Headwall BHS 2 3.900 0.250 0.300 0.585
0.585 Cum

4 Fibre Board
Raft MCW 1 3.900 0.450 1.755
Wall MCW 2 3.000 0.450 2.700
Slab MCW 1 3.900 0.450 1.755
Haunch 4 0.150 0.075 0.045 6.255 Sqm
25.020 Rm
5 Filter Media - Geocomposite
BHS 2 82.500 3.450 569.25
Quantity - BOX Culvert at km 137+850
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.45 0.45
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 41.250 41.250 41.250 0.000 41.250 LHS RHS LCW
0.000 41.250 41.250 41.250 0.000 41.250 105.827

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 93.967 0.000

Inv Lev 93.20


FL 92.925
depth 1.042
Top slab level 96.650
2.683

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

569.250 Sqm

6 Weep Holes
BHS 2 166 332
332 Nos

7 Toe Wall

Toe Wall-PCC BHS 0 1.000 1.100 0.100 0.000


Toe Wall BHS 0 1.000 0.900 0.500 0.000
Toe Wall BHS 0 1.000 0.450 0.500 0.000

0.000 Cum
8 U-TROUGH
RCC RAFT U/S 0 3.000 3.400 0.25 0.000 0.000
RCC RAFT D/S 0 6.000 3.400 0.25 0.000 0.000
WALL U/S 0 3.000 0.200 3.000 0.000 0.000
WALL D/S 0 6.000 0.200 3.000 0.000 0.000

9 Reinforcement
Box Structure
Box - Foundation LHS 1 10.558 10.558
Box - Foundation RHS 1 10.638 10.638
Quantity - BOX Culvert at km 137+850
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.45 0.45
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 41.250 41.250 41.250 0.000 41.250 LHS RHS LCW
0.000 41.250 41.250 41.250 0.000 41.250 105.827

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 93.967 0.000

Inv Lev 93.20


FL 92.925
depth 1.042
Top slab level 96.650
2.683

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

21.196 MT

Box - Substructure LHS 1 11.532 11.532


Box - Substructure RHS 1 11.613 11.613
23.145 MT

Box - Super Structure LHS 1 9.529 9.529


Box - Super Structure RHS 1 9.602 9.602
19.131 MT

10 Less Embankment Quantity of Box Culvert


Embankment Qty of Box
B/S -1 82.5 3.9 4 -1287.000
as per Initial Profile
-1287.0 Cum

c c c c c c c c c c
t.slab
0.45
0.450

FRL
RCW
105.827

BOQ
Item No.

6.01 a

6.02 b

6.20 c

6.20 c

6.20 c
t.slab
0.45
0.450

FRL
RCW
105.827

BOQ
Item No.

6.22 c

6.22 c

6.22 c

6.22 c

6.22 c

6.42 a
t.slab
0.45
0.450

FRL
RCW
105.827

BOQ
Item No.

6.60 b

6.52

6.02 a

6.20 d
6.20 d
6.22 d
6.22 d
t.slab
0.45
0.450

FRL
RCW
105.827

BOQ
Item No.

6.30 a

6.30 b

6.30 c

2.02

c
Quantity - BOX Culvert at km 137+850 (RSR)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.000 7.500 0.000 7.500 LHS RHS LCW
0.000 0.000 7.500 0.000 0.000 7.500

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 93.315 0.000

Inv Lev 93.1515


FL 92.702
depth 0.613
Top slab level 96.452
3.137

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

1 Excavation for Structures


Below Box Raft

Raft RCW 1 7.700 4.000 0.613 18.880


Shear Key BHS 2 3.800 1.100 0.750 6.270
U-Trough BHS 1 9.100 5.350 0.613 29.844
1 14.000 2.350 0.613 20.168
Flexible Apron D/S 1 6.100 13.800 0.913 76.856
152.018 Cum

2 Levelling Course - PCC


Below Box Raft
Raft SR 1 7.500 3.800 0.150 4.275
U-TROUGH 1 8.900 5.150 0.150 6.875
1 13.800 2.150 0.150 4.451
15.601 Cum
3 Box Structure - Conc.
Raft - Box Str

Raft SR 1 7.500 3.600 0.300 8.100


8.100 Cum
Shear Key SR 2 3.600 0.900 0.750 4.860
4.860 Cum
Quantity - BOX Culvert at km 137+850 (RSR)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.000 7.500 0.000 7.500 LHS RHS LCW
0.000 0.000 7.500 0.000 0.000 7.500

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 93.315 0.000

Inv Lev 93.1515


FL 92.702
depth 0.613
Top slab level 96.452
3.137

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

U-TROUGH 1 8.874 5.000 0.300 13.311


1 13.600 2.000 0.300 8.160
21.471 Cum

Wall - Box Str

Wall (Outer) SR 2 7.500 0.300 3.000 13.500


Haunch (Bottom) SR 2 7.500 0.150 0.075 0.169
Haunch (Top) SR 2 7.500 0.150 0.075 0.169 13.838 Cum

U-TROUGH SR 2 7.1 2.25 0.300 9.546


2 2.0 1.00 0.300 1.200 10.746 Cum

Slab - Box Str


Slab SR 1 7.500 3.600 0.300 8.100
8.100 Cum

4 Fibre Board
Raft MCW 1 3.600 0.300 1.080
Wall MCW 2 0.300 3.000 1.800
Haunch 4 0.150 0.075 0.045 2.925 Sqm
11.700 Rm
5 Filter Media - Geocomposite
Wall BHS 2 7.500 3.300 49.50
49.500 Sqm
Quantity - BOX Culvert at km 137+850 (RSR)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.000 7.500 0.000 7.500 LHS RHS LCW
0.000 0.000 7.500 0.000 0.000 7.500

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 93.315 0.000

Inv Lev 93.1515


FL 92.702
depth 0.613
Top slab level 96.452
3.137

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

U-TROUGH BHS 2 7.07 2.250 15.91


2 2 1.000 2.00 17.910 Sqm
Quantity - BOX Culvert at km 137+850 (RSR)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.000 7.500 0.000 7.500 LHS RHS LCW
0.000 0.000 7.500 0.000 0.000 7.500

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 93.315 0.000

Inv Lev 93.1515


FL 92.702
depth 0.613
Top slab level 96.452
3.137

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

6 Weep Holes
BHS 2 16 32
32 Nos
7 Toe Wall
Toe Wall-EXC BHS 2 1.000 1.100 1.100 2.420 2.420
Toe Wall-PCC BHS 2 1.000 1.100 0.100 0.220
Toe Wall BHS 2 1.000 0.900 0.500 0.900
Toe Wall BHS 2 1.000 0.450 0.500 0.450
1.570 Cum
7 Curtain Wall

Curtain Wall-PCC RHS-SR 1 15.200 1.850 0.150 4.218


Curtain Wall RHS-SR 1 15.200 1.650 0.550 13.794
Curtain Wall RHS-SR 1 15.200 0.750 0.750 8.550
Curtain Wall RHS-SR 1 15.200 0.450 0.750 5.130
Curtain Wall RHS-SR 1 15.200 0.200 0.450 1.368
33.060 Cum
8 CRASH BARRIER
Box Str + Approach
Slab
RCC Crash Barrier B/S 2 3.600 0.296 2.131
2.131 Cum

9 Reinforcement
Box Structure
Quantity - BOX Culvert at km 137+850 (RSR)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.000 7.500 0.000 7.500 LHS RHS LCW
0.000 0.000 7.500 0.000 0.000 7.500

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 93.315 0.000

Inv Lev 93.1515


FL 92.702
depth 0.613
Top slab level 96.452
3.137

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

Box - Foundation RHS-SR 1 1.349 1.349


U-Trough Foundation RHS-SR 1 1.759 1.759
3.108 MT

Box - Substructure RHS-SR 1 1.575 1.575

U-Trough Substructure RHS-SR 0.458 0.458

2.033 MT

Box - Super Structure RHS-SR 1 1.023 1.023


RCC Crash Barrier RHS-SR 2 3.600 0.048 0.342
1.365 MT
9 FLEXIBLE APRON
Flexible Apron D/S 1 6.000 8.5 0.75 38.250 38.250 Cum
Flexible Apron U/S 0 3.000 8.5 0.75 0.000 0.000 Cum

10 Less Embankment Quantity of Box Culvert


Embankment Qty of Box B/S -1 7.500 3.6 3.1 -84.699
-84.7 Cum

c c c c c c c c c c
t.slab
0.30
0.300

FRL
RCW

BOQ
Item No.

6.01 a

6.02 b

6.20 c

6.20 c
t.slab
0.30
0.300

FRL
RCW

BOQ
Item No.

6.20 c

6.22 c

6.22 c

6.22 c

6.42 a

6.60 b
t.slab
0.30
0.300

FRL
RCW

BOQ
Item No.

6.60 b
t.slab
0.30
0.300

FRL
RCW

BOQ
Item No.

6.52

6.01 a

6.02 a

6.02 a

6.47
t.slab
0.30
0.300

FRL
RCW

BOQ
Item No.

6.30 a

6.30 b

6.30 c

16.11
16.11

2.02

c
Quantity - BOX Culvert at km 137+850 (LSR)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.000 9.000 0.000 9.000 LHS RHS LCW
0.000 0.000 9.000 0.000 0.000 9.000

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 94.359 0.000

Inv Lev 93.2455


FL 92.796
depth 1.564
Top slab level 96.546
2.186

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

1 Excavation for Structures


Below Box Raft

Raft LCW 1 9.200 4.000 1.564 57.537


Shear Key BHS 2 3.800 1.100 0.750 6.270
U-Trough BHS 1 9.100 5.350 1.564 76.119
1 14.000 2.350 1.564 51.439
Flexible Apron U/S 1 3.100 13.800 1.864 79.721
271.086 Cum

2 Levelling Course - PCC


Below Box Raft
Raft SR 1 9.000 3.800 0.150 5.130
U-TROUGH 1 8.900 5.150 0.150 6.875
1 13.800 2.150 0.150 4.451
16.456 Cum
3 Box Structure - Conc.
Raft - Box Str

Raft SR 1 9.000 3.600 0.300 9.720


9.720 Cum
Shear Key SR 2 3.600 0.900 0.750 4.860
4.860 Cum
Quantity - BOX Culvert at km 137+850 (LSR)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.000 9.000 0.000 9.000 LHS RHS LCW
0.000 0.000 9.000 0.000 0.000 9.000

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 94.359 0.000

Inv Lev 93.2455


FL 92.796
depth 1.564
Top slab level 96.546
2.186

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

U-TROUGH 1 8.874 5.000 0.300 13.311


1 13.600 2.000 0.300 8.160
21.471 Cum

Wall - Box Str

Wall (Outer) SR 2 9.000 0.300 3.000 16.200


Haunch (Bottom) SR 2 9.000 0.150 0.075 0.203
Haunch (Top) SR 2 9.000 0.150 0.075 0.203 16.606 Cum

U-TROUGH SR 2 7.1 2.25 0.300 9.546


2 2.0 1.00 0.300 1.200 10.746 Cum

Slab - Box Str


Slab SR 1 9.000 3.600 0.300 9.720
9.720 Cum

4 Fibre Board
Raft MCW 1 3.600 0.300 1.080
Wall MCW 2 0.300 3.000 1.800
Haunch 4 0.150 0.075 0.045 2.925 Sqm
11.700 Rmt
5 Filter Media - Geocomposite
Wall BHS 2 9.000 3.300 59.40
59.400 Sqm
Quantity - BOX Culvert at km 137+850 (LSR)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.000 9.000 0.000 9.000 LHS RHS LCW
0.000 0.000 9.000 0.000 0.000 9.000

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 94.359 0.000

Inv Lev 93.2455


FL 92.796
depth 1.564
Top slab level 96.546
2.186

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

U-TROUGH BHS 2 7.07 2.250 15.91


2 2 1.000 2.00 17.910 Sqm
6 Weep Holes
BHS 2 18 36
36 Nos
7 Toe Wall
Toe Wall-EXC BHS 2 1.000 1.100 1.100 2.420 2.420
Toe Wall-PCC BHS 2 1.000 1.100 0.100 0.220
Toe Wall BHS 2 1.000 0.900 0.500 0.900
Toe Wall BHS 2 1.000 0.450 0.500 0.450
1.570 Cum
7 Curtain Wall

Curtain Wall-PCC LHS-SR 1 15.200 1.500 0.150 3.420


Curtain Wall LHS-SR 1 15.200 1.300 0.800 15.808
Curtain Wall LHS-SR 1 15.200 0.450 0.750 5.130
Curtain Wall LHS-SR 1 15.200 0.450 0.200 1.368
25.726 Cum
8 CRASH BARRIER
Box Str + Approach
Slab
RCC Crash Barrier B/S 2 3.600 0.296 2.131
2.131 Cum

9 Reinforcement
Quantity - BOX Culvert at km 137+850 (LSR)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.000 9.000 0.000 9.000 LHS RHS LCW
0.000 0.000 9.000 0.000 0.000 9.000

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 94.359 0.000

Inv Lev 93.2455


FL 92.796
depth 1.564
Top slab level 96.546
2.186

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

Box Structure
Box - Foundation LHS-SR 1 1.349 1.349
U-Trough Foundation LHS-SR 1 1.759 1.759
3.108 MT

Box - Substructure LHS-SR 1 1.575 1.575

U-Trough Substructure LHS-SR 0.458 0.458

2.033 MT

Box - Super Structure LHS-SR 1 1.023 1.023


RCC Crash Barrier RHS-SR 2 3.600 0.048 0.342
1.365 MT
9 FLEXIBLE APRON
Flexible Apron D/S 0 6.000 8.5 0.75 0.000 0.000 Cum
Flexible Apron U/S 1 3.000 8.5 0.75 19.125 19.125 Cum

10 Less Embankment Quantity of Box Culvert


Embankment Qty of Box B/S -1 9.000 3.6 2.2 -70.843
-70.8 Cum
t.slab
0.30
0.300

FRL
RCW

BOQ
Item No.

6.01 a

6.02 b

6.20 c

6.20 c
t.slab
0.30
0.300

FRL
RCW

BOQ
Item No.

6.20 c

6.22 c

6.22 c

6.22 c

6.42 a

6.60 b
t.slab
0.30
0.300

FRL
RCW

BOQ
Item No.

6.60 b

6.52

6.01 a

6.02 a

6.02 a

6.47
t.slab
0.30
0.300

FRL
RCW

BOQ
Item No.

6.30 a

6.30 b

6.30 c

16.11
16.11

2.02
Quantity - BOX Culvert at km 138+300 MCW

BC - 1 x 1 x 0 Cell a b H W c b.slab wall t.slab


Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.45 0.45 0.45
Skew (rad) = 0.00 1.00 0.000 0.450

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 23.250 23.250 23.250 0.000 23.250 LHS RHS LCW RCW
0.000 23.250 23.250 23.250 0.000 23.250 103.874 103.874

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 93.766 0.000

Inv Lev 93.9


FL 93.450
depth 0.466
Top slab level 97.350
3.584
levelling pad top level 92.597
Ht of Wall Deduction 4.753

Sl. BOQ
Description Side No. Length Width Depth Quantity Sub Total Unit Item No.
No.

1 Excavation for Structures


Excavation for:
Raft LCW 1 21.750 4.100 0.466 41.556
Raft RCW 1 21.750 4.100 0.466 41.556
Shear Key BHS 2 4.100 0.950 0.675 5.258
U-Trough LCW 1 11.800 3.800 0.466 20.895
U-Trough RCW 1 21.500 3.800 0.466 38.072 147.337 Cum 6.01 a

2 Levelling Course - PCC


Below Box Raft
Below Box Raft LCW 1 21.750 4.100 0.150 13.376
Below Box Raft RCW 1 21.750 4.100 0.150 13.376
Shear Key BS 2 1.461 4.100 0.150 1.797
U-TROUGH LCW 1 11.800 3.800 0.150 6.726
U-TROUGH RCW 1 21.500 3.800 0.150 12.255 47.530 Cum 6.02 b

3 Box Structure - Conc.


Raft - Box Str
Raft LCW 1 23.250 3.900 0.450 40.804
Quantity - BOX Culvert at km 138+300 MCW

BC - 1 x 1 x 0 Cell a b H W c b.slab wall t.slab


Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.45 0.45 0.45
Skew (rad) = 0.00 1.00 0.000 0.450

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 23.250 23.250 23.250 0.000 23.250 LHS RHS LCW RCW
0.000 23.250 23.250 23.250 0.000 23.250 103.874 103.874

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 93.766 0.000

Inv Lev 93.9


FL 93.450
depth 0.466
Top slab level 97.350
3.584
levelling pad top level 92.597
Ht of Wall Deduction 4.753

Sl. BOQ
Description Side No. Length Width Depth Quantity Sub Total Unit Item No.
No.

40.804 Cum 6.20 c


Raft RCW 1 23.250 3.900 0.450 40.804
40.804 Cum 6.20 c
Shear Key BS 2 3.900 0.750 0.675 3.949
3.949 Cum 6.20 c

Wall - Box Str


Wall (Outer) LCW 2 23.250 0.450 3.000 62.775
Haunch (Bottom) LCW 2 23.250 0.150 0.075 0.523
Haunch (Top) LCW 2 23.250 0.150 0.075 0.523 63.821 Cum 6.22 c

Wall (Outer) RCW 2 23.250 0.450 3.000 62.775


Haunch (Bottom) RCW 2 23.250 0.150 0.075 0.523
Haunch (Top) RCW 2 23.250 0.150 0.075 0.523 63.821 Cum 6.22 c

Slab - Box Str


Slab LCW 1 23.250 3.900 0.450 40.804 40.804 Cum 6.22 c
Slab RCW 1 23.250 3.900 0.450 40.804 40.804 Cum 6.22 c
Headwall BS 2 3.900 0.250 0.300 0.585 0.585 Cum 6.22 c
Quantity - BOX Culvert at km 138+300 MCW

BC - 1 x 1 x 0 Cell a b H W c b.slab wall t.slab


Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.45 0.45 0.45
Skew (rad) = 0.00 1.00 0.000 0.450

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 23.250 23.250 23.250 0.000 23.250 LHS RHS LCW RCW
0.000 23.250 23.250 23.250 0.000 23.250 103.874 103.874

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 93.766 0.000

Inv Lev 93.9


FL 93.450
depth 0.466
Top slab level 97.350
3.584
levelling pad top level 92.597
Ht of Wall Deduction 4.753

Sl. BOQ
Description Side No. Length Width Depth Quantity Sub Total Unit Item No.
No.

4 Fibre Board
Raft MCW 1 3.900 0.450 1.755
Wall m MCW 2 3.000 0.450 2.700
Wall end MCW 0 3.000 0.450 0.000
Slab MCW 1 3.900 0.450 1.755
Haunch 4 0.150 0.075 0.045 6.255 Sqm
25.020 Rm 6.42 a
5 Filter Media - Geocomposite
BHS 2 46.500 3.450 320.85 320.850 Sqm 6.60 b

6 Weep Holes
BHS 2 94 188
188 Nos 6.52

7 Curtain Wall

8 U-TROUGH
RCC RAFT U/S 1 21.500 3.600 0.300 23.220 23.220 Cum 6.20 c
RCC RAFT D/S 1 11.800 3.600 0.300 12.744 12.744 Cum 6.20 c
Quantity - BOX Culvert at km 138+300 MCW

BC - 1 x 1 x 0 Cell a b H W c b.slab wall t.slab


Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.45 0.45 0.45
Skew (rad) = 0.00 1.00 0.000 0.450

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 23.250 23.250 23.250 0.000 23.250 LHS RHS LCW RCW
0.000 23.250 23.250 23.250 0.000 23.250 103.874 103.874

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 93.766 0.000

Inv Lev 93.9


FL 93.450
depth 0.466
Top slab level 97.350
3.584
levelling pad top level 92.597
Ht of Wall Deduction 4.753

Sl. BOQ
Description Side No. Length Width Depth Quantity Sub Total Unit Item No.
No.

WALL U/S 2 21.500 0.300 3.000 38.700 38.700 Cum 6.22 c


WALL D/S 2 11.800 0.300 3.000 21.240 21.240 Cum 6.22 c
Haunch U/S 2 21.500 0.150 0.075 0.484 0.484 Cum 6.22 c
Haunch D/S 2 11.800 0.150 0.075 0.266 0.266 Cum 6.22 c

9 Reinforcement
Box Structure
Box - Foundation BHS 1 10.402 10.402
U-Trough Foundation BHS 1 4.622 4.622
15.024 MT 6.30 a

Box - Substructure BHS 1 11.092 11.092


U-Trough Substructure BHS 1 2.358 2.358
13.450 MT 6.30 b

Box - Super Structure BHS 1 9.662 9.662


9.662 MT 6.30 c
Quantity - BOX Culvert at km 138+300 MCW

BC - 1 x 1 x 0 Cell a b H W c b.slab wall t.slab


Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.45 0.45 0.45
Skew (rad) = 0.00 1.00 0.000 0.450

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 23.250 23.250 23.250 0.000 23.250 LHS RHS LCW RCW
0.000 23.250 23.250 23.250 0.000 23.250 103.874 103.874

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 93.766 0.000

Inv Lev 93.9


FL 93.450
depth 0.466
Top slab level 97.350
3.584
levelling pad top level 92.597
Ht of Wall Deduction 4.753

Sl. BOQ
Description Side No. Length Width Depth Quantity Sub Total Unit Item No.
No.

10 Less Quantity for Box Culvert


Embankment Qty of Box B/S -1 46.500 3.900 3.584 -649.958 -649.958 Cum 2.02
RE Wall Panel area B/S -2 3.900 4.753 -37.073 -37.073 Sqm 6.90 a
Levelling Pad PCC B/S -2 3.900 0.300 0.150 -0.351 -0.351 Cum 6.02 b

c c c c c c c c c c c
Quantity - BOX Culvert at km 138+300 (LHS & RHS)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 9.000 0.000 9.000 0.000 0.000 LHS RHS LCW
0.000 9.000 0.000 9.000 0.000 0.000 93.650 93.650 97.175

e GL C/s Road Inv Lvl


LCW RCW Avg FRL LHS RHS
-2.50% -2.50% 93.766 0.000 93.800 93.854

Inv Lev 93.827 93.827


FL 93.527
Top slab level 97.127
depth 3.300
Ut-Wall Ht 3.300

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

1 Excavation for Structures


Below Box Raft
Below Box Raft BSR 2 9.200 3.800 0.511 35.729
Shear Key BSR 4 3.800 1.100 0.750 12.540
U-Trough D/S 2 2.000 13.000 0.389 20.228
U-Trough U/S 2 4.600 8.400 0.389 30.062
Flexible Apron D/S 1 6.100 13.000 0.716 56.779
Flexible Apron U/S 1 3.100 13.000 0.662 26.679 182.017 Cum

2 Levelling Course - PCC


Below Box Raft
Below Box Raft SR 2 9.200 3.800 0.150 10.488
Shear Key SR 4 3.800 1.100 0.150 2.508
U-Trough BS 2 8.874 5.150 0.150 13.711
U-Trough BS 2 13.750 2.150 0.150 8.869
35.576 Cum
3 Box Structure - Conc.
Raft - Box Str

Raft BS 2 9.000 3.600 0.300 19.440


Shear Key BS 4 3.600 0.900 0.750 9.720
U-Trough BS 2 8.874 5.000 0.300 26.623
U-Trough BS 2 13.600 2.000 0.300 16.320 72.103 Cum
Quantity - BOX Culvert at km 138+300 (LHS & RHS)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 9.000 0.000 9.000 0.000 0.000 LHS RHS LCW
0.000 9.000 0.000 9.000 0.000 0.000 93.650 93.650 97.175

e GL C/s Road Inv Lvl


LCW RCW Avg FRL LHS RHS
-2.50% -2.50% 93.766 0.000 93.800 93.854

Inv Lev 93.827 93.827


FL 93.527
Top slab level 97.127
depth 3.300
Ut-Wall Ht 3.300

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

Wall - Box Str


Wall (Outer) BS SR 4 9.000 0.300 3.000 32.400
Haunch (Bottom) BS SR 4 9.000 0.150 0.075 0.405
Haunch (Top) BS SR 4 9.000 0.150 0.075 0.405
Wall - U-Though
Wall (Outer) BS SR 4 7.071 2.250 0.300 19.092
Wall (Tapper) BS SR 4 2.000 1.000 0.300 2.400 54.702 Cum

Slab - Box Str


Slab BS SR 2 9.000 3.600 0.300 19.440 19.440 Cum

Crash Barrier BS SR 4 3.600 0.296 4.262 4.262 Cum

4 Fibre Board
Raft BS SR 2 3.600 0.300 2.160
Wall BS SR 4 0.300 3.000 3.600
Haunch BS SR 8 0.150 0.075 0.090 5.850 Sqm
23.400 Rm
5 Filter Media - Geocomposite
BS SR 4 9.000 3.300 118.80
118.800 Sqm

6 Weep Holes
Quantity - BOX Culvert at km 138+300 (LHS & RHS)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 9.000 0.000 9.000 0.000 0.000 LHS RHS LCW
0.000 9.000 0.000 9.000 0.000 0.000 93.650 93.650 97.175

e GL C/s Road Inv Lvl


LCW RCW Avg FRL LHS RHS
-2.50% -2.50% 93.766 0.000 93.800 93.854

Inv Lev 93.827 93.827


FL 93.527
Top slab level 97.127
depth 3.300
Ut-Wall Ht 3.300

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

BS SR 4 18 72
72 Nos
7 Curtain Wall

Excavavtion U/S 1 13.000 1.700 1.550 34.255 34.255


Curtain Wall-PCC U/S 1 12.800 1.500 0.150 2.880
Curtain Wall-1st Lift U/S 1 12.800 1.300 0.800 13.312
Curtain Wall-2nd Lift U/S 1 12.800 0.450 0.750 4.320
Curtain Wall-3rd Lift U/S 1 12.800 0.200 0.450 1.152 21.664 Cum

Excavavtion D/S 1 13.000 2.050 2.050 54.633 54.633


Curtain Wall-PCC D/S 1 12.800 1.850 0.150 3.552
Curtain Wall-1st Lift D/S 1 12.800 1.650 0.550 11.616
Curtain Wall-2nd Lift D/S 1 12.800 0.750 0.750 7.200
Curtain Wall-3rd Lift D/S 1 12.800 0.450 0.750 4.320
Curtain Wall-4th Lift D/S 1 12.800 0.200 0.450 1.152 27.840 Cum

7 Toe Wall

8 Reinforcement
Box Structure
Box - Foundation BHS 1 2.356 2.356
U-Trough Foundation BHS 1 3.518 3.518
5.874 MT
Quantity - BOX Culvert at km 138+300 (LHS & RHS)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 9.000 0.000 9.000 0.000 0.000 LHS RHS LCW
0.000 9.000 0.000 9.000 0.000 0.000 93.650 93.650 97.175

e GL C/s Road Inv Lvl


LCW RCW Avg FRL LHS RHS
-2.50% -2.50% 93.766 0.000 93.800 93.854

Inv Lev 93.827 93.827


FL 93.527
Top slab level 97.127
depth 3.300
Ut-Wall Ht 3.300

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

Box - Substructure BHS 1 1.944 1.944


U-Trough Substructure BHS 0.916 0.916
2.860 MT

Box - Super Structure BHS 1 2.198 2.198


RCC Crash Barrier BHS 4 3.600 0.048 0.684
2.882 MT

9 FLEXIBLE APRON
Flexible Apron D/S 1 6.000 12.800 0.75 57.600 57.600 Cum
Flexible Apron U/S 1 3.000 12.800 0.75 28.800 28.800 Cum

10 Less Embankment Quantity of Box Culvert


Embankment Qty of Box B/S -2 12.361 3.6 3.361 -299.126
-299.1 Cum

c c c c c c c c c c
t.slab
0.30
0.300

FRL
RCW
97.175

BOQ
Item No.

6.01 a

6.02 b

6.20 c
t.slab
0.30
0.300

FRL
RCW
97.175

BOQ
Item No.

6.22 c

6.22 c

6.47

6.42 a

6.60 b
t.slab
0.30
0.300

FRL
RCW
97.175

BOQ
Item No.

6.52

6.01 a

6.02 a

6.01 a

6.02 a

6.30 a
t.slab
0.30
0.300

FRL
RCW
97.175

BOQ
Item No.

6.30 b

6.30 c

16.11
16.11

2.02

c
Quantity - Syphon at Km.138+365
Sl. BOQ
Description Side No. Length Width Depth Quantity Sub Total Unit Item No.
No.

1 Excavation
Excavation B/S 1 25.200 2.200 1.409 78.14
Excavation LHS 1 3.300 1.600 1.159 6.12
Excavation RHS 1 3.300 2.300 1.159 8.80
Apron (U/S) U/S 1 4.400 4.400 2.259 43.74
Apron (D/S) D/S 1 4.400 5.400 2.259 53.69
Excavation for Toe wall U/S 1 6.200 0.900 0.950 5.30
Excavation for Toe wall D/S 1 6.200 0.900 1.150 6.42
Excavation of CC Block B/S 2 3.300 0.500 0.500 1.65

203.86 Cum 6.01 a


2 Compaction of OGL under PCC for Pipe Culvert
Compaction 1 21.200 1.740 0.500 18.44
Compaction 1 3.3 2.3 0.500 3.80

22.24 Cum 3.19


3 Levelling Course /Head Wall - PCC

PCC Under Pipe 1 22.000 1.740 0.150 5.74


PCC Under Pipe 1 3.300 2.300 0.150 1.14
Headwall PCC U/S 1 3.000 1.300 0.150 0.585
Headwall PCC D/S 1 3.000 2.000 0.150 0.900
8.366 Cum 6.02 b
Headwall Inclined portion U/S 1 3.000 0.825 2.200 5.445
Headwall Parapet U/S 1 3.000 0.300 0.350 0.315
Headwall Inclined portion D/S 1 3.000 1.300 2.050 7.995
Headwall Parapet D/S 1 3.000 0.450 0.350 0.473
Headwall (Pipe Deduction)-U/S -1 3.142 0.490 0.998 -1.536
Headwall (Pipe Deduction)-D/S -1 3.142 0.490 1.172 -1.804
Toe Wall PCC 2 6.200 0.900 0.150 1.674
Toe Wall U/S 1 6.200 0.500 0.800 2.480
Toe Wall D/S 1 6.200 0.500 1.000 3.100
CC Block 2 3.000 0.500 0.500 1.500
Transision Wings U/S 2 7.071 1.700 0.450 10.819
Transision Wings D/S 2 8.485 1.700 0.450 12.982
Headwall Construction Transition
2 7.071 0.713 1.700 17.130
U/S
Headwall Expansion Transition
2 8.485 0.713 1.700 20.556
D/S
Head Wall Top Portaion U/S 2 7.071 0.350 0.300 1.485
Head Wall Top Portaion D/S 2 8.485 0.350 0.300 1.782
Pipe Protection below drain 1 3.000 2.000 0.300 6.000
Quantity - Syphon at Km.138+365
Sl. BOQ
Description Side No. Length Width Depth Quantity Sub Total Unit Item No.
No.

Pipe Protection below drain 1 3.000 1.600 0.720 4.800


Pipe Protection below drain -1 3.000 0.029 0.300 0.086
Pipe Protection below drain 1 3.000 2.300 0.300 6.900
Pipe Protection below drain 2 3.000 0.650 0.300 1.950
Pipe Protection below drain 2 3.000 0.350 0.300 1.050
U/S Cut off wall 1 3.840 0.500 1.025 1.920
D/S Cut off wall 1 5.000 0.500 1.550 2.500

109.602 Cum 6.02 c

4 Providing & Laying of Pipe

Providing & Laying of NP-3 Pipe 1 25.000 25.000 25.000 Mtr 9.20.B

`
5 DRY STONE PITCHING FOR APRON
Up Streem U/S 1 2.520 2.5 1.1625 7.324
Up Streem U/S -1 2.520 0.5 0.5 -0.630
Up Streem U/S -1 2.520 1 0.25 -0.630
Down Streem D/S 1 3.100 4.5 1.423 19.851
Down Streem D/S -1 3.100 0.8 0.6 -1.395
Down Streem D/S -1 3.100 1.3 0.4 -1.550
Down Streem D/S -1 3.100 1.3 0.2 -0.775
22.195 Cum 15.4

300mm THK. DRY STONE


PAVEMENT OVER FILTER
6
GRANULAR MATERIAL
BACKING 150MM THIK
Stone Pitching 4 3.987 Area 0.3 4.784 0.000 15.4
Filter Media under the stone pitching 4 2.508 Area 0.3 3.009 0.000 15.5

7 Dry Brick Pitching


Brick Work U/S 1 4.920 1.600 0.400 3.149 3.149 Cum 13.1
Brick Work D/S 1 5.500 0.600 0.400 1.320 1.320 Cum 13.1
Quantity - BOX Culvert at km 140+415
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 2.000 2.000 0.00 0.30 0.25
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.000 5.500 0.000 5.500 LHS RHS LCW
0.000 0.000 5.500 0.000 0.000 5.500 88.298 88.298 94.350

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 92.786 0.000

Inv Lev 92.05


FL 91.750
Top slab level 94.300
depth 2.250

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

1 Excavation for Structures


Below Box Raft

Raft RCW 1 5.700 2.700 1.136 17.483


Shear Key BS 2 2.700 1.100 0.750 4.455
U-Trough BS 0 9.000 0.000 1.136 0.000
21.938 Cum

2 Levelling Course - PCC


Below Box Raft
Raft SR 1 5.700 2.700 0.150 2.309
U-TROUGH BS 0 9.000 0.000 0.150 0.000
2.309 Cum
3 Box Structure - Conc.
Raft - Box Str

Raft SR 1 5.500 2.500 0.300 4.125


4.125 Cum
Shear Key SR 2 2.500 0.900 0.750 3.375
3.375 Cum

Wall - Box Str


Quantity - BOX Culvert at km 140+415
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 2.000 2.000 0.00 0.30 0.25
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.000 5.500 0.000 5.500 LHS RHS LCW
0.000 0.000 5.500 0.000 0.000 5.500 88.298 88.298 94.350

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 92.786 0.000

Inv Lev 92.05


FL 91.750
Top slab level 94.300
depth 2.250

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

Wall (Outer) SR 2 5.500 0.250 2.000 5.500


Haunch (Bottom) SR 2 5.500 0.150 0.075 0.124
Haunch (Top) SR 2 5.500 0.150 0.075 0.124 5.748 Cum

Slab - Box Str


Slab SR 1 5.500 2.500 0.250 3.438 Cum
Crash Barrier BS SR 4 2.500 0.296 2.960 3.438 Cum

Headwall SR 0 2.500 0.250 0.300 0.000


0.000 Cum

4 Fibre Board
Raft MCW 1 2.500 0.300 0.750
Wall MCW 2 0.250 2.000 1.000
Haunch 4 0.150 0.075 0.045 1.795 Sqm
7.180 Rm
5 Filter Media - Geocomposite
BHS 2 5.500 2.250 24.75
24.750 Sqm

6 Weep Holes
Quantity - BOX Culvert at km 140+415
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 2.000 2.000 0.00 0.30 0.25
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.000 5.500 0.000 5.500 LHS RHS LCW
0.000 0.000 5.500 0.000 0.000 5.500 88.298 88.298 94.350

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 92.786 0.000

Inv Lev 92.05


FL 91.750
Top slab level 94.300
depth 2.250

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

BHS 2 11 22
22 Nos
7 Curtain Wall

Excavavtion U/S 1 8.700 1.500 1.550 20.228 20.228


Curtain Wall-PCC U/S 1 8.700 1.500 0.150 1.958
Curtain Wall-1st Lift U/S 1 8.500 1.300 0.800 8.840
Curtain Wall-2nd Lift U/S 1 8.500 0.450 0.750 2.869
Curtain Wall-3rd Lift U/S 1 8.500 0.200 0.450 0.765

Excavavtion D/S 1 8.700 1.850 2.050 32.995 32.995


Curtain Wall-PCC D/S 1 8.700 1.850 0.150 2.414
Curtain Wall-1st Lift D/S 1 8.500 1.650 0.550 7.714
Curtain Wall-2nd Lift D/S 1 8.500 0.750 0.750 4.781
Curtain Wall-3rd Lift D/S 1 8.500 0.450 0.750 2.869
Curtain Wall-4th Lift D/S 1 8.500 0.200 0.450 0.765
32.975 Cum
7 Toe Wall

Toe Wall-EXC BHS 2 1.000 1.100 1.100 2.420 2.420 Cum


Toe Wall-PCC BHS 4 1.000 1.100 0.100 0.440
Toe Wall BHS 4 1.000 0.900 0.500 1.800
Toe Wall BHS 4 1.000 0.450 0.500 0.900
Quantity - BOX Culvert at km 140+415
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 2.000 2.000 0.00 0.30 0.25
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.000 5.500 0.000 5.500 LHS RHS LCW
0.000 0.000 5.500 0.000 0.000 5.500 88.298 88.298 94.350

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 92.786 0.000

Inv Lev 92.05


FL 91.750
Top slab level 94.300
depth 2.250

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

3.140 Cum
8 U-TROUGH
U-Trough Excavation D/S 1 5.954 7.700 0.500 22.921 22.921
U/S 1 8.700 5.200 0.500 22.620 22.620
U-Trough PCC D/S 1 5.754 3.150 0.150 2.719 2.719
U/S 1 8.500 2.150 0.150 2.741 2.741
U-Trough Raft D/S 1 5.754 3.000 0.300 5.178 5.178
U/S 1 8.500 2.000 0.300 5.100 5.100
U-Trough Wall D/S 2 4.243 1.750 0.250 3.712 3.712
U/S 2 2.000 1.000 0.250 1.000 1.000

9 Reinforcement
Box Structure
Box - Foundation BHS 1 0.467 0.467
U-Trough Foundation BHS 2 0.742 1.484
1.951 MT

Box - Substructure BHS 1 0.420 0.420


U-Trough Substructure BHS 2 0.286 0.572
0.992 MT
Quantity - BOX Culvert at km 140+415
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 2.000 2.000 0.00 0.30 0.25
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.000 5.500 0.000 5.500 LHS RHS LCW
0.000 0.000 5.500 0.000 0.000 5.500 88.298 88.298 94.350

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 92.786 0.000

Inv Lev 92.05


FL 91.750
Top slab level 94.300
depth 2.250

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

Box - Super Structure BHS 1 0.467 0.467


RCC Crash Barrier BHS 2 2.500 0.048 0.240
0.707 MT

10 FLEXIBLE APRON
Excavation-Up Streem U/S 1 7.500 3.000 0.75 16.875 16.875 Cum
Excavation-Down Streem D/S 1 7.500 6.000 0.75 33.750 33.750 Cum
Flexible Apron U/S 1 7.500 3.000 0.75 16.875 16.875 Cum
Flexible Apron D/S 1 7.500 6.000 0.75 33.750 33.750 Cum

10 Less Embankment Quantity of Box Culvert


Embankment Qty of Box B/S -1 5.500 2.5 1.514 -20.818

-20.8 Cum

c c c c c c c c c c
t.slab
0.25
0.250

FRL
RCW
94.350

BOQ
Item No.

6.01 a

6.02 b

6.20 c

6.20 c
t.slab
0.25
0.250

FRL
RCW
94.350

BOQ
Item No.

6.22 c

6.22 c
6.47

6.25 c

6.42 a

6.60 b
t.slab
0.25
0.250

FRL
RCW
94.350

BOQ
Item No.

6.52

6.01 a

6.01 a

6.02 a

6.01 a
t.slab
0.25
0.250

FRL
RCW
94.350

BOQ
Item No.

6.02 a

6.01 a
6.01 a
6.02 a
6.02 a
6.20 d
6.20 d
6.22 d
6.22 d

6.30 a

6.30 b
t.slab
0.25
0.250

FRL
RCW
94.350

BOQ
Item No.

6.30 c

6.01 a
6.01 a
16.11
16.11

2.02

c
Quantity - BOX Culvert at km 140+450 MCW
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall t.slab
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.35 0.30 0.30
Skew (rad) = 0.00 1.00 0.000 0.300

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 28.790 31.080 28.790 0.000 31.080 LHS RHS LCW RCW
0.000 28.790 31.080 28.790 0.000 31.080 97.954 97.954 98.304 98.304

e GL C/s Road
LCW RCW Avg FRL
-3.00% -3.00% 92.726 0.000

Inv Lev 92.517 MATCH FROM DRAWIN


FL 92.167
Top slab level 95.817
depth 3.300

Sl. BOQ
Description Side No. Length Width Depth Quantity Sub Total Unit Item No.
No.

1 Excavation for Structures


Below Box Raft
Raft LCW 1 28.990 3.800 0.659 72.597
Raft RCW 1 31.280 3.800 0.659 78.331
Shear Key BHS 2 3.800 1.050 0.725 5.786
Flexible Apron D/S 1 6.100 13.000 0.959 76.049
Flexible Apron U/S 1 3.100 13.000 0.959 38.648 Cum
U-Trough BHS 0 9.000 0.000 0.659 0.000
271.411 Cum 6.01 a

2 Levelling Course - PCC


Below Box Raft
Raft LCW 1 28.990 3.800 0.150 16.524
Raft RCW 1 31.280 3.800 0.150 17.830
U-TROUGH BS 0 9.000 0.000 0.100 0.000
34.354 Cum 6.02 b
3 Box Structure - Conc.
Raft - Box Str
Raft LCW 1 28.790 3.600 0.350 36.275
36.275 Cum 6.20 c
Raft RCW 1 31.080 3.600 0.350 39.161
39.161 Cum 6.20 c
Shear Key BS 2 3.600 0.850 0.725 4.437
4.437 Cum 6.20 c
Quantity - BOX Culvert at km 140+450 MCW
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall t.slab
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.35 0.30 0.30
Skew (rad) = 0.00 1.00 0.000 0.300

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 28.790 31.080 28.790 0.000 31.080 LHS RHS LCW RCW
0.000 28.790 31.080 28.790 0.000 31.080 97.954 97.954 98.304 98.304

e GL C/s Road
LCW RCW Avg FRL
-3.00% -3.00% 92.726 0.000

Inv Lev 92.517 MATCH FROM DRAWIN


FL 92.167
Top slab level 95.817
depth 3.300

Sl. BOQ
Description Side No. Length Width Depth Quantity Sub Total Unit Item No.
No.

Wall - Box Str


Wall (Outer) LCW 2 28.790 0.300 3.000 51.822
Haunch (Bottom) LCW 2 28.790 0.150 0.075 0.648
Haunch (Top) LCW 2 28.790 0.150 0.075 0.648 53.118 Cum 6.22 c

Wall (Outer) RCW 2 31.080 0.300 3.000 55.944


Haunch (Bottom) RCW 2 31.080 0.150 0.075 0.699
Haunch (Top) RCW 2 31.080 0.150 0.075 0.699 57.342 Cum 6.22 c

Slab - Box Str


Slab LCW 1 28.790 3.600 0.300 31.093
31.093 Cum 6.22 c
Slab RCW 1 31.080 3.600 0.300 33.566
33.566 Cum 6.22 c
Headwall BS 2 3.600 0.250 0.300 0.540
0.540 Cum 6.22 c

4 Fibre Board
Raft MCW 1 3.600 0.350 1.260
Wall MCW 2 3.000 0.300 1.800
Wall MCW 2.000 0.150 0.300
Slab MCW 1 3.600 0.300 1.080
Haunch 4 0.150 0.075 0.045 4.485 Sqm
17.940 Rm 6.42 a
Quantity - BOX Culvert at km 140+450 MCW
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall t.slab
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.35 0.30 0.30
Skew (rad) = 0.00 1.00 0.000 0.300

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 28.790 31.080 28.790 0.000 31.080 LHS RHS LCW RCW
0.000 28.790 31.080 28.790 0.000 31.080 97.954 97.954 98.304 98.304

e GL C/s Road
LCW RCW Avg FRL
-3.00% -3.00% 92.726 0.000

Inv Lev 92.517 MATCH FROM DRAWIN


FL 92.167
Top slab level 95.817
depth 3.300

Sl. BOQ
Description Side No. Length Width Depth Quantity Sub Total Unit Item No.
No.

5 Filter Media - Geocomposite


BHS 2 59.870 3.300 395.14
395.142 Sqm 6.60 b

6 Weep Holes
BHS 2 120 240
240 Nos 6.52

7 Toe Wall

Toe Wall-PCC BHS 0 1.000 1.100 0.100 0.000


Toe Wall BHS 0 1.000 0.900 0.500 0.000
Toe Wall BHS 0 1.000 0.450 0.500 0.000

0.000 Cum 6.02 a


8 U-TROUGH
U-Trough Excavation D/S 1 5.954 7.700 0.000 0.000 0.000 6.01 a
D/S 1 8.700 5.200 0.000 0.000 0.000 6.01 a
U-Trough PCC D/S 1 5.754 3.150 0.150 2.719 2.719 6.02 a
D/S 1 8.500 2.150 0.150 2.741 2.741 6.02 a
U-Trough Raft D/S 1 5.754 3.000 0.300 5.178 5.178 6.20 d
D/S 1 8.500 2.000 0.300 5.100 5.100 6.20 d
U-Trough Wall D/S 2 4.243 1.750 0.250 3.712 3.712 6.20 d
Quantity - BOX Culvert at km 140+450 MCW
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall t.slab
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.35 0.30 0.30
Skew (rad) = 0.00 1.00 0.000 0.300

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 28.790 31.080 28.790 0.000 31.080 LHS RHS LCW RCW
0.000 28.790 31.080 28.790 0.000 31.080 97.954 97.954 98.304 98.304

e GL C/s Road
LCW RCW Avg FRL
-3.00% -3.00% 92.726 0.000

Inv Lev 92.517 MATCH FROM DRAWIN


FL 92.167
Top slab level 95.817
depth 3.300

Sl. BOQ
Description Side No. Length Width Depth Quantity Sub Total Unit Item No.
No.

D/S 2 2.000 1.000 0.250 1.000 1.000 6.20 d


U-Trough Excavation U/S 1 5.954 7.700 0.150 6.876 6.876 6.01 a
U/S 1 8.700 5.200 0.150 6.786 6.786 6.01 a
U-Trough PCC U/S 1 5.754 3.150 0.150 2.719 2.719 6.02 a
U/S 1 8.500 2.150 0.150 2.741 2.741 6.02 a
U-Trough Raft U/S 1 5.754 3.000 0.300 5.178 5.178 6.20 d
U/S 1 8.500 2.000 0.300 5.100 5.100 6.20 d
U-Trough Wall U/S 2 4.243 1.750 0.250 3.712 3.712 6.20 d
U/S 2 2.000 1.000 0.250 1.000 1.000 6.20 d

7 Curtain Wall

Excavavtion U/S 1 8.700 1.500 1.550 20.228 20.228 6.01 a


Curtain Wall-PCC U/S 1 8.700 1.500 0.150 1.958
Curtain Wall-1st Lift U/S 1 8.500 1.300 0.800 8.840
Curtain Wall-2nd Lift U/S 1 8.500 0.450 0.750 2.869
Curtain Wall-3rd Lift U/S 1 8.500 0.200 0.450 0.765

Excavavtion D/S 1 8.700 1.850 2.050 32.995 32.995 6.01 a


Curtain Wall-PCC D/S 1 8.700 1.850 0.150 2.414
Curtain Wall-1st Lift D/S 1 8.500 1.650 0.550 7.714
Curtain Wall-2nd Lift D/S 1 8.500 0.750 0.750 4.781
Curtain Wall-3rd Lift D/S 1 8.500 0.450 0.750 2.869
Curtain Wall-4th Lift D/S 1 8.500 0.200 0.450 0.765
32.975 Cum 6.02 a
Quantity - BOX Culvert at km 140+450 MCW
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall t.slab
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.35 0.30 0.30
Skew (rad) = 0.00 1.00 0.000 0.300

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 28.790 31.080 28.790 0.000 31.080 LHS RHS LCW RCW
0.000 28.790 31.080 28.790 0.000 31.080 97.954 97.954 98.304 98.304

e GL C/s Road
LCW RCW Avg FRL
-3.00% -3.00% 92.726 0.000

Inv Lev 92.517 MATCH FROM DRAWIN


FL 92.167
Top slab level 95.817
depth 3.300

Sl. BOQ
Description Side No. Length Width Depth Quantity Sub Total Unit Item No.
No.

9 Reinforcement
Box Structure
Box - Foundation BHS 1 4.942 4.942
U-Trough Foundation BHS 2 1.759 3.518
8.460 MT 6.30 a

Box - Substructure BHS 1 4.898 4.898


U-Trough Substructure BHS 2 0.458 0.916
5.814 MT 6.30 b

Box - Super Structure BHS 1 4.448 4.448


4.448 MT 6.30 c
9 FLEXIBLE APRON
Flexible Apron D/S 1 6.000 8.5 0.75 38.250 38.250 Cum 16.11
Flexible Apron U/S 1 3.000 8.5 0.75 19.125 19.125 Cum 16.11

10 Less Embankment Quantity of Box Culvert


Embankment Qty of Box B/S -1 59.870 3.600 3.091 -666.209

-666.209 Cum 2.02


Quantity - BOX Culvert at km 140+450 (RHS)

BC - 1 x 1 x 0 Cell a b H W c b.slab wall


Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.000 7.500 0.000 0.000 0.000 LHS RHS LCW
0.000 0.000 7.500 0.000 0.000 0.000 92.127 92.127 95.418

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 92.726 94.649

Inv Lev 92.427


FL 92.127
Top slab level 95.727
depth 3.300

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

1 Excavation for Structures


Below Box Raft

Raft RCW 1 7.700 3.800 0.699 20.453


Shear Key BS 2 3.800 1.100 0.750 6.270
Flexible Apron D/S 1 6.100 13.000 1.049 83.186
Flexible Apron U/S 1 3.100 13.000 1.049 42.275 152.184 Cum
U-Trough BS 0 9.000 3.800 0.699 0.000
152.184 Cum

2 Levelling Course - PCC


Below Box Raft
Raft SR 1 7.700 3.800 0.150 4.389
U-TROUGH BS 0 9.000 3.800 0.100 0.000
4.389 Cum
3 Box Structure - Conc.
Raft - Box Str

Raft SR 1 7.500 3.600 0.300 8.100


8.100 Cum
Shear Key SR 2 3.600 0.900 0.750 4.860
4.860 Cum
Quantity - BOX Culvert at km 140+450 (RHS)

BC - 1 x 1 x 0 Cell a b H W c b.slab wall


Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.000 7.500 0.000 0.000 0.000 LHS RHS LCW
0.000 0.000 7.500 0.000 0.000 0.000 92.127 92.127 95.418

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 92.726 94.649

Inv Lev 92.427


FL 92.127
Top slab level 95.727
depth 3.300

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

Wall - Box Str

Wall (Outer) SR 2 7.500 0.300 3.000 13.500


Haunch (Bottom) SR 2 7.500 0.150 0.075 0.169
Haunch (Top) SR 2 7.500 0.150 0.075 0.169 13.838 Cum

Slab - Box Str


Slab SR 1 7.500 3.600 0.300 8.100
8.100 Cum
Headwall SR 2 3.600 0.250 0.300 0.540
0.540 Cum

4 Fibre Board
Raft MCW 2 3.600 0.300 2.160
Wall MCW 4 0.300 3.000 3.600
Haunch 4 0.150 0.075 0.045 5.805 Sqm
23.220 Rm

5 Filter Media - Geocomposite


BHS 2 7.500 3.300 49.50
49.500 Sqm
Quantity - BOX Culvert at km 140+450 (RHS)

BC - 1 x 1 x 0 Cell a b H W c b.slab wall


Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.000 7.500 0.000 0.000 0.000 LHS RHS LCW
0.000 0.000 7.500 0.000 0.000 0.000 92.127 92.127 95.418

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 92.726 94.649

Inv Lev 92.427


FL 92.127
Top slab level 95.727
depth 3.300

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

6 Weep Holes
BHS 2 15 30
30 Nos
7 Toe Wall

Toe Wall-PCC BHS 0 1.000 1.100 0.100 0.000


Toe Wall BHS 0 1.000 0.900 0.500 0.000
Toe Wall BHS 0 1.000 0.450 0.500 0.000

0.000 Cum
8 U-TROUGH
U-Trough Excavation D/S 1 5.954 7.700 0.000 0.000 0.000
D/S 1 8.700 5.200 0.000 0.000 0.000
U-Trough PCC D/S 1 5.754 3.150 0.150 2.719 2.719
D/S 1 8.500 2.150 0.150 2.741 2.741
U-Trough Raft D/S 1 5.754 3.000 0.300 5.178 5.178
D/S 1 8.500 2.000 0.300 5.100 5.100
U-Trough Wall D/S 2 4.243 1.750 0.250 3.712 3.712
D/S 2 2.000 1.000 0.250 1.000 1.000

U-Trough Excavation U/S 1 5.954 7.700 0.150 6.876 6.876


U/S 1 8.700 5.200 0.150 6.786 6.786
U-Trough PCC U/S 1 5.754 3.150 0.150 2.719 2.719
U/S 1 8.500 2.150 0.150 2.741 2.741
Quantity - BOX Culvert at km 140+450 (RHS)

BC - 1 x 1 x 0 Cell a b H W c b.slab wall


Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.000 7.500 0.000 0.000 0.000 LHS RHS LCW
0.000 0.000 7.500 0.000 0.000 0.000 92.127 92.127 95.418

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 92.726 94.649

Inv Lev 92.427


FL 92.127
Top slab level 95.727
depth 3.300

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

U-Trough Raft U/S 1 5.754 3.000 0.300 5.178 5.178


U/S 1 8.500 2.000 0.300 5.100 5.100
U-Trough Wall U/S 2 4.243 1.750 0.250 3.712 3.712
U/S 2 2.000 1.000 0.250 1.000 1.000

8 CRASH BARRIER
Box Str + Approach
Slab
RCC Crash Barrier B/S 2 3.600 0.296 2.131
2.131 Cum

9 Reinforcement
Box Structure
Box - Foundation BHS 1 0.613 0.613
U-Trough Foundation BHS 2 1.719 3.438
4.051 MT

Box - Substructure BHS 1 0.570 0.570


U-Trough Substructure BHS 2 0.458 0.916
1.486 MT

Box - Super Structure BHS 1 0.619 0.619


RCC Crash Barrier BHS 2 3.600 0.048 0.342
Quantity - BOX Culvert at km 140+450 (RHS)

BC - 1 x 1 x 0 Cell a b H W c b.slab wall


Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.000 7.500 0.000 0.000 0.000 LHS RHS LCW
0.000 0.000 7.500 0.000 0.000 0.000 92.127 92.127 95.418

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 92.726 94.649

Inv Lev 92.427


FL 92.127
Top slab level 95.727
depth 3.300

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

0.961 MT

9 FLEXIBLE APRON
Flexible Apron D/S 1 6.000 8.5 0.75 38.250 38.250 Cum
Flexible Apron U/S 1 3.000 8.5 0.75 19.125 19.125 Cum

10 Less Embankment Quantity of Box Culvert


Embankment Qty of Box B/S -1 7.500 3.6 3.001 -81.027

-81.0 Cum
t.slab
0.30
0.300

FRL
RCW
95.418

BOQ
Item No.

6.01 a

6.02 b

6.20 c

6.20 c
t.slab
0.30
0.300

FRL
RCW
95.418

BOQ
Item No.

6.22 c

6.22 c

6.25 c

6.42 a

6.60 b
t.slab
0.30
0.300

FRL
RCW
95.418

BOQ
Item No.

6.52

6.02 a

6.01 a
6.01 a
6.02 a
6.02 a
6.20 d
6.20 d
6.20 d
6.20 d

6.01 a
6.01 a
6.02 a
6.02 a
t.slab
0.30
0.300

FRL
RCW
95.418

BOQ
Item No.

6.20 d
6.20 d
6.20 d
6.20 d

6.47

6.30 a

6.30 b
t.slab
0.30
0.300

FRL
RCW
95.418

BOQ
Item No.

6.30 c

16.11
16.11

2.02
Quantity - LVUP at km 153+316

LVUP - 1 x 10.50 x 3.50 m Cell a b b-lhs b-rhs c d e


Skew (deg) = 0.00 1 10.50 5.792 5.792 5.792 0.00 0.550 0.600
Skew (rad) = 0.00 10.50 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 22.750 22.750 21.250 3.000 21.250 LHS RHS LCW
0.000 22.750 22.750 21.250 3.000 21.250 89.471 89.471 96.729

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 90.471 92.064

Sl. Sub
Description Side No. Length Width Depth Quantity Unit
No. Total

1 Excavation for Structure


Exv for Raft LCW 1 22.850 11.800 1.100 296.59

Exv for Raft RCW 1 22.850 11.800 1.100 296.59


593.19 Cum
Sl. Sub
Description Side No. Length Width Depth Quantity Unit
No. Total

2 Levelling Course - PCC


Below Box Raft
Raft LCW 1 22.850 11.800 0.100 26.963
Raft RCW 1 22.850 11.800 0.100 26.963
53.926 Cum

Below Approach Slab LHS 2 21.550 3.350 0.150 21.658


RHS 2 21.550 3.350 0.150 21.658

Footpath B/S 4 22.750 1.500 0.150 20.475


63.791 Cum

3 Box Structure - Conc.


Raft - Box Str
Raft LCW 1 22.750 11.600 0.600 158.340
158.340 Cum
Raft RCW 1 22.750 11.600 0.600 158.340
158.340 Cum

Wall - Box Str


Wall (Outer) LCW 2 22.750 0.550 5.792 144.945
Wall (Inner) LCW 0 22.750 0.000 5.792 0.000
Haunch (Bottom) LCW 2 22.750 0.450 0.075 1.536
Median Wall LCW 2 1.500 0.550 0.550 0.908
Haunch (Top) LCW 2 21.250 0.450 0.075 1.434 148.823 Cum

Wall (Outer) RCW 2 22.750 0.550 5.792 144.945


Wall (Inner) RCW 0 22.750 0.000 5.792 0.000
Haunch (Bottom) RCW 2 22.750 0.450 0.075 1.536
Median Wall RCW 2 1.500 0.550 0.550 0.908
Haunch (Top) RCW 2 21.250 0.450 0.075 1.434 148.823 Cum

Bracket LCW 2 21.250 0.450 0.300 5.738


RCW 2 21.250 0.450 0.300 5.738 11.476 Cum

Slab - Box Str


Slab LCW 1 21.250 11.600 0.550 135.575
135.575 Cum
Slab RCW 1 21.250 11.600 0.550 135.575
135.575 Cum

4 RCC Crash Barrier - Conc.


Sl. Sub
Description Side No. Length Width Depth Quantity Unit
No. Total

Box Str + Approach


Slab
RCC CB (Outer Edge) B/S 2 18.600 0.317 11.789
RCC CB (Median Edge) B/S 2 18.600 0.317 11.789
RCC CB (Closure) B/S 2 3.000 0.317 1.901

25.479 Cum

5 Approach Slab
Approach Slab LHS 2 21.250 3.500 0.300 44.625
RHS 2 21.250 3.500 0.300 44.625 89.250 Cum

6 Reinforcement
Rnf Box Structure
Rnf Box - Foundation LHS 1 16.677 16.677
Rnf RHS 1 16.677 16.677 33.354 MT
Rnf
Rnf Box - Substructure LHS 1 21.209 21.209
Rnf RHS 1 21.209 21.209 42.418 MT
Rnf
Rnf Box - Super Structure LHS 1 16.873 16.873
Rnf RHS 1 16.873 16.873 33.746 MT
Rnf
Rnf RCC Crash Barrier
Rnf RCC CB (Outer Edge) B/S 2 18.600 0.047 1.748
Rnf RCC CB (Median Edge) B/S 2 18.600 0.047 1.748
Rnf RCC CB (Closure) B/S 2 3.000 0.047 0.282
Rnf
Rnf 3.778 MT
Rnf
7 Drainage Spout
LHS 3 3.00
RHS 3 3.00 6.00 Nos

8 Weep Holes
LHS 122 122.00
RHS 122 122.00 244.00 Nos
Sl. Sub
Description Side No. Length Width Depth Quantity Unit
No. Total

9 Fibre Board
Box & Median Wall Med 2 6.658 0.550 7.32
CB Med 4 0.317 1.27
Approach Slab B/S 4 21.250 0.300 25.50
Box Raft Med 1 11.600 0.600 6.96 41.052 Sqm
164.208 Rm
10 Filter Media - Geocomposite
LHS 2 22.750 6.392 290.84
RHS 2 22.750 6.392 290.84 581.672 Sqm

11 RE Wall
Return Wall LHS 2 13.403 4.370 4.739 117.13
2 2.000 2.000 4.739 8.00
RHS 2 13.403 4.370 4.739 117.13
2 2.000 2.000 4.739 8.00 250.257 Sqm

Levelling Pad BHS 4 13.403 0.350 0.150 2.815


BHS 4 2.000 0.350 0.150 0.420 3.235 Cum

Excavation BHS 4 13.403 6.000 1.000 321.66


BHS 4 2.000 6.000 1.000 48.000 369.662 Cum

12 Embankment
Embankment Qty as per
B/S km. 152+560 to 153+700 212937.2
Revised Profile
212937.2 Cum

13 Sub Grade
Subgrade in Flared Portion
B/S 4 75.000 1.875 0.500 281.25
in Str Approach of MCW

Connecting LSR & RSR B/S 1 111.030 10.500 0.500 582.91


Shoulder of LSR & RSR B/S 2 65.530 1.000 0.230 30.14
894.30 Cum

14 GSB

GSB in Flared Portion in Str


B/S 4 75.000 1.875 0.200 112.50
Approach of MCW
Granular Shoulder in Flared
Portion in Str Approach of B/S 4 75.000 1.875 0.400 225.00
MCW
Sl. Sub
Description Side No. Length Width Depth Quantity Unit
No. Total

Connecting LSR & RSR B/S 1 111.030 10.500 0.175 204.02


541.52 Cum

15 WMM
Connecting LSR & RSR B/S 1 116.000 7.300 0.150 127.02
127.02 Cum

16 Prime Coat
Wearing Coat above Str. B/S 2 18.600 20.250 753.30
Connecting LSR & RSR B/S 1 116.250 7.000 813.75
1567.05 Sqm

17 Tack Coat - Granular Surface


Connecting LSR & RSR B/S 1 116.250 7.000 813.75
813.75 Sqm

18 DBM
Connecting LSR & RSR B/S 1 116.250 7.000 0.050 40.69
40.69 Cum

19 Tack Coat - Bituminous Surface


Connecting LSR & RSR B/S 1 116.250 7.000 813.75
813.75 Sqm

20 BC
Wearing Coat above Str. B/S 2 18.600 20.250 0.050 37.67

Connecting LSR & RSR B/S 1 116.250 7.000 0.030 24.41 62.08 Cum

21 Drainage Chute
In Geocell Area LHS 0 0.00 0.00
RHS 0 0.00 0.00 0.00 Lm

In Turfing Area LHS 56 10.52 589.12


RHS 56 10.40 582.40 1171.52 Lm

22 Geocell with Concrete filling along Chute Drain


In Geocell Area LHS 0 0.00 2.00 0.00
RHS 0 0.00 2.00 0.00

In Turfing Area LHS 56 10.52 2.00 1178.24


RHS 56 10.40 2.00 1164.80 2343.04 Sqm
Sl. Sub
Description Side No. Length Width Depth Quantity Unit
No. Total

23 Geocell covered with fine grass


Geocell Area LHS 1 0.00 0.00
RHS 1 0.00 0.00
Less for Chute Drain & Geocell with Concrete
LHS 0 0.00 -2.60 0.00
RHS 0 0.00 -2.60 0.00 0.00 Sqm

24 Turfing with Sods


Turfing Area LHS 1 11810.38 11810.38
RHS 1 11674.53 11674.53
Less for Chute Drain & Geocell with Concrete
LHS 56 10.52 -2.60 -1531.71
RHS 56 10.40 -2.60 -1514.24 20438.96 Sqm

25 Qty - Misc work

Metal Beam Crash barrier B/S 0.000 18.600 0.000 Rm

k Kerb
Along LVUP Footpath B/S 4 22.750 0.1087 9.892 9.892 Cum

26 Pavement Marking: Lane/Edge


Pedestrian Crossing
B/S 7 3.000 0.500 10.500
(Cross Road)
Pedestrian Crossing
B/S 6 3.000 0.500 9.000
(Service Road)
Edge Line LHS 1 116.250 0.150 17.438
Edge Line RHS 1 116.250 0.150 17.438
Centre Line PCL 20 3.000 0.100 6.000 60.375 Sqm
27 Kerb and Crash Barrier Painting
Painting on Kerb LHS 4 22.750 0.789 71.799

Painting on Crash Barrier 2 40.200 2.483 199.633


271.432 Sqm
28 Retro-Reflectorised Traffic Signs
Retro-Reflectorised Traffic Signs 2 2 2.000 Each

Providing and fixing lighting for LVUP, including all lifts and leads of material
29
and manpower complete as per work order issued.
LVUP Electrical works 1 1 1.000 Each
fo
0.550
0.550

FRL
RCW
96.729

BOQ Item
No.

6.01 a
BOQ Item
No.

6.02 a

6.02 b

6.20 d

6.20 d

6.22 d

6.22 d

6.22 d

6.25 c

6.25 c
BOQ Item
No.

6.47

6.45

6.30 a

6.30 b

6.30 c

as per attached annex

6.30 c

6.53

6.52
BOQ Item
No.

6.42 a

6.60 b

6.90 a

6.02 b

6.01 a

2.02

2.05
BOQ Item
No.

3.01

3.04

4.01

4.02 a

4.04 d

4.02 b

4.05 b

15.15

15.15

15.04 C
BOQ Item
No.

15.04 D

3.22

8.23 A

7.03 b

8.13

8.02

8.03

8.27
Quantity - MCW as per Sch-B at the Location of LVUP at km 153+316
Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

1 Embankment
Embankment Qty as per
B/S km. 152+560 to 153+700 111706.3
Initial Profile
111706.340 Cum 2.02

2 Sub Grade

Subgrade - MCW B/S 2 11.600 20.775 0.500 240.99


240.990 Cum 2.05

3 GSB

GSB - MCW B/S 2 15.100 20.040 0.200 121.04

121.042 Cum 3.01

4 WMM
WMM - MCW B/S 2 18.600 16.180 0.250 150.47
150.474 Cum 3.04

5 Prime Coat
Prime Coat - MCW B/S 2 18.600 15.000 558.00
558.000 Sqm 4.01

6 Tack Coat - Granular Surface


Tack Coat - MCW B/S 2 18.600 15.000 558.00
558.000 Sqm 4.02 a

7 DBM
DBM - MCW B/S 2 18.600 15.000 0.100 55.80
55.800 Cum 4.04 d

8 Tack Coat - Bituminous Surface


Tack Coat - MCW B/S 0 18.600 15.000 0.00
0.000 Sqm 4.02 b

9 BC
BC - MCW B/S 2 18.600 15.000 0.050 27.90
27.900 Cum 4.05 b

10 Drainage Chute
In Geocell Area LHS 0 0.00 0.00
RHS 0 0.00 0.00 0.000 Lm 15.15

In Turfing Area LHS 57 6.80 387.60


Sl. BOQ Item
Description Side No. Length Width Depth Quantity Sub Total Unit
No. No.

RHS 57 6.67 380.19 767.790 Lm 15.15

11 Geocell with Concrete filling along Chute Drain


In Geocell Area LHS 0 0.00 2.00 0.00
RHS 0 0.00 2.00 0.00

In Turfing Area LHS 57 6.80 2.00 775.20


RHS 57 6.67 2.00 760.38 1535.580 Sqm 15.04 C

12 Geocell covered with fine grass


Geocell Area LHS 1 0.00 0.00
RHS 1 0.00 0.00
Less for Chute Drain & Geocell with Concrete
LHS 0 0.00 -2.55 0.00
RHS 0 0.00 -2.55 0.00 0.000 Sqm 15.04 D

13 Turfing with Sods


Turfing Area LHS 1 7732.53 7732.53
RHS 1 7592.18 7592.18
Less for Chute Drain & Geocell with Concrete
LHS 57 6.80 -2.55 -988.38
RHS 57 6.67 -2.55 -969.49 13366.845 Sqm 3.22

14 Qty - Misc work as per original scope

i Metal Beam Crash barrier

Median Edge B/S 2 18.600 37.20 37.200 Lm 8.23 A

ii Kerb
Median Kerb (I-Sec) B/S 2 18.600 0.055 2.046
Outer Kerb (L-Sec) B/S 2 18.600 0.1087 4.044
6.090 Cum 7.03 b

iv Painting on Kerb
Median Kerb (I-Sec) 2 18.6 0.273 10.156 10.156 Cum 8.02
Outer Kerb (L-Sec) 2 18.6 0.789 29.351 29.351 Cum 8.02
Qty - Embankment Slope Protection in the Approaches of LVUP at km 153+316 (wrt Revised Profile)
GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area)
FRL at
Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope
LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS
Edge Width Edge Width

H= K= L= N= R= S=
A B C D E F G J = H-C M = L-D P Q
E+Fx17 √J2+(2xJ)2 E+Gx17 √M2+(2xM)2 Avg.PxB Avg.QxB

152+560 90.541 90.536 93.852 -2.50% -2.50% 93.427 2.886 6.453 93.427 2.891 6.464 Turfing Turfing - -
152+570 10 90.532 90.547 93.896 -2.50% -2.50% 93.471 2.939 6.572 93.471 2.924 6.538 Turfing Turfing 65.13 65.01
152+580 10 90.577 90.558 93.939 -2.50% -2.50% 93.514 2.937 6.567 93.514 2.956 6.610 Turfing Turfing 65.70 65.74
152+590 10 90.566 90.562 93.987 -2.50% -2.50% 93.562 2.996 6.699 93.562 3.000 6.708 Turfing Turfing 66.33 66.59
152+600 10 90.545 90.566 94.034 -2.50% -2.50% 93.609 3.064 6.851 93.609 3.043 6.804 Turfing Turfing 67.75 67.56
152+610 10 90.616 90.574 94.082 -2.50% -2.50% 93.657 3.041 6.800 93.657 3.083 6.894 Turfing Turfing 68.26 68.49
152+620 10 90.632 90.582 94.129 -2.50% -2.50% 93.704 3.072 6.869 93.704 3.122 6.981 Turfing Turfing 68.35 69.37
152+630 10 90.627 90.591 94.177 -2.50% -2.50% 93.752 3.125 6.988 93.752 3.161 7.068 Turfing Turfing 69.29 70.25
152+640 10 90.622 90.599 94.224 -2.50% -2.50% 93.799 3.177 7.104 93.799 3.200 7.155 Turfing Turfing 70.46 71.12
152+650 10 90.611 90.575 94.272 -2.50% -2.50% 93.847 3.236 7.236 93.847 3.272 7.316 Turfing Turfing 71.70 72.36
152+660 10 90.601 90.550 94.319 -2.50% -2.50% 93.894 3.293 7.363 93.894 3.344 7.477 Turfing Turfing 73.00 73.97
152+670 10 90.585 90.551 94.367 -2.50% -2.50% 93.942 3.357 7.506 93.942 3.391 7.583 Turfing Turfing 74.35 75.30
152+680 10 90.578 90.552 94.414 -2.50% -2.50% 93.989 3.411 7.627 93.989 3.437 7.685 Turfing Turfing 75.67 76.34
152+690 10 90.581 90.556 94.462 -2.50% -2.50% 94.037 3.456 7.728 94.037 3.481 7.784 Turfing Turfing 76.78 77.35
152+700 10 90.582 90.560 94.509 -2.50% -2.50% 94.084 3.502 7.831 94.084 3.524 7.880 Turfing Turfing 77.79 78.32
152+710 10 90.561 90.563 94.557 -2.50% -2.50% 94.132 3.571 7.985 94.132 3.569 7.981 Turfing Turfing 79.08 79.30
152+720 10 90.549 90.565 94.604 -2.50% -2.50% 94.179 3.630 8.117 94.179 3.614 8.081 Turfing Turfing 80.51 80.31
152+730 10 90.555 90.566 94.652 -2.50% -2.50% 94.227 3.672 8.211 94.227 3.661 8.186 Turfing Turfing 81.64 81.34
152+740 10 90.581 90.566 94.699 -2.50% -2.50% 94.274 3.693 8.258 94.274 3.708 8.291 Turfing Turfing 82.34 82.39
152+750 10 90.515 90.554 94.747 -2.50% -2.50% 94.322 3.807 8.513 94.322 3.768 8.426 Turfing Turfing 83.85 83.58
152+760 10 90.534 90.542 94.794 -2.50% -2.50% 94.369 3.835 8.575 94.369 3.827 8.557 Turfing Turfing 85.44 84.92
152+770 10 90.510 90.577 94.842 -2.50% -2.50% 94.417 3.907 8.736 94.417 3.840 8.587 Turfing Turfing 86.56 85.72
152+780 10 90.499 90.612 94.889 -2.50% -2.50% 94.464 3.965 8.866 94.464 3.852 8.613 Turfing Turfing 88.01 86.00
152+790 10 90.523 90.594 94.937 -2.50% -2.50% 94.512 3.989 8.920 94.512 3.918 8.761 Turfing Turfing 88.93 86.87
152+800 10 90.501 90.575 94.984 -2.50% -2.50% 94.559 4.058 9.074 94.559 3.984 8.908 Turfing Turfing 89.97 88.35
GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area)
FRL at
Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope
LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS
Edge Width Edge Width

H= K= L= N= R= S=
A B C D E F G J = H-C M = L-D P Q
E+Fx17 √J2+(2xJ)2 E+Gx17 √M2+(2xM)2 Avg.PxB Avg.QxB

152+810 10 90.531 90.557 95.032 -2.50% -2.50% 94.607 4.076 9.114 94.607 4.050 9.056 Turfing Turfing 90.94 89.82
152+820 10 90.522 90.539 95.079 -2.50% -2.50% 94.654 4.132 9.239 94.654 4.115 9.201 Turfing Turfing 91.77 91.29
152+830 10 90.546 90.559 95.127 -2.50% -2.50% 94.702 4.156 9.293 94.702 4.143 9.264 Turfing Turfing 92.66 92.33
152+840 10 90.544 90.578 95.174 -2.50% -2.50% 94.749 4.205 9.403 94.749 4.171 9.327 Turfing Turfing 93.48 92.95
152+850 10 90.553 90.562 95.222 -2.50% -2.50% 94.797 4.244 9.490 94.797 4.235 9.470 Turfing Turfing 94.46 93.98
152+860 10 90.556 90.546 95.269 -2.50% -2.50% 94.844 4.288 9.588 94.844 4.298 9.611 Turfing Turfing 95.39 95.40
152+870 10 90.550 90.549 95.317 -2.50% -2.50% 94.892 4.342 9.709 94.892 4.343 9.711 Turfing Turfing 96.49 96.61
152+880 10 90.570 90.551 95.364 -2.50% -2.50% 94.939 4.369 9.769 94.939 4.388 9.812 Turfing Turfing 97.39 97.62
152+890 10 90.576 90.554 95.412 -2.50% -2.50% 94.987 4.411 9.863 94.987 4.433 9.912 Turfing Turfing 98.16 98.62
152+900 10 90.546 90.557 95.459 -2.50% -2.50% 95.034 4.488 10.035 95.034 4.477 10.011 Turfing Turfing 99.49 99.62
152+910 10 90.557 90.552 95.507 -2.50% -2.50% 95.082 4.525 10.118 95.082 4.530 10.129 Turfing Turfing 100.77 100.70
152+920 10 90.554 90.546 95.554 -2.50% -2.50% 95.129 4.575 10.230 95.129 4.583 10.248 Turfing Turfing 101.74 101.89
152+930 10 90.529 90.570 95.602 -2.50% -2.50% 95.177 4.648 10.393 95.177 4.607 10.302 Turfing Turfing 103.12 102.75
152+940 10 90.527 90.594 95.649 -2.50% -2.50% 95.224 4.697 10.503 95.224 4.630 10.353 Turfing Turfing 104.48 103.27
152+950 10 90.505 90.586 95.697 -2.50% -2.50% 95.272 4.767 10.659 95.272 4.686 10.478 Turfing Turfing 105.81 104.16
152+960 10 90.495 90.578 95.744 -2.50% -2.50% 95.319 4.824 10.787 95.319 4.741 10.601 Turfing Turfing 107.23 105.40
152+970 10 90.483 90.579 95.792 -2.50% -2.50% 95.367 4.884 10.921 95.367 4.788 10.706 Turfing Turfing 108.54 106.54
152+980 10 90.472 90.579 95.839 -2.50% -2.50% 95.414 4.942 11.051 95.414 4.835 10.811 Turfing Turfing 109.86 107.59
152+990 10 90.480 90.567 95.887 -2.50% -2.50% 95.462 4.982 11.140 95.462 4.895 10.946 Turfing Turfing 110.95 108.79
153+000 10 90.458 90.554 95.934 -2.50% -2.50% 95.509 5.051 11.294 95.509 4.955 11.080 Turfing Turfing 112.17 110.13
153+010 10 90.511 90.560 95.982 -2.50% -2.50% 95.557 5.046 11.283 95.557 4.997 11.174 Turfing Turfing 112.89 111.27
153+020 10 90.397 90.565 96.029 -2.50% -2.50% 95.604 5.207 11.643 95.604 5.039 11.268 Turfing Turfing 114.63 112.21
153+030 10 90.403 90.579 96.077 -2.50% -2.50% 95.652 5.249 11.737 95.652 5.073 11.344 Turfing Turfing 116.90 113.06
153+040 10 90.392 90.593 96.124 -2.50% -2.50% 95.699 5.307 11.867 95.699 5.106 11.417 Turfing Turfing 118.02 113.81
153+050 10 90.402 90.572 96.172 -2.50% -2.50% 95.747 5.345 11.952 95.747 5.175 11.572 Turfing Turfing 119.09 114.95
153+060 10 90.397 90.550 96.219 -2.50% -2.50% 95.794 5.397 12.068 95.794 5.244 11.726 Turfing Turfing 120.10 116.49
153+070 10 90.384 90.560 96.267 -2.50% -2.50% 95.842 5.458 12.204 95.842 5.282 11.811 Turfing Turfing 121.36 117.68
GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area)
FRL at
Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope
LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS
Edge Width Edge Width

H= K= L= N= R= S=
A B C D E F G J = H-C M = L-D P Q
E+Fx17 √J2+(2xJ)2 E+Gx17 √M2+(2xM)2 Avg.PxB Avg.QxB

153+080 10 90.374 90.570 96.314 -2.50% -2.50% 95.889 5.515 12.332 95.889 5.319 11.894 Turfing Turfing 122.68 118.52
153+090 10 90.391 90.572 96.362 -2.50% -2.50% 95.937 5.546 12.401 95.937 5.365 11.997 Turfing Turfing 123.67 119.45
153+100 10 90.378 90.573 96.409 -2.50% -2.50% 95.984 5.606 12.535 95.984 5.411 12.099 Turfing Turfing 124.68 120.48
153+110 10 90.363 90.571 96.457 -2.50% -2.50% 96.032 5.669 12.676 96.032 5.461 12.211 Turfing Turfing 126.06 121.55
153+120 10 90.329 90.569 96.504 -2.50% -2.50% 96.079 5.750 12.857 96.079 5.510 12.321 Turfing Turfing 127.67 122.66
153+130 10 90.346 90.568 96.546 -2.50% -2.50% 96.121 5.775 12.913 96.121 5.553 12.417 Turfing Turfing 128.85 123.69
153+140 10 90.329 90.566 96.588 -2.50% -2.50% 96.163 5.834 13.045 96.163 5.597 12.515 Turfing Turfing 129.79 124.66
153+150 10 90.323 90.556 96.624 -2.50% -2.50% 96.199 5.876 13.139 96.199 5.643 12.618 Turfing Turfing 130.92 125.67
153+160 10 90.332 90.545 96.659 -2.50% -2.50% 96.234 5.902 13.197 96.234 5.689 12.721 Turfing Turfing 131.68 126.70
153+170 10 90.327 90.539 96.688 -2.50% -2.50% 96.263 5.936 13.273 96.263 5.724 12.799 Turfing Turfing 132.35 127.60
153+180 10 90.323 90.532 96.716 -2.50% -2.50% 96.291 5.968 13.345 96.291 5.759 12.878 Turfing Turfing 133.09 128.38
153+190 10 90.526 90.528 96.738 -2.50% -2.50% 96.313 5.787 12.940 96.313 5.785 12.936 Turfing Turfing 131.43 129.07
153+200 10 90.499 90.524 96.759 -2.50% -2.50% 96.334 5.835 13.047 96.334 5.810 12.992 Turfing Turfing 129.94 129.64
153+210 10 90.502 90.528 96.773 -2.50% -2.50% 96.348 5.846 13.072 96.348 5.820 13.014 Turfing Turfing 130.60 130.03
153+220 10 90.480 90.532 96.787 -2.50% -2.50% 96.362 5.882 13.153 96.362 5.830 13.036 Turfing Turfing 131.12 130.25
153+230 10 90.494 90.540 96.795 -2.50% -2.50% 96.370 5.876 13.139 96.370 5.830 13.036 Turfing Turfing 131.46 130.36
153+240 10 90.480 90.547 96.802 -2.50% -2.50% 96.377 5.897 13.186 96.377 5.830 13.036 Turfing Turfing 131.63 130.36
153+250 10 90.498 90.552 96.803 -2.50% -2.50% 96.378 5.880 13.148 96.378 5.826 13.027 Turfing Turfing 131.67 130.32
153+260 10 90.433 90.557 96.803 -2.50% -2.50% 96.378 5.945 13.293 96.378 5.821 13.016 Turfing Turfing 132.21 130.22
153+270 10 90.461 90.529 96.796 -2.50% -2.50% 96.371 5.910 13.215 96.371 5.842 13.063 Turfing Turfing 132.54 130.40
153+280 10 90.438 90.500 96.789 -2.50% -2.50% 96.364 5.926 13.251 96.364 5.864 13.112 Turfing Turfing 132.33 130.88
153+290 10 90.421 90.521 96.776 -2.50% -2.50% 96.351 5.930 13.260 96.351 5.830 13.036 Turfing Turfing 132.55 130.74
153+300 10.0 90.433 90.541 96.762 -2.50% -2.50% 96.337 5.904 13.202 96.337 5.796 12.960 Turfing Turfing 132.31 129.98
153+310 10.0 90.444 90.528 96.741 -2.50% -2.50% 96.316 5.872 13.130 96.316 5.788 12.942 Turfing Turfing 131.66 129.51
153+310 0.2 90.443 90.528 96.741 -2.50% -2.50% 96.316 5.873 13.134 96.316 5.788 12.943 Turfing Turfing 2.63 2.59
153+316 5.8 90.400 90.520 96.728 -2.50% -2.50% 0.000 0.000
153+320 4.0 90.370 90.514 96.720 -2.50% -2.50% LVUP at km 153+316 0.000 LVUP at km 153+316 0.000
GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area)
FRL at
Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope
LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS
Edge Width Edge Width

H= K= L= N= R= S=
A B C D E F G J = H-C M = L-D P Q
E+Fx17 √J2+(2xJ)2 E+Gx17 √M2+(2xM)2 Avg.PxB Avg.QxB
LVUP at km 153+316 LVUP at km 153+316
153+322 1.8 90.371 90.523 96.715 -2.50% -2.50% 0.000 0.000
153+330 8.2 90.375 90.562 96.692 -2.50% -2.50% 96.267 5.892 13.175 96.267 5.705 12.757 Turfing Turfing 54.02 52.30
153+340 10.0 90.397 90.610 96.664 -2.50% -2.50% 96.239 5.842 13.063 96.239 5.629 12.587 Turfing Turfing 131.19 126.72
153+350 10.0 90.383 90.619 96.630 -2.50% -2.50% 96.205 5.822 13.018 96.205 5.586 12.491 Turfing Turfing 130.41 125.39
153+360 10.0 90.361 90.627 96.595 -2.50% -2.50% 96.170 5.809 12.989 96.170 5.543 12.395 Turfing Turfing 130.04 124.43
153+370 10 90.382 90.619 96.553 -2.50% -2.50% 96.128 5.746 12.848 96.128 5.509 12.318 Turfing Turfing 129.19 123.57
153+380 10 90.405 90.610 96.511 -2.50% -2.50% 96.086 5.681 12.703 96.086 5.476 12.245 Turfing Turfing 127.76 122.82
153+390 10 90.399 90.600 96.462 -2.50% -2.50% 96.037 5.638 12.607 96.037 5.437 12.158 Turfing Turfing 126.55 122.01
153+400 10 90.375 90.590 96.413 -2.50% -2.50% 95.988 5.613 12.551 95.988 5.398 12.070 Turfing Turfing 125.79 121.14
153+410 10 90.415 90.579 96.358 -2.50% -2.50% 95.933 5.518 12.339 95.933 5.354 11.972 Turfing Turfing 124.45 120.21
153+420 10 90.440 90.567 96.302 -2.50% -2.50% 95.877 5.437 12.158 95.877 5.310 11.874 Turfing Turfing 122.48 119.23
153+430 10 90.390 90.539 96.239 -2.50% -2.50% 95.814 5.424 12.128 95.814 5.275 11.795 Turfing Turfing 121.43 118.34
153+440 10 90.348 90.511 96.176 -2.50% -2.50% 95.751 5.403 12.081 95.751 5.240 11.717 Turfing Turfing 121.05 117.56
153+450 10 90.360 90.476 96.106 -2.50% -2.50% 95.681 5.321 11.898 95.681 5.205 11.639 Turfing Turfing 119.90 116.78
153+460 10 90.422 90.441 96.036 -2.50% -2.50% 95.611 5.189 11.603 95.611 5.170 11.560 Turfing Turfing 117.51 116.00
153+470 10 90.417 90.455 95.959 -2.50% -2.50% 95.534 5.117 11.442 95.534 5.079 11.357 Turfing Turfing 115.23 114.59
153+480 10 90.432 90.468 95.882 -2.50% -2.50% 95.457 5.025 11.236 95.457 4.989 11.156 Turfing Turfing 113.39 112.56
153+490 10 90.446 90.429 95.798 -2.50% -2.50% 95.373 4.927 11.017 95.373 4.944 11.055 Turfing Turfing 111.27 111.05
153+500 10 90.451 90.390 95.714 -2.50% -2.50% 95.289 4.838 10.818 95.289 4.899 10.954 Turfing Turfing 109.18 110.05
153+510 10 90.389 90.339 95.623 -2.50% -2.50% 95.198 4.809 10.753 95.198 4.859 10.865 Turfing Turfing 107.86 109.10
153+520 10 90.312 90.287 95.532 -2.50% -2.50% 95.107 4.795 10.722 95.107 4.820 10.778 Turfing Turfing 107.38 108.22
153+530 10 90.268 90.276 95.439 -2.50% -2.50% 95.014 4.746 10.612 95.014 4.738 10.594 Turfing Turfing 106.67 106.86
153+540 10 90.267 90.264 95.346 -2.50% -2.50% 94.921 4.654 10.407 94.921 4.657 10.413 Turfing Turfing 105.10 105.04
153+550 10 90.266 90.266 95.253 -2.50% -2.50% 94.828 4.562 10.201 94.828 4.562 10.201 Turfing Turfing 103.04 103.07
153+560 10 90.510 90.267 95.160 -2.50% -2.50% 94.735 4.225 9.447 94.735 4.468 9.991 Turfing Turfing 98.24 100.96
153+570 10 90.510 90.273 95.068 -2.50% -2.50% 94.643 4.133 9.242 94.643 4.370 9.772 Turfing Turfing 93.45 98.81
153+580 10 90.313 90.278 94.975 -2.50% -2.50% 94.550 4.237 9.474 94.550 4.272 9.552 Turfing Turfing 93.58 96.62
GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area)
FRL at
Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope
LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS
Edge Width Edge Width

H= K= L= N= R= S=
A B C D E F G J = H-C M = L-D P Q
E+Fx17 √J2+(2xJ)2 E+Gx17 √M2+(2xM)2 Avg.PxB Avg.QxB

153+590 10 90.303 90.300 94.897 -2.50% -2.50% 94.472 4.169 9.322 94.472 4.172 9.329 Turfing Turfing 93.98 94.41
153+600 10 90.407 90.321 94.819 -2.50% -2.50% 94.394 3.987 8.915 94.394 4.073 9.108 Turfing Turfing 91.19 92.18
153+610 10 90.403 90.291 94.764 -2.50% -2.50% 94.339 3.936 8.801 94.339 4.048 9.052 Turfing Turfing 88.58 90.80
153+620 10 90.408 90.260 94.708 -2.50% -2.50% 94.283 3.875 8.665 94.283 4.023 8.996 Turfing Turfing 87.33 90.24
153+630 10 90.379 90.251 94.675 -2.50% -2.50% 94.250 3.871 8.656 94.250 3.999 8.942 Turfing Turfing 86.60 89.69
153+640 10 90.340 90.241 94.642 -2.50% -2.50% 94.217 3.877 8.669 94.217 3.976 8.891 Turfing Turfing 86.63 89.16
153+650 10 90.320 90.250 94.632 -2.50% -2.50% 94.207 3.887 8.692 94.207 3.957 8.848 Turfing Turfing 86.80 88.69
153+660 10 90.307 90.259 94.621 -2.50% -2.50% 94.196 3.889 8.696 94.196 3.937 8.803 Turfing Turfing 86.94 88.26
153+670 10 90.277 90.231 94.633 -2.50% -2.50% 94.208 3.931 8.790 94.208 3.977 8.893 Turfing Turfing 87.43 88.48
153+680 10 90.225 90.203 94.644 -2.50% -2.50% 94.219 3.994 8.931 94.219 4.016 8.980 Turfing Turfing 88.60 89.36
153+690 10 90.223 90.212 94.678 -2.50% -2.50% 94.253 4.030 9.011 94.253 4.041 9.036 Turfing Turfing 89.71 90.08
153+700 10 90.251 90.221 94.712 -2.50% -2.50% 94.287 4.036 9.025 94.287 4.066 9.092 Turfing Turfing 90.18 90.64

Geocell Area (Total) 0.00 0.00


Turfing Area (Total) 11810.38 11674.53

No. of Chute Drain in Geocell Area 0 0


No. of Chute Drain in Turfing Area 56 56

Avg. Length of Chute Drain in Geocell Area 0 0


Avg Length of Chute Drain in Turfing Area 10.52 10.4
Quantity - BOX Culvert at km 152+680
BC - 1 x 3 x 3 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.482 0.482 0.482 0.000 0.482 LHS RHS LCW
0.000 0.482 0.482 0.482 0.000 0.482 94.413

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 90.578 0.000

New FRL 94.413


Old FRL 94.172
Diff Ht 0.241
Total Length 0.964

Inv lvl 90.239


top slab lvl 93.539

Sl. Sub
Description Side No. Length Width Depth Quantity Unit
No. Total

1 Excavation for Structure


Exv for Raft LCW 1 0.882 3.800 0.439 1.47

Exv for Raft RCW 1 0.882 3.800 0.439 1.47


2.94 Cum
2 Levelling Course - PCC
Below Box Raft
Raft LCW 1 0.682 3.800 0.100 0.259
Raft RCW 1 0.882 3.800 0.100 0.335
0.594 Cum

3 Box Structure - Conc.


Raft - Box Str
Raft LCW 1 0.482 3.600 0.300 0.521
0.521 Cum
Raft RCW 1 0.482 3.600 0.300 0.521
0.521 Cum

Wall - Box Str


Wall (Outer) LCW 2 0.482 0.300 3.000 0.868
Haunch (Bottom) LCW 2 0.482 0.150 0.075 0.011
Haunch (Top) LCW 2 0.482 0.150 0.075 0.011 0.890 Cum
Quantity - BOX Culvert at km 152+680
BC - 1 x 3 x 3 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.482 0.482 0.482 0.000 0.482 LHS RHS LCW
0.000 0.482 0.482 0.482 0.000 0.482 94.413

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 90.578 0.000

New FRL 94.413


Old FRL 94.172
Diff Ht 0.241
Total Length 0.964

Inv lvl 90.239


top slab lvl 93.539

Sl. Sub
Description Side No. Length Width Depth Quantity Unit
No. Total

Wall (Outer) RCW 2 0.482 0.300 3.000 0.868


Haunch (Bottom) RCW 2 0.482 0.150 0.075 0.011
Haunch (Top) RCW 2 0.482 0.150 0.075 0.011 0.890 Cum

Slab - Box Str


Slab LCW 1 0.482 3.600 0.300 0.521
0.521 Cum
Slab RCW 1 0.482 3.600 0.300 0.521
0.521 Cum

4 Reinforcement
Box Structure CA COS
Box - Foundation BHS 1 5.804 5.906 0.102
0.102 MT

Box - Substructure BHS 1 5.976 6.113 0.137


0.137 MT

Box - Super Structure BHS 1 5.400 5.523 0.123


0.123 MT

5 Less Difference Embankment Quantity of Box Culvert


Embankment Qty of Box B/S -1 0.964 3.600 2.961 -10.276
Quantity - BOX Culvert at km 152+680
BC - 1 x 3 x 3 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.482 0.482 0.482 0.000 0.482 LHS RHS LCW
0.000 0.482 0.482 0.482 0.000 0.482 94.413

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 90.578 0.000

New FRL 94.413


Old FRL 94.172
Diff Ht 0.241
Total Length 0.964

Inv lvl 90.239


top slab lvl 93.539

Sl. Sub
Description Side No. Length Width Depth Quantity Unit
No. Total

-10.276 Cum
t.slab
0.30
0.300

FRL
RCW
91.413

BOQ
Item No.

6.01 a

6.02 b

6.20 c

6.20 c

6.22 c
t.slab
0.30
0.300

FRL
RCW
91.413

BOQ
Item No.

6.22 c

6.22 c

6.22 c

6.30 a

6.30 b

6.30 c
t.slab
0.30
0.300

FRL
RCW
91.413

BOQ
Item No.

2.02
Quantity - BOX Culvert at km 153+180
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 2.000 2.000 0.00 0.35 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 5.616 5.616 5.616 0.000 5.616 LHS RHS LCW
0.000 5.616 5.616 5.616 0.000 5.616 96.716

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 90.542 0.000

New FRL 96.716


Old FRL 93.908
Diff Ht 2.808
Total Length 11.232

Inv lvl 90.303


top slab lvl 92.603

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

1 Excavation for Structure


Exv for Raft LCW 1 5.816 2.800 0.339 5.52

Exv for Raft RCW 1 5.816 2.800 0.339 5.52


11.04 Cum
2 Levelling Course - PCC
Below Box Raft
Raft LCW 1 5.816 2.800 0.100 1.628
Raft RCW 1 5.816 2.800 0.100 1.628
3.256 Cum

3 Box Structure - Conc.


Raft - Box Str
Raft LCW 1 5.616 2.600 0.350 5.111
5.111 Cum
Raft RCW 1 5.616 2.600 0.350 5.111
5.111 Cum

Wall - Box Str


Wall (Outer) LCW 2 5.616 0.300 2.000 6.739
Haunch (Bottom) LCW 2 5.616 0.150 0.075 0.126
Haunch (Top) LCW 2 5.616 0.150 0.075 0.126 6.991 Cum
Quantity - BOX Culvert at km 153+180
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 2.000 2.000 0.00 0.35 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 5.616 5.616 5.616 0.000 5.616 LHS RHS LCW
0.000 5.616 5.616 5.616 0.000 5.616 96.716

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 90.542 0.000

New FRL 96.716


Old FRL 93.908
Diff Ht 2.808
Total Length 11.232

Inv lvl 90.303


top slab lvl 92.603

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

Wall (Outer) RCW 2 5.616 0.300 2.000 6.739


Haunch (Bottom) RCW 2 5.616 0.150 0.075 0.126
Haunch (Top) RCW 2 5.616 0.150 0.075 0.126 6.991 Cum

Slab - Box Str


Slab LCW 1 5.616 2.600 0.300 4.380
4.380 Cum
Slab RCW 1 5.616 2.600 0.300 4.380
4.380 Cum

4 Reinforcement
Box Structure CA COS
Box - Foundation BHS 1 4.197 5.118 0.921
0.921 MT

Box - Substructure BHS 1 4.257 5.215 0.958


0.958 MT

Box - Super Structure BHS 1 4.162 5.080 0.918


0.918 MT

5 Less Difference Embankment Quantity of Box Culvert


Quantity - BOX Culvert at km 153+180
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 2.000 2.000 0.00 0.35 0.30
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 5.616 5.616 5.616 0.000 5.616 LHS RHS LCW
0.000 5.616 5.616 5.616 0.000 5.616 96.716

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 90.542 0.000

New FRL 96.716


Old FRL 93.908
Diff Ht 2.808
Total Length 11.232

Inv lvl 90.303


top slab lvl 92.603

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

Embankment Qty of Box B/S -1 11.232 2.600 2.061 -60.188


-60.188 Cum
t.slab
0.30
0.300

FRL
RCW
96.716

BOQ
Item No.

6.01 a

6.02 b

6.20 c

6.20 c

6.22 c
t.slab
0.30
0.300

FRL
RCW
96.716

BOQ
Item No.

6.22 c

6.22 c

6.22 c

6.30 a

6.30 b

6.30 c
t.slab
0.30
0.300

FRL
RCW
96.716

BOQ
Item No.

2.02
Quantity - BOX Culvert at km 153+680
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall t.slab
Skew (deg) = 0.00 1 1.00 0.000 2.000 2.000 0.00 0.30 0.25 0.25
Skew (rad) = 0.00 1.00 0.000 0.250

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.240 0.240 0.240 0.000 0.240 LHS RHS LCW RCW
0.000 0.240 0.240 0.240 0.000 0.240 94.644 94.644

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 90.144 0.000

New FRL 94.644


Old FRL 94.524
Diff Ht 0.120
Total Length 0.480

Inv lvl 89.807


top slab lvl 92.107

Sl. BOQ
Description Side No. Length Width Depth Quantity Sub Total Unit Item No.
No.

1 Excavation for Structure


Exv for Raft LCW 1 0.440 2.700 0.437 0.52

Exv for Raft RCW 1 0.440 2.700 0.437 0.52


1.04 Cum 6.01 a
2 Levelling Course - PCC
Below Box Raft
Raft LCW 1 0.440 2.700 0.100 0.119
Raft RCW 1 0.440 2.700 0.100 0.119
0.238 Cum 6.02 b

3 Box Structure - Conc.


Raft - Box Str
Raft LCW 1 0.240 2.500 0.300 0.180
0.180 Cum 6.20 c
Raft RCW 1 0.240 2.500 0.300 0.180
0.180 Cum 6.20 c

Wall - Box Str


Wall (Outer) LCW 2 0.240 0.250 2.000 0.240
Haunch (Bottom) LCW 2 0.240 0.150 0.075 0.005
Haunch (Top) LCW 2 0.240 0.150 0.075 0.005 0.250 Cum 6.22 c
Quantity - BOX Culvert at km 153+680
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall t.slab
Skew (deg) = 0.00 1 1.00 0.000 2.000 2.000 0.00 0.30 0.25 0.25
Skew (rad) = 0.00 1.00 0.000 0.250

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.240 0.240 0.240 0.000 0.240 LHS RHS LCW RCW
0.000 0.240 0.240 0.240 0.000 0.240 94.644 94.644

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 90.144 0.000

New FRL 94.644


Old FRL 94.524
Diff Ht 0.120
Total Length 0.480

Inv lvl 89.807


top slab lvl 92.107

Sl. BOQ
Description Side No. Length Width Depth Quantity Sub Total Unit Item No.
No.

Wall (Outer) RCW 2 0.240 0.250 2.000 0.240


Haunch (Bottom) RCW 2 0.240 0.150 0.075 0.005
Haunch (Top) RCW 2 0.240 0.150 0.075 0.005 0.250 Cum 6.22 c

Slab - Box Str


Slab LCW 1 0.240 2.500 0.250 0.150
0.150 Cum 6.22 c
Slab RCW 1 0.240 2.500 0.250 0.150
0.150 Cum 6.22 c

4 Reinforcement
Box Structure CA COS
Box - Foundation BHS 1 4.087 4.126 0.039
0.039 MT 6.30 a

Box - Substructure BHS 1 4.251 4.282 0.031


0.031 MT 6.30 b

Box - Super Structure BHS 1 3.260 3.646 0.386


0.386 MT 6.30 c

5 Less Difference Embankment Quantity of Box Culvert


Quantity - BOX Culvert at km 153+680
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall t.slab
Skew (deg) = 0.00 1 1.00 0.000 2.000 2.000 0.00 0.30 0.25 0.25
Skew (rad) = 0.00 1.00 0.000 0.250

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 0.240 0.240 0.240 0.000 0.240 LHS RHS LCW RCW
0.000 0.240 0.240 0.240 0.000 0.240 94.644 94.644

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 90.144 0.000

New FRL 94.644


Old FRL 94.524
Diff Ht 0.120
Total Length 0.480

Inv lvl 89.807


top slab lvl 92.107

Sl. BOQ
Description Side No. Length Width Depth Quantity Sub Total Unit Item No.
No.

Embankment Qty of Box B/S -1 0.480 2.500 1.963 -2.356


-2.356 Cum 2.02
Quantity - BOX Culvert at km 162+140 MCW (Prop Ch.160+220)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.45 0.45
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 23.250 23.250 23.250 0.000 23.250 LHS RHS LCW
0.000 23.250 23.250 23.250 0.000 23.250 85.910 85.910 97.133

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 86.660 0.000

Inv Lev 86.36


FL 85.910
Top slab level 89.810
depth 3.450

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

1 Excavation for Structures


Below Box Raft
Raft LCW 1 23.450 4.100 0.850 81.723
Raft RCW 1 23.450 4.100 0.850 81.723
Shear Key BHS 2 4.100 0.950 0.675 5.258
U-Trough BHS 1 21.700 3.800 0.850 70.091
Flexible Apron D/S 1 6.100 13.800 1.050 88.389
Flexible Apron U/S 0 3.100 13.800 1.050 0.000
327.184 Cum

2 Levelling Course - PCC


Below Box Raft
Raft LCW 1 23.450 4.100 0.150 14.422
Raft RCW 1 23.450 4.100 0.150 14.422
Shear Key BS 2 0.311 4.100 0.150 0.382
U-TROUGH U/S 1 21.500 3.450 0.100 7.418
U-TROUGH D/S 0 21.500 0.200 0.100 0.000
36.644 Cum
3 Box Structure - Conc.
Raft - Box Str
Raft LCW 1 23.250 3.900 0.450 40.804
40.804 Cum
Raft RCW 1 23.250 3.900 0.450 40.804
Quantity - BOX Culvert at km 162+140 MCW (Prop Ch.160+220)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.45 0.45
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 23.250 23.250 23.250 0.000 23.250 LHS RHS LCW
0.000 23.250 23.250 23.250 0.000 23.250 85.910 85.910 97.133

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 86.660 0.000

Inv Lev 86.36


FL 85.910
Top slab level 89.810
depth 3.450

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

40.804 Cum
Shear Key BS 2 3.900 0.750 0.675 3.949
3.949 Cum

Wall - Box Str


Wall (Outer) LCW 2 23.250 0.450 3.000 62.775
Haunch (Bottom) LCW 2 23.250 0.150 0.075 0.523
Haunch (Top) LCW 2 23.250 0.150 0.075 0.523 63.821 Cum

Wall (Outer) RCW 2 23.250 0.450 3.000 62.775


Haunch (Bottom) RCW 2 23.250 0.150 0.075 0.523
Haunch (Top) RCW 2 23.250 0.150 0.075 0.523 63.821 Cum

Slab - Box Str


Slab LCW 1 23.250 3.900 0.450 40.804
40.804 Cum
Slab RCW 1 23.250 3.900 0.450 40.804
40.804 Cum
Headwall BS 2 3.900 0.250 0.300 0.585
0.585 Cum

4 Fibre Board
Raft MCW 1 3.900 0.450 1.755
Quantity - BOX Culvert at km 162+140 MCW (Prop Ch.160+220)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.45 0.45
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 23.250 23.250 23.250 0.000 23.250 LHS RHS LCW
0.000 23.250 23.250 23.250 0.000 23.250 85.910 85.910 97.133

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 86.660 0.000

Inv Lev 86.36


FL 85.910
Top slab level 89.810
depth 3.450

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

Wall MCW 2 3.000 0.450 2.700


U-TROUGH Wall MCW 4 3.000 0.150 1.800
Slab MCW 1 3.900 0.450 1.755
Haunch 4 0.150 0.075 0.045 8.055 Sqm
32.220 Rm
5 Filter Media - Geocomposite
BHS 2 46.500 3.450 320.85
320.850 Sqm

6 Weep Holes
BHS 2 93 186
186 Nos

7 Toe Wall

Toe Wall-PCC BHS 0 1.000 1.100 0.100 0.000


Toe Wall BHS 0 1.000 0.900 0.500 0.000
Toe Wall BHS 0 1.000 0.450 0.500 0.000

0.000 Cum
8 U-TROUGH
Quantity - BOX Culvert at km 162+140 MCW (Prop Ch.160+220)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.45 0.45
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 23.250 23.250 23.250 0.000 23.250 LHS RHS LCW
0.000 23.250 23.250 23.250 0.000 23.250 85.910 85.910 97.133

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 86.660 0.000

Inv Lev 86.36


FL 85.910
Top slab level 89.810
depth 3.450

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

RCC RAFT LHS 1 21.500 3.600 0.3 23.220 23.220


WALL LHS 2 21.500 0.300 3 38.700 38.700
8 U-TROUGH
U-Trough Excavation D/S 1 9.1 5.15 0.150 7.010 7.010
D/S 1 14.0 2.15 0.150 4.499 4.499
U-Trough PCC D/S 1 8.874 5.150 0.150 6.855 6.855
D/S 1 13.750 2.150 0.150 4.434 4.434
U-Trough Raft D/S 1 8.874 5.000 0.300 13.311 13.311
D/S 1 13.600 2.000 0.300 8.160 8.160
U-Trough Wall D/S 2 7.071 2.250 0.300 9.546 9.546
D/S 2 2.000 1.000 0.300 1.200 1.200

9 Reinforcement
Box Structure
Box - Foundation BHS 1 10.400 10.400
U-Trough Foundation LHS 1 0.903 0.903
U-Trough Foundation 45 RHS 1 1.759 1.759
13.062 MT

Box - Substructure BHS 1 11.092 11.092


U-Trough Substructure LHS 1 1.920 1.920
U-Trough Substructure 45 RHS 1 0.458 0.458
Quantity - BOX Culvert at km 162+140 MCW (Prop Ch.160+220)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.45 0.45
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 23.250 23.250 23.250 0.000 23.250 LHS RHS LCW
0.000 23.250 23.250 23.250 0.000 23.250 85.910 85.910 97.133

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 86.660 0.000

Inv Lev 86.36


FL 85.910
Top slab level 89.810
depth 3.450

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

13.470 MT

Box - Super Structure BHS 1 9.664 9.664


9.664 MT
7 Curtain Wall

Excavavtion U/S 1 13.700 1.500 1.550 31.853 31.853


Curtain Wall-PCC U/S 1 13.700 1.500 0.150 3.083
Curtain Wall-1st Lift U/S 1 13.700 1.300 0.800 14.248
Curtain Wall-2nd Lift U/S 1 13.700 0.450 0.750 4.624
Curtain Wall-3rd Lift U/S 1 13.700 0.200 0.450 1.233

Excavavtion D/S 0 7.500 1.850 2.050 0.000 0.000


Curtain Wall-PCC D/S 0 7.500 1.850 0.150 0.000
Curtain Wall-1st Lift D/S 0 7.500 1.650 0.550 0.000
Curtain Wall-2nd Lift D/S 0 7.500 0.750 0.750 0.000
Curtain Wall-3rd Lift D/S 0 7.500 0.450 0.750 0.000
Curtain Wall-4th Lift D/S 0 7.500 0.200 0.450 0.000
23.188 Cum
9 FLEXIBLE APRON
Flexible Apron D/S 1 6.000 13.700 0.75 61.650 61.650 Cum
Flexible Apron U/S 0 3.000 13.700 0.75 0.000 0.000 Cum
Quantity - BOX Culvert at km 162+140 MCW (Prop Ch.160+220)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.45 0.45
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 23.250 23.250 23.250 0.000 23.250 LHS RHS LCW
0.000 23.250 23.250 23.250 0.000 23.250 85.910 85.910 97.133

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 86.660 0.000

Inv Lev 86.36


FL 85.910
Top slab level 89.810
depth 3.450

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

10 Less Embankment Quantity of Box Culvert


Embankment Qty of Box B/S -1 46.500 3.900 3.150 -571.253

-571.253 Cum
t.slab
0.45
0.450

FRL
RCW
97.133

BOQ
Item No.

6.01 a

6.02 b

6.20 c
t.slab
0.45
0.450

FRL
RCW
97.133

BOQ
Item No.

6.20 c

6.20 c

6.22 c

6.22 c

6.22 c

6.22 c

6.22 c
t.slab
0.45
0.450

FRL
RCW
97.133

BOQ
Item No.

6.42 a

6.60 b

6.52

6.02 a
t.slab
0.45
0.450

FRL
RCW
97.133

BOQ
Item No.

6.20 d
6.22 d

6.01 a
6.01 a
6.02 a
6.02 a
6.20 d
6.20 d
6.20 d
6.20 d

6.30 a
t.slab
0.45
0.450

FRL
RCW
97.133

BOQ
Item No.

6.30 b

6.30 c

6.01 a

6.01 a

6.02 a

16.11
16.11
t.slab
0.45
0.450

FRL
RCW
97.133

BOQ
Item No.

2.02
Quantity - BOX Culvert at km 160+220 (LSR)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.25
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 7.500 0.000 7.500 0.000 0.000 LHS RHS LCW
0.000 7.500 0.000 7.500 0.000 0.000 86.100 86.100 90.741

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 86.660 0.000

Inv Lev 86.400 Cushion 1.091


FL 86.100 7.500
Top slab level 89.650 Ht of Ew 2.990 11.864
depth 3.250 23.824

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

1 Excavation for Structures


Below Box Raft

Raft RCW 1 7.500 3.700 0.660 18.315


Shear Key BS 2 3.700 1.100 0.750 6.105
Flexible Apron U/S 1 3.100 13.600 1.010 42.582
67.002 Cum

2 Levelling Course - PCC


Below Box Raft
Raft SR 1 7.500 3.700 0.150 4.163
Shear Key SR 2 0.373 3.700 0.150 0.414
4.577 Cum
3 Box Structure - Conc.
Raft - Box Str

Raft SR 1 7.500 3.500 0.300 7.875


7.875 Cum
Shear Key SR 2 3.500 0.900 0.750 4.725
4.725 Cum

Wall - Box Str


Quantity - BOX Culvert at km 160+220 (LSR)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.25
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 7.500 0.000 7.500 0.000 0.000 LHS RHS LCW
0.000 7.500 0.000 7.500 0.000 0.000 86.100 86.100 90.741

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 86.660 0.000

Inv Lev 86.400 Cushion 1.091


FL 86.100 7.500
Top slab level 89.650 Ht of Ew 2.990 11.864
depth 3.250 23.824

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

Wall (Outer) SR 2 7.500 0.250 3.000 11.250


Haunch (Bottom) SR 2 7.500 0.150 0.075 0.169
Haunch (Top) SR 2 7.500 0.150 0.075 0.169 11.588 Cum

Slab - Box Str


Slab SR 1 7.500 3.500 0.250 6.563
6.563 Cum
Crash Barrier SR 2 3.500 0.296 2.074
2.074 Cum

4 Fibre Board
Raft MCW 1 3.500 0.300 1.050
Wall MCW 2 0.250 3.000 1.500
Haunch 4 0.150 0.075 0.045 2.595 Sqm
10.380 Rm
5 Filter Media - Geocomposite
BHS 2 7.500 2.950 44.25
44.250 Sqm

6 Weep Holes
BHS 2 15 30
8 U-TROUGH
Quantity - BOX Culvert at km 160+220 (LSR)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.25
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 7.500 0.000 7.500 0.000 0.000 LHS RHS LCW
0.000 7.500 0.000 7.500 0.000 0.000 86.100 86.100 90.741

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 86.660 0.000

Inv Lev 86.400 Cushion 1.091


FL 86.100 7.500
Top slab level 89.650 Ht of Ew 2.990 11.864
depth 3.250 23.824

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

U-Trough Excavation U/S 1 9.1 5.15 0.150 7.010 7.010


U/S 1 14.0 2.15 0.150 4.499 4.499
U-Trough PCC U/S 1 8.874 5.150 0.150 6.855 6.855
U/S 1 13.750 2.150 0.150 4.434 4.434
U-Trough Raft U/S 1 8.874 5.000 0.300 13.311 13.311
U/S 1 13.600 2.000 0.300 8.160 8.160
U-Trough Wall U/S 2 7.071 2.250 0.300 9.546 9.546
U/S 2 2.000 1.000 0.300 1.200 1.200

85 Nos
7 Reinforcement
Box Structure
Box - Foundation BHS 1 1.055 1.055
U-Trough Foundation RHS 1 1.759 1.759
2.814 MT

Box - Substructure BHS 1 1.291 1.291


U-Trough Substructure RHS 0.458 0.458
1.749 MT

Box - Super Structure BHS 1 0.786 0.786


Crash Barrier BHS 2 3.500 0.0475 0.333
1.119 MT
9 FLEXIBLE APRON
Quantity - BOX Culvert at km 160+220 (LSR)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.25
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 7.500 0.000 7.500 0.000 0.000 LHS RHS LCW
0.000 7.500 0.000 7.500 0.000 0.000 86.100 86.100 90.741

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 86.660 0.000

Inv Lev 86.400 Cushion 1.091


FL 86.100 7.500
Top slab level 89.650 Ht of Ew 2.990 11.864
depth 3.250 23.824

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.

Flexible Apron D/S 0 6.000 13.700 0.75 0.000 0.000 Cum


Flexible Apron U/S 1 3.000 13.700 0.75 30.825 30.825 Cum

7 Curtain Wall

Excavavtion U/S 0 13.700 1.500 1.550 0.000 0.000


Curtain Wall-PCC U/S 0 13.700 1.500 0.150 0.000
Curtain Wall-1st Lift U/S 0 13.700 1.300 0.800 0.000
Curtain Wall-2nd Lift U/S 0 13.700 0.450 0.750 0.000
Curtain Wall-3rd Lift U/S 0 13.700 0.200 0.450 0.000

Excavavtion D/S 1 7.500 1.850 2.050 28.444 28.444


Curtain Wall-PCC D/S 1 7.500 1.850 0.150 2.081
Curtain Wall-1st Lift D/S 1 7.500 1.650 0.550 6.806
Curtain Wall-2nd Lift D/S 1 7.500 0.750 0.750 4.219
Curtain Wall-3rd Lift D/S 1 7.500 0.450 0.750 2.531
Curtain Wall-4th Lift D/S 1 7.500 0.200 0.450 0.675
16.312 Cum

8 Less Embankment Quantity of Box Culvert


Embankment Qty of Box B/S -1 17.844 3.5 2.990 -186.737

-186.737 Cum
Quantity - BOX Culvert at km 160+220 (LSR)
Inputs
BC - 1 x 1 x 0 Cell a b H W c b.slab wall
Skew (deg) = 0.00 1 1.00 0.000 3.000 3.000 0.00 0.30 0.25
Skew (rad) = 0.00 1.00 0.000

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 7.500 0.000 7.500 0.000 0.000 LHS RHS LCW
0.000 7.500 0.000 7.500 0.000 0.000 86.100 86.100 90.741

e GL C/s Road
LCW RCW Avg FRL
-2.50% -2.50% 86.660 0.000

Inv Lev 86.400 Cushion 1.091


FL 86.100 7.500
Top slab level 89.650 Ht of Ew 2.990 11.864
depth 3.250 23.824

Sl.
Description Side No. Length Width Depth Quantity Sub Total Unit
No.
t.slab
0.25
0.250

FRL
RCW
90.741

BOQ
Item No.

6.01 a

6.02 b

6.20 c

6.20 c
t.slab
0.25
0.250

FRL
RCW
90.741

BOQ
Item No.

6.22 c

6.22 c

6.47

6.42 a

6.60 b
t.slab
0.25
0.250

FRL
RCW
90.741

BOQ
Item No.

6.01 a
6.01 a
6.02 a
6.02 a
6.20 d
6.20 d
6.20 d
6.20 d

6.52

6.30 a

6.30 b

6.30 c
t.slab
0.25
0.250

FRL
RCW
90.741

BOQ
Item No.

16.11
16.11

6.01 a

6.01 a

6.02 a

2.02
t.slab
0.25
0.250

FRL
RCW
90.741

BOQ
Item No.
Quantity - LVUP at km 162+382
LVUP - 1 x 10.50 x 4.30 m Cell a b b-lhs b-rhs c d e fo
Skew (deg) = 0.00 1 10.50 8.51 8.245 8.78 0.00 0.55 0.85 0.85
Skew (rad) = 0.00 10.50 0.000 0.850

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 22.750 22.750 21.250 3.000 21.250 LHS RHS LCW RCW
0.000 22.750 22.750 21.250 3.000 21.250 86.211 86.211 96.172 96.172

e GL C/s Road
LCW RCW Avg FRL
-2.50% 2.50% 88.286 88.937

Sl. Sub BOQ Item


Description Side No. Length Width Depth Quantity Unit
No. Total No.

1 Excavation for Structure


Exv for Raft LCW 1 22.950 12.400 2.175 618.87

Exv for Raft RCW 1 22.950 12.400 2.175 618.87


1237.73 Cum 6.01 a
Sl. Sub BOQ Item
Description Side No. Length Width Depth Quantity Unit
No. Total No.

2 Levelling Course - PCC


Below Box Raft
Raft LCW 1 22.950 12.400 0.100 28.458
Raft RCW 1 22.950 12.400 0.100 28.458
56.916 Cum 6.02 a

Below Approach Slab LHS 2 21.550 3.350 0.150 21.658


RHS 2 21.550 3.350 0.150 21.658

Footpath B/S 4 22.750 1.500 0.150 20.475


63.791 Cum 6.02 b

3 Box Structure - Conc.


Raft - Box Str
Raft LCW 1 22.750 12.200 0.850 235.918
235.918 Cum 6.20 d
Raft RCW 1 22.750 12.200 0.850 235.918
235.918 Cum 6.20 d

Wall - Box Str


Wall (Outer) LCW 2 22.750 0.850 8.245 318.875
Wall (Inner) LCW 0 22.750 0.000 8.245 0.000
Haunch (Bottom) LCW 2 22.750 0.450 0.075 1.536
Median Wall LCW 2 1.500 0.850 0.550 1.403
Haunch (Top) LCW 2 21.250 0.450 0.075 1.434 323.248 Cum 6.22 d

Wall (Outer) RCW 2 22.750 0.850 8.777 339.450


Wall (Inner) RCW 0 22.750 0.000 8.777 0.000
Haunch (Bottom) RCW 2 22.750 0.450 0.075 1.536
Median Wall RCW 2 1.500 0.850 0.550 1.403
Haunch (Top) RCW 2 21.250 0.450 0.075 1.434 343.823 Cum 6.22 d

Bracket LCW 2 21.250 0.450 0.300 5.738


RCW 2 21.250 0.450 0.300 5.738 11.476 Cum 6.22 d

Slab - Box Str


Slab LCW 1 21.250 12.200 0.550 142.588
142.588 Cum 6.25 c
Slab RCW 1 21.250 12.200 0.550 142.588
142.588 Cum 6.25 c

4 RCC Crash Barrier - Conc.


Box Str + Approach
Slab
Sl. Sub BOQ Item
Description Side No. Length Width Depth Quantity Unit
No. Total No.

RCC CB (Outer Edge) B/S 2 19.200 0.317 12.169


RCC CB (Median Edge) B/S 2 19.200 0.317 12.169
RCC CB (Closure) B/S 2 3.000 0.317 1.901

26.239 Cum 6.47

5 Approach Slab
Approach Slab LHS 2 21.250 3.500 0.300 44.625
RHS 2 21.250 3.500 0.300 44.625 89.250 Cum 6.45

6 Reinforcement
Rnf Box Structure
Rnf Box - Foundation LHS 1 20.570 20.570
Rnf RHS 1 22.391 22.391 42.961 MT 6.30 a
Rnf
Rnf Box - Substructure LHS 1 35.979 35.979
Rnf RHS 1 37.146 37.146 73.125 MT 6.30 b
Rnf
Rnf Box - Super Structure LHS 1 16.885 16.885
Rnf RHS 1 17.560 17.560 34.445 MT 6.30 c
Rnf
Rnf RCC Crash Barrier
Rnf RCC CB (Outer Edge) B/S 2 19.200 0.048 1.824
Rnf RCC CB (Median Edge) B/S 2 19.200 0.048 1.824
Rnf RCC CB (Closure) B/S 2 3.000 0.048 0.285
Rnf
Rnf 3.933 MT 6.30 c
Rnf

7 Drainage Spout
LHS 3 3.00
RHS 3 3.00 6.00 Nos 6.53

8 Weep Holes
LHS 196 196.00
RHS 220 220.00 416.00 Nos 6.52
Sl. Sub BOQ Item
Description Side No. Length Width Depth Quantity Unit
No. Total No.

9 Fibre Board
Box & Median Wall Med 2 9.061 0.850 15.40
CB Med 4 0.317 1.27
Approach Slab B/S 4 21.250 0.300 25.50
Box Raft Med 1 12.200 0.850 10.37 52.542 Sqm
210.168 Rm 6.42 a
10 Filter Media - Geocomposite
LHS 2 22.750 9.095 413.82
RHS 2 22.750 9.627 438.03 851.852 Sqm 6.60 b

11 RE Wall
Return Wall LHS 2 18.008 5.184 6.368 186.69
2 2.000 2.000 6.368 8.00
RHS 2 18.008 5.184 6.368 186.69
2 2.000 2.000 6.368 8.00 389.389 Sqm 6.90 a

Levelling Pad BHS 4 18.008 0.350 0.150 3.782


BHS 4 2.000 0.350 0.150 0.420 4.202 Cum 6.02 b

Excavation BHS 4 18.008 6.000 1.000 432.18


BHS 4 2.000 6.000 1.000 48.000 480.181 Cum 6.01 a

12 Embankment
Embankment Qty as per
B/S km. 162+150 to 162+800 239624.3
Revised Profile
239624.3 Cum 2.02

13 Sub Grade
Subgrade in Flared Portion
B/S 4 75.000 1.875 0.500 281.25
in Str Approach of MCW

Connecting LSR & RSR B/S 1 111.750 10.500 0.500 586.69


Shoulder of LSR & RSR B/S 2 66.250 1.000 0.230 30.48
898.41 Cum 2.05

14 GSB

GSB in Flared Portion in Str


B/S 4 75.000 1.875 0.200 112.50
Approach of MCW
Granular Shoulder in Flared
Portion in Str Approach of B/S 4 75.000 1.875 0.400 225.00
MCW

Connecting LSR & RSR B/S 1 111.750 10.500 0.175 205.34


Sl. Sub BOQ Item
Description Side No. Length Width Depth Quantity Unit
No. Total No.

542.84 Cum 3.01


Sl. Sub BOQ Item
Description Side No. Length Width Depth Quantity Unit
No. Total No.

15 WMM
Connecting LSR & RSR B/S 1 116.500 7.300 0.150 127.57
127.57 Cum 3.04

16 Prime Coat
Wearing Coat above Str. B/S 2 19.200 20.250 777.60
Connecting LSR & RSR B/S 1 116.250 7.000 813.75
1591.35 Sqm 4.01

17 Tack Coat - Granular Surface


Connecting LSR & RSR B/S 1 116.250 7.000 813.75
813.75 Sqm 4.02 a

18 DBM
Connecting LSR & RSR B/S 1 116.250 7.000 0.050 40.69
40.69 Cum 4.04 d
19 Tack Coat - Bituminous Surface
Connecting LSR & RSR B/S 1 116.250 7.000 813.75
813.75 Sqm 4.02 b

20 BC
Wearing Coat above Str. B/S 2 19.200 20.250 0.050 38.88

Connecting LSR & RSR B/S 1 116.250 7.000 0.030 24.41 63.29 Cum 4.05 b

21 Drainage Chute
In Geocell Area LHS 27 17.39 469.53
RHS 27 18.21 491.67 961.20 Lm 15.15

In Turfing Area LHS 5 12.33 61.65


RHS 5 12.37 61.85 123.50 Lm 15.15

22 Geocell with Concrete filling along Chute Drain


In Geocell Area LHS 27 17.39 2.00 939.06
RHS 27 18.21 2.00 983.34

In Turfing Area LHS 5 12.33 2.00 123.30


RHS 5 12.37 2.00 123.70 2169.40 Sqm 15.04 C
Sl. Sub BOQ Item
Description Side No. Length Width Depth Quantity Unit
No. Total No.

23 Geocell covered with fine grass


Geocell Area LHS 1 9354.79 9354.79
RHS 1 9976.00 9976.00
Less for Chute Drain & Geocell with Concrete
LHS 27 17.39 -2.60 -1220.78
RHS 27 18.21 -2.60 -1278.34 16831.66 Sqm 15.04 D

24 Turfing with Sods


Turfing Area LHS 1 1245.67 1245.67
RHS 1 1124.59 1124.59
Less for Chute Drain & Geocell with Concrete
LHS 5 12.33 -2.60 -160.29
RHS 5 12.37 -2.60 -160.81 2049.16 Sqm 3.22

25 Qty - Misc work

Metal Beam Crash barrier B/S 0.000 19.200 0.000 Rm 8.23 A

k Kerb
Along LVUP Footpath B/S 4 22.750 0.1087 9.892 9.892 Cum 7.03 b

26 Pavement Marking: Lane/Edge


Pedestrian Crossing
B/S 7 3.000 0.500 10.500
(Cross Road)
Pedestrian Crossing
B/S 3 3.000 0.500 4.500
(Service Road)
Edge Line LHS 1 116.250 0.150 17.438
Edge Line RHS 1 116.250 0.150 17.438
Centre Line PCL 20 3.000 0.100 6.000 55.875 Sqm 8.13
27 Kerb and Crash Barrier Painting
Painting on Kerb LHS 4 22.750 0.789 71.799

Painting on Crash Barrier 2 41.400 2.483 205.592


277.391 Sqm 8.02
28 Retro-Reflectorised Traffic Signs
Retro-Reflectorised Traffic Signs 2 2 2.000 Each 8.03

Providing and fixing lighting for LVUP, including all lifts and leads of
29 material and manpower complete as per work order issued.

LVUP Electrical works 1 1 1.000 Each 8.27


Quantity - MCW as per Sch-B at the Location of LVUP at km 162+382
Sl. Sub BOQ Item
Description Side No. Length Width Depth Quantity Unit
No. Total No.

1 Embankment
Embankment Qty as per
B/S km. 162+150 to 162+800 165811.9
Initial Profile
165811.9 Cum 2.02

2 Sub Grade

Subgrade - MCW B/S 2 12.200 20.700 0.500 252.54


252.54 Cum 2.05

3 GSB

GSB - MCW B/S 2 15.700 20.000 0.200 125.60

125.60 Cum 3.01

4 WMM
WMM - MCW B/S 2 19.200 15.800 0.250 151.68
151.68 Cum 3.04

5 Prime Coat
Prime Coat - MCW B/S 2 19.200 15.000 576.00
576.00 Sqm 4.01

6 Tack Coat - Granular Surface


Tack Coat - MCW B/S 2 19.200 15.000 576.00
576.00 Sqm 4.02 a

7 DBM
DBM - MCW B/S 2 19.200 15.000 0.100 57.60
57.60 Cum 4.04 d

8 Tack Coat - Bituminous Surface


Tack Coat - MCW B/S 0 19.200 15.000 0.00
0.00 Sqm 4.02 b

9 BC
BC - MCW B/S 2 19.200 15.000 0.050 28.80
28.80 Cum 4.05 b

10 Drainage Chute
In Geocell Area LHS 9 14.37 129.33
RHS 14 15.43 216.02 345.35 Lm 15.15
Sl. Sub BOQ Item
Description Side No. Length Width Depth Quantity Unit
No. Total No.

In Turfing Area LHS 24 11.77 282.48


RHS 19 11.91 226.29 508.77 Lm 15.15

11 Geocell with Concrete filling along Chute Drain


In Geocell Area LHS 9 14.37 2.00 258.66
RHS 14 15.43 2.00 432.04

In Turfing Area LHS 24 11.77 2.00 564.96


RHS 19 11.91 2.00 452.58 1708.24 Sqm 15.04 C

12 Geocell covered with fine grass


Geocell Area LHS 1 2575.53 2575.53
RHS 1 4161.12 4161.12
Less for Chute Drain & Geocell with Concrete
LHS 9 14.37 -2.60 -336.26
RHS 14 15.43 -2.60 -561.65 5838.75 Sqm 15.04 D

13 Turfing with Sods


Turfing Area LHS 1 5570.13 5570.13
RHS 1 4544.20 4544.20
Less for Chute Drain & Geocell with Concrete
LHS 24 11.77 -2.60 -734.45
RHS 19 11.91 -2.60 -588.35 8791.53 Sqm 3.22

14 Qty - Misc work as per original scope

i Metal Beam Crash barrier

Median Edge B/S 2 19.200 38.40 38.40 Lm 8.23 A

ii Kerb
Median Kerb (I-Sec) B/S 2 19.200 0.055 2.112
Outer Kerb (L-Sec) B/S 2 19.200 0.1087 4.174
6.286 Cum 7.03 b

iii Median Drain


PCC 1 12.200 0.800 0.100 0.976 0.976 Cum 6.02 a

Raft 1 12.200 0.600 0.125 0.915


Wall 2 12.200 0.125 0.400 1.220
2.135 Cum 7.03 b

iv Painting on Kerb
Sl. Sub BOQ Item
Description Side No. Length Width Depth Quantity Unit
No. Total No.

Median Kerb (I-Sec) 2 19.200 0.273 10.483 10.483 Cum 8.02


Outer Kerb (L-Sec) 2 19.200 0.789 30.298 30.298 Cum 8.02
Qty - Embankment Slope Protection in the Approaches of LVUP at km 162+382 (wrt Initial Profile) Qty - Embankment Slope Protection in the Approaches of LVUP at km 162+382 (wrt Revised Profile)
GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area) GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area)
FRL at FRL at
Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope Remarks Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope
LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS
Edge Width Edge Width Edge Width Edge Width

H= K= L= N= R= S= H= K= L= N= R= S=
A B C D E F G J = H-C M = L-D P Q T A B C D E F G J = H-C M = L-D P Q
E+Fx17 √J +(2xJ)2
2
E+Gx17 √M +(2xM)2
2
Avg.PxB Avg.QxB E+Fx17 √J +(2xJ)2
2
E+Gx17 √M +(2xM)2
2
Avg.PxB Avg.QxB

162+150 89.284 88.848 92.818 -2.50% 2.50% 92.393 3.109 6.952 93.243 4.395 9.828 Turfing Turfing - - 162+150 89.284 88.848 95.326 -2.50% 2.50% 94.901 5.617 12.560 95.751 6.903 15.436 Turfing Geocell - -
162+160 10 89.041 88.737 92.853 -2.50% 2.50% 92.428 3.387 7.574 93.278 4.541 10.154 Turfing Turfing 72.63 99.91 162+160 10 89.041 88.737 95.382 -2.50% 2.50% 94.957 5.916 13.229 95.807 7.070 15.809 Turfing Geocell 128.94 156.22
162+170 10 88.777 88.625 92.889 -2.50% 2.50% 92.464 3.687 8.244 93.314 4.689 10.485 Turfing Turfing 79.09 103.20 162+170 10 88.777 88.625 95.439 -2.50% 2.50% 95.014 6.237 13.946 95.864 7.239 16.187 Geocell Geocell 135.88 159.98
162+180 10 88.513 88.513 92.924 -2.50% 2.50% 92.499 3.986 8.913 93.349 4.836 10.814 Turfing Turfing 85.79 106.49 162+180 10 88.513 88.513 95.495 -2.50% 2.50% 95.070 6.557 14.662 95.920 7.407 16.563 Geocell Geocell 143.04 163.75
162+190 10 88.172 88.496 92.960 -2.50% 2.50% 92.535 4.363 9.756 93.385 4.889 10.932 Turfing Turfing 93.35 108.73 162+190 10 88.172 88.496 95.550 -2.50% 2.50% 95.125 6.953 15.547 95.975 7.479 16.724 Geocell Geocell 151.05 166.43
162+200 10 87.861 88.479 92.995 -2.50% 2.50% 92.570 4.709 10.530 93.420 4.941 11.048 Turfing Turfing 101.43 109.90 162+200 10 87.861 88.479 95.605 -2.50% 2.50% 95.180 7.319 16.366 96.030 7.551 16.885 Geocell Geocell 159.57 168.04
162+210 10 87.699 88.618 93.031 -2.50% 2.50% 92.606 4.907 10.972 93.456 4.838 10.818 Turfing Turfing 107.51 109.33 162+210 10 87.699 88.618 95.655 -2.50% 2.50% 95.230 7.531 16.840 96.080 7.462 16.686 Geocell Geocell 166.03 167.85
162+220 10 87.537 88.757 93.066 -2.50% 2.50% 92.641 5.104 11.413 93.491 4.734 10.586 Turfing Turfing 111.93 107.02 162+220 10 87.537 88.757 95.705 -2.50% 2.50% 95.280 7.743 17.314 96.130 7.373 16.487 Geocell Geocell 170.77 165.86
162+230 10 87.408 88.384 93.102 -2.50% 2.50% 92.677 5.269 11.782 93.527 5.143 11.500 Turfing Turfing 115.97 110.43 162+230 10 87.408 88.384 95.751 -2.50% 2.50% 95.326 7.918 17.705 96.176 7.792 17.423 Geocell Geocell 175.10 169.55
162+240 10 87.278 88.010 93.137 -2.50% 2.50% 92.712 5.434 12.151 93.562 5.552 12.415 Turfing Turfing 119.66 119.57 162+240 10 87.278 88.010 95.796 -2.50% 2.50% 95.371 8.093 18.096 96.221 8.211 18.360 Geocell Geocell 179.01 178.92
162+250 10 87.098 87.769 93.173 -2.50% 2.50% 92.748 5.650 12.634 93.598 5.829 13.034 Turfing Turfing 123.92 127.24 162+250 10 87.098 87.769 95.837 -2.50% 2.50% 95.412 8.314 18.591 96.262 8.493 18.991 Geocell Geocell 183.44 186.76
162+260 10 86.176 87.528 93.208 -2.50% 2.50% 92.783 6.607 14.774 93.633 6.105 13.651 Geocell Geocell 137.04 133.43 162+260 10 86.176 87.528 95.878 -2.50% 2.50% 95.453 9.277 20.744 96.303 8.775 19.621 Geocell Geocell 196.67 193.06
162+270 10 86.239 87.337 93.244 -2.50% 2.50% 92.819 6.580 14.713 93.669 6.332 14.159 Geocell Geocell 147.44 139.05 162+270 10 86.239 87.337 95.914 -2.50% 2.50% 95.489 9.250 20.684 96.339 9.002 20.129 Geocell Geocell 207.14 198.75
162+280 10 86.338 87.145 93.279 -2.50% 2.50% 92.854 6.516 14.570 93.704 6.559 14.666 Geocell Geocell 146.42 144.13 162+280 10 86.338 87.145 95.950 -2.50% 2.50% 95.525 9.187 20.543 96.375 9.230 20.639 Geocell Geocell 206.13 203.84
162+290 10 86.385 86.947 93.315 -2.50% 2.50% 92.890 6.505 14.546 93.740 6.793 15.190 Geocell Geocell 145.58 149.28 162+290 10 86.385 86.947 95.982 -2.50% 2.50% 95.557 9.172 20.509 96.407 9.460 21.153 Geocell Geocell 205.26 208.96
162+300 10 86.554 86.748 93.350 -2.50% 2.50% 92.925 6.371 14.246 93.775 7.027 15.713 Geocell Geocell 143.96 154.51 162+300 10 86.554 86.748 96.013 -2.50% 2.50% 95.588 9.034 20.201 96.438 9.690 21.667 Geocell Geocell 203.55 214.10
162+310 10 86.572 86.651 93.386 -2.50% 2.50% 92.961 6.389 14.286 93.811 7.160 16.010 Geocell Geocell 142.66 158.62 162+310 10 86.572 86.651 96.040 -2.50% 2.50% 95.615 9.043 20.221 96.465 9.814 21.945 Geocell Geocell 202.11 218.06
162+320 10 86.481 86.554 93.421 -2.50% 2.50% 92.996 6.515 14.568 93.846 7.292 16.305 Geocell Geocell 144.27 161.58 162+320 10 86.481 86.554 96.067 -2.50% 2.50% 95.642 9.161 20.485 96.492 9.938 22.222 Geocell Geocell 203.53 220.83
162+330 10 86.844 86.581 93.457 -2.50% 2.50% 93.032 6.188 13.837 93.882 7.301 16.326 Geocell Geocell 142.02 163.16 162+330 10 86.844 86.581 96.089 -2.50% 2.50% 95.664 8.820 19.722 96.514 9.933 22.211 Geocell Geocell 201.03 222.17
162+340 10 87.175 86.608 93.492 -2.50% 2.50% 93.067 5.892 13.175 93.917 7.309 16.343 Turfing Geocell 135.06 163.35 162+340 10 87.175 86.608 96.111 -2.50% 2.50% 95.686 8.511 19.031 96.536 9.928 22.200 Geocell Geocell 193.77 222.05
162+350 10 87.531 86.676 93.528 -2.50% 2.50% 93.103 5.572 12.459 93.953 7.277 16.272 Turfing Geocell 128.17 163.08 162+350 10 87.531 86.676 96.129 -2.50% 2.50% 95.704 8.173 18.275 96.554 9.878 22.088 Geocell Geocell 186.53 221.44
162+360 10 87.913 86.744 93.563 -2.50% 2.50% 93.138 5.225 11.683 93.988 7.244 16.198 Turfing Geocell 120.71 162.35 162+360 10 87.913 86.744 96.146 -2.50% 2.50% 95.721 7.808 17.459 96.571 9.827 21.974 Geocell Geocell 178.67 220.31
162+370 10 88.151 86.929 93.599 -2.50% 2.50% 93.174 5.023 11.232 94.024 7.095 15.865 Turfing Geocell 114.58 160.32 162+370 10 88.151 86.929 96.159 -2.50% 2.50% 95.734 7.583 16.956 96.584 9.655 21.589 Geocell Geocell 172.08 217.82
162+376 162+376 5.9 88.331 87.038 96.166 -2.50% 2.50% 95.741 7.410 16.569 96.591 9.553 21.361 Geocell Geocell 98.90 126.70
162+380 10 88.456 87.114 93.634 -2.50% 2.50% 93.209 4.753 10.628 94.059 6.945 15.529 Turfing Geocell 109.30 156.97 162+380 4.1 88.456 87.114 96.171 -2.50% 2.50% 95.746 96.596
LVUP at km 162+382 LVUP at km 162+382
162+382 162+382 2 88.456 87.096 96.173 -2.50% 2.50% 95.748 96.598
162+388 162+388 6.1 88.456 87.026 96.179 -2.50% 2.50% 95.754 7.298 16.319 96.604 9.578 21.417
162+390 10 88.456 87.026 93.670 -2.50% 2.33% 93.245 4.789 10.709 94.065 7.039 15.740 Turfing Geocell 106.68 156.35 162+390 1.9 88.456 87.026 96.179 -2.50% 2.50% 95.754 7.298 16.319 96.604 9.578 21.417 Geocell Geocell 31.01 40.69
162+400 10 88.424 86.937 93.705 -2.50% 2.08% 93.280 4.856 10.858 94.058 7.121 15.923 Turfing Geocell 107.83 158.31 162+400 10 88.424 86.937 96.187 -2.50% 2.08% 95.762 7.338 16.408 96.540 9.603 21.473 Geocell Geocell 163.64 214.45
162+410 10 88.571 86.896 93.741 -2.50% 1.83% 93.316 4.745 10.610 94.051 7.155 15.999 Turfing Geocell 107.34 159.61 162+410 10 88.571 86.896 96.190 -2.50% 1.83% 95.765 7.194 16.086 96.500 9.604 21.475 Geocell Geocell 162.47 214.74
162+420 10 88.512 86.855 93.776 -2.50% 1.58% 93.351 4.839 10.820 94.044 7.189 16.075 Turfing Geocell 107.15 160.37 162+420 10 88.512 86.855 96.193 -2.50% 1.58% 95.768 7.256 16.225 96.461 9.606 21.480 Geocell Geocell 161.56 214.77
162+430 10 88.170 86.882 93.812 -2.50% 1.33% 93.387 5.217 11.666 94.037 7.155 15.999 Turfing Geocell 112.43 160.37 162+430 10 88.170 86.882 96.192 -2.50% 1.33% 95.767 7.597 16.987 96.417 9.535 21.321 Geocell Geocell 166.06 214.00
162+440 10 88.020 86.908 93.847 -2.50% 1.08% 93.422 5.402 12.079 94.030 7.122 15.925 Turfing Geocell 118.72 159.62 162+440 10 88.020 86.908 96.190 -2.50% 1.08% 95.765 7.745 17.318 96.373 9.465 21.164 Geocell Geocell 171.53 212.43
162+450 10 87.704 86.934 93.883 -2.50% 0.83% 93.458 5.754 12.866 94.023 7.089 15.851 Turfing Geocell 124.73 158.88 162+450 10 87.704 86.934 96.184 -2.50% 0.83% 95.759 8.055 18.012 96.324 9.390 20.997 Geocell Geocell 176.65 210.81
162+460 10 87.412 86.959 93.918 -2.50% 0.58% 93.493 6.081 13.598 94.016 7.057 15.780 Geocell Geocell 132.32 158.16 162+460 10 87.412 86.959 96.178 -2.50% 0.58% 95.753 8.341 18.651 96.276 9.317 20.833 Geocell Geocell 183.31 209.15
162+470 10 87.209 87.040 93.954 -2.50% 0.33% 93.529 6.320 14.132 94.009 6.969 15.583 Geocell Geocell 138.65 156.82 162+470 10 87.209 87.040 96.167 -2.50% 0.33% 95.742 8.533 19.080 96.222 9.182 20.532 Geocell Geocell 188.66 206.83
162+480 10 87.023 87.120 93.989 -2.50% 0.08% 93.564 6.541 14.626 94.002 6.882 15.389 Geocell Geocell 143.79 154.86 162+480 10 87.023 87.120 96.156 -2.50% 0.08% 95.731 8.708 19.472 96.169 9.049 20.234 Geocell Geocell 192.76 203.83
162+490 10 86.991 87.465 94.025 -2.50% -0.18% 93.600 6.609 14.778 93.995 6.530 14.602 Geocell Geocell 147.02 149.95 162+490 10 86.991 87.465 96.141 -2.50% -0.18% 95.716 8.725 19.510 96.111 8.646 19.333 Geocell Geocell 194.91 197.84
162+500 10 86.997 87.809 94.060 -2.50% -0.43% 93.635 6.638 14.843 93.988 6.179 13.817 Geocell Geocell 148.11 142.09 162+500 10 86.997 87.809 96.125 -2.50% -0.43% 95.700 8.703 19.460 96.053 8.244 18.434 Geocell Geocell 194.85 188.84
162+510 10 87.093 87.811 94.096 -2.50% -0.68% 93.671 6.578 14.709 93.981 6.170 13.797 Geocell Geocell 147.76 138.07 162+510 10 87.093 87.811 96.105 -2.50% -0.68% 95.680 8.587 19.201 95.990 8.179 18.289 Geocell Geocell 193.31 183.62
162+520 10 87.295 87.813 94.131 -2.50% -0.93% 93.706 6.411 14.335 93.974 6.161 13.776 Geocell Geocell 145.22 137.87 162+520 10 87.295 87.813 96.085 -2.50% -0.93% 95.660 8.365 18.705 95.928 8.115 18.146 Geocell Geocell 189.53 182.17
162+530 10 87.415 87.970 94.167 -2.50% -1.18% 93.742 6.327 14.148 93.967 5.997 13.410 Geocell Turfing 142.42 135.93 162+530 10 87.415 87.970 96.060 -2.50% -1.18% 95.635 8.220 18.380 95.860 7.890 17.643 Geocell Geocell 185.43 178.94
162+540 10 87.458 88.127 94.202 -2.50% -1.43% 93.777 6.319 14.130 93.960 5.833 13.043 Geocell Turfing 141.39 132.26 162+540 10 87.458 88.127 96.035 -2.50% -1.43% 95.610 8.152 18.228 95.793 7.666 17.142 Geocell Geocell 183.05 173.92
162+550 10 87.656 88.305 94.238 -2.50% -1.68% 93.813 6.157 13.767 93.953 5.648 12.629 Geocell Turfing 139.49 128.36 162+550 10 87.656 88.305 96.006 -2.50% -1.68% 95.581 7.925 17.721 95.721 7.416 16.583 Geocell Geocell 179.75 168.62
162+560 10 88.123 88.483 94.273 -2.50% -1.93% 93.848 5.725 12.801 93.946 5.463 12.216 Turfing Turfing 132.85 124.23 162+560 10 88.123 88.483 95.976 -2.50% -1.93% 95.551 7.428 16.610 95.649 7.166 16.024 Geocell Geocell 171.65 163.03
162+570 10 88.218 88.482 94.309 -2.50% -2.18% 93.884 5.666 12.670 93.939 5.457 12.202 Turfing Turfing 127.36 122.09 162+570 10 88.218 88.482 95.942 -2.50% -2.18% 95.517 7.299 16.321 95.572 7.090 15.854 Geocell Geocell 164.65 159.39
162+580 10 88.291 88.480 94.344 -2.50% -2.43% 93.919 5.628 12.585 93.932 5.452 12.191 Turfing Turfing 126.27 121.97 162+580 10 88.291 88.480 95.907 -2.50% -2.43% 95.482 7.191 16.080 95.495 7.015 15.686 Geocell Geocell 162.00 157.70
162+590 10 88.308 88.554 94.380 -2.50% -2.50% 93.955 5.647 12.627 93.955 5.401 12.077 Turfing Turfing 126.06 121.34 162+590 10 88.308 88.554 95.868 -2.50% -2.50% 95.443 7.135 15.954 95.443 6.889 15.404 Geocell Geocell 160.17 155.45
162+600 10 88.351 88.628 94.415 -2.50% -2.50% 93.990 5.639 12.609 93.990 5.362 11.990 Turfing Turfing 126.18 120.33 162+600 10 88.351 88.628 95.829 -2.50% -2.50% 95.404 7.053 15.771 95.404 6.776 15.152 Geocell Geocell 158.63 152.78
162+610 10 88.280 88.670 94.451 -2.50% -2.50% 94.026 5.746 12.848 94.026 5.356 11.976 Turfing Turfing 127.29 119.83 162+610 10 88.280 88.670 95.785 -2.50% -2.50% 95.360 7.080 15.831 95.360 6.690 14.959 Geocell Geocell 158.01 150.55
162+620 10 88.108 88.711 94.486 -2.50% -2.50% 94.061 5.953 13.311 94.061 5.350 11.963 Turfing Turfing 130.80 119.70 162+620 10 88.108 88.711 95.741 -2.50% -2.50% 95.316 7.208 16.118 95.316 6.605 14.769 Geocell Geocell 159.75 148.64
162+630 10 88.146 88.635 94.521 -2.50% -2.50% 94.096 5.950 13.305 94.096 5.461 12.211 Turfing Turfing 133.08 120.87 162+630 10 88.146 88.635 95.693 -2.50% -2.50% 95.268 7.122 15.925 95.268 6.633 14.832 Geocell Geocell 160.21 148.01
162+640 10 88.130 88.558 94.556 -2.50% -2.50% 94.131 6.001 13.419 94.131 5.573 12.462 Turfing Turfing 133.62 123.36 162+640 10 88.130 88.558 95.644 -2.50% -2.50% 95.219 7.089 15.851 95.219 6.661 14.894 Geocell Geocell 158.88 148.63
162+650 10 88.244 88.518 94.587 -2.50% -2.50% 94.162 5.918 13.233 94.162 5.644 12.620 Turfing Turfing 133.26 125.41 162+650 10 88.244 88.518 95.591 -2.50% -2.50% 95.166 6.922 15.478 95.166 6.648 14.865 Geocell Geocell 156.65 148.80
162+660 10 88.186 88.478 94.618 -2.50% -2.50% 94.193 6.007 13.432 94.193 5.715 12.779 Turfing Turfing 133.33 127.00 162+660 10 88.186 88.478 95.538 -2.50% -2.50% 95.113 6.927 15.489 95.113 6.635 14.836 Geocell Geocell 154.84 148.51
162+670 10 88.160 88.554 94.642 -2.50% -2.50% 94.217 6.057 13.544 94.217 5.663 12.663 Turfing Turfing 134.88 127.21 162+670 10 88.160 88.554 95.480 -2.50% -2.50% 95.055 6.895 15.418 95.055 6.501 14.537 Geocell Geocell 154.54 146.87
162+680 10 88.247 88.629 94.665 -2.50% -2.50% 94.240 5.993 13.401 94.240 5.611 12.547 Turfing Turfing 134.72 126.05 162+680 10 88.247 88.629 95.422 -2.50% -2.50% 94.997 6.750 15.093 94.997 6.368 14.239 Geocell Geocell 152.56 143.88
162+690 10 88.320 88.675 94.682 -2.50% -2.50% 94.257 5.937 13.276 94.257 5.582 12.482 Turfing Turfing 133.38 125.14 162+690 10 88.320 88.675 95.362 -2.50% -2.50% 94.937 6.617 14.796 94.937 6.262 14.002 Geocell Geocell 149.45 141.21
162+700 10 88.245 88.720 94.699 -2.50% -2.50% 94.274 6.029 13.481 94.274 5.554 12.419 Turfing Turfing 133.78 124.50 162+700 10 88.245 88.720 95.301 -2.50% -2.50% 94.876 6.631 14.827 94.876 6.156 13.765 Geocell Geocell 148.12 138.84
162+710 10 88.298 88.751 94.709 -2.50% -2.50% 94.284 5.986 13.385 94.284 5.533 12.372 Turfing Turfing 134.33 123.96 162+710 10 88.298 88.751 95.240 -2.50% -2.50% 94.815 6.517 14.572 94.815 6.064 13.560 Geocell Geocell 147.00 136.62
162+720 10 88.755 88.781 94.719 -2.50% -2.50% 94.294 5.539 12.386 94.294 5.513 12.327 Turfing Turfing 128.85 123.50 162+720 10 88.755 88.781 95.179 -2.50% -2.50% 94.754 5.999 13.414 94.754 5.973 13.356 Turfing Turfing 139.93 134.58
162+730 10 88.795 88.833 94.722 -2.50% -2.50% 94.297 5.502 12.303 94.297 5.464 12.218 Turfing Turfing 123.44 122.73 162+730 10 88.795 88.833 95.118 -2.50% -2.50% 94.693 5.898 13.188 94.693 5.860 13.103 Turfing Turfing 133.01 132.30
162+740 10 88.715 88.884 94.725 -2.50% -2.50% 94.300 5.585 12.488 94.300 5.416 12.111 Turfing Turfing 123.96 121.64 162+740 10 88.715 88.884 95.057 -2.50% -2.50% 94.632 5.917 13.231 94.632 5.748 12.853 Turfing Turfing 132.10 129.78
162+750 10 89.008 88.921 94.722 -2.50% -2.50% 94.297 5.289 11.827 94.297 5.376 12.021 Turfing Turfing 121.58 120.66 162+750 10 89.008 88.921 94.996 -2.50% -2.50% 94.571 5.563 12.439 94.571 5.650 12.634 Turfing Turfing 128.35 127.43
162+760 10 89.095 88.958 94.718 -2.50% -2.50% 94.293 5.198 11.623 94.293 5.335 11.929 Turfing Turfing 117.25 119.75 162+760 10 89.095 88.958 94.935 -2.50% -2.50% 94.510 5.415 12.108 94.510 5.552 12.415 Turfing Turfing 122.74 125.24
162+770 10 89.060 89.006 94.708 -2.50% -2.50% 94.283 5.223 11.679 94.283 5.277 11.800 Turfing Turfing 116.51 118.65 162+770 10 89.060 89.006 94.874 -2.50% -2.50% 94.449 5.389 12.050 94.449 5.443 12.171 Turfing Turfing 120.79 122.93
162+780 10 89.113 89.054 94.697 -2.50% -2.50% 94.272 5.159 11.536 94.272 5.218 11.668 Turfing Turfing 116.07 117.34 162+780 10 89.113 89.054 94.813 -2.50% -2.50% 94.388 5.275 11.795 94.388 5.334 11.927 Turfing Turfing 119.23 120.49
GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area) GL at 25m Cross Fall LHS RHS Slope Protection Qty (Area)
FRL at FRL at
Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope Remarks Chainage Lgth FRL at Sh. Slope FRL at Sh. Slope
LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS LHS RHS Med Edge LHS RHS Emb Ht Emb Ht LHS RHS LHS RHS
Edge Width Edge Width Edge Width Edge Width

H= K= L= N= R= S= H= K= L= N= R= S=
A B C D E F G J = H-C M = L-D P Q T A B C D E F G J = H-C M = L-D P Q
E+Fx17 √J2+(2xJ)2 E+Gx17 √M2+(2xM)2 Avg.PxB Avg.QxB E+Fx17 √J2+(2xJ)2 E+Gx17 √M2+(2xM)2 Avg.PxB Avg.QxB

162+790 10 89.551 89.143 94.679 -2.50% -2.50% 94.254 4.703 10.516 94.254 5.111 11.429 Turfing Turfing 110.26 115.48 162+790 10 89.551 89.143 94.752 -2.50% -2.50% 94.327 4.776 10.679 94.327 5.184 11.592 Turfing Turfing 112.37 117.60
162+800 10 89.364 89.232 94.661 -2.50% -2.50% 94.236 4.872 10.894 94.236 5.004 11.189 Turfing Turfing 107.05 113.09 162+800 10 89.364 89.232 94.691 -2.50% -2.50% 94.266 4.902 10.961 94.266 5.034 11.256 Turfing Turfing 108.20 114.24

Geocell Area (Total) 2575.53 4161.12 Geocell Area (Total) 9354.79 9976.00
Turfing Area (Total) 5570.13 4544.20 Turfing Area (Total) 1245.67 1124.59

No. of Chute Drain in Geocell Area 9 14 No. of Chute Drain in Geocell Area 27 27
No. of Chute Drain in Turfing Area 24 19 No. of Chute Drain in Turfing Area 5 5

Avg. Length of Chute Drain in Geocell Area 14.37 15.43 Avg. Length of Chute Drain in Geocell Area 17.39 18.21
Avg Length of Chute Drain in Turfing Area 11.77 11.91 Avg Length of Chute Drain in Turfing Area 12.33 12.37
Quantity - BOX Culvert at km 162+520
Inputs
BC - 1 x 2 x 2 Cell a b H W c b.slab wall t.slab
Skew (deg) = 0.00 1 1.00 0.000 2.000 2.000 0.00 0.35 0.35 0.35
Skew (rad) = 0.00 1.00 0.000 0.350

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 3.908 3.908 3.908 0.000 3.908 LHS RHS LCW RCW
0.000 3.908 3.908 3.908 0.000 3.908 86.782 86.782 96.085 96.085

e GL C/s Road
LCW RCW Avg FRL
-2.50% -9.25% 87.679 0.000

New FRL 96.085


Old FRL 94.131
Diff Ht 1.954
Total Length 7.816

Inv lvl 87.0445


top slab lvl 89.3945

Sl. BOQ
Description Side No. Length Width Depth Quantity Sub Total Unit Item No.
No.

1 Excavation for Structure


Exv for Raft LCW 1 4.308 2.900 0.734 9.18

Exv for Raft RCW 1 4.308 2.900 0.734 9.18


18.35 Cum 6.01 a
1 Levelling Course - PCC
Below Box Raft
Raft LCW 1 4.108 2.900 0.100 1.191
Raft RCW 1 4.308 2.900 0.100 1.249
2.440 Cum 6.02 b

2 Box Structure - Conc.


Raft - Box Str
Raft LCW 1 3.908 2.700 0.350 3.693
3.693 Cum 6.20 c
Raft RCW 1 3.908 2.700 0.350 3.693
3.693 Cum 6.20 c

Wall - Box Str


Wall (Outer) LCW 2 3.908 0.350 2.000 5.471
Haunch (Bottom) LCW 2 3.908 0.150 0.075 0.088
Haunch (Top) LCW 2 3.908 0.150 0.075 0.088 5.647 Cum 6.22 c
Quantity - BOX Culvert at km 162+520
Inputs
BC - 1 x 2 x 2 Cell a b H W c b.slab wall t.slab
Skew (deg) = 0.00 1 1.00 0.000 2.000 2.000 0.00 0.35 0.35 0.35
Skew (rad) = 0.00 1.00 0.000 0.350

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 3.908 3.908 3.908 0.000 3.908 LHS RHS LCW RCW
0.000 3.908 3.908 3.908 0.000 3.908 86.782 86.782 96.085 96.085

e GL C/s Road
LCW RCW Avg FRL
-2.50% -9.25% 87.679 0.000

New FRL 96.085


Old FRL 94.131
Diff Ht 1.954
Total Length 7.816

Inv lvl 87.0445


top slab lvl 89.3945

Sl. BOQ
Description Side No. Length Width Depth Quantity Sub Total Unit Item No.
No.

Wall (Outer) RCW 2 3.908 0.350 2.000 5.471


Haunch (Bottom) RCW 2 3.908 0.150 0.075 0.088
Haunch (Top) RCW 2 3.908 0.150 0.075 0.088 5.647 Cum 6.22 c

Slab - Box Str


Slab LCW 1 3.908 2.700 0.350 3.693
3.693 Cum 6.22 c
Slab RCW 1 3.908 2.700 0.350 3.693
3.693 Cum 6.22 c

3 Reinforcement
Box Structure CA COS
Box - Foundation BHS 1 7.247 8.079 0.832
0.832 MT 6.30 a

Box - Substructure BHS 1 8.792 9.800 1.008


1.008 MT 6.30 b

Box - Super Structure BHS 1 6.530 7.268 0.738


0.738 MT 6.30 c

4 Less Difference Embankment Quantity of Box Culvert


Quantity - BOX Culvert at km 162+520
Inputs
BC - 1 x 2 x 2 Cell a b H W c b.slab wall t.slab
Skew (deg) = 0.00 1 1.00 0.000 2.000 2.000 0.00 0.35 0.35 0.35
Skew (rad) = 0.00 1.00 0.000 0.350

fi W-LHS W-RHS W-LCW W-Med W-RCW Fnd Lvl FRL


0.00 3.908 3.908 3.908 0.000 3.908 LHS RHS LCW RCW
0.000 3.908 3.908 3.908 0.000 3.908 86.782 86.782 96.085 96.085

e GL C/s Road
LCW RCW Avg FRL
-2.50% -9.25% 87.679 0.000

New FRL 96.085


Old FRL 94.131
Diff Ht 1.954
Total Length 7.816

Inv lvl 87.0445


top slab lvl 89.3945

Sl. BOQ
Description Side No. Length Width Depth Quantity Sub Total Unit Item No.
No.

Embankment Qty of Box -1 7.816 2.700 1.716 -36.203


-36.2 Cum 2.02
Coping RE
Chainage Side TLP Wall Top Level Beam(Thk) Height Average Height Length Qty (Sqm) Remarks
FILL@5M
200 LHS 95.873 103.833 0.2 7.38 Sec-15
220 LHS 95.873 103.888 0.2 7.435 7.408 20 148.150 740.75
240 LHS 95.873 103.933 0.2 7.48 7.458 20 149.150 745.75
260 LHS 95.873 103.977 0.2 7.524 7.502 20 150.040 750.20
280 LHS 95.873 104.002 0.2 7.549 7.537 20 150.730 753.65
308.631 LHS 95.873 104.009 0.2 7.556 7.553 28.631 216.236 308.631 1,081.18
15.194 323.825

323.825 LHS 95.965 103.999 0.2 7.454 LVUP at ch


0+308
340 LHS 95.965 103.976 0.2 7.431 7.443 16.175 120.382 601.91
360 LHS 95.965 103.944 0.2 7.399 7.415 20 148.300 741.50
380 LHS 95.965 103.886 0.2 7.341 7.370 20 147.400 737.00
Sec-15
400 LHS 95.965 103.8 0.2 7.255 7.298 20 145.960 729.80
420 LHS 95.965 103.694 0.2 7.149 7.202 20 144.040 720.20
440 LHS 95.965 103.576 0.2 7.031 7.090 20 141.800 709.00
460 LHS 95.965 103.432 0.2 6.887 6.959 20 139.180 695.90
480 LHS 95.965 103.278 0.2 6.733 6.810 20 136.200 Sec-14 681.00
482.072 LHS 95.965 103.263 0.2 6.718 6.726 2.072 13.935 69.68
Qty 266.878 1951.503 Sqm.

Coping
Chainage Side TLP Wall Top Level Height Average Height Length Qty (Sqm) Remarks
Beam(Thk)
230.799 RHS 96.021 104.28 0.2 7.679 Sec-16 -
240 RHS 96.021 104.303 0.2 7.702 7.691 9.201 70.760 353.80
260 RHS 96.021 104.335 0.2 7.734 7.718 20 154.360 771.80
280 RHS 96.021 104.351 0.2 7.75 7.742 20 154.840 774.20
315.661 RHS 96.021 104.361 0.2 7.76 7.755 35.661 276.551 315.661 1,382.76
324.318

324.318 RHS 96.075 104.327 0.2 7.672 LVUP at ch


0+318
340 RHS 96.075 104.3 0.2 7.645 7.659 15.682 120.101 600.50
360 RHS 96.075 104.25 0.2 7.595 7.620 20 152.400 Sec-16 762.00
380 RHS 96.075 104.183 0.2 7.528 7.562 20 151.230 756.15
400 RHS 96.075 104.101 0.2 7.446 7.487 20 149.740 748.70
420 RHS 96.075 104.002 0.2 7.347 7.397 20 147.930 Sec-15 739.65
421.529 RHS 96.075 103.993 0.2 7.338 7.343 1.529 11.227 56.13
Qty 182.073 1389.139 Sqm.

Grand Total 448.951 3340.642 Sqm. 16,703.21


Rm
Crash Barrier pre-cast
Chaiange
Side Length Width Depth Quantity Remarks.
From To
0+200 0+482 LHS 282.072 0.689 194.348 M-40
0+231 0+422 RHS 190.73 0.689 131.413 M-40
-25.616 0.689 -17.649 M-40
447.186 Qty 308.111
Friction Slab PCC
Chaiange
Side Length Width Depth Quantity Remarks.
From To
0+200 0+482 LHS 282.272 1.875 0.075 39.695 M-15 PCC
0+231 0+422 LHS 190.930 1.875 0.075 26.850 M-15 PCC
-25.616 1.875 0.075 -3.602 M-15 PCC
Qty 62.942
Friction Slab RCC
Chaiange
Side Length Width Depth Quantity Remarks.
From To
0+200 0+482 LHS 282.272 1.290 0.275 100.136 M-30 RCC
0+231 0+422 LHS 190.930 1.290 0.275 67.732 M-30 RCC
-25.616 1.290 0.275 -9.087 M-30 RCC
Qty 158.781
RE WALL PCC
Chaiange
Side Length Width Depth Quantity Remarks.
From To
0+200 0+482 LHS 282.272 0.350 0.150 14.819 M-15 M-20 RCC
0+231 0+422 LHS 190.93 0.350 0.150 10.024 M-15 M-20 RCC
-25.616 0.350 0.150 -1.345 M-15 M-20 RCC
Qty 23.498
260 of 327

UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY


Development purvanchal expressway (Package-IV) from Sidhi Ganeshpur (Distt-Sultanpur) to Sansarpur (Distt-Sultanpur From KM. 121+600 To 164+300) in the state of Uttar Pradesh on EPC basis.
Client:-UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY Authority Engineer :- Agis International S A in JV with AGIS India Consulting & Engineers Pvt. Ltd.
BAR BENDING SCHEDULE
EPC Contractor:- GR Infra Projects Ltd. Structure: LVUP @ KM 0+318(122+638 ) Name of component: LVUP BOX 10.5x5
Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) a b c d length (m) Kg/m Kg.

Slab bottom main bar b


1 ts1 25 160 a c 44 400 12150 400 4 12.750 3.858 2164.338
placing length-6842 mm

a
Slab bottom curtail bar
2 ts1a 20 160 43 6600 6.600 2.470 700.986
placing length-6842 mm

Slab bottom main bar a


3 ts1b 25 160 d 109 400 12150 300 400 2 6.925 3.858 2912.115
placing length-17566 mm
Varies= (b to c)

Slab bottom main bar d a


4 ts1c 20 160 109 400 12150 300 400 2 6.945 2.470 1869.802
placing length-17566 mm
Varies= (b to c)

b
5 Slab top bar placing length- ts2 25 160 c 44 2330 12150 2330 2 16.710 3.858 2836.556
6842 mm a

6 Slab top bar placing length- ts2a 25 160 a 109 2330 12150 300 1 8.505 3.858 3576.540
17566 mm
Varies= (b to c)

b
7 Slab bottom binder ts3 16 150 123 400 24252 400 2 24.988 1.580 4856.168
a c

b
8 Slab top binder ts4 20 150 c 123 400 24252 400 2 24.972 2.470 7586.743
a
261 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure: LVUP @ KM 0+318(122+638 ) Name of component: LVUP BOX 10.5x5
Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) a b c d length (m) Kg/m Kg.
a

9 Slab conner bar in outer wall ts5 16 - 2x4= 8 24252 24.252 1.580 306.545

10 Slab conner bar in outer wall ts6 16 - 2x4= 8 24252 24.252 1.580 306.545

11 Slab edge beam main bar ts7 32 - 2x2x12 48 19613 19.613 6.320 5949.800

(b to c)
Wall vertical outer in
12 carriageway placing length w1 32 160 Varies 2x129= 258 3975 7841 8083 3975 2 15.784 6.320 25736.759
16418
a

varies b to c
Wall vertical outer in
13 w1a 32 160 2x26= 52 7841 300 3975 2 11.988 6.320 3939.736
a

carriageway in 3975 mm
varies b to c

varies b to c
Wall vertical outer in
14 w1a 32 160 2x26= 52 710 300 1600 2 2.482 6.320 815.684
a

carriageway in 3975 mm

varies b to c
(b to c)

d
Wall vertical inner in
15 w2 16 160 2x152= 304 400 7841 8083 400 2 8.698 1.580 4177.823
Varies

carriageway
a
262 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure: LVUP @ KM 0+318(122+638 ) Name of component: LVUP BOX 10.5x5
Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) a b c d length (m) Kg/m Kg.

b
16 Wall vertical outer Binder w3 16 150 a c 2x42= 84 300 24247 300 2 24.783 1.580 3289.200

b
17 Wall vertical Inner Binder w4 12 160 a c 2x40= 80 300 24247 300 2 24.799 0.888 1761.721

c
18 Wall vertical end bar w5 16 - 2x4= 8 400 8083 400 2 8.819 1.580 111.472

b
a

c
19 Wall vertical end bar w5 16 - 2x4= 8 400 7841 400 2 8.577 1.580 108.413
b

b
20 Wall curtail bar w6 25 160 a c 2x151= 302 300 2837 300 1 3.387 3.858 3946.248

Raft bottom bar placing b


21 bs1 25 160 44 2600 12150 2600 2 17.250 3.858 2928.222
length 6482 mm a c

Raft bottom bar placing


22 bs1a 25 160 a
2x109= 218 400 12150 300 6.625 3.858 5571.917
length-17566 mm
Varies= (b to c)

b
23 Raft top bar placing length bs2 20 160 a c 44 500 12150 500 2 13.070 2.470 1420.448
6482

a
Raft top curtail bar palced
24 alternative with bs2 placing bs2a 20 160 43 6600 6.600 2.470 700.986
length 6482
263 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure: LVUP @ KM 0+318(122+638 ) Name of component: LVUP BOX 10.5x5
Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) a b c d length (m) Kg/m Kg.

25 Raft top bar placing length bs2b 25 160 d a 2x109= 218 500 12150 300 500 2 7.125 3.858 5992.439
17566
Varies= (b to c)

Raft top bar placed


26 alternative with bs2b placing bs2c d a
20 160 2x108= 216 500 12150 300 500 2 7.145 2.470 3812.000
length 17566
Varies= (b to c)
a
27 Raft top extra bar bs7 32 - 2x2x12 48 19613 19.613 6.320 5949.800

b
28 Raft bottom binder bs3 16 150 59 500 24247 500 2 25.183 1.580 2347.559
a c

b
29 Raft top binder bs4 16 150 59 500 24247 500 2 25.183 1.580 2347.559
a c
a
30 Raft corner bar bs5 16 - 2x4= 8 24247 24.247 1.580 306.482

a
31 Raft corner bar bs6 16 - 2x4= 8 24247 24.247 1.580 306.482

c
Top Slab haunch bar in
32 h1 16 160 b 2x152= 304 200 3936 200 1 4.304 1.580 2067.297
outer wall
a

33 Bottom Slab haunch bar in h2 16 160


b
2x152= 304 200 4762 200 1 5.130 1.580 2464.042
outer wall a
264 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure: LVUP @ KM 0+318(122+638 ) Name of component: LVUP BOX 10.5x5
Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) a b c d length (m) Kg/m Kg.
a

34 Bottom raft haunch binder h3 12 - 2x4= 8 24247 24.247 0.888 172.251

35 Top slab haunch binder h3 12 - 2x4= 8 24252 24.252 0.888 172.286

Slab link bar in 3200 mm


36 portion 160c/c in trans & s1 12 160 a c 2x22x152= 6688 75 710 75 1 0.836 0.888 4964.957
150 in long.
b

Raft link bar in 3200 mm


a c
37 portion 160c/c in trans & s2 12 160 2x41x152= 12464 75 950 75 1 1.076 0.888 11909.202
150 in long.
b

Wall link bar in 1500 mm


38 portion 160c/c in trans & s3 10 160 a c 2x11x152= 3344 75 1360 75 1 1.490 0.617 3074.240
150 in vertical
b

b
Slab top beam 4 legged
39 s4 12 150 2x121= 242 660 1000 75 4 3.374 0.888 725.059
a

stirups c
265 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure: LVUP @ KM 0+318(122+638 ) Name of component: LVUP BOX 10.5x5
Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) a b c d length (m) Kg/m Kg.

Slab top beam 4 legged c


40 s4 12 150 2x122= 244 660 2922 75 4 7.218 0.888 1563.938

a
stirups

41 Raft beam 4 legged stirups s5 12 150 2x121= 242 660 2000 75 4 5.374 0.888 1154.851

a
c

42 Raft beam 4 legged stirups s5 12 150 c 2x121= 242 660 5869 75 4 13.112 0.888 2817.716
a

b
a c
43 Approach slab bracket bar b1 12 100 2x244= 488 210 1122 200 1587 3 4.287 0.888 1857.636
d

a
44 Approach slab bricket binder b2 12 - 5 24252 24.252 0.888 107.679
266 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure: LVUP @ KM 0+318(122+638 ) Name of component: LVUP BOX 10.5x5
Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) a b c d length (m) Kg/m Kg.

Approach slab bricket 2L


45 b3a 10 400 c 2x62= 124 212 1080 75 4 2.654 0.617 203.052

a
stirrups

Approach slab bricket 2L


46 b3b 10 400 c 2x62= 124 212 1080 75 4 2.654 0.617 203.052

a
stirrups

b
Approach slab bricket 2L
47 b3c 10 400 2x62= 124 212 780 212 4 2.328 0.617 178.111
a
stirrups c

8mm 10mm 12mm 16mm 20mm 25mm 28mm 32mm Total 142272.459

0.000 3658.455 27207.298 22995.589 16090.966 29928.373 42391.779 142272.459

Foundation 47.566
Wall 51.837
Slab 42.870
Precast Crash Barrier
Spacing Cutting Total Length (m)
Dia. of Total
Sl. Bar (c/c) Length No. Weigth of
Location of Bar Shape of Bar Bar No. Remarks
No. Mkd. of bar of bar of bar Bar( kg)
(mm) of Bar Ф8 Ф10 Ф12 Ф16 Ф20 Ф25 Ф28 Ф32
(mm) (m)

Precast Crash Barrier

300
1 1 170 175 10 150 2.3 14 14 32.2 19.867

1720
2015
1
2 2 10 150 2.19 14 14 30.66 18.917
7
0

1920
3 3 10 200 1.92 10 X 2 20 38.4 23.693

2
0
562 0
4 4 12 150 1.53 14 14 21.42 19.021
2 3
7 0
0 300 0

75
8
6
5 1
5 5 6 12 150 2.723 14 14 38.122 33.852
0
1 5
7
0 80

6 6 1920 10 200 1.92 6 6 11.52 7.108

Contractor's Representative 267 Consultant's Representative


Precast Crash Barrier
Spacing Cutting Total Length (m)
Dia. of Total
Sl. Bar (c/c) Length No. Weigth of
Location of Bar Shape of Bar Bar No. Remarks
No. Mkd. of bar of bar of bar Bar( kg)
(mm) of Bar Ф8 Ф10 Ф12 Ф16 Ф20 Ф25 Ф28 Ф32
(mm) (m)

7 7 1920 10 200 1.92 9 9 17.28 10.662

8 8 1920 10 1.92 3 3 5.76 3.554

10
1920 10 1.92 3 3 5.76 3.554

2
0
1105 0
11 11 12 150 1.481 14 14 20.734 18.412
2
0
0

Total Length (in metre per Diameter of Bar) 0.000 141.580 80.276 0.000 0.000 0.000 0.000 0.000
Unit Weight (in Kg./m) 0.395 0.617 0.888 1.578 2.466 3.853 4.853 6.313
Total Weight (in Kg.) 0.000 87.355 71.285 0.000 0.000 0.000 0.000 0.000
Grand Total (in Kg.) 158.640
Payable Quantity (in MT) 0.159

Contractor's Representative 268 Consultant's Representative


269 of 327
UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Development purvanchal expressway (Package-IV) from Sidhi Ganeshpur (Distt-Sultanpur) to Sansarpur (Distt-Sultanpur From KM. 121+600 To 164+300) in the state of Uttar
Pradesh on EPC basis.
BAR BENDING SCHEDULE
Client:- UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY Name of component:-BOX CULVERT 1x3x3
Authority Engineer :- Egis International S A in JV with AGIS India Consulting & Engineers Pvt. Ltd.
EPC Contractor:- GR Infra Projects Ltd. Structure : MCW Box Culvert @KM -137+850 LHS/RHS Box Length (mm)= 74420

Dimensions of Bar Cutting

Bend
Bar Spacing Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars length
Mark (mm) Kg/m Kg.
a b c d (m)

1 Slab bottom bar ts1 16 160 a c 466 150 3750 150 2 3.986 1.580 2934.812
b
b
2 Slab top bar ts2 16 160 a c 466 2305 3750 2305 2 8.296 1.580 6108.179

3 Slab bottom binder ts3 10 150 a c 21 150 74240 150 2 74.500 0.617 965.297
b
b
4 Slab top binder ts4 10 150 a c 21 150 74240 150 2 74.500 0.617 965.297

a
5 Slab corner bar ts5 12 - 2x4= 8 74240 74.240 0.888 527.401

a
6 Slab corner bar ts6 12 - 2x2= 4 74240 74.240 0.888 263.700

7 Slab botto etra bar ts7 12 160 a c 466 150 3750 150 4.050 0.888 1675.922
b
a
8 Slab corner bar ts8 16 - 4 3750 3.750 1.580 23.700

a
9 Wall vertical outer w1 16 160 2x146= 932 1275 3780 1275 2 6.266 1.580 9227.061
b

EPC Contractor Authority Engineer


270 of 327
EPC Contractor:- GR Infra Projects Ltd. Structure : MCW Box Culvert @KM -137+850 LHS/RHS Box Length (mm)= 74420

Dimensions of Bar Cutting

Bend
Bar Spacing Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars length
Mark (mm) Kg/m Kg.
a b c d (m)

10 Wall vertical inner w2 12 80 2x291= 1860 120 3780 120 2 3.972 0.888 6560.473

b
c

Wall vertical outer a c


11 w3 12 200 2x21= 32 120 74240 120 2 74.432 0.888 2115.060
binder
b

Wall vertical inner a c


12 w4 10 200 2x21= 32 120 74240 120 2 74.440 0.617 1469.743
binder
b

13 Raft bottom bar bs1 16 160 a c 465 2275 3750 2275 2 8.236 1.580 6050.989
b
b
14 Raft top bar bs2 16 80 a c 929 100 3750 100 2 3.886 1.580 5703.949

15 Raft bottom binder bs3 12 200 a c 16 100 74270 100 2 74.422 0.888 1057.388
b
b
16 Raft top binder bs4 12 200 a c 16 100 74270 100 2 74.422 0.888 1057.388

a
17 Raft corner bar bs5 12 - 2x4= 8 74270 74.270 0.888 527.614

a
18 Raft corner bar bs6 12 - 2x2= 4 74270 74.270 0.888 263.807

a
19 Raft top extra bar bs7 NOT USED 0.000 0.000 0.000

c
b
20 key cs1 10 150 100 26 195 1034 1229 1462 4 4.040 0.617 64.814
d
a
a
21 key binder cs2 12 - 2x10= 20 3750 3.750 0.888 66.600

EPC Contractor Authority Engineer


271 of 327
EPC Contractor:- GR Infra Projects Ltd. Structure : MCW Box Culvert @KM -137+850 LHS/RHS Box Length (mm)= 74420

Dimensions of Bar Cutting

Bend
Bar Spacing Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars length
Mark (mm) Kg/m Kg.
a b c d (m)

Slab link bar in 1000 a c


22 s1 10 160 4x2x443 3544 100 380 100 0.580 0.617 1268.256
mm portion
b

23 Raft link bar s2 12 160 a c 14x443 6202 120 324 120 2 0.516 0.888 2841.806
b
Wall link bar in 900 a c
s3 10 100 20 100 0.220 0.617
mm portion
b

c
24 Raft top haunch bar h2 10 160 2x465= 930 300 1182 300 1 1.762 0.617 1011.053
a b

c
Slab bottom haunch
25 h1 10 160 2x466= 932 300 1225 300 1 1.805 0.617 1037.954
bar
a b
26 Hunch binder h3 10 - a 1x4= 4 74240 74.240 0.617 183.224

27 Head wall ring - 12 150 b c 26 160 660 100 4 1.744 0.888 40.265

28 Head wall binder - 10 - a 6 3750 3.750 0.617 13.883


8mm 10mm 12mm 16mm 20mm 25mm 28mm 32mm Total 54025.635
0.000 6979.521 16997.425 30048.690 0.000 0.000 0.000 0.000 54025.635

8 0.00 Raft 17634.355


10 6979.52 Wall 21658.717
12 16997.42 Slab 14732.564
16 30048.69
20 0.00
54025.64

EPC Contractor Authority Engineer


UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Development purvanchal expressway (Package-IV) from Sidhi Ganeshpur (Distt-Sultanpur) to Sansarpur (Distt-Sultanpur From KM. 121+600 To 164+300) in the state of Uttar
Pradesh on EPC basis.
BAR BENDING SCHEDULE
Client:- UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY Name of component:-U-TROUGH 1X3x3
Authority Engineer :- Egis International S A in JV with AGIS India Consulting & Engineers Pvt. Ltd.
EPC Contractor:- GR Infra Projects Ltd. Structure : MCW U-TROUGH @KM -138+550 RHS/LHS U-TROUGH (mm)= 9000

Dimensions of Bar Cutting

Bend
Bar Spacing Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars length
Mark (mm) Kg/m Kg.
a b c d (m)

1 Raft bottom Main Bar 1 8 180 51 0 3310 0 0 3.310 0.395 66.680


b
2 Wall outer Main Bar 1 8 180
a c 51 3160 0 3160 2 6.288 0.395 126.672

3 Raft top Main Bar 2 12 90 b 100 3090 0 3.090 0.888 274.392

4 Wall inner Main Bar 2 12 90 a c 100 3045 3045 2 6.042 0.888 536.530

5 Raft Binder 3 8 180 b 18 8910 0 8.910 0.395 63.350

6 Raft Binder 4 8 250 b 14 8910 0 8.910 0.395 49.272

7 Wall inner Binder 3 8 180 b 36 8910 0 8.910 0.395 126.700

8 Wall outer Binder 4 8 250 b 28 8910 0 8.910 0.395 98.545


8 531.22 1342.141
10 0.00 Foundation 453.694
12 810.92 Wall 888.446
16 0.00
20 0.00
1342.14
273 of 327
UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY

Development purvanchal expressway (Package-IV) from Sidhi Ganeshpur (Distt-Sultanpur) to Sansarpur (Distt-Sultanpur From KM. 121+600 To 164+300) in the state of Uttar Pradesh on EPC basis.

BAR BENDING SCHEDULE


Client:- UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY Name of component:-BOX CULVERT 1x3x3
Authority Engineer :- Egis International S A in JV with AGIS India Consulting & Engineers Pvt. Ltd.
EPC Contractor:- GR Infra Projects Ltd. Structure : SR Box Culvert @ KM- 138+550 RSR Box Length (mm)= 7500

Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) length (m) Kg/m Kg.
a b c d

1 Slab bottom bar ts1 12 100 a c 75 150 3450 150 2 3.702 0.888 246.553
b
b
2 Slab top bar ts2 12 200 a c 38 855 3450 855 2 5.112 0.888 172.499

3 Slab bottom binder ts3 10 250 a c 13 180 7410 180 2 7.730 0.617 62.002
b
b
4 Slab top binder ts4 10 250 a c 13 180 7410 180 2 7.730 0.617 62.002

a
5 Slab corner bar ts5 12 - 2x4= 8 7410 7.410 0.888 52.641
a
6 Slab corner bar ts6 12 - 2x2= 4 7410 7.410 0.888 26.320
a
7 Slab bottom extra bar ts7 12 - 2X4= 8 3450 2 3.402 0.888 24.168

a
8 Wall vertical outer w1 12 200 2X56= 76 825 3480 825 2 5.082 0.888 342.974
b

c
a
9 Wall vertical outer w2 10 200 2X56= 76 120 3480 120 2 3.680 0.617 172.563
b

EPC Contractor Authority Engineer Client


274 of 327
EPC Contractor:- GR Infra Projects Ltd. Structure : SR Box Culvert @ KM- 138+550 RSR Box Length (mm)= 7500

Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) length (m) Kg/m Kg.
a b c d

Wall vertical outer


10 w3 10 250 a c 26 100 7410 100 2 7.570 0.617 121.438
binder
b

Wall vertical inner a c


11 w4 10 250 26 100 7410 100 2 7.570 0.617 121.438
binder
b

12 Raft bottom bar bs1 12 200 a c 38 825 3450 825 2 5.052 0.888 170.475
b
b
13 Raft top bar bs2 12 100 a c 75 150 3450 150 2 3.702 0.888 246.553

14 Raft bottom binder bs3 10 250 a c 13 180 7350 180 2 7.670 0.617 61.521
b
b
15 Raft top binder bs4 10 250 a c 13 180 7350 180 2 7.670 0.617 61.521

a
16 Raft corner bar bs5 12 - 2x4= 8 7350 7.350 0.888 52.214

a
17 Raft corner bar bs6 12 - 2x2= 4 7350 7.350 0.888 26.107
N/A
18 Raft top extra bar bs7

c
100 b
19 key cs1 10 150 24 195 1038 1233 1468 4 4.054 0.617 60.031
d
a

a
20 key binder cs2 12 - 10 3450 3.450 0.888 30.636

EPC Contractor Authority Engineer Client


275 of 327
EPC Contractor:- GR Infra Projects Ltd. Structure : SR Box Culvert @ KM- 138+550 RSR Box Length (mm)= 7500

Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) length (m) Kg/m Kg.
a b c d
Slab link bar in
21 N/A
600mm portion

Raft link bar in 600mm


22 N/A
portion (120c/c)

c
23 Raft top haunch bar h2 12 180 2x52= 84 200 758 200 1 1.134 0.888 84.587
a b

c
Slab bottom haunch
24 h1 12 180 2x52= 84 200 800 200 1 1.176 0.888 87.720
bar
a b
a

25 Hunch binder h3 12 - 4 7410 7.410 0.888 26.320

b
26 Head wall ring - 12 150 c 24 160 510 100 4 1.444 0.888 30.775
a

a
27 Head wall binder - 10 - 6 3450 3.450 0.617 12.772

28 8mm 10mm 12mm 20mm 25mm 28mm 32mm Total 2355.831


10 735.288
12 1620.543 Raft 709.059
16 0.000 Wall 1000.587
20 0.000 Slab 646.186
Total in MT 2.356

EPC Contractor Authority Engineer Client


276 of 327

UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY

Development purvanchal expressway (Package-IV) from Sidhi Ganeshpur (Distt-Sultanpur) to Sansarpur (Distt-Sultanpur From KM. 121+600 To 164+300) in the state of Uttar Pradesh on EPC basis.

BAR BENDING SCHEDULE


Client:- UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY Name of component:-BOX CULVERT 1x3x3
Authority Engineer :- Egis International S A in JV with AGIS India Consulting & Engineers Pvt. Ltd.
EPC Contractor:- GR Infra Projects Ltd. Structure : SR Box Culvert @ KM- 138+550 LSR Box Length (mm)= 10846

Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) length (m) Kg/m Kg.
a b c d

1 Slab bottom bar ts1 12 100 a c 109 150 3450 150 2 3.702 0.888 358.324
b
b
2 Slab top bar ts2 12 200 a c 55 855 3450 855 2 5.112 0.888 249.670

3 Slab bottom binder ts3 10 250 a c 13 180 10756 180 2 11.076 0.617 88.841
b
b
4 Slab top binder ts4 10 250 a c 13 180 10756 180 2 11.076 0.617 88.841

a
5 Slab corner bar ts5 12 - 2x4= 8 10756 10.756 0.888 76.411

a
6 Slab corner bar ts6 12 - 2x2= 4 10756 10.756 0.888 38.205
a
7 Slab bottom extra bar ts7 12 - 2X4= 8 3450 2 3.402 0.888 24.168

a
8 Wall vertical outer w1 12 200 2X56= 110 825 3480 825 2 5.082 0.888 496.410
b

EPC Contractor Authority Engineer Client


277 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : SR Box Culvert @ KM- 138+550 LSR Box Length (mm)= 10846

Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) length (m) Kg/m Kg.
a b c d

a
9 Wall vertical outer w2 10 200 2X56= 110 120 3480 120 2 3.680 0.617 249.762

b
c

Wall vertical outer


10 w3 10 250 a c 26 100 10756 100 2 10.916 0.617 175.114
binder
b

Wall vertical inner a c


11 w4 10 250 26 100 10756 100 2 10.916 0.617 175.114
binder
b

12 Raft bottom bar bs1 12 200 a c 54 825 3450 825 2 5.052 0.888 242.254
b
b
13 Raft top bar bs2 12 100 a c 108 150 3450 150 2 3.702 0.888 355.037

14 Raft bottom binder bs3 10 250 a c 13 180 10696 180 2 11.016 0.617 88.359
b
b
15 Raft top binder bs4 10 250 a c 13 180 10696 180 2 11.016 0.617 88.359

a
16 Raft corner bar bs5 12 - 2x4= 8 10696 10.696 0.888 75.984

a
17 Raft corner bar bs6 12 - 2x2= 4 10696 10.696 0.888 37.992

N/A
18 Raft top extra bar bs7

EPC Contractor Authority Engineer Client


278 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : SR Box Culvert @ KM- 138+550 LSR Box Length (mm)= 10846

Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) length (m) Kg/m Kg.
a b c d
c
100 b
19 key cs1 10 150 24 195 1038 1233 1468 4 4.054 0.617 60.031
d
a

a
20 key binder cs2 12 - 10 3450 3.450 0.888 30.636

Slab link bar in


21 N/A
600mm portion

Raft link bar in 600mm


22 N/A
portion (120c/c)

c
23 Raft top haunch bar h2 12 180 2x52= 120 200 758 200 1 1.134 0.888 120.839
a b

c
Slab bottom haunch
24 h1 12 180 2x52= 122 200 800 200 1 1.176 0.888 127.403
bar
a b
a

25 Hunch binder h3 12 - 4 10756 10.756 0.888 38.205

EPC Contractor Authority Engineer Client


279 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : SR Box Culvert @ KM- 138+550 LSR Box Length (mm)= 10846

Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) length (m) Kg/m Kg.
a b c d

b
26 Head wall ring - 12 150 c 24 160 510 100 4 1.444 0.888 30.775
a

a
27 Head wall binder - 10 - 6 3450 3.450 0.617 12.772

28 8mm 10mm 12mm 20mm 25mm 28mm 32mm Total 3329.506


10 1027.193
12 2302.312 Raft 978.652
16 0.000 Wall 1426.394
20 0.000 Slab 924.459
Total in MT 3.330

EPC Contractor Authority Engineer Client


280 of 327

UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY


Development purvanchal expressway (Package-IV) from Sidhi Ganeshpur (Distt-Sultanpur) to Sansarpur (Distt-Sultanpur From KM. 121+600 To 164+300) in the state of Uttar
Pradesh on EPC basis.
BAR BENDING SCHEDULE
Client:- UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY Name of component:-BOX CULVERT 1x3x3 (h=6 to 8m)
Authority Engineer :- Egis International S A in JV with AGIS India Consulting & Engineers Pvt. Ltd.
EPC Contractor:- GR Infra Projects Ltd. Structure : MCW Box Culvert @KM -138+300 LHS Box Length (mm)= 23250

Dimensions of Bar Cutting

Bend
Bar Spacing Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars length
Mark (mm) Kg/m Kg.
a b c d (m)

1 Slab bottom bar ts1 16 160 a c 146 150 3750 150 2 3.986 1.580 919.490
b
b
2 Slab top bar ts2 16 160 a c 146 1305 3750 1305 2 6.296 1.580 1452.361

3 Slab bottom binder ts3 10 180 a c 18 150 23065 150 2 23.325 0.617 259.047
b
b
4 Slab top binder ts4 12 200 a c 16 150 23065 150 2 23.317 0.888 331.288

a
5 Slab corner bar ts5 12 - 2x4= 8 23065 23.065 0.888 163.854
a
6 Slab corner bar ts6 12 - 2x2= 4 23065 23.065 0.888 81.927

a
7 Slab botto etra bar ts7 12 160 145 3750 3.750 0.888 482.850

a
8 Slab corner bar ts8 16 - 4 3750 3.750 1.580 23.700

a
9 Wall vertical outer w1 16 160 2x146= 292 1275 3780 1275 2 6.266 1.580 2890.882
b

EPC Contractor Authority Engineer


281 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : MCW Box Culvert @KM -138+300 LHS Box Length (mm)= 23250

Dimensions of Bar Cutting

Bend
Bar Spacing Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars length
Mark (mm) Kg/m Kg.
a b c d (m)

a
10 Wall vertical inner w2 10 80 2x146= 580 120 3780 120 2 3.980 0.617 1424.283

b
c

Wall vertical outer a c


11 w3 12 200 2x21= 32 120 23065 120 2 23.257 0.888 660.871
binder
b
Wall vertical inner a c
12 w4 8 100 2x31= 62 120 23065 120 2 23.273 0.395 569.956
binder
b

13 Raft bottom bar bs1 16 160 a c 145 1275 3750 1275 2 6.236 1.580 1428.668
b
b
14 Raft top bar bs2 16 160 a c 145 100 3750 100 2 3.886 1.580 890.283

15 Raft bottom binder bs3 12 200 a c 16 100 23095 100 2 23.247 0.888 330.293
b
b
16 Raft top binder bs4 12 200 a c 16 100 23095 100 2 23.247 0.888 330.293

a
17 Raft corner bar bs5 12 - 2x4= 8 23095 23.095 0.888 164.067
a
18 Raft corner bar bs6 12 - 2x2= 4 23095 23.095 0.888 82.033

19 Raft top extra bar bs7 16 160 a 144 3750 3.750 1.580 853.200
c
b
20 key cs1 10 150 100 26 195 1034 1229 1462 4 4.040 0.617 64.814
d
a

EPC Contractor Authority Engineer


282 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : MCW Box Culvert @KM -138+300 LHS Box Length (mm)= 23250

Dimensions of Bar Cutting

Bend
Bar Spacing Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars length
Mark (mm) Kg/m Kg.
a b c d (m)
a
21 key binder cs2 12 - 10 3750 3.750 0.888 33.300

Slab link bar in a c


22 s1 10 160 234x7x2= 2044 80 380 80 0.540 0.617 681.020
900mm portion
b
Raft link bar in 900mm a c
23 s2 10 180 233x9x2= 2610 80 320 80 2 0.440 0.617 708.563
portion
b

c
24 Raft top haunch bar h2 10 160 2x145= 290 300 1182 300 1 1.762 0.617 315.275
a b

c
Slab bottom haunch
25 h1 10 160 2x146= 292 300 1225 300 1 1.805 0.617 325.196
bar
a b
26 Hunch binder h3 10 - a 1x4= 4 23065 23.065 0.617 56.924

27 Head wall ring - 12 150 b c 26 160 660 100 4 1.744 0.888 40.265

28 Head wall binder - 10 - a 6 3750 3.750 0.617 13.883


8mm 10mm 12mm 16mm 20mm 25mm 28mm 32mm Total 15578.587
569.956 3849.005 2701.042 8458.584 0.000 0.000 0.000 0.000 15578.587

8 569.96 Raft 400 mm Foundation 4176.952


10 3849.01 Wall 350 mm Substructure 7687.117
12 2701.04 Slab 350 mm Superstructure 3714.518
16 8458.58
20 0.00

EPC Contractor Authority Engineer


283 of 327

UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY


Development purvanchal expressway (Package-IV) from Sidhi Ganeshpur (Distt-Sultanpur) to Sansarpur (Distt-Sultanpur From KM. 121+600 To 164+300) in the state of Uttar
Pradesh on EPC basis.
BAR BENDING SCHEDULE
Client:- UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY Name of component:-BOX CULVERT 1x3x3 (h=6 to 8m)
Authority Engineer :- Egis International S A in JV with AGIS India Consulting & Engineers Pvt. Ltd.
EPC Contractor:- GR Infra Projects Ltd. Structure : MCW Box Culvert @KM -138+300 RHS Box Length (mm)= 23250

Dimensions of Bar Cutting

Bend
Bar Spacing Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars length
Mark (mm) Kg/m Kg.
a b c d (m)

1 Slab bottom bar ts1 16 160 a c 146 150 3750 150 2 3.986 1.580 919.490
b
b
2 Slab top bar ts2 16 160 a c 146 1305 3750 1305 2 6.296 1.580 1452.361

3 Slab bottom binder ts3 10 180 a c 18 150 23065 150 2 23.325 0.617 259.047
b
b
4 Slab top binder ts4 12 200 a c 16 150 23065 150 2 23.317 0.888 331.288

a
5 Slab corner bar ts5 12 - 2x4= 8 23065 23.065 0.888 163.854
a
6 Slab corner bar ts6 12 - 2x2= 4 23065 23.065 0.888 81.927

a
7 Slab botto etra bar ts7 12 160 145 3750 3.750 0.888 482.850

a
8 Slab corner bar ts8 16 - 4 3750 3.750 1.580 23.700

a
9 Wall vertical outer w1 16 160 2x146= 292 1275 3780 1275 2 6.266 1.580 2890.882
b

EPC Contractor Authority Engineer


284 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : MCW Box Culvert @KM -138+300 RHS Box Length (mm)= 23250

Dimensions of Bar Cutting

Bend
Bar Spacing Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars length
Mark (mm) Kg/m Kg.
a b c d (m)

a
10 Wall vertical inner w2 10 80 2x146= 580 120 3780 120 2 3.980 0.617 1424.283

b
c

Wall vertical outer a c


11 w3 12 200 2x21= 32 120 23065 120 2 23.257 0.888 660.871
binder
b
Wall vertical inner a c
12 w4 8 100 2x31= 62 120 23065 120 2 23.273 0.395 569.956
binder
b

13 Raft bottom bar bs1 16 160 a c 145 1275 3750 1275 2 6.236 1.580 1428.668
b
b
14 Raft top bar bs2 16 160 a c 145 100 3750 100 2 3.886 1.580 890.283

15 Raft bottom binder bs3 12 200 a c 16 100 23095 100 2 23.247 0.888 330.293
b
b
16 Raft top binder bs4 12 200 a c 16 100 23095 100 2 23.247 0.888 330.293

a
17 Raft corner bar bs5 12 - 2x4= 8 23095 23.095 0.888 164.067
a
18 Raft corner bar bs6 12 - 2x2= 4 23095 23.095 0.888 82.033

19 Raft top extra bar bs7 16 160 a 144 3750 3.750 1.580 853.200
c
b
20 key cs1 10 150 100 26 195 1034 1229 1462 4 4.040 0.617 64.814
d
a

EPC Contractor Authority Engineer


285 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : MCW Box Culvert @KM -138+300 RHS Box Length (mm)= 23250

Dimensions of Bar Cutting

Bend
Bar Spacing Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars length
Mark (mm) Kg/m Kg.
a b c d (m)
a
21 key binder cs2 12 - 10 3750 3.750 0.888 33.300

Slab link bar in a c


22 s1 10 160 234x7x2= 2044 80 380 80 0.540 0.617 681.020
900mm portion
b
Raft link bar in 900mm a c
23 s2 10 180 233x9x2= 2610 80 320 80 2 0.440 0.617 708.563
portion
b

c
24 Raft top haunch bar h2 10 160 2x145= 290 300 1182 300 1 1.762 0.617 315.275
a b

c
Slab bottom haunch
25 h1 10 160 2x146= 292 300 1225 300 1 1.805 0.617 325.196
bar
a b
26 Hunch binder h3 10 - a 1x4= 4 23065 23.065 0.617 56.924

27 Head wall ring - 12 150 b c 26 160 660 100 4 1.744 0.888 40.265

28 Head wall binder - 10 - a 6 3750 3.750 0.617 13.883


8mm 10mm 12mm 16mm 20mm 25mm 28mm 32mm Total 15578.587
569.956 3849.005 2701.042 8458.584 0.000 0.000 0.000 0.000 15578.587

8 569.96 Raft 400 mm Foundation 4176.952


10 3849.01 Wall 350 mm Substructure 7687.117
12 2701.04 Slab 350 mm Superstructure 3714.518
16 8458.58
20 0.00

EPC Contractor Authority Engineer


286 of 327

UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY


Development purvanchal expressway (Package-IV) from Sidhi Ganeshpur (Distt-Sultanpur) to Sansarpur (Distt-Sultanpur From KM. 121+600 To 164+300) in the state of Uttar Pradesh on EPC
basis.
BAR BENDING SCHEDULE
Client:- UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY Name of component:-BOX CULVERT 1x3x3 with cution (0 to 2m)
Authority Engineer :- Egis International S A in JV with AGIS India Consulting & Engineers Pvt. Ltd.
EPC Contractor:- GR Infra Projects Ltd. Structure : SR Box Culvert @ KM- 138+300 -RHS Box Length (mm)= 9700

Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) length (m) Kg/m Kg.
a b c d

1 Slab bottom bar ts1 12 100 a c 97 150 3450 150 2 3.702 0.888 318.875
b
b
2 Slab top bar ts2 12 200 a c 49 1155 3450 1155 2 5.712 0.888 248.541

3 Slab bottom binder ts3 10 200 a c 16 220 9610 220 2 10.010 0.617 98.819
b
b
4 Slab top binder ts4 10 200 a c 16 220 9610 220 2 10.010 0.617 98.819

a
5 Slab corner bar ts5 12 - 2x4= 8 9610 9.610 0.888 68.269

a
6 Slab corner bar ts6 12 - 2x2= 4 9610 9.610 0.888 34.135
a
7 Slab bottom extra bar ts7 12 - 2X4= 8 3450 2 3.402 0.888 24.168

a
8 Wall vertical outer w1 16 200 2X75= 98 1125 3480 1125 2 5.666 1.580 877.323
b

EPC Contractor Authority Engineer Client


287 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : SR Box Culvert @ KM- 138+300 -RHS Box Length (mm)= 9700

Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) length (m) Kg/m Kg.
a b c d

a
9 Wall vertical outer w2 12 200 2X75= 98 200 3480 200 2 3.832 0.888 333.476

b
c

Wall vertical outer


10 w3 12 200 a c 32 200 9610 200 2 9.962 0.888 283.080
binder
b

Wall vertical inner a c


11 w4 10 200 32 200 9610 200 2 9.970 0.617 196.848
binder
b

12 Raft bottom bar bs1 12 200 a c 49 1125 3450 1125 2 5.652 0.888 245.930
b
b
13 Raft top bar bs2 16 100 a c 97 200 3450 200 2 3.786 1.580 580.242

14 Raft bottom binder bs3 10 200 a c 16 220 9550 220 2 9.950 0.617 98.226
b
b
15 Raft top binder bs4 12 200 a c 16 220 9550 220 2 9.942 0.888 141.256

a
16 Raft corner bar bs5 12 - 2x4= 8 9550 9.550 0.888 67.843

a
17 Raft corner bar bs6 12 - 2x2= 4 9550 9.550 0.888 33.922

EPC Contractor Authority Engineer Client


288 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : SR Box Culvert @ KM- 138+300 -RHS Box Length (mm)= 9700

Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) length (m) Kg/m Kg.
a b c d
N/A
18 Raft top extra bar bs7

c
100 b
19 key cs1 10 150 24 195 1034 1229 1462 4 4.040 0.617 59.829
d
a

a
20 key binder cs2 12 - 10 3450 3.450 0.888 30.636

Slab link bar in


21 s1 8 a c 10x75x2 1500 10 210 10 2 0.198 0.395 117.315
900mm portion
b

22 Raft link bar in 900mm a c


s2 8 10x75x2 1500 10 210 10 2 0.198 0.395 117.315
portion
b

c
23 Raft top haunch bar h2 12 180 2x83= 108 200 758 200 1 1.134 0.888 108.755
a b

c
Slab bottom haunch
24 h1 12 180 2x83= 108 200 800 200 1 1.176 0.888 112.783
bar
a b

EPC Contractor Authority Engineer Client


289 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : SR Box Culvert @ KM- 138+300 -RHS Box Length (mm)= 9700

Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) length (m) Kg/m Kg.
a b c d
a

25 Hunch binder h3 12 - 4 9610 9.610 0.888 34.135

### Total 4330.540


8 234.630
10 552.540 Foundation 1167.419
12 2085.804 Substructure 2271.495
16 1457.566 Superstructure 891.625
20 0.000
Total in MT 4.331

EPC Contractor Authority Engineer Client


UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Development purvanchal expressway (Package-IV) from Sidhi Ganeshpur (Distt-Sultanpur) to Sansarpur (Distt-Sultanpur From KM. 121+600 To 164+300) in
Tothe
be state
updateof as
Uttar
per
Pradesh on EPC basis. approved
BAR BENDING SCHEDULE
Client:- UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY Name of component:-U-TROUGH 1X3x3
Authority Engineer :- Egis International S A in JV with AGIS India Consulting & Engineers Pvt. Ltd.
EPC Contractor:- GR Infra Projects Ltd. Structure : MCW U-TROUGH @KM -138+300 RHS/LHS U-TROUGH (mm)= 21500

Dimensions of Bar Cutting

Bend
Bar Spacing Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars length
Mark (mm) Kg/m Kg.
a b c d (m)

1 Raft bottom Main Bar 1 8 180 120 0 2910 0 0 2.910 0.395 137.934
b
2 Wall outer Main Bar 1 8 180
a c 120 2910 0 2910 2 5.788 0.395 274.351

3 Raft top Main Bar 2 12 90 b 239 2490 0 2.490 0.888 528.458

4 Wall inner Main Bar 2 12 90 a c 239 2745 2745 2 5.442 0.888 1154.967

5 Raft Binder 3 8 180 b 15 21410 0 21.410 0.395 126.854

6 Raft Binder 4 8 250 b 13 21410 0 21.410 0.395 109.940

7 Wall inner Binder 3 8 180 b 32 21410 0 21.410 0.395 270.622

8 Wall outer Binder 4 8 250 b 26 21410 0 21.410 0.395 219.881


8 1139.58 2823.007
10 0.00 Foundation 903.186
12 1683.42 Wall 1919.821
16 0.00
20 0.00
2823.01
UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Development purvanchal expressway (Package-IV) from Sidhi Ganeshpur (Distt-Sultanpur) to Sansarpur (Distt-Sultanpur From KM. 121+600 To 164+300) in the state of Uttar
Pradesh on EPC basis.
BAR BENDING SCHEDULE
Client:- UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY Name of component:-U-TROUGH 1X2X2
Authority Engineer :- Egis International S A in JV with AGIS India Consulting & Engineers Pvt. Ltd.
EPC Contractor:- GR Infra Projects Ltd. Structure : MCW U-TROUGH @KM -140+415 RHS/LHS U-TROUGH (mm)= 9000

Dimensions of Bar Cutting

Bend
Bar Spacing Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars length
Mark (mm) Kg/m Kg.
a b c d (m)

1 Raft Main Bar 1 10 100 90 0 2210 0 0 2.210 0.617 122.721


b
2 Wall Main Bar 1 10 100
a c 90 2060 0 2060 2 4.080 0.617 226.562

3 Raft Binder 2 8 200 a 12 8910 0 8.910 0.395 42.233


4 Wall Binder 2 8 200 a 22 8910 0 8.910 0.395 77.428
8 119.66 468.945
10 349.28
12 0.00
16 0.00
20 0.00
468.95
292 of 327

UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY


Development purvanchal expressway (Package-IV) from Sidhi Ganeshpur (Distt-Sultanpur) to Sansarpur (Distt-Sultanpur From KM. 121+600 To 164+300) in the state of Uttar
Pradesh on EPC basis.
BAR BENDING SCHEDULE
Client:- UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY Name of component:-BOX CULVERT 1x2x2 (h=2 to 4m)
Authority Engineer :- Egis International S A in JV with AGIS India Consulting & Engineers Pvt. Ltd.
EPC Contractor:- GR Infra Projects Ltd. Structure : MCW Box Culvert @KM -140+415 Box Length (mm)= 63044

Dimensions of Bar Cutting

Bend
Bar Spacing Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars length
Mark (mm) Kg/m Kg.
a b c d (m)

1 Slab bottom bar ts1 12 180 a c 351 150 3550 150 2 3.802 0.888 1185.038
b
b
2 Slab top bar ts2 12 180 a c 351 1205 3550 1205 2 5.912 0.888 1842.699

3 Slab bottom binder ts3 10 250 a c 13 150 62864 150 2 63.124 0.617 506.318
b
b
4 Slab top binder ts4 12 250 a c 13 150 62864 150 2 63.116 0.888 728.611

a
5 Slab corner bar ts5 12 - 2x4= 8 62864 62.864 0.888 446.586

a
6 Slab corner bar ts6 12 - 2x2= 4 62864 62.864 0.888 223.293

a
7 Slab botto etra bar ts7 10 200 315 3550 3.550 0.617 689.960

a
8 Slab corner bar ts8 16 - 4 3550 3.550 1.580 22.436

EPC Contractor Authority Engineer


293 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : MCW Box Culvert @KM -140+415 Box Length (mm)= 63044

Dimensions of Bar Cutting

Bend
Bar Spacing Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars length
Mark (mm) Kg/m Kg.
a b c d (m)

a
9 Wall vertical outer w1 12 180 2x146= 702 1175 3630 1175 2 5.932 0.888 3697.866

b
c

10 Wall vertical inner w2 10 180 2x146= 702 120 3630 120 2 3.830 0.617 1658.903

b
c

Wall vertical outer a c


11 w3 10 250 2x21= 26 120 62864 120 2 63.064 0.617 1011.673
binder
b

Wall vertical inner a c


12 w4 8 150 2x21= 42 120 62864 120 2 63.072 0.395 1046.364
binder
b

13 Raft bottom bar bs1 10 180 a c 350 1225 3550 1225 2 5.960 0.617 1287.062
b
b
14 Raft top bar bs2 12 180 a c 350 100 3550 100 2 3.702 0.888 1150.582

15 Raft bottom binder bs3 10 250 a c 13 100 62894 100 2 63.054 0.617 505.756
b
b
16 Raft top binder bs4 10 250 a c 13 100 62894 100 2 63.054 0.617 505.756

EPC Contractor Authority Engineer


294 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : MCW Box Culvert @KM -140+415 Box Length (mm)= 63044

Dimensions of Bar Cutting

Bend
Bar Spacing Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars length
Mark (mm) Kg/m Kg.
a b c d (m)
a
17 Raft corner bar bs5 12 - 2x4= 8 62894 62.894 0.888 446.799

a
18 Raft corner bar bs6 12 - 2x2= 4 62894 62.894 0.888 223.399

c
b
19 key cs1 10 150 100 25 195 1038 1233 1468 4 4.054 0.617 62.532
d
a
a
20 key binder cs2 12 - 10 3550 3.550 0.888 31.524

Slab link bar in a c


21 s1 8 180
900mm portion
b
Raft link bar in 900mm a c
22 s2 8 180 145x9x2= 6300 80 266 80 2 0.394 0.395 980.469
portion
b

c
23 Raft top haunch bar h2 12 180 2x145= 700 300 970 300 1 1.546 0.888 960.994
a b

c
Slab bottom haunch
24 h1 12 180 2x146= 702 300 942 300 1 1.518 0.888 946.285
bar
a b

EPC Contractor Authority Engineer


295 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : MCW Box Culvert @KM -140+415 Box Length (mm)= 63044

Dimensions of Bar Cutting

Bend
Bar Spacing Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars length
Mark (mm) Kg/m Kg.
a b c d (m)

25 Hunch binder h3 12 - a 1x4= 4 62864 62.864 0.888 223.293

26 Head wall ring - 12 150 b c 25 160 560 100 4 1.544 0.888 34.277

27 Head wall binder - 10 - a 6 3550 3.550 0.617 13.142


8mm 10mm 12mm 16mm 20mm 25mm 28mm 32mm Total 20431.618
2026.833 6241.102 12141.246 22.436 0.000 0.000 0.000 #VALUE! #VALUE!

8 2026.83 Raft 400 mm Foundation 4213.411


10 6241.10 Wall 350 mm Substructure 10573.266
12 12141.25 Slab 350 mm Superstructure 5644.941
16 22.44
20 0.00
20431.62

EPC Contractor Authority Engineer


296 of 327

UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY


Development purvanchal expressway (Package-IV) from Sidhi Ganeshpur (Distt-Sultanpur) to Sansarpur (Distt-Sultanpur From KM. 121+600 To 164+300) in the state of Uttar Pradesh on EPC
basis.
BAR BENDING SCHEDULE
Client:- UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY Name of component:-BOX CULVERT 1x2x2 with cution (0 to 2m)
Authority Engineer :- Egis International S A in JV with AGIS India Consulting & Engineers Pvt. Ltd.
EPC Contractor:- GR Infra Projects Ltd. Structure : SR Box Culvert @ KM- 140+415 -RHS Box Length (mm)= 7984

Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) length (m) Kg/m Kg.
a b c d

1 Slab bottom bar ts1 12 100 a c 80 150 3450 150 2 3.702 0.888 262.990
b
b
2 Slab top bar ts2 12 200 a c 40 1155 3450 1155 2 5.712 0.888 202.890

3 Slab bottom binder ts3 10 200 a c 16 220 7894 220 2 8.294 0.617 81.878
b
b
4 Slab top binder ts4 10 200 a c 16 220 7894 220 2 8.294 0.617 81.878

a
5 Slab corner bar ts5 12 - 2x4= 8 7894 7.894 0.888 56.079

a
6 Slab corner bar ts6 12 - 2x2= 4 7894 7.894 0.888 28.039
a
7 Slab bottom extra bar ts7 12 - 2X4= 8 3450 2 3.402 0.888 24.168

EPC Contractor Authority Engineer Client


297 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : SR Box Culvert @ KM- 140+415 -RHS Box Length (mm)= 7984

Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) length (m) Kg/m Kg.
a b c d

a
8 Wall vertical outer w1 16 200 2X75= 80 1125 3480 1125 2 5.666 1.580 716.182

b
c
a
9 Wall vertical outer w2 12 200 2X75= 80 200 3480 200 2 3.832 0.888 272.225

b
c

Wall vertical outer


10 w3 12 200 a c 32 200 7894 200 2 8.246 0.888 234.318
binder
b

Wall vertical inner a c


11 w4 10 200 32 200 7894 200 2 8.254 0.617 162.967
binder
b

12 Raft bottom bar bs1 12 200 a c 40 1125 3450 1125 2 5.652 0.888 200.759
b
b
13 Raft top bar bs2 16 100 a c 79 200 3450 200 2 3.786 1.580 472.569

14 Raft bottom binder bs3 10 200 a c 16 220 7834 220 2 8.234 0.617 81.286
b
b
15 Raft top binder bs4 12 200 a c 16 220 7834 220 2 8.226 0.888 116.875

EPC Contractor Authority Engineer Client


298 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : SR Box Culvert @ KM- 140+415 -RHS Box Length (mm)= 7984

Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) length (m) Kg/m Kg.
a b c d
a
16 Raft corner bar bs5 12 - 2x4= 8 7834 7.834 0.888 55.653

a
17 Raft corner bar bs6 12 - 2x2= 4 7834 7.834 0.888 27.826

N/A
18 Raft top extra bar bs7

c
100 b
19 key cs1 10 150 24 195 1034 1229 1462 4 4.040 0.617 59.829
d
a

a
20 key binder cs2 12 - 10 3450 3.450 0.888 30.636

Slab link bar in


21 s1 8 a c 10x75x2 1500 10 210 10 2 0.198 0.395 117.315
900mm portion
b

22 Raft link bar in 900mm s2 8


a c
10x75x2 1500 10 210 10 2 0.198 0.395 117.315
portion
b

c
23 Raft top haunch bar h2 12 180 2x83= 90 200 758 200 1 1.134 0.888 90.629
a b

EPC Contractor Authority Engineer Client


299 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : SR Box Culvert @ KM- 140+415 -RHS Box Length (mm)= 7984

Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) length (m) Kg/m Kg.
a b c d

c
Slab bottom haunch
24 h1 12 180 2x83= 90 200 800 200 1 1.176 0.888 93.986
bar
a b
a

25 Hunch binder h3 12 - 4 7894 7.894 0.888 28.039

### Total 3616.333


8 234.630
10 467.838 Foundation 954.968
12 1725.114 Substructure 1923.442
16 1188.751 Superstructure 737.923
20 0.000
Total in MT 3.616

EPC Contractor Authority Engineer Client


300 of 327

UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY


Development purvanchal expressway (Package-IV) from Sidhi Ganeshpur (Distt-Sultanpur) to Sansarpur (Distt-Sultanpur From KM. 121+600 To 164+300) in the state of Uttar
Pradesh on EPC basis.
BAR BENDING SCHEDULE
Client:- UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY Name of component:-BOX CULVERT 1x3x3 (h=2 to 4m)
Authority Engineer :- Egis International S A in JV with AGIS India Consulting & Engineers Pvt. Ltd.
EPC Contractor:- GR Infra Projects Ltd. Structure : MCW Box Culvert @KM -140+450 Box Length (mm)= 38000

Dimensions of Bar Cutting

Bend
Bar Spacing Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars length
Mark (mm) Kg/m Kg.
a b c d (m)

1 Slab bottom bar ts1 12 180 a c 212 150 3550 150 2 3.802 0.888 715.749
b
b
2 Slab top bar ts2 12 180 a c 212 1205 3550 1205 2 5.912 0.888 1112.969

3 Slab bottom binder ts3 10 250 a c 13 150 37820 150 2 38.080 0.617 305.440
b
b
4 Slab top binder ts4 12 250 a c 13 150 37820 150 2 38.072 0.888 439.503

a
5 Slab corner bar ts5 12 - 2x4= 8 37820 37.820 0.888 268.673

a
6 Slab corner bar ts6 12 - 2x2= 4 37820 37.820 0.888 134.337

a
7 Slab botto etra bar ts7 10 180 211 3550 3.550 0.617 462.164

a
8 Slab corner bar ts8 16 - 4 3550 3.550 1.580 22.436

EPC Contractor Authority Engineer


301 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : MCW Box Culvert @KM -140+450 Box Length (mm)= 38000

Dimensions of Bar Cutting

Bend
Bar Spacing Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars length
Mark (mm) Kg/m Kg.
a b c d (m)

a
9 Wall vertical outer w1 16 180 2x146= 424 1175 3630 1175 2 5.916 1.580 3963.247

b
c

10 Wall vertical inner w2 10 90 2x146= 844 120 3630 120 2 3.830 0.617 1994.465

b
c

Wall vertical outer a c


11 w3 8 100 2x21= 62 120 37820 120 2 38.028 0.395 931.306
binder
b

Wall vertical inner a c


12 w4 8 150 2x21= 42 120 37820 120 2 38.028 0.395 630.885
binder
b

13 Raft bottom bar bs1 12 180 a c 211 1225 3550 1225 2 5.952 0.888 1115.214
b
b
14 Raft top bar bs2 12 90 a c 422 100 3550 100 2 3.702 0.888 1387.273

15 Raft bottom binder bs3 12 250 a c 13 100 37850 100 2 38.002 0.888 438.695
b
b
16 Raft top binder bs4 10 250 a c 13 100 37850 100 2 38.010 0.617 304.878

EPC Contractor Authority Engineer


302 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : MCW Box Culvert @KM -140+450 Box Length (mm)= 38000

Dimensions of Bar Cutting

Bend
Bar Spacing Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars length
Mark (mm) Kg/m Kg.
a b c d (m)
a
17 Raft corner bar bs5 12 - 2x4= 8 37850 37.850 0.888 268.886

a
18 Raft corner bar bs6 12 - 2x2= 4 37850 37.850 0.888 134.443

c
b
19 key cs1 10 150 100 25 195 1038 1233 1468 4 4.054 0.617 62.532
d
a
a
20 key binder cs2 12 - 10 3550 3.550 0.888 31.524

Slab link bar in a c


21 s1 8 180 146x9x2= 3816 80 276 80 0.436 0.395 657.192
900mm portion
b
Raft link bar in 900mm a c
22 s2 8 180 145x9x2= 3798 80 266 80 2 0.394 0.395 591.083
portion
b

c
23 Raft top haunch bar h2 12 180 2x145= 422 300 970 300 1 1.546 0.888 579.342
a b

c
Slab bottom haunch
24 h1 12 180 2x146= 424 300 942 300 1 1.518 0.888 571.545
bar
a b
25 Hunch binder h3 12 - a 1x4= 4 37820 37.820 0.888 134.337

EPC Contractor Authority Engineer


303 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : MCW Box Culvert @KM -140+450 Box Length (mm)= 38000

Dimensions of Bar Cutting

Bend
Bar Spacing Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars length
Mark (mm) Kg/m Kg.
a b c d (m)

26 Head wall ring - 12 150 b c 25 160 560 100 4 1.544 0.888 34.277

27 Head wall binder - 10 - a 6 3550 3.550 0.617 13.142


8mm 10mm 12mm 16mm 20mm 25mm 28mm 32mm Total 17305.536
2810.465 3142.621 7366.768 3985.683 0.000 0.000 0.000 0.000 17305.536

8 2810.46 Raft 400 mm Foundation 3743.446


10 3142.62 Wall 350 mm Substructure 10100.819
12 7366.77 Slab 350 mm Superstructure 3461.271
16 3985.68
20 0.00
17305.54

EPC Contractor Authority Engineer


304 of 327

UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY


Development purvanchal expressway (Package-IV) from Sidhi Ganeshpur (Distt-Sultanpur) to Sansarpur (Distt-Sultanpur From KM. 121+600 To 164+300) in the state of Uttar Pradesh on EPC
basis.
BAR BENDING SCHEDULE
Client:- UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY Name of component:-BOX CULVERT 1x3x3 with cution (0 to 2m)
Authority Engineer :- Egis International S A in JV with AGIS India Consulting & Engineers Pvt. Ltd.
EPC Contractor:- GR Infra Projects Ltd. Structure : SR Box Culvert @ KM- 140+450 -RHS Box Length (mm)= 11268

Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) length (m) Kg/m Kg.
a b c d

1 Slab bottom bar ts1 12 100 a c 113 150 3450 150 2 3.702 0.888 371.473
b
b
2 Slab top bar ts2 12 200 a c 57 1155 3450 1155 2 5.712 0.888 289.119

3 Slab bottom binder ts3 10 200 a c 16 220 11178 220 2 11.578 0.617 114.298
b
b
4 Slab top binder ts4 10 200 a c 16 220 11178 220 2 11.578 0.617 114.298

a
5 Slab corner bar ts5 12 - 2x4= 8 11178 11.178 0.888 79.409

a
6 Slab corner bar ts6 12 - 2x2= 4 11178 11.178 0.888 39.704
a
7 Slab bottom extra bar ts7 12 - 2X4= 8 3450 2 3.402 0.888 24.168

a
8 Wall vertical outer w1 16 200 2X75= 114 1125 3480 1125 2 5.666 1.580 1020.560
b

EPC Contractor Authority Engineer Client


305 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : SR Box Culvert @ KM- 140+450 -RHS Box Length (mm)= 11268

Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) length (m) Kg/m Kg.
a b c d

a
9 Wall vertical outer w2 12 200 2X75= 114 200 3480 200 2 3.832 0.888 387.921

b
c

Wall vertical outer


10 w3 12 200 a c 32 200 11178 200 2 11.530 0.888 327.636
binder
b

Wall vertical inner a c


11 w4 10 200 32 200 11178 200 2 11.538 0.617 227.806
binder
b

12 Raft bottom bar bs1 12 200 a c 57 1125 3450 1125 2 5.652 0.888 286.082
b
b
13 Raft top bar bs2 16 100 a c 112 200 3450 200 2 3.786 1.580 669.971

14 Raft bottom binder bs3 10 200 a c 16 220 11118 220 2 11.518 0.617 113.706
b
b
15 Raft top binder bs4 12 200 a c 16 220 11118 220 2 11.510 0.888 163.534

a
16 Raft corner bar bs5 12 - 2x4= 8 11118 11.118 0.888 78.982

a
17 Raft corner bar bs6 12 - 2x2= 4 11118 11.118 0.888 39.491

EPC Contractor Authority Engineer Client


306 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : SR Box Culvert @ KM- 140+450 -RHS Box Length (mm)= 11268

Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) length (m) Kg/m Kg.
a b c d
N/A
18 Raft top extra bar bs7

c
100 b
19 key cs1 10 150 24 195 1034 1229 1462 4 4.040 0.617 59.829
d
a

a
20 key binder cs2 12 - 10 3450 3.450 0.888 30.636

Slab link bar in


21 s1 8 a c 10x75x2 1500 10 210 10 2 0.198 0.395 117.315
900mm portion
b

22 Raft link bar in 900mm a c


s2 8 10x75x2 1500 10 210 10 2 0.198 0.395 117.315
portion
b

c
23 Raft top haunch bar h2 12 180 2x83= 126 200 758 200 1 1.134 0.888 126.881
a b

c
Slab bottom haunch
24 h1 12 180 2x83= 126 200 800 200 1 1.176 0.888 131.580
bar
a b

EPC Contractor Authority Engineer Client


307 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : SR Box Culvert @ KM- 140+450 -RHS Box Length (mm)= 11268

Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) length (m) Kg/m Kg.
a b c d
a

25 Hunch binder h3 12 - 4 11178 11.178 0.888 39.704

### Total 4971.418


8 234.630
10 629.937 Foundation 1351.765
12 2416.321 Substructure 2587.184
16 1690.530 Superstructure 1032.469
20 0.000
Total in MT 4.971

EPC Contractor Authority Engineer Client


UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Development purvanchal expressway (Package-IV) from Sidhi Ganeshpur (Distt-Sultanpur) to Sansarpur (Distt-Sultanpur From KM. 121+600 To 164+300) in the state of Uttar
Pradesh on EPC basis.
BAR BENDING SCHEDULE
Client:- UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY Name of component:-U-TROUGH 1X3x3
Authority Engineer :- Egis International S A in JV with AGIS India Consulting & Engineers Pvt. Ltd.
EPC Contractor:- GR Infra Projects Ltd. Structure : MCW U-TROUGH @KM -140+450 RHS/LHS U-TROUGH (mm)= 9000

Dimensions of Bar Cutting

Bend
Bar Spacing Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars length
Mark (mm) Kg/m Kg.
a b c d (m)

1 Raft bottom Main Bar 1 8 180 51 0 3310 0 0 3.310 0.395 66.680


b
2 Wall outer Main Bar 1 8 180
a c 51 3160 0 3160 2 6.288 0.395 126.672

3 Raft top Main Bar 2 12 90 b 100 3090 0 3.090 0.888 274.392

4 Wall inner Main Bar 2 12 90 a c 100 3045 3045 2 6.042 0.888 536.530

5 Raft Binder 3 8 180 b 18 8910 0 8.910 0.395 63.350

6 Raft Binder 4 8 250 b 14 8910 0 8.910 0.395 49.272

7 Wall inner Binder 3 8 180 b 36 8910 0 8.910 0.395 126.700

8 Wall outer Binder 4 8 250 b 28 8910 0 8.910 0.395 98.545


8 531.22 1342.141
10 0.00 Foundation 453.694
12 810.92 Wall 888.446
16 0.00
20 0.00
1342.14
309 of 327

UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY


Development purvanchal expressway (Package-IV) from Sidhi Ganeshpur (Distt-Sultanpur) to Sansarpur (Distt-Sultanpur From KM. 121+600 To 164+300) in the state of Uttar Pradesh on
EPC basis.
BAR BENDING SCHEDULE
Client:- UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY Name of component:-BOX CULVERT 1x3x3 (h=2 to 4m)
Authority Engineer :- Egis International S A in JV with AGIS India Consulting & Engineers Pvt. Ltd.
EPC Contractor:- GR Infra Projects Ltd. Structure : MCW Box Culvert @KM -160+220 BHS Box Length (mm)= 77176

Dimensions of Bar Cutting

Bend
Bar Unit Wt. Total Wt.
SN Description Dia Spacing (mm) Shap of the bar No. of bars length
Mark Kg/m Kg.
a b c d (m)

1 Slab bottom bar ts1 16 160 a c 483 150 3550 150 2 3.786 1.580 2889.248
b
b
2 Slab top bar ts2 16 160 a c 483 1205 3550 1205 2 5.896 1.580 4499.473

3 Slab bottom binder ts3 10 180 a c 18 150 76996 150 2 77.256 0.617 858.005
b
b
4 Slab top binder ts4 12 200 a c 16 150 76996 150 2 77.248 0.888 1097.540

a
5 Slab corner bar ts5 12 - 2x4= 8 76996 76.996 0.888 546.980

a
6 Slab corner bar ts6 12 - 2x2= 4 76996 76.996 0.888 273.490

a
7 Slab botto etra bar ts7 12 160 482 3550 3.550 0.888 1519.457

a
8 Slab corner bar ts8 16 - 4 3550 3.550 1.580 22.436

EPC Contractor Authority Engineer


310 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : MCW Box Culvert @KM -160+220 BHS Box Length (mm)= 77176

Dimensions of Bar Cutting

Bend
Bar Unit Wt. Total Wt.
SN Description Dia Spacing (mm) Shap of the bar No. of bars length
Mark Kg/m Kg.
a b c d (m)

a
9 Wall vertical outer w1 16 160 2x146= 966 1175 3630 1175 2 5.916 1.580 9029.472

b
c

10 Wall vertical inner w2 10 80 2x146= 1930 120 3630 120 2 3.830 0.617 4560.802

b
c

Wall vertical outer a c


11 w3 12 200 2x21= 32 120 76996 120 2 77.188 0.888 2193.374
binder
b
Wall vertical inner a c
12 w4 8 100 2x21= 62 120 76996 120 2 77.204 0.395 1890.726
binder
b

13 Raft bottom bar bs1 16 160 a c 482 1225 3550 1225 2 5.936 1.580 4520.620
b
b
14 Raft top bar bs2 16 160 a c 482 100 3550 100 2 3.686 1.580 2807.110

15 Raft bottom binder bs3 12 200 a c 16 100 77026 100 2 77.178 0.888 1096.545
b
b
16 Raft top binder bs4 12 200 a c 16 100 77026 100 2 77.178 0.888 1096.545

a
17 Raft corner bar bs5 12 - 2x4= 8 77026 77.026 0.888 547.193

EPC Contractor Authority Engineer


311 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : MCW Box Culvert @KM -160+220 BHS Box Length (mm)= 77176

Dimensions of Bar Cutting

Bend
Bar Unit Wt. Total Wt.
SN Description Dia Spacing (mm) Shap of the bar No. of bars length
Mark Kg/m Kg.
a b c d (m)
a
18 Raft corner bar bs6 12 - 2x2= 4 77026 77.026 0.888 273.596

c
b
19 key cs1 10 150 100 25 195 1034 1229 1462 4 4.040 0.617 62.322
d
a
a
20 key binder cs2 12 - 10 3550 3.550 0.888 31.524

Slab link bar in a c


21 s1 10 180 146x9x2= 7722 80 280 80 0.440 0.617 2096.369
900mm portion
b
Raft link bar in 900mm a c
22 s2 10 180 145x9x2= 7722 80 270 80 2 0.390 0.617 1858.145
portion
b

c
23 Raft top haunch bar h2 10 160 2x145= 964 300 970 300 1 1.550 0.617 921.921
a b

c
Slab bottom haunch
24 h1 10 160 2x146= 966 300 942 300 1 1.522 0.617 907.145
bar
a b
25 Hunch binder h3 10 - a 1x4= 4 76996 76.996 0.617 190.026

EPC Contractor Authority Engineer


312 of 327

EPC Contractor:- GR Infra Projects Ltd. Structure : MCW Box Culvert @KM -160+220 BHS Box Length (mm)= 77176

Dimensions of Bar Cutting

Bend
Bar Unit Wt. Total Wt.
SN Description Dia Spacing (mm) Shap of the bar No. of bars length
Mark Kg/m Kg.
a b c d (m)

26 Head wall ring - 12 150 b c 25 160 560 100 4 1.544 0.888 34.277

27 Head wall binder - 10 - a 6 3550 3.550 0.617 13.142


8mm 10mm 12mm 16mm 20mm 25mm 28mm 32mm Total 45837.484
1890.726 11467.878 8710.520 23768.360 0.000 0.000 0.000 0.000 45837.484

8 1890.73 Raft 400 mm Foundation 10435.455


10 11467.88 Wall 350 mm Substructure 23695.400
12 8710.52 Slab 350 mm Superstructure 11706.628
16 23768.36
20 0.00
45837.48

EPC Contractor Authority Engineer


UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Development purvanchal expressway (Package-IV) from Sidhi Ganeshpur (Distt-Sultanpur) to Sansarpur (Distt-Sultanpur From KM. 121+600 To 164+300) in the state of Uttar
Pradesh on EPC basis.
BAR BENDING SCHEDULE
Client:- UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY Name of component:-U-TROUGH 1X3x3
Authority Engineer :- Egis International S A in JV with AGIS India Consulting & Engineers Pvt. Ltd.
EPC Contractor:- GR Infra Projects Ltd. Structure : MCW U-TROUGH @KM -138+550 RHS/LHS U-TROUGH (mm)= 9000

Dimensions of Bar Cutting

Bend
Bar Spacing Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars length
Mark (mm) Kg/m Kg.
a b c d (m)

1 Raft bottom Main Bar 1 8 180 51 0 3310 0 0 3.310 0.395 66.680


b
2 Wall outer Main Bar 1 8 180
a c 51 3160 0 3160 2 6.288 0.395 126.672

3 Raft top Main Bar 2 12 90 b 100 3090 0 3.090 0.888 274.392

4 Wall inner Main Bar 2 12 90 a c 100 3045 3045 2 6.042 0.888 536.530

5 Raft Binder 3 8 180 b 18 8910 0 8.910 0.395 63.350

6 Raft Binder 4 8 250 b 14 8910 0 8.910 0.395 49.272

7 Wall inner Binder 3 8 180 b 36 8910 0 8.910 0.395 126.700

8 Wall outer Binder 4 8 250 b 28 8910 0 8.910 0.395 98.545


8 531.22 1342.141
10 0.00 Foundation 453.694
12 810.92 Wall 888.446
16 0.00
20 0.00
1342.14
314 of 327
UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Development purvanchal expressway (Package-IV) from Sidhi Ganeshpur (Distt-Sultanpur) to Sansarpur (Distt-Sultanpur From KM. 121+600 To 164+300) in the state of Uttar Pradesh on EPC
basis.
BAR BENDING SCHEDULE
Client:- UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY Name of component:-BOX CULVERT 1x3x3 with cution (0 to 2m)
Authority Engineer :- Egis International S A in JV with AGIS India Consulting & Engineers Pvt. Ltd.
EPC Contractor:- GR Infra Projects Ltd. Structure : SR Box Culvert @ KM- 160+220 -LHS Box Length (mm)= 12936

Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) length (m) Kg/m Kg.
a b c d

1 Slab bottom bar ts1 12 100 a c 129 150 3450 150 2 3.702 0.888 424.072
b
b
2 Slab top bar ts2 12 200 a c 65 1155 3450 1155 2 5.712 0.888 329.697

3 Slab bottom binder ts3 10 200 a c 16 220 12846 220 2 13.246 0.617 130.765
b
b
4 Slab top binder ts4 10 200 a c 16 220 12846 220 2 13.246 0.617 130.765

a
5 Slab corner bar ts5 12 - 2x4= 8 12846 12.846 0.888 91.258

6 Slab corner bar ts6 12 - a 2x2= 4 12846 12.846 0.888 45.629


a
7 Slab bottom extra bar ts7 12 - 2X4= 8 3450 2 3.402 0.888 24.168

EPC Contractor Authority Engineer Client


315 of 327
EPC Contractor:- GR Infra Projects Ltd. Structure : SR Box Culvert @ KM- 160+220 -LHS Box Length (mm)= 12936

Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) length (m) Kg/m Kg.
a b c d

a
8 Wall vertical outer w1 16 200 2X75= 130 1125 3480 1125 2 5.666 1.580 1163.796

b
c
a
9 Wall vertical outer w2 12 200 2X75= 130 200 3480 200 2 3.832 0.888 442.366

b
c

Wall vertical outer


10 w3 12 200 a c 32 200 12846 200 2 13.198 0.888 375.034
binder
b

Wall vertical inner a c


11 w4 10 200 32 200 12846 200 2 13.206 0.617 260.739
binder
b

12 Raft bottom bar bs1 12 200 a c 65 1125 3450 1125 2 5.652 0.888 326.233
b
b
13 Raft top bar bs2 16 100 a c 129 200 3450 200 2 3.786 1.580 771.663

14 Raft bottom binder bs3 10 200 a c 16 220 12786 220 2 13.186 0.617 130.172
b
b
15 Raft top binder bs4 12 200 a c 16 220 12786 220 2 13.178 0.888 187.233

EPC Contractor Authority Engineer Client


316 of 327
EPC Contractor:- GR Infra Projects Ltd. Structure : SR Box Culvert @ KM- 160+220 -LHS Box Length (mm)= 12936

Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) length (m) Kg/m Kg.
a b c d
a
16 Raft corner bar bs5 12 - 2x4= 8 12786 12.786 0.888 90.832

a
17 Raft corner bar bs6 12 - 2x2= 4 12786 12.786 0.888 45.416

N/A
18 Raft top extra bar bs7

c
100 b
19 key cs1 10 150 24 195 1034 1229 1462 4 4.040 0.617 59.829
d
a

a
20 key binder cs2 12 - 10 3450 3.450 0.888 30.636

Slab link bar in


21 s1 8 a c Not Used 0.000 0.395 0.000
900mm portion
b

22 Raft link bar in 900mm s2 8


a c
Not Used 0 0 0.000 0.395 0.000
portion
b

c
23 Raft top haunch bar h2 12 180 2x83= 144 200 758 200 1 1.134 0.888 145.007
a b

EPC Contractor Authority Engineer Client


317 of 327
EPC Contractor:- GR Infra Projects Ltd. Structure : SR Box Culvert @ KM- 160+220 -LHS Box Length (mm)= 12936

Dimensions of Bar

Bend
Bar Spacing Cutting Unit Wt. Total Wt.
SN Description Dia Shap of the bar No. of bars
Mark (mm) length (m) Kg/m Kg.
a b c d

c
Slab bottom haunch
24 h1 12 180 2x83= 144 200 800 200 1 1.176 0.888 150.377
bar
a b
a

25 Hunch binder h3 12 - 4 12846 12.846 0.888 45.629

### Total 5401.315


8 0.000
10 712.269 Foundation 1551.549
12 2753.587 Substructure 2673.414
16 1935.459 Superstructure 1176.352
20 0.000
Total in MT 5.401

EPC Contractor Authority Engineer Client


Development of Purvanchal Expressway on EPC mode Package-IV from Sidhi Ganeshpur (Dist. Sultanpur) to Sansarpur (Dist. Sultanpur) Km 121+600 to Km 164+300 in the state
Embankment Qty - In the Approaches of UP of Structures under COS
Chainage Lgth Emb. - wrt Initial Profile Emb. - wrt Revised Profile
LHS RHS C/S Area Qty Cum Qty Remarks LHS RHS C/S Area Qty Cum Qty Remarks

122200 112.944 114.281 227.225 0.00 0.00 127.736 129.390 257.126 0.00 0.00
122210 10 122.078 130.801 252.879 2400.52 2400.52 136.534 145.921 282.455 2697.91 2697.91
122220 10 128.952 127.104 256.056 2544.68 4945.20 143.741 141.751 285.492 2839.74 5537.64
122230 10 126.630 124.217 250.847 2534.52 7479.71 141.361 138.835 280.196 2828.44 8366.08
122240 10 123.359 121.672 245.031 2479.39 9959.10 138.005 136.246 274.251 2772.24 11138.32
122250 10 121.352 119.523 240.875 2429.53 12388.63 136.320 134.425 270.745 2724.98 13863.30
122260 10 118.693 116.743 235.436 2381.56 14770.19 134.022 132.000 266.022 2683.84 16547.13
122270 10 115.514 114.324 229.838 2326.37 17096.56 131.537 130.249 261.786 2639.04 19186.17
122280 10 113.437 112.614 226.051 2279.45 19376.00 130.201 129.291 259.492 2606.39 21792.56
122290 10 115.508 114.028 229.536 2277.94 21653.94 133.725 131.867 265.592 2625.42 24417.98
122300 10 116.433 113.908 230.341 2299.39 23953.32 135.866 132.904 268.770 2671.81 27089.79
122310 10 116.038 113.154 229.192 2297.67 26250.99 137.022 133.959 270.981 2698.76 29788.55
122320 10 113.700 109.875 223.575 2263.84 28514.82 136.270 132.171 268.441 2697.11 32485.66
122330 10 110.990 106.059 217.049 2203.12 30717.94 135.419 130.171 265.590 2670.16 35155.81
122340 10 108.270 102.689 210.959 2140.04 32857.98 134.520 128.623 263.143 2643.67 37799.48
122350 10 105.515 99.804 205.319 2081.39 34939.37 133.966 127.785 261.751 2624.47 40423.95
122360 10 106.223 97.160 203.383 2043.51 36982.88 137.101 127.399 264.500 2631.26 43055.20
122370 10 103.945 94.741 198.686 2010.35 38993.23 137.626 127.597 265.223 2648.62 45703.82
122380 10 106.153 96.249 202.402 2005.44 40998.67 143.075 132.009 275.084 2701.54 48405.35
122390 10 103.882 94.592 198.474 2004.38 43003.05 143.760 133.628 277.388 2762.36 51167.71
122400 10 96.916 95.126 192.042 1952.58 44955.63 139.709 137.580 277.289 2773.39 53941.10
122410 10 92.950 93.208 186.158 1891.00 46846.63 138.891 139.259 278.150 2777.20 56718.29
122420 10 88.944 89.834 178.778 1824.68 48671.31 137.806 139.474 277.280 2777.15 59495.44
122430 10 85.940 80.406 166.346 1725.62 50396.93 138.607 133.354 271.961 2746.21 62241.65
122440 10 81.677 72.761 154.438 1603.92 52000.85 137.841 126.879 264.720 2683.41 64925.05
122450 10 81.453 69.801 151.254 1528.46 53529.31 141.857 127.369 269.226 2669.73 67594.78
122460 10 79.351 63.051 142.402 1468.28 54997.59 143.857 123.724 267.581 2684.04 70278.82
122470 10 76.227 62.016 138.243 1403.23 56400.81 144.159 125.916 270.075 2688.28 72967.10
122480 10 76.065 57.244 133.309 1357.76 57758.57 148.188 124.168 272.356 2712.16 75679.25
122490 10 74.436 52.870 127.306 1303.08 59061.65 149.807 122.039 271.846 2721.01 78400.26
122500 10 72.755 48.935 121.690 1244.98 60306.63 151.507 120.221 271.728 2717.87 81118.13
122510 10 70.325 45.256 115.581 1186.36 61492.98 151.749 118.277 270.026 2708.77 83826.90
122520 10 70.175 45.746 115.921 1157.51 62650.49 154.639 121.751 276.390 2732.08 86558.98
122530 10 68.959 44.929 113.888 1149.05 63799.54 155.632 123.029 278.661 2775.26 89334.24
122540 10 67.597 43.862 111.459 1126.74 64926.27 156.558 124.085 280.643 2796.52 92130.76
122550 10 67.229 43.017 110.246 1108.53 66034.80 158.379 124.852 283.231 2819.37 94950.13
122560 10 66.455 42.062 108.517 1093.82 67128.61 159.311 125.531 284.842 2840.37 97790.49
122570 10 66.212 42.201 108.413 1084.65 68213.26 160.810 127.025 287.835 2863.39 100653.88
122580 10 66.200 42.068 108.268 1083.41 69296.67 162.284 128.206 290.490 2891.63 103545.50
122590 10 66.801 43.107 109.908 1090.88 70387.55 163.968 130.254 294.222 2923.56 106469.06
122600 10 67.459 42.842 110.301 1101.05 71488.59 165.406 130.942 296.348 2952.85 109421.91
122610 10 68.455 43.740 112.195 1112.48 72601.07 167.284 132.634 299.918 2981.33 112403.24
122620 10 69.386 44.719 114.105 1131.50 73732.57 168.989 134.240 303.229 3015.74 115418.98
122632.15 12.15 70.347 46.396 116.743 1402.40 75134.97 170.235 136.445 306.680 3705.20 119124.17
122638.00 5.85 118.130 687.00 75821.97 308.332 0.00 119124.17
LVUP at km 122+638
122643.85 5.85 71.974 47.542 119.516 695.11 76517.09 172.095 137.888 309.983 0.00 119124.17
122650 6.15 64.323 37.648 101.971 681.07 77198.16 160.738 124.317 285.055 1829.74 120953.91
122660 10 74.025 50.888 124.913 1222.15 78420.31 173.598 140.741 314.339 2996.97 123950.88
122670 10 76.561 51.758 128.319 1151.45 79571.76 175.392 140.922 316.314 3153.27 127104.15
122680 10 78.443 53.413 131.856 1283.85 80855.60 176.576 141.917 318.493 3174.04 130278.18
122690 10 80.733 55.700 136.433 1341.45 82197.05 177.652 143.224 320.876 3196.85 133475.03
122700 10 82.877 57.998 140.875 1386.54 83583.59 178.673 144.553 323.226 3220.51 136695.54
122710 10 86.224 60.563 146.787 1438.31 85021.90 180.455 145.623 326.078 3246.52 139942.06
122720 10 88.678 63.046 151.724 1492.56 86514.45 181.093 146.625 327.718 3268.98 143211.04
122730 10 92.686 66.457 159.143 1554.34 88068.79 183.044 148.224 331.268 3294.93 146505.97
122740 10 95.989 69.173 165.162 1621.53 89690.31 184.309 149.044 333.353 3323.11 149829.07
122750 10 99.524 72.570 172.094 1686.28 91376.59 185.473 150.467 335.940 3346.47 153175.54
122760 10 103.471 76.364 179.835 1759.65 93136.24 187.220 152.052 339.272 3376.06 156551.60
122770 10 106.663 78.305 184.968 1824.02 94960.25 187.870 151.913 339.783 3395.28 159946.87
122780 10 110.644 81.717 192.361 1886.65 96846.90 189.426 153.270 342.696 3412.40 163359.27
122790 10 114.043 87.285 201.328 1968.45 98815.34 190.491 157.645 348.136 3454.16 166813.43
122800 10 118.031 90.462 208.493 2049.11 100864.45 192.004 158.720 350.724 3494.30 170307.73
122810 10 121.801 93.577 215.378 2119.36 102983.80 193.250 160.513 353.763 3522.44 173830.16
122820 10 125.183 96.763 221.946 2186.62 105170.42 194.087 161.389 355.476 3546.20 177376.36
122830 10 128.373 97.584 225.957 2239.52 107409.94 194.695 159.223 353.918 3546.97 180923.33
122840 10 132.227 102.364 234.591 2302.74 109712.68 196.031 161.322 357.353 3556.36 184479.68
122850 10 136.388 106.570 242.958 2387.75 112100.42 197.559 163.519 361.078 3592.16 188071.84
122860 10 139.146 111.567 250.713 2468.36 114568.78 197.616 165.889 363.505 3622.92 191694.75
122870 10 141.312 116.637 257.949 2543.31 117112.09 196.917 168.320 365.237 3643.71 195338.46
122880 10 144.415 120.817 265.232 2615.91 119727.99 197.294 170.147 367.441 3663.39 199001.85
122890 10 147.427 123.859 271.286 2682.59 122410.58 197.503 170.637 368.140 3677.91 202679.76
122900 10 149.807 128.042 277.849 2745.68 125156.26 196.998 172.473 369.471 3688.06 206367.81
122910 10 151.747 132.554 284.301 2810.75 127967.01 196.124 174.629 370.753 3701.12 210068.93
122920 10 155.612 137.559 293.171 2887.36 130854.37 197.373 177.336 374.709 3727.31 213796.24
122930 10 157.604 141.547 299.151 2961.61 133815.98 196.840 179.045 375.885 3752.97 217549.21
122940 10 160.815 145.504 306.319 3027.35 136843.33 197.529 180.768 378.297 3770.91 221320.12
122950 10 163.241 149.048 312.289 3093.04 139936.37 197.641 182.176 379.817 3790.57 225110.69
Chainage Lgth Emb. - wrt Initial Profile Emb. - wrt Revised Profile
LHS RHS C/S Area Qty Cum Qty Remarks LHS RHS C/S Area Qty Cum Qty Remarks
122960 10 166.465 153.134 319.599 3159.44 143095.81 198.645 184.212 382.857 3813.37 228924.06
122970 10 168.248 156.125 324.373 3219.86 146315.67 198.228 185.223 383.451 3831.54 232755.60
122980 10 170.883 159.441 330.324 3273.49 149589.15 198.717 186.509 385.226 3843.39 236598.99
122990 10 172.835 162.390 335.225 3327.75 152916.90 198.587 187.535 386.122 3856.74 240455.73
123000 10 174.673 165.797 340.470 3378.48 156295.37 198.388 189.026 387.414 3867.68 244323.41
123010 10 176.390 168.964 345.354 3429.12 159724.49 198.100 190.303 388.403 3879.09 248202.49
123020 10 178.315 171.446 349.761 3475.58 163200.07 198.136 190.972 389.108 3887.56 252090.05
123030 10 179.159 174.206 353.365 3515.63 166715.70 197.123 191.946 389.069 3890.89 255980.93
123040 10 180.246 176.560 356.806 3550.86 170266.55 196.352 192.529 388.881 3889.75 259870.68
123050 10 181.868 178.750 360.618 3587.12 173853.67 196.308 193.089 389.397 3891.39 263762.07
123060 10 182.807 180.482 363.289 3619.54 177473.21 195.496 193.166 388.662 3890.30 267652.37
123070 10 183.271 182.819 366.090 3646.90 181120.10 194.390 193.938 388.328 3884.95 271537.32
123080 10 183.796 183.428 367.224 3666.57 184786.67 193.320 192.954 386.274 3873.01 275410.33
123090 10 186.944 185.533 372.477 3698.51 188485.18 195.055 193.645 388.700 3874.87 279285.20
123100 10 188.602 186.848 375.450 3739.64 192224.81 195.276 193.512 388.788 3887.44 283172.64
123110 10 190.543 188.770 379.313 3773.82 195998.63 195.945 194.133 390.078 3894.33 287066.97
123120 10 191.235 190.392 381.627 3804.70 199803.33 195.294 194.446 389.740 3899.09 290966.06
123130 10 192.816 191.453 384.269 3829.48 203632.81 195.693 194.328 390.021 3898.81 294864.86
123140 10 194.345 193.757 388.102 3861.86 207494.66 196.013 195.429 391.442 3907.32 298772.18
123150 10 194.544 194.894 389.438 3887.70 211382.36 195.134 195.486 390.620 3910.31 302682.49

134180 76.943 76.531 153.474 0.00 0.00 78.275 77.864 156.139 0.00 0.00
134190 10 74.209 74.921 149.130 1513.02 1513.02 76.668 77.387 154.055 1550.97 1550.97
134200 10 71.847 72.359 144.206 1466.68 2979.70 75.420 75.945 151.365 1527.10 3078.07
134210 10 70.243 70.756 140.999 1426.03 4405.73 75.494 76.026 151.520 1514.43 4592.50
134220 10 68.182 68.904 137.086 1390.43 5796.15 75.078 75.797 150.875 1511.98 6104.47
134230 10 66.960 67.598 134.558 1358.22 7154.37 76.072 76.705 152.777 1518.26 7622.73
134240 10 66.578 66.265 132.843 1337.01 8491.38 77.952 77.604 155.556 1541.67 9164.40
134250 10 64.883 65.240 130.123 1314.83 9806.21 78.713 79.072 157.785 1566.71 10731.10
134260 10 63.464 64.287 127.751 1289.37 11095.58 79.748 80.548 160.296 1590.41 12321.51
134270 10 64.071 63.397 127.468 1276.10 12371.67 82.874 82.131 165.005 1626.51 13948.01
134280 10 62.979 62.587 125.566 1265.17 13636.84 84.296 83.783 168.079 1665.42 15613.43
134290 10 62.103 62.026 124.129 1248.48 14885.32 85.999 85.774 171.773 1699.26 17312.69
134300 10 66.407 60.918 127.325 1257.27 16142.59 92.845 87.157 180.002 1758.88 19071.57
134310 10 64.411 64.436 128.847 1280.86 17423.45 93.347 93.368 186.715 1833.59 20905.15
134320 10 65.418 65.121 130.539 1296.93 18720.38 96.817 96.313 193.130 1899.23 22804.38
134330 10 66.399 66.565 132.964 1317.52 20037.89 99.581 99.702 199.283 1962.07 24766.44
134340 10 66.472 66.623 133.095 1330.30 21368.19 101.463 101.564 203.027 2011.55 26777.99
134350 10 66.979 67.295 134.274 1336.85 22705.03 103.222 103.571 206.793 2049.10 28827.09
134360 10 66.654 68.675 135.329 1348.02 24053.05 104.183 106.325 210.508 2086.51 30913.60
134370 10 68.633 66.712 135.345 1353.37 25406.42 106.984 105.345 212.329 2114.19 33027.78
134380 10 70.587 71.705 142.292 1388.19 26794.60 109.743 110.977 220.720 2165.25 35193.03
134390 10 72.600 74.101 146.701 1444.97 28239.57 112.164 113.694 225.858 2232.89 37425.92
134400 10 75.210 75.948 151.158 1489.30 29728.86 115.146 115.798 230.944 2284.01 39709.93
134410 10 78.498 78.311 156.809 1539.84 31268.70 118.806 118.567 237.373 2341.59 42051.51
134420 10 80.925 80.838 161.763 1592.86 32861.56 121.539 121.325 242.864 2401.19 44452.70
134430 10 83.290 82.378 165.668 1637.16 34498.71 124.168 123.374 247.542 2452.03 46904.73
134440 10 85.881 84.645 170.526 1680.97 36179.68 127.126 125.581 252.707 2501.25 49405.97
134450 10 87.916 87.012 174.928 1727.27 37906.95 129.502 128.229 257.731 2552.19 51958.16
134460 10 89.906 89.382 179.288 1771.08 39678.03 131.794 130.897 262.691 2602.11 54560.27
134470 10 92.131 90.527 182.658 1809.73 41487.76 134.163 132.333 266.496 2645.94 57206.21
134480 10 94.465 93.307 187.772 1852.15 43339.91 136.803 135.308 272.111 2693.04 59899.24
134490 10 96.637 96.005 192.642 1902.07 45241.98 139.391 138.307 277.698 2749.05 62648.29
134500 10 96.132 94.777 190.909 1917.76 47159.74 138.740 137.060 275.800 2767.49 65415.78
134510 10 97.428 96.225 193.653 1922.81 49082.55 140.196 138.680 278.876 2773.38 68189.16
134520 10 98.819 97.054 195.873 1947.63 51030.18 141.773 139.657 281.430 2801.53 70990.69
134530 10 100.213 97.596 197.809 1968.41 52998.59 143.293 140.342 283.635 2825.33 73816.01
134540 10 101.488 100.110 201.598 1997.04 54995.62 144.658 143.112 287.770 2857.03 76673.04
134550 10 102.440 102.133 204.573 2030.86 57026.48 147.232 146.852 294.084 2909.27 79582.31
134560 10 101.200 103.558 204.758 2046.66 59073.13 147.294 150.054 297.348 2957.16 82539.47
134570 10 100.967 104.642 205.609 2051.84 61124.97 145.388 149.679 295.067 2962.08 85501.54
134580 10 101.674 105.291 206.965 2062.87 63187.84 144.851 148.425 293.276 2941.72 88443.26
134590 10 106.694 102.845 209.539 2082.52 65270.36 150.389 145.351 295.740 2945.08 91388.34
134600 10 108.059 97.747 205.806 2076.73 67347.08 152.267 140.741 293.008 2943.74 94332.08
134610 10 112.472 96.291 208.763 2072.85 69419.93 158.268 139.237 297.505 2952.57 97284.64
134620 10 111.512 94.304 205.816 2072.90 71492.82 158.693 137.647 296.340 2969.23 100253.87
134630 10 105.198 96.259 201.457 2036.37 73529.19 148.798 137.723 286.521 2914.31 103168.17
134632 2.2 105.846 93.508 199.354 440.89 73970.08 148.783 134.922 283.705 627.25 103795.42
134634 1.8 106.377 91.257 197.634 357.29 74327.37 148.771 132.631 281.402 103795.42
134638 4 107.556 86.256 193.811 74327.37 PUP at km 148.744 127.539 276.283 103795.42
134640 2 108.145 83.755 191.900 74327.37 134+638 148.730 124.993 273.723 103795.42 Upgraded to LVUP
from PUP at km
134642 2 109.095 91.373 200.467 74327.37 150.006 133.256 283.262 103795.42 134+638
134644 1.8 109.950 98.228 208.178 367.78 74695.15 151.155 140.693 291.848 103795.42
134649 5.2 112.419 118.034 230.453 1140.44 75835.59 154.474 162.177 316.650 1582.10 105377.51
134650 1 112.894 121.843 234.737 232.60 76068.19 155.112 166.308 321.420 319.04 105696.55
134651 1 112.059 119.693 231.752 233.25 76301.43 154.395 163.939 318.334 319.88 106016.43
134659 8 105.378 102.495 207.873 1758.50 78059.93 148.659 144.987 293.646 2447.92 108464.35
134660 1 104.543 100.345 204.888 206.38 78266.31 147.942 142.618 290.560 292.10 108756.45
134661 1 104.295 100.333 204.628 204.76 78471.07 147.637 142.580 290.217 290.39 109046.84
134670 9 102.058 100.226 202.284 1831.10 80302.17 144.892 142.241 287.133 2598.08 111644.91
Chainage Lgth Emb. - wrt Initial Profile Emb. - wrt Revised Profile
LHS RHS C/S Area Qty Cum Qty Remarks LHS RHS C/S Area Qty Cum Qty Remarks
134680 10 103.938 103.489 207.427 2048.56 82350.73 146.378 145.814 292.192 2896.63 114541.54
134690 10 103.739 102.530 206.269 2068.48 84419.21 145.956 144.659 290.615 2914.04 117455.57
134700 10 102.783 102.088 204.871 2055.70 86474.91 144.778 143.985 288.763 2896.89 120352.46
134710 10 102.042 101.728 203.770 2043.21 88518.11 143.858 143.470 287.328 2880.46 123232.92
134720 10 102.042 102.097 204.139 2039.55 90557.66 143.716 143.682 287.398 2873.63 126106.55
134730 10 102.029 102.509 204.538 2043.39 92601.04 143.441 143.946 287.387 2873.93 128980.47
134740 10 102.643 102.763 205.406 2049.72 94650.76 143.860 143.860 287.720 2875.54 131856.01
134750 10 102.621 102.186 204.807 2051.07 96701.83 143.670 143.256 286.926 2873.23 134729.24
134760 10 102.829 101.436 204.265 2045.36 98747.19 143.926 142.558 286.484 2867.05 137596.29
134770 10 106.922 101.440 208.362 2063.14 100810.32 148.142 142.023 290.165 2883.25 140479.53
134780 10 108.082 106.487 214.569 2114.66 102924.98 149.122 147.149 296.271 2932.18 143411.71
134790 10 107.463 106.038 213.501 2140.35 105065.33 148.220 146.519 294.739 2955.05 146366.76
134800 10 105.871 104.852 210.723 2121.12 107186.45 146.243 145.029 291.272 2930.06 149296.82
134810 10 104.040 103.421 207.461 2090.92 109277.37 143.879 143.182 287.061 2891.67 152188.48
134820 10 102.503 102.067 204.570 2060.16 111337.52 142.038 141.433 283.471 2852.66 155041.14
134830 10 100.916 100.539 201.455 2030.13 113367.65 140.084 139.557 279.641 2815.56 157856.70
134840 10 99.528 97.928 197.456 1994.56 115362.20 138.243 136.470 274.713 2771.77 160628.47
134850 10 98.610 95.779 194.389 1959.23 117321.43 137.009 133.886 270.895 2728.04 163356.51
134860 10 97.383 94.629 192.012 1932.01 119253.43 135.438 132.329 267.767 2693.31 166049.82
134870 10 96.037 93.263 189.300 1906.56 121159.99 133.662 130.532 264.194 2659.81 168709.63
134880 10 94.487 91.357 185.844 1875.72 123035.71 131.686 128.190 259.876 2620.35 171329.98
134890 10 93.333 89.352 182.685 1842.65 124878.36 130.167 125.718 255.885 2578.81 173908.78
134900 10 89.871 88.469 178.340 1805.13 126683.48 126.108 124.307 250.415 2531.50 176440.28
134910 10 87.443 86.192 173.635 1759.88 128443.36 123.308 121.643 244.951 2476.83 178917.11
134920 10 82.716 80.845 163.561 1685.98 130129.34 118.087 115.821 233.908 2394.30 181311.41
134930 10 79.634 79.399 159.033 1612.97 131742.31 114.292 113.962 228.254 2310.81 183622.22
134940 10 77.233 77.298 154.531 1567.82 133310.13 111.477 111.479 222.956 2256.05 185878.27
134950 10 75.965 75.504 151.469 1530.00 134840.13 109.751 109.201 218.952 2209.54 188087.81
134960 10 73.801 73.340 147.141 1493.05 136333.18 107.175 106.628 213.803 2163.78 190251.58
134970 10 71.207 71.693 142.900 1450.21 137783.38 104.125 104.606 208.731 2112.67 192364.25
134980 10 70.138 70.501 140.639 1417.70 139201.08 102.760 102.991 205.751 2072.41 194436.66
134990 10 68.117 69.037 137.154 1388.97 140590.04 100.291 101.168 201.459 2036.05 196472.71
135000 10 65.891 67.404 133.295 1352.25 141942.29 97.509 99.152 196.661 1990.60 198463.31
135010 10 64.403 64.792 129.195 1312.45 143254.74 95.726 95.971 191.697 1941.79 200405.10
135020 10 61.832 62.024 123.856 1265.26 144519.99 92.660 92.908 185.568 1886.33 202291.43
135030 10 60.769 61.211 121.980 1229.18 145749.17 91.204 91.759 182.963 1842.66 204134.08
135040 10 59.964 60.057 120.021 1210.01 146959.18 90.154 90.221 180.375 1816.69 205950.77
135050 10 58.269 57.808 116.077 1180.49 148139.67 88.113 87.643 175.756 1780.66 207731.43
135060 10 56.802 56.819 113.621 1148.49 149288.16 86.273 86.283 172.556 1741.56 209472.99
135070 10 55.412 54.180 109.592 1116.07 150404.22 84.474 83.220 167.694 1701.25 211174.24
135080 10 53.907 53.006 106.913 1082.53 151486.75 82.516 81.690 164.206 1659.50 212833.74
135090 10 52.648 52.671 105.319 1061.16 152547.91 80.674 80.919 161.593 1629.00 214462.73
135100 10 51.570 50.901 102.471 1038.95 153586.86 79.140 78.589 157.729 1596.61 216059.34
135110 10 50.956 50.703 101.659 1020.65 154607.51 77.706 77.493 155.199 1564.64 217623.98
135120 10 50.217 51.657 101.874 1017.67 155625.17 76.107 77.631 153.738 1544.69 219168.67
135130 10 50.036 51.158 101.194 1015.34 156640.51 74.677 75.827 150.504 1521.21 220689.88
135140 10 49.973 49.917 99.890 1005.42 157645.93 73.392 73.372 146.764 1486.34 222176.22
135150 10 50.864 49.216 100.080 999.85 158645.78 72.927 71.249 144.176 1454.70 223630.92
135160 10 51.751 49.744 101.495 1007.88 159653.66 72.432 70.277 142.709 1434.43 225065.34
135170 10 54.142 50.134 104.276 1028.86 160682.51 73.415 69.219 142.634 1426.72 226492.06
135180 10 53.904 50.333 104.237 1042.57 161725.08 71.731 67.978 139.709 1411.72 227903.77
135190 10 53.220 50.444 103.664 1039.51 162764.58 69.602 66.697 136.299 1380.04 229283.81
135200 10 53.516 51.765 105.281 1044.73 163809.31 68.502 66.660 135.162 1357.31 230641.12
135210 10 54.703 54.534 109.237 1072.59 164881.90 68.346 68.106 136.452 1358.07 231999.19
135220 10 55.878 55.628 111.506 1103.72 165985.61 68.156 67.830 135.986 1362.19 233361.38
135230 10 56.932 57.773 114.705 1131.06 167116.67 67.865 68.701 136.566 1362.76 234724.14
135240 10 58.527 59.233 117.760 1162.33 168278.99 68.124 68.861 136.985 1367.76 236091.89
135250 10 60.666 61.315 121.981 1198.71 169477.70 68.963 69.632 138.595 1377.90 237469.79
135260 10 62.365 62.629 124.994 1234.88 170712.57 69.322 69.612 138.934 1387.65 238857.44
135270 10 64.946 65.147 130.093 1275.44 171988.01 70.607 70.822 141.429 1401.82 240259.25
135280 10 66.521 66.769 133.290 1316.92 173304.92 70.856 71.101 141.957 1416.93 241676.18
135290 10 69.123 69.070 138.193 1357.42 174662.34 72.357 72.305 144.662 1433.10 243109.28
135300 10 71.733 71.465 143.198 1406.96 176069.29 73.832 73.556 147.388 1460.25 244569.53
135310 10 74.459 73.941 148.400 1457.99 177527.28 75.840 75.320 151.160 1492.74 246062.27
135320 10 76.838 76.722 153.560 1509.80 179037.08 77.492 77.375 154.867 1530.14 247592.40

137000 49.791 52.698 102.489 0.00 0.00 51.350 54.269 105.619 0.00 0.00
137010 10 51.681 52.427 104.108 1032.99 1032.99 53.753 54.508 108.261 1069.40 1069.40
137020 10 51.335 51.592 102.927 1035.18 2068.16 53.916 54.175 108.091 1081.76 2151.16
137030 10 51.615 51.789 103.404 1031.66 3099.82 54.835 55.009 109.844 1089.68 3240.84
137040 10 51.104 51.686 102.790 1030.97 4130.79 54.931 55.516 110.447 1101.46 4342.29
137050 10 51.903 52.827 104.730 1037.60 5168.39 56.508 57.439 113.947 1121.97 5464.26
137060 10 54.060 53.698 107.758 1062.44 6230.83 59.460 59.091 118.551 1162.49 6626.75
137070 10 54.424 54.239 108.663 1082.11 7312.93 60.694 60.502 121.196 1198.74 7825.49
137080 10 54.820 55.393 110.213 1094.38 8407.31 61.979 62.557 124.536 1228.66 9054.15
137090 10 56.601 56.948 113.549 1118.81 9526.12 64.808 65.176 129.984 1272.60 10326.75
137100 10 57.419 58.272 115.691 1146.20 10672.32 66.676 67.561 134.237 1321.11 11647.85
137110 10 58.984 59.794 118.778 1172.35 11844.67 69.458 70.308 139.766 1370.02 13017.87
137120 10 60.826 60.699 121.525 1201.52 13046.18 72.567 72.449 145.016 1423.91 14441.78
137130 10 62.698 62.534 125.232 1233.79 14279.97 75.762 75.604 151.366 1481.91 15923.69
Chainage Lgth Emb. - wrt Initial Profile Emb. - wrt Revised Profile
LHS RHS C/S Area Qty Cum Qty Remarks LHS RHS C/S Area Qty Cum Qty Remarks
137140 10 65.265 65.076 130.341 1277.87 15557.83 79.737 79.561 159.298 1553.32 17477.01
137150 10 66.714 67.535 134.249 1322.95 16880.78 82.637 83.466 166.103 1627.01 19104.01
137160 10 67.991 69.253 137.244 1357.47 18238.25 85.276 86.588 171.864 1689.84 20793.85
137170 10 70.729 71.871 142.600 1399.22 19637.47 89.508 90.655 180.163 1760.14 22553.98
137180 10 73.107 73.737 146.844 1447.22 21084.69 93.332 93.985 187.317 1837.40 24391.38
137190 10 76.029 76.333 152.362 1496.03 22580.72 97.795 98.113 195.908 1916.13 26307.51
137200 10 78.488 78.438 156.926 1546.44 24127.16 101.784 101.754 203.538 1997.23 28304.74
137210 10 81.049 80.685 161.734 1593.30 25720.46 105.916 105.528 211.444 2074.91 30379.65
137220 10 83.529 82.494 166.023 1638.79 27359.24 109.951 108.854 218.805 2151.25 32530.89
137230 10 85.029 84.308 169.337 1676.80 29036.04 112.961 112.256 225.217 2220.11 34751.00
137240 10 86.679 86.517 173.196 1712.67 30748.71 116.158 116.058 232.216 2287.17 37038.17
137250 10 88.879 88.677 177.556 1753.76 32502.47 119.967 119.848 239.815 2360.16 39398.32
137260 10 91.772 99.709 191.481 1845.19 34347.65 124.607 134.083 258.690 2492.53 41890.85
137270 10 94.859 104.014 198.873 1951.77 36299.42 129.366 140.053 269.419 2640.55 44531.39
137280 10 96.340 104.986 201.326 2001.00 38300.42 132.460 142.847 275.307 2723.63 47255.02
137290 10 98.281 98.322 196.603 1989.65 40290.06 136.130 136.403 272.533 2739.20 49994.22
137300 10 100.123 100.183 200.306 1984.55 42274.61 139.750 139.878 279.628 2760.81 52755.03
137310 10 102.022 102.377 204.399 2023.53 44298.13 143.339 143.866 287.205 2834.17 55589.19
137320 10 104.563 104.567 209.130 2067.65 46365.78 147.672 147.734 295.406 2913.06 58502.25
137327 7.2 105.976 105.932 211.908 1515.74 47881.51 150.326 150.292 300.618 2145.69 60647.93
137329 1.8 106.329 106.273 212.602 382.06 48263.57 150.989 150.932 301.921 60647.93
137330 1 106.525 106.463 212.988 48263.57 151.358 151.287 302.645 60647.93
137333 3 107.176 107.134 214.310 48263.57 PUP at km 152.564 152.485 305.049 60647.93
137337 4 108.062 108.003 216.064 48263.57 137+333 154.195 154.059 308.255 60647.93 Upgraded to LVUP
137339 1.8 108.243 108.562 216.805 389.58 48653.15 154.654 154.993 309.647 60647.93 from PUP at km
137+333
137340 1.2 108.696 108.699 217.395 260.52 48913.67 155.379 155.279 310.658 372.18 61020.12
137350 10 110.915 110.862 221.777 2195.86 51109.53 159.465 159.208 318.673 3146.66 64166.77
137360 10 112.382 113.618 226.000 2238.89 53348.42 162.596 163.920 326.516 3225.95 67392.72
137370 10 113.496 115.355 228.851 2274.26 55622.67 165.216 167.401 332.617 3295.67 70688.38
137380 10 118.877 119.327 238.204 2335.28 57957.95 172.941 173.485 346.426 3395.22 74083.60
137390 10 120.969 122.418 243.387 2407.96 60365.90 176.607 178.606 355.213 3508.20 77591.79
137400 10 122.162 123.033 245.195 2442.91 62808.81 179.777 180.954 360.731 3579.72 81171.51
137410 10 123.980 127.144 251.124 2481.60 65290.41 183.415 187.196 370.611 3656.71 84828.22
137420 10 126.641 128.453 255.094 2531.09 67821.50 188.043 190.525 378.568 3745.90 88574.12
137430 10 129.404 132.469 261.873 2584.84 70406.33 192.776 196.608 389.384 3839.76 92413.88
137440 10 132.704 134.499 267.203 2645.38 73051.71 198.206 200.611 398.817 3941.01 96354.88
137450 10 134.612 137.649 272.261 2697.32 75749.03 201.870 205.775 407.645 4032.31 100387.19
137460 10 137.931 140.823 278.754 2755.08 78504.11 207.414 211.232 418.646 4131.46 104518.65
137470 10 140.820 144.327 285.147 2819.51 81323.61 212.168 216.914 429.082 4238.64 108757.29
137480 10 143.273 147.660 290.933 2880.40 84204.01 216.941 222.681 439.622 4343.52 113100.81
137490 10 154.922 149.760 304.682 2978.08 87182.09 233.520 226.346 459.866 4497.44 117598.25
137500 10 155.285 152.607 307.892 3062.87 90244.96 235.932 231.488 467.420 4636.43 122234.68
137510 10 156.879 155.322 312.201 3100.47 93345.42 238.792 236.338 475.130 4712.75 126947.43
137520 10 159.435 158.501 317.936 3150.69 96496.11 242.616 241.863 484.479 4798.05 131745.47
137530 10 161.183 162.005 323.188 3205.62 99701.73 245.998 247.638 493.636 4890.58 136636.05
137540 10 163.709 166.549 330.258 3267.23 102968.96 250.608 254.741 505.349 4994.93 141630.97
137550 10 167.752 171.774 339.526 3348.92 106317.88 256.901 262.689 519.590 5124.70 146755.67
137560 10 170.811 176.125 346.936 3432.31 109750.19 262.298 269.452 531.750 5256.70 152012.37
137570 10 173.629 181.623 355.252 3510.94 113261.13 267.239 277.523 544.762 5382.56 157394.93
137580 10 174.547 186.752 361.299 3582.76 116843.88 269.889 285.534 555.423 5500.93 162895.85
137590 10 175.307 190.168 365.475 3633.87 120477.75 273.175 291.071 564.246 5598.35 168494.20
137600 10 179.816 193.422 373.238 3693.57 124171.32 281.518 296.460 577.978 5711.12 174205.32
137610 10 173.684 175.209 348.893 3610.66 127781.97 290.545 302.710 593.255 5856.17 180061.48
137620 10 178.408 177.259 355.667 3522.80 131304.77 298.414 309.272 607.686 6004.71 186066.19
137630 10 179.376 180.164 359.540 3576.04 134880.81 304.251 314.390 618.641 6131.64 192197.82
137640 10 178.545 181.381 359.926 3597.33 138478.14 313.245 316.973 630.218 6244.30 198442.12
137650 10 180.851 177.068 357.919 3589.23 142067.36 317.859 319.773 637.632 6339.25 204781.37
137660 10 185.323 182.866 368.189 3630.54 145697.90 319.220 323.633 642.853 6402.43 211183.79
137670 10 187.539 187.981 375.520 3718.55 149416.45 329.781 329.832 659.613 6512.33 217696.12

142500 73.740 63.700 137.440 0.00 0.00 74.882 64.783 139.665 0.00 0.00
142510 10 75.217 67.101 142.318 1398.79 1398.79 76.559 68.372 144.931 1422.98 1422.98
142520 10 77.222 63.313 140.535 1414.27 2813.06 78.765 64.773 143.538 1442.35 2865.33
142530 10 80.235 62.719 142.954 1417.45 4230.50 82.024 64.397 146.421 1449.80 4315.12
142540 10 87.494 69.196 156.690 1498.22 5728.72 89.537 71.093 160.630 1535.26 5850.38
142550 10 97.961 69.753 167.714 1622.02 7350.74 100.450 71.901 172.351 1664.91 7515.28
142560 10 66.144 29.526 95.670 1316.92 8667.66 68.574 31.560 100.134 1362.43 8877.71
142570 10 64.811 33.611 98.422 970.46 9638.12 67.548 35.906 103.454 1017.94 9895.65
142580 10 61.216 35.648 96.864 976.43 10614.55 64.210 38.192 102.402 1029.28 10924.93
142590 10 63.187 40.800 103.987 1004.26 11618.81 66.481 43.682 110.163 1062.83 11987.75
142600 10 102.427 78.054 180.481 1422.34 13041.15 106.273 81.592 187.865 1490.14 13477.89
142610 10 106.600 73.089 179.689 1800.85 14842.00 110.773 76.903 187.676 1877.71 15355.60
142620 10 110.858 69.595 180.453 1800.71 16642.71 115.357 73.571 188.928 1883.02 17238.62
142630 10 115.577 71.378 186.955 1837.04 18479.75 120.418 75.543 195.961 1924.45 19163.06
142640 10 118.638 73.560 192.198 1895.77 20375.51 123.831 77.996 201.827 1988.94 21152.00
142650 10 121.933 77.757 199.690 1959.44 22334.95 127.481 82.533 210.014 2059.21 23211.21
142660 10 125.614 80.915 206.529 2031.10 24366.05 131.513 85.956 217.469 2137.42 25348.62
142670 10 129.996 84.301 214.297 2104.13 26470.18 136.256 89.662 225.918 2216.94 27565.56
142680 10 134.497 89.850 224.347 2193.22 28663.40 141.131 95.609 236.740 2313.29 29878.85
142690 10 138.421 90.722 229.143 2267.45 30930.85 145.437 96.775 242.212 2394.76 32273.61
Chainage Lgth Emb. - wrt Initial Profile Emb. - wrt Revised Profile
LHS RHS C/S Area Qty Cum Qty Remarks LHS RHS C/S Area Qty Cum Qty Remarks
142700 10 142.437 93.797 236.234 2326.89 33257.73 149.853 100.120 249.973 2460.93 34734.53
142710 10 146.255 96.607 242.862 2395.48 35653.21 154.079 103.263 257.342 2536.58 37271.11
142720 10 149.515 98.776 248.291 2455.77 38108.98 157.717 105.766 263.483 2604.13 39875.23
142730 10 148.539 100.577 249.116 2487.04 40596.01 157.037 107.904 264.941 2642.12 42517.35
142740 10 147.184 101.360 248.544 2488.30 43084.31 156.002 109.007 265.009 2649.75 45167.10
142750 10 145.015 106.739 251.754 2501.49 45585.80 154.151 114.882 269.033 2670.21 47837.31
142760 10 139.098 110.486 249.584 2506.69 48092.49 148.507 119.382 267.889 2684.61 50521.92
142770 10 127.230 106.705 233.935 2417.60 50510.09 136.866 115.546 252.412 2601.51 53123.43
142780 10 114.793 109.194 223.987 2289.61 52799.70 124.571 118.390 242.961 2476.87 55600.29
142790 10 121.890 111.823 233.713 2288.50 55088.20 132.072 121.335 253.407 2481.84 58082.13
142800 10 159.551 117.672 277.223 2554.68 57642.88 170.641 127.566 298.207 2758.07 60840.20
142810 10 164.101 118.963 283.064 2801.44 60444.31 175.607 129.212 304.819 3015.13 63855.33
142820 10 164.957 120.901 285.858 2844.61 63288.92 176.862 131.472 308.334 3065.77 66921.10
142830 10 167.042 123.375 290.417 2881.38 66170.30 179.285 134.315 313.600 3109.67 70030.77
142840 10 170.114 123.313 293.427 2919.22 69089.52 182.711 134.478 317.189 3153.95 73184.71
142850 10 153.775 125.855 279.630 2865.29 71954.80 166.255 137.399 303.654 3104.22 76288.93
142860 10 150.866 126.191 277.057 2783.44 74738.24 163.644 137.968 301.612 3026.33 79315.26
142870 10 146.780 114.386 261.166 2691.12 77429.35 159.775 126.287 286.062 2938.37 82253.63
142880 10 147.823 112.662 260.485 2608.26 80037.61 161.240 124.820 286.060 2860.61 85114.24
142890 10 149.004 111.567 260.571 2605.28 82642.89 162.851 124.032 286.883 2864.72 87978.95
142900 10 151.665 111.466 263.131 2618.51 85261.40 165.944 124.126 290.070 2884.77 90863.72
142910 10 157.025 110.140 267.165 2651.48 87912.88 171.640 122.733 294.373 2922.22 93785.93
142920 10 159.713 111.456 271.169 2691.67 90604.55 174.623 124.257 298.880 2966.27 96752.20
142930 10 165.240 114.128 279.368 2752.69 93357.23 169.904 118.136 288.040 2934.60 99686.80
142940 10 167.402 117.138 284.540 2819.54 96176.77 161.801 112.304 274.105 2810.73 102497.52
142950 10 173.365 119.473 292.838 2886.89 99063.66 177.680 123.197 300.877 2874.91 105372.43
142960 10 188.277 121.765 310.042 3014.40 102078.06 202.862 134.365 337.227 3190.52 108562.95
142970 10 180.322 125.577 305.899 3079.71 105157.77 194.565 137.925 332.490 3348.59 111911.54
142980 10 184.899 129.502 314.401 3101.50 108259.27 198.870 141.591 340.461 3364.76 115276.29
142990 10 188.643 133.064 321.707 3180.54 111439.81 202.247 144.886 347.133 3437.97 118714.26
143000 10 200.889 139.378 340.267 3309.87 114749.68 214.456 151.070 365.526 3563.30 122277.56
143010 10 200.572 141.335 341.907 3410.87 118160.55 213.703 152.762 366.465 3659.96 125937.51
143020 10 200.863 144.190 345.053 3434.80 121595.35 213.584 155.293 368.877 3676.71 129614.22
143030 10 203.043 146.425 349.468 3472.61 125067.95 215.398 157.171 372.569 3707.23 133321.45
143040 10 203.931 148.939 352.870 3511.69 128579.64 215.911 159.359 375.270 3739.20 137060.65
143050 10 205.944 145.517 351.461 3521.66 132101.30 217.563 155.524 373.087 3741.79 140802.43
143057 7.05 207.113 145.103 352.216 2480.46 134581.76 218.468 154.858 373.325 2631.10 143433.53
143060 2.95 207.602 144.930 352.532 1039.50 135621.26 218.846 154.579 373.425 143433.53
143061 0.95 207.923 145.165 353.088 335.17 135956.43 219.133 154.781 373.915 143433.53
143063 2.05 208.617 145.671 354.287 135956.43 PUP at km 219.754 155.218 374.971 143433.53 Upgraded to LVUP
143065 2 209.293 146.165 355.458 135956.43 143+065 220.359 155.644 376.002 143433.53 from PUP at km
143+063
143068.95 3.95 210.629 147.140 357.769 135956.43 221.553 156.484 378.038 143433.53
143069.05 0.1 210.663 147.164 357.827 135956.43 221.584 156.506 378.089 37.81 143471.34
143070 0.95 210.984 147.399 358.383 340.20 136296.63 221.871 156.708 378.579 359.42 143830.76
143080 10 215.691 150.516 366.207 3622.95 139919.58 226.203 159.473 385.676 3821.28 147652.03
143090 10 217.203 154.232 371.435 3688.21 143607.79 227.329 162.953 390.282 3879.79 151531.82
143100 10 218.716 163.832 382.548 3769.92 147377.70 228.451 172.404 400.855 3955.69 155487.51
143110 10 220.429 164.096 384.525 3835.37 151213.07 229.741 172.271 402.012 4014.34 159501.84
143120 10 222.985 166.364 389.349 3869.37 155082.44 231.888 174.176 406.064 4040.38 163542.22
143130 10 224.880 167.857 392.737 3910.43 158992.87 233.418 175.326 408.744 4074.04 167616.26
143140 10 228.259 168.492 396.751 3947.44 162940.31 236.379 175.570 411.949 4103.47 171719.73
143150 10 232.999 173.144 406.143 4014.47 166954.78 240.692 179.869 420.561 4162.55 175882.28
143160 10 237.697 178.799 416.496 4113.20 171067.97 244.980 185.198 430.178 4253.70 180135.97
143170 10 240.020 180.984 421.004 4187.50 175255.47 246.896 187.040 433.936 4320.57 184456.54
143180 10 241.017 183.134 424.151 4225.78 179481.25 247.442 188.806 436.248 4350.92 188807.46
143190 10 241.750 184.396 426.146 4251.49 183732.73 247.722 189.676 437.398 4368.23 193175.69
143200 10 238.017 185.777 423.794 4249.70 187982.43 243.460 190.636 434.096 4357.47 197533.16
143210 10 235.147 187.262 422.409 4231.02 192213.45 240.094 191.737 431.831 4329.64 201862.80
143220 10 240.647 188.616 429.263 4258.36 196471.81 245.184 192.695 437.879 4348.55 206211.35
143230 10 236.271 187.899 424.170 4267.17 200738.97 240.293 191.532 431.825 4348.52 210559.87
143240 10 233.346 189.144 422.490 4233.30 204972.27 236.888 192.378 429.266 4305.46 214865.32
143250 10 231.082 192.339 423.421 4229.56 209201.83 234.164 195.178 429.342 4293.04 219158.36
143260 10 229.039 195.461 424.500 4239.61 213441.43 231.662 197.899 429.561 4294.52 223452.88
143270 10 227.489 195.693 423.182 4238.41 217679.84 229.615 197.679 427.294 4284.28 227737.15
143280 10 225.050 195.154 420.204 4216.93 221896.77 226.686 196.683 423.369 4253.32 231990.47
143290 10 222.920 197.981 420.901 4205.53 226102.30 224.102 199.098 423.200 4232.85 236223.31
143300 10 220.173 200.065 420.238 4205.70 230307.99 220.870 200.731 421.601 4224.01 240447.32

152560 43.770 43.701 87.471 0.00 0.00 44.880 44.809 89.689 0.00 0.00
152570 10 44.536 44.461 88.997 882.34 882.34 45.943 45.870 91.813 907.51 907.51
152580 10 45.170 45.500 90.670 898.34 1780.68 46.880 47.212 94.092 929.53 1837.04
152590 10 46.142 46.009 92.151 914.11 2694.78 48.183 48.048 96.231 951.62 2788.65
152600 10 46.941 46.785 93.726 929.39 3624.17 49.286 49.131 98.417 973.24 3761.89
152610 10 46.933 47.782 94.715 942.21 4566.37 49.604 50.459 100.063 992.40 4754.29
152620 10 47.560 48.163 95.723 952.19 5518.56 50.539 51.147 101.686 1008.75 5763.04
152630 10 48.793 49.379 98.172 969.48 6488.04 52.134 52.730 104.864 1032.75 6795.79
152640 10 49.426 50.138 99.564 988.68 7476.72 53.130 53.851 106.981 1059.23 7855.01
152650 10 50.010 50.385 100.395 999.80 8476.51 54.254 54.635 108.889 1079.35 8934.36
152660 10 51.087 51.323 102.410 1014.03 9490.54 55.852 56.096 111.948 1104.19 10038.55
152670 10 51.808 52.302 104.110 1032.60 10523.14 57.288 57.771 115.059 1135.04 11173.58
Chainage Lgth Emb. - wrt Initial Profile Emb. - wrt Revised Profile
LHS RHS C/S Area Qty Cum Qty Remarks LHS RHS C/S Area Qty Cum Qty Remarks
152680 10 52.213 52.446 104.659 1043.85 11566.98 58.395 58.610 117.005 1160.32 12333.90
152690 10 52.742 52.650 105.392 1050.26 12617.24 59.816 59.701 119.517 1182.61 13516.51
152700 10 53.367 53.236 106.603 1059.98 13677.21 61.305 61.149 122.454 1209.86 14726.37
152710 10 53.651 53.414 107.065 1068.34 14745.55 62.645 62.388 125.033 1237.44 15963.80
152720 10 53.876 53.948 107.824 1074.45 15820.00 63.930 63.992 127.922 1264.78 17228.58
152730 10 54.184 54.391 108.575 1082.00 16901.99 65.461 65.662 131.123 1295.23 18523.80
152740 10 53.628 54.518 108.146 1083.61 17985.60 66.124 67.025 133.149 1321.36 19845.16
152750 10 55.403 55.612 111.015 1095.81 19081.40 69.344 69.573 138.917 1360.33 21205.49
152760 10 54.878 55.558 110.436 1107.26 20188.66 70.201 70.911 141.112 1400.15 22605.64
152770 10 54.540 54.923 109.463 1099.50 21288.15 71.427 71.839 143.266 1421.89 24027.53
152780 10 54.405 54.457 108.862 1091.63 22379.78 72.868 72.931 145.799 1445.33 25472.85
152790 10 53.801 52.866 106.667 1077.65 23457.42 74.007 73.028 147.035 1464.17 26937.02
152800 10 53.162 52.458 105.620 1061.44 24518.86 75.110 74.432 149.542 1482.89 28419.91
152810 10 52.564 52.724 105.288 1054.54 25573.40 76.420 76.732 153.152 1513.47 29933.38
152820 10 52.011 52.706 104.717 1050.03 26623.42 77.789 78.695 156.484 1548.18 31481.56
152830 10 50.962 51.508 102.470 1035.94 27659.36 78.796 79.445 158.241 1573.63 33055.18
152840 10 50.222 50.632 100.854 1016.62 28675.98 80.094 80.633 160.727 1594.84 34650.02
152850 10 48.956 50.127 99.083 999.69 29675.66 80.895 82.202 163.097 1619.12 36269.14
152860 10 48.438 49.501 97.939 985.11 30660.77 82.469 83.590 166.059 1645.78 37914.92
152870 10 47.681 48.659 96.340 971.40 31632.17 83.700 84.891 168.591 1673.25 39588.17
152880 10 46.949 47.648 94.597 954.69 32586.85 84.942 85.911 170.853 1697.22 41285.39
152890 10 46.054 46.674 92.728 936.63 33523.48 86.334 87.010 173.344 1720.99 43006.38
152900 10 45.611 46.051 91.662 921.95 34445.43 87.823 88.353 176.176 1747.60 44753.98
152910 10 44.801 44.885 89.686 906.74 35352.17 89.043 89.305 178.348 1772.62 46526.60
152920 10 44.428 44.970 89.398 895.42 36247.59 90.805 91.447 182.252 1803.00 48329.60
152930 10 43.828 44.033 87.861 886.30 37133.88 92.367 92.717 185.084 1836.68 50166.28
152940 10 43.192 43.685 86.877 873.69 38007.57 93.820 94.459 188.279 1866.82 52033.09
152950 10 43.190 43.780 86.970 869.24 38876.81 96.052 96.663 192.715 1904.97 53938.06
152960 10 42.612 43.020 85.632 863.01 39739.82 97.518 98.042 195.560 1941.38 55879.44
152970 10 41.955 42.299 84.254 849.43 40589.25 99.032 99.474 198.506 1970.33 57849.77
152980 10 41.273 41.111 82.384 833.19 41422.44 100.401 100.198 200.599 1995.53 59845.29
152990 10 40.306 41.164 81.470 819.27 42241.71 101.388 102.258 203.646 2021.23 61866.52
153000 10 40.293 40.291 80.584 810.27 43051.98 103.076 103.408 206.484 2050.65 63917.17
153010 10 40.194 40.332 80.526 805.55 43857.53 105.111 105.065 210.176 2083.30 66000.47
153020 10 41.159 41.434 82.593 815.60 44673.12 108.090 108.429 216.519 2133.48 68133.94
153030 10 41.378 41.402 82.780 826.87 45499.99 109.743 109.811 219.554 2180.37 70314.31
153040 10 41.359 41.761 83.120 829.50 46329.49 111.138 111.446 222.584 2210.69 72525.00
153050 10 41.380 41.501 82.881 830.01 47159.49 112.251 112.380 224.631 2236.08 74761.07
153060 10 41.963 42.456 84.419 836.50 47995.99 113.925 114.515 228.440 2265.36 77026.43
153070 10 42.730 42.768 85.498 849.59 48845.58 115.652 115.716 231.368 2299.04 79325.47
153080 10 43.573 43.359 86.932 862.15 49707.73 117.381 117.180 234.561 2329.65 81655.11
153090 10 43.768 44.495 88.263 875.98 50583.70 118.204 119.079 237.283 2359.22 84014.33
153100 10 45.134 45.341 90.475 893.69 51477.39 120.344 120.625 240.969 2391.26 86405.59
153110 10 46.159 45.615 91.774 911.25 52388.64 122.167 121.570 243.737 2423.53 88829.12
153120 10 47.440 47.376 94.816 932.95 53321.59 124.319 124.270 248.589 2461.63 91290.75
153130 10 48.228 48.358 96.586 957.01 54278.60 125.631 125.726 251.357 2499.73 93790.48
153140 10 49.008 48.933 97.941 972.64 55251.23 126.964 126.902 253.866 2526.12 96316.60
153150 10 49.778 49.653 99.431 986.86 56238.09 128.048 127.864 255.912 2548.89 98865.49
153160 10 50.468 46.629 97.097 982.64 57220.73 129.038 124.269 253.307 2546.10 101411.58
153170 10 51.502 48.738 100.240 986.69 58207.42 130.240 126.714 256.954 2551.31 103962.89
153180 10 52.463 48.418 100.881 1005.61 59213.02 131.039 126.413 257.452 2572.03 106534.92
153190 10 48.683 48.513 97.196 990.39 60203.41 126.707 126.600 253.307 2553.80 109088.71
153200 10 49.352 49.233 98.585 978.91 61182.31 127.308 127.244 254.552 2539.30 111628.01
153210 10 49.762 49.897 99.659 991.22 62173.53 127.659 127.878 255.537 2550.45 114178.45
153220 10 50.429 50.294 100.723 1001.91 63175.44 128.328 128.300 256.628 2560.83 116739.28
153230 10 50.538 51.449 101.987 1013.55 64188.99 128.348 129.612 257.960 2572.94 119312.22
153240 10 50.989 51.940 102.929 1024.58 65213.57 128.822 130.011 258.833 2583.97 121896.18
153250 10 51.056 52.313 103.369 1031.49 66245.06 128.797 130.497 259.294 2590.64 124486.82
153260 10 52.613 54.025 106.638 1050.04 67295.10 130.396 132.149 262.545 2609.20 127096.01
153270 10 52.204 53.438 105.642 1061.40 68356.50 129.845 131.476 261.321 2619.33 129715.34
153280 10 52.230 53.111 105.341 1054.92 69411.41 129.810 130.831 260.641 2609.81 132325.15
153290 10 51.596 53.000 104.596 1049.69 70461.10 129.225 130.645 259.870 2602.56 134927.71
153300 10 51.263 52.568 103.831 1042.14 71503.23 128.713 130.147 258.860 2593.65 137521.36
153310 10 50.449 50.699 101.148 1024.90 72528.13 127.684 127.931 255.615 2572.38 140093.73
153310.2 0.2 50.422 50.650 101.072 20.22 72548.35 127.660 127.873 255.533 51.12 140144.85
153316 5.8 49.643 49.231 98.873 579.84 73128.19 126.970 126.193 253.163 140144.85 Add'nl LVUP at km
153320 4 49.105 48.252 97.357 392.46 73520.65 126.494 125.034 251.528 140144.85 153+316
153322 1.8 49.447 48.332 97.779 175.62 73696.27 126.789 125.039 251.828 140144.85
153330 8.2 51.006 48.695 99.701 809.67 74505.94 128.134 125.063 253.197 2070.60 142215.45
153340 10 48.935 47.040 95.975 978.38 75484.32 125.772 123.302 249.074 2511.36 144726.80
153350 10 49.070 46.552 95.622 957.99 76442.31 125.743 122.240 247.983 2485.29 147212.09
153360 10 48.853 45.831 94.684 951.53 77393.84 125.187 121.146 246.333 2471.58 149683.67
153370 10 47.575 45.021 92.596 936.40 78330.24 123.416 119.924 243.340 2448.37 152132.03
153380 10 47.260 44.847 92.107 923.52 79253.75 122.592 119.331 241.923 2426.32 154558.35
153390 10 47.119 44.452 91.571 918.39 80172.14 121.672 118.194 239.866 2408.95 156967.29
153400 10 46.278 44.214 90.492 910.32 81082.46 120.232 117.307 237.539 2387.03 159354.32
153410 10 44.974 44.238 89.212 898.52 81980.98 117.745 116.454 234.199 2358.69 161713.01
153420 10 43.717 42.549 86.266 877.39 82858.37 115.325 113.667 228.992 2315.96 164028.96
153430 10 43.901 42.951 86.852 865.59 83723.96 114.256 112.907 227.163 2280.78 166309.74
153440 10 44.675 42.477 87.152 870.02 84593.98 113.750 110.719 224.469 2258.16 168567.90
Chainage Lgth Emb. - wrt Initial Profile Emb. - wrt Revised Profile
LHS RHS C/S Area Qty Cum Qty Remarks LHS RHS C/S Area Qty Cum Qty Remarks
153450 10 44.034 42.995 87.029 870.91 85464.88 111.103 109.764 220.867 2226.68 170794.58
153460 10 39.805 42.117 81.922 844.76 86309.64 104.935 107.316 212.251 2165.59 172960.17
153470 10 42.519 42.312 84.831 833.77 87143.40 105.235 105.095 210.330 2112.91 175073.07
153480 10 41.850 42.445 84.295 845.63 87989.03 102.187 102.914 205.101 2077.16 177150.23
153490 10 42.131 43.054 85.185 847.40 88836.43 99.915 100.640 200.555 2028.28 179178.51
153500 10 42.677 43.345 86.022 856.04 89692.47 98.170 98.577 196.747 1986.51 181165.02
153510 10 44.176 43.655 87.831 869.27 90561.73 96.484 95.912 192.396 1945.72 183110.73
153520 10 46.314 44.252 90.566 891.99 91453.72 95.908 93.512 189.420 1909.08 185019.81
153530 10 47.638 44.628 92.266 914.16 92367.88 94.101 90.681 184.782 1871.01 186890.82
153540 10 48.716 46.714 95.430 938.48 93306.36 91.915 89.720 181.635 1832.09 188722.91
153550 10 49.546 47.020 96.566 959.98 94266.34 89.269 86.568 175.837 1787.36 190510.27
153560 10 45.139 47.893 93.032 947.99 95214.33 80.764 83.913 164.677 1702.57 192212.84
153570 10 46.178 48.748 94.926 939.79 96154.12 78.249 81.125 159.374 1620.26 193833.09
153580 10 50.909 49.602 100.511 977.19 97131.30 79.895 78.329 158.224 1587.99 195421.08
153590 10 52.322 50.051 102.373 1014.42 98145.72 77.869 75.363 153.232 1557.28 196978.36
153600 10 52.193 50.994 103.187 1027.80 99173.52 74.193 72.930 147.123 1501.78 198480.14
153610 10 53.641 53.247 106.888 1050.38 100223.90 72.693 72.111 144.804 1459.64 199939.77
153620 10 55.558 54.216 109.774 1083.31 101307.21 71.623 70.126 141.749 1432.77 201372.54
153630 10 57.764 57.138 114.902 1123.38 102430.59 71.264 70.570 141.834 1417.92 202790.45
153640 10 59.953 60.092 120.045 1174.74 103605.32 70.840 70.965 141.805 1418.20 204208.65
153650 10 61.939 61.971 123.910 1219.78 104825.10 70.640 70.648 141.288 1415.47 205624.11
153660 10 64.570 64.423 128.993 1264.52 106089.61 71.071 70.938 142.009 1416.49 207040.60
153670 10 68.132 67.902 136.034 1325.14 107414.75 73.021 72.776 145.797 1439.03 208479.63
153680 10 70.416 70.602 141.018 1385.26 108800.01 73.620 73.822 147.442 1466.20 209945.82
153690 10 73.132 72.527 145.659 1433.39 110233.39 75.252 74.648 149.900 1486.71 211432.53
153700 10 74.325 74.606 148.931 1472.95 111706.34 75.377 75.658 151.035 1504.68 212937.21

162150 55.229 75.063 130.292 0.00 0.00 124.587 150.638 275.225 0.00 0.00
162160 10 62.131 81.181 143.312 1368.02 1368.02 133.657 157.969 291.626 2834.26 2834.26
162170 10 69.239 87.655 156.894 1501.03 2869.05 142.977 165.801 308.778 3002.02 5836.28
162180 10 77.120 92.808 169.928 1634.11 4503.16 153.070 172.329 325.399 3170.89 9007.16
162190 10 86.862 97.014 183.876 1769.02 6272.18 165.090 177.794 342.884 3341.42 12348.58
162200 10 95.084 150.004 245.088 2144.82 8417.00 174.739 241.911 416.650 3797.67 16146.25
162210 10 100.218 151.146 251.364 2482.26 10899.26 181.110 243.912 425.022 4208.36 20354.61
162220 10 105.684 156.527 262.211 2567.88 13467.14 188.015 250.562 438.577 4318.00 24672.60
162230 10 108.975 153.560 262.535 2623.73 16090.87 193.784 247.853 441.637 4401.07 29073.67
162240 10 112.613 153.538 266.151 2643.43 18734.30 199.147 247.969 447.116 4443.77 33517.44
162250 10 120.924 155.903 276.827 2714.89 21449.19 208.989 251.067 460.056 4535.86 38053.30
162260 10 148.395 158.816 307.211 2920.19 24369.38 241.634 254.162 495.796 4779.26 42832.56
162270 10 149.150 159.407 308.557 3078.84 27448.22 242.140 254.855 496.995 4963.96 47796.51
162280 10 149.728 161.278 311.006 3097.82 30546.03 242.941 256.891 499.832 4984.14 52780.65
162290 10 149.906 161.329 311.235 3111.21 33657.24 242.685 256.371 499.056 4994.44 57775.09
162300 10 145.105 154.330 299.435 3053.35 36710.59 237.395 249.028 486.423 4927.40 62702.48
162310 10 146.514 158.929 305.443 3024.39 39734.98 238.085 253.027 491.112 4887.68 67590.16
162320 10 146.931 162.156 309.087 3072.65 42807.63 237.103 257.209 494.312 4927.12 72517.28
162330 10 138.711 163.598 302.309 3056.98 45864.61 226.580 258.303 484.883 4895.98 77413.25
162340 10 133.185 164.507 297.692 3000.01 48864.61 218.648 258.774 477.422 4811.53 82224.78
162350 10 122.435 159.885 282.320 2900.06 51764.67 205.437 253.491 458.928 4681.75 86906.53
162360 10 110.447 151.464 261.911 2721.16 54485.83 191.239 244.239 435.478 4472.03 91378.56
162370 10 99.423 141.892 241.315 2516.13 57001.96 177.917 233.614 411.531 4235.05 95613.60
162376 5.9 101.286 142.832 244.118 1432.03 58433.98 179.744 233.884 413.628 2434.22 98047.82
162380 4.1 102.581 143.485 246.066 1004.88 59438.86 181.014 234.072 415.086 98047.82
162382 2 102.786 143.874 246.660 492.73 59931.59 181.067 233.548 414.615 98047.82 Add'nl LVUP at km
162388 6.1 103.411 145.062 248.473 1510.16 61441.74 181.230 231.948 413.178 98047.82 162+382
162390 1.9 103.606 145.432 249.038 472.64 61914.38 181.281 231.450 412.731 784.61 98832.43
162394 4 105.305 154.082 259.387 1016.85 62931.23 182.821 241.410 424.231 1673.92 100506.36
162400 6 107.854 167.057 274.911 1602.90 64534.13 185.132 256.349 441.481 2597.14 103103.49
162406 6 107.909 168.569 276.478 1654.17 66188.29 184.960 257.356 442.316 2651.39 105754.88
162410 4 107.945 169.577 277.522 1108.00 67296.29 184.845 258.027 442.872 1770.38 107525.26
162420 10 109.123 168.711 277.834 2776.78 70073.07 184.141 255.770 439.911 4413.92 111939.17
162430 10 114.559 167.738 282.297 2800.66 72873.73 189.984 252.962 442.946 4414.29 116353.46
162440 10 119.520 167.876 287.396 2848.47 75722.19 195.198 251.878 447.076 4450.11 120803.57
162450 10 129.978 168.255 298.233 2928.15 78650.34 205.346 250.413 455.759 4514.18 125317.74
162460 10 139.612 164.529 304.141 3011.87 81662.21 215.614 245.201 460.815 4582.87 129900.61
162470 10 145.213 161.298 306.511 3053.26 84715.47 219.790 238.970 458.760 4597.88 134498.49
162480 10 146.631 160.228 306.859 3066.85 87782.32 219.577 236.105 455.682 4572.21 139070.70
162490 10 146.606 153.539 300.145 3035.02 90817.34 218.564 226.235 444.799 4502.41 143573.10
162500 10 153.618 149.322 302.940 3015.43 93832.76 224.310 219.728 444.038 4444.19 148017.29
162510 10 148.596 143.788 292.384 2976.62 96809.38 217.105 211.442 428.547 4362.93 152380.21
162520 10 145.351 140.774 286.125 2892.55 99701.93 211.994 205.757 417.751 4231.49 156611.70
162530 10 142.802 137.467 280.269 2831.97 102533.90 206.828 199.399 406.227 4119.89 160731.59
162540 10 140.207 133.594 273.801 2770.35 105304.25 202.026 193.144 395.170 4006.99 164738.58
162550 10 133.781 128.962 262.743 2682.72 107986.97 192.188 185.881 378.069 3866.20 168604.77
162560 10 123.556 120.057 243.613 2531.78 110518.75 179.525 173.571 353.096 3655.83 172260.60
162570 10 122.648 117.141 239.789 2417.01 112935.76 176.366 168.477 344.843 3489.70 175750.29
162580 10 122.315 113.876 236.191 2379.90 115315.66 173.708 162.591 336.299 3405.71 179156.00
162590 10 121.343 113.803 235.146 2356.69 117672.34 169.824 159.845 329.669 3329.84 182485.84
162600 10 121.500 114.156 235.656 2354.01 120026.35 167.662 157.847 325.509 3275.89 185761.73
162610 10 123.925 114.962 238.887 2372.72 122399.07 167.454 156.166 323.620 3245.65 189007.38
162620 10 129.288 116.544 245.832 2423.60 124822.66 170.373 155.355 325.728 3246.74 192254.12
Chainage Lgth Emb. - wrt Initial Profile Emb. - wrt Revised Profile
LHS RHS C/S Area Qty Cum Qty Remarks LHS RHS C/S Area Qty Cum Qty Remarks
162630 10 131.885 118.161 250.046 2479.39 127302.05 170.176 154.305 324.481 3251.05 195505.16
162640 10 132.324 120.506 252.830 2514.38 129816.43 167.566 154.379 321.945 3232.13 198737.29
162650 10 130.629 122.770 253.399 2531.15 132347.58 162.787 154.015 316.802 3193.74 201931.03
162660 10 131.186 124.144 255.330 2543.65 134891.22 160.727 152.670 313.397 3151.00 205082.02
162670 10 127.869 124.412 252.281 2538.06 137429.28 154.673 150.366 305.039 3092.18 208174.20
162680 10 131.624 123.544 255.168 2537.25 139966.52 155.619 146.780 302.399 3037.19 211211.39
162690 10 128.707 123.770 252.477 2538.23 142504.75 150.178 144.710 294.888 2986.44 214197.83
162700 10 130.804 123.393 254.197 2533.37 145038.12 149.810 141.875 291.685 2932.87 217130.69
162710 10 129.433 124.420 253.853 2540.25 147578.37 146.084 140.620 286.704 2891.95 220022.64
162720 10 121.093 125.970 247.063 2504.58 150082.95 135.123 140.020 275.143 2809.24 222831.87
162730 10 117.919 116.855 234.774 2409.19 152492.13 130.016 128.852 258.868 2670.06 225501.93
162740 10 118.732 116.126 234.858 2348.16 154840.29 128.853 126.136 254.989 2569.29 228071.21
162750 10 112.078 115.049 227.127 2309.93 157150.22 120.225 123.301 243.526 2492.58 230563.79
162760 10 108.797 112.484 221.281 2242.04 159392.26 115.198 118.990 234.188 2388.57 232952.36
162770 10 109.262 111.962 221.224 2212.53 161604.78 114.165 116.930 231.095 2326.42 235278.77
162780 10 105.629 111.614 217.243 2192.34 163797.12 109.030 115.052 224.082 2275.89 237554.66
162790 10 93.701 92.013 185.714 2014.79 165811.90 95.763 94.083 189.846 2069.64 239624.30
COS New Plan & Profile
Height EMB Top Bottom Area
Chainage OGL FRL Diff Crust Avg Area Length Quanatity
(-Crust) width Width ( SQM)
100 97.157 103.624 6.467 0.405 6.062 15.12 37.368 159.091
120 97.17 103.744 6.574 0.405 6.169 15.12 37.796 163.219 161.155 20 3223.105
140 97.188 103.884 6.696 0.405 6.291 15.12 38.284 167.982 165.601 20 3312.017
160 97.208 104.012 6.804 0.405 6.399 15.12 38.716 172.248 170.115 20 3402.306
180 97.154 104.122 6.968 0.405 6.563 15.12 39.372 178.815 175.532 20 3510.638
200 97.177 104.213 7.036 0.405 6.631 15.12 39.644 181.570 180.193 20 3603.855
220 97.122 104.287 7.165 0.405 6.76 15.12 40.160 186.846 184.208 20 3684.164
240 97.144 104.342 7.198 0.405 6.793 15.12 40.292 188.207 187.527 20 3750.533
260 97.149 104.379 7.23 0.405 6.825 15.12 40.420 189.530 188.869 20 3777.371
280 97.317 104.397 7.08 0.405 6.675 15.12 39.820 183.362 186.446 20 3728.925
300 97.354 104.397 7.043 0.405 6.638 15.12 39.672 181.855 182.608 20 3652.169
320 97.956 104.379 6.423 0.405 6.018 15.12 37.192 157.407 169.631 20 3392.615
340 97.378 104.343 6.965 0.405 6.56 15.12 39.360 178.694 168.051 20 3361.012
360 97.398 104.288 6.89 0.405 6.485 15.12 39.060 175.679 177.187 20 3543.731
380 97.331 104.215 6.884 0.405 6.479 15.12 39.036 175.438 175.559 20 3511.170
400 97.267 104.124 6.857 0.405 6.452 15.12 38.928 174.359 174.899 20 3497.972
420 97.208 104.015 6.807 0.405 6.402 15.12 38.728 172.367 173.363 20 3467.263
440 97.244 103.887 6.643 0.405 6.238 15.12 38.072 165.906 169.137 20 3382.733
460 97.258 103.741 6.483 0.405 6.078 15.12 37.432 159.706 162.806 20 3256.114
480 97.293 103.581 6.288 0.405 5.883 15.12 36.652 152.287 155.996 20 3119.929
487.491 97.307 103.52 6.213 0.405 5.808 15.12 36.352 149.475 150.881 7.491 1130.250
Total 67,307.87
UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Development purvanchal expressway (Package-IV) from Sidhi Ganeshpur (Distt-Sultanpur) to Sansarpur (Distt-Sultanpur From KM. 121+600 To 164+300) in the state of Uttar Pradesh on EPC basis.

Client:-UTTAR PRADESH EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY Authority Engineer :- Egis International S A in JV with EGIS India Consulting & Engineers Pvt. Ltd.
BAR BENDING SCHEDULE

EPC Contractor:- GR Infra Projects Ltd. Structure:LVUP @ KM 134+638 BHS Name of component:Crash Barrier

Dimensions of Bar Weight

Bend
Bar Spacing No. of Cutting length
SN Description Dia Shap of the bar Unit Wt. Kg/m Total Wt. Kg. Remarks
Mark (mm) bars (m)
a b c d 8mm 10mm 12mm 16mm 20mm 25mm 28mm 32mm
a

d
Crash Barrier b
1 1 12 150 4x77& 4x10 348 75 1610 500 1105 3 3.218 0.888 994.439 994.439
main bar

Crash Barrier
2 2 12 150 b 4x77 & 4x10 348 300 565 655 500 2 1.972 0.888 609.395 619.604
main bar
c
d

Distribution bar
3 3 10 4x2x7= 56 11450 0 0 0 0 13.550 0.617 468.180 266.050
(slab part)
a

Distribution bar
4 10 4x2x7= 56 1400 0 0.0 0.0 0.0 1.400 0.617 48.373
(median part)
a

2120.387 266.050 1614.043