General Supervisor (Civil , Installation Electrical , Maintenance and


Steel Structure ) (QA/QC ) (Coordinator project )(Team leader)
HAMDY ABDALAZIZ
OBJECTIVE :- To secure a challenging position in a reputable
organization to expand my learnings, knowledge, and skills.
Secure a responsible career opportunity to fully utilize my training and
skills, while making a significant contribution to th success of th company
My experiences

2015 at now
CONTACT Designation :superintendent steel structure (fabrication -
Erection)
Address: Project :Shuqaiq independent water project.
Mount Bisan - Cortoba ● Permit receives certified in site check all perucation safety.
District - Riyadh
● Lifting plan supervisor. Calculate all required weight for
Phone:
+966583376350 lifting.
● Reading good for all drowning before starting activities.
Email: ● Handle with customer the priority work indeed.
hamdysuadi2015@gmail. ● Manpower arring, and all tools using for activities.
com ● Supervising for all installation, erection steel structure.
LANGUAGES ● Inspection for all members as per drowning in right location
as per drawing.
● Confirmed for work in safety situations good.
ARABIC ● Mak roprot for progress and next type and indeed for
ENGLISH activities
ARDO
EDUCATION Designation:- general installation supervisor
Qualifications and Project:- RIYHAD METRO PROJECT(ALSTOM ) Line 5 , 6
courses :- Primary • FIELD INSTALLATION.
education - Secondary • Providing project management / Site Manager site status reports
education • Manages routine installations, testing site meetings and monitors
-Quality control Diploma subordinate workloads to maximize performance
• Immediately inform management of any observed hazards, injuries or
- Diploma of land
dangerous occurrences, which become apparent during work
Surveyor and AutoCAD -
Maintenance Planning
• Use all equipment provided safely in materials, plant or processes and of
&Scheduling any new materials, plant or processes which become apparent in the
course of work dat may impact on safety or the environment
With over 12+Years of • Work closely with the Construction Supervision Consultant, Contractors,
experience in vendors, and suppliers in resolution of site-related problems and to ensure
1- INSTALLATION that identified deficiencies are repaired and update as to actual site
SUPERVISOR condition
2- Electrical activities
(Cables pulling - Erection 2016 at 2018
panels –Installation bus Designation : superintendent, Team leader
bar duct- Leader Tray and Project:- Power Plan Hall .
Fabrication - Termination
_SS ) ❖ Handle many different areas of home or business repair, such as
plumbing, electricity, ventilation, air conditioning, and other
3- Civil works- Steel building systems.
structure (Fabrication -
Erection - Welding and ❖ Responsible for evaluating problematic systems and determining
paint – Maintenance metal what repairs need to be performed.
structures) ❖ Supervising also in charge of hiring workers, and assigning duties
3- Surveying work and provide training on equipment and procedures used in a
building or complex.
5-Calculation of quantities
❖ Moreover, additional my duties include developing and
6-Quality control implementing maintenance procedures and keeping personnel
7-Materials inspection records.
8- Safety orientation ❖ My duties maintenance inventory and training costs. Supervising
may also be in charge of evaluations and accident investigations, as
9 -have good practical in
AutoCAD and MS Office
well as filing reports.

10-Logistics Management Project:- PE 134 (Construction of 380 VK Double Circuit OHTL from
SAFETY TRAINGINGS :- RABIG – IPP2 to Gantry – 1 close to ADIL BSP. Substation and
Transmission line ( SEC ) – PE 154 Tabuk 2 Circuit transmission line
Safety induction
orientation and underground cable( SEC)
FIELD CIVIL AND STEEL STRUCTURE SUPERINTENDENT
Crane safety &basic Key Skills : concert works –construction concert piles- access road work
rigging / lifting – Surveying work – tower line – substation, underground cable
Electrical safety
Work at height Responsibilities:-
● Preparing all Civil Activities (manpower – materials– steel
Track safety
workshop- finishing work) #
LSPIC-Lead site person in ● Site Supervision for activities worker company and subcontractor
charge activities. #
PICOW-Person in charge ● Site Coordination for Equipment, Manpower and Materials
of machine Deliveries.
● Supervising in all works for subcontractor and coordination.
● Action needs to purchase applications.
● DO report weekly work for the achievements and the remaining
business.
Organization : GS Engineering & Construction(Korea
Company) 2010 up to 2015
● Project :- Egyptian Refining Company
Location : Motored -Egypt
● Designation : STEEL STRUCTURAL Superintendent
(FABRICATION – ERETION)
Key Skills: Fabrication and Erection of structural steel,
Equipment Erection, piping fabrication and Erection.
Responsibilities:-
● Coordinate with sub-contracting companies (Acrosome –bane
Hassan All am sons) in the supply business.
● Supervising the work of manufacturing, installing and paints
according to the specifications of the project.
● Fabrication & Erection of heavy steel structure, piping
(Pipeline). Studying drawing, plans and parameters
● Follow-up in surface preparation of raw steel including sand
blasting& painting, Marking and shape and other measurement
on metal,
● Coordination with QMD personal for inspection and testing,
Scheduling ,
● Coordination with vendors on continuous quality improvement.
of fabrication work,
● Supervision of site activities, Creation and updating of
production formats,
● Making toolbox meetings with worker and Staff of Contractor
s to keep awareness about Safety for Safe Work at Site.
Contractor billing, material reconciliation
● Always try to complete work in schedule period.
Familiar with welding process,
● NDT & materials .Familiar with WPS, PQR, Welder
Qualifications

Organization : international company for engineering &construction( inceco)


(Egypt)
● Designation :- Director Steel structure (fabrication – erection )

● Project : MANY FACTORIES (Heater factory (600) ton Steel


Structure – Universal Stores (400) ton ss – Universal Washing
machine factory (1800) ton s s – (500)
● Universal works in steel erection – fabrication and Mechanical
works (mechanical pleats-support rack – cooling support rack-
pipe support rack )
● Location :6TH OCTOBER - EGYPT
● Duration: jun-2007 –you n 2010.
● Designation : Senior Supervisors Implementation
● Key Skills: Fabrication Erection of structural steel, Equipment
Erection, piping fabrication Erection.
● Job Responsibilities:
● Coordinating activities and Inspection (Fabrication – Erection
–Welding)
● Preparing material sub-metals.
● Site Coordinator, Coordination between sub-contractors
● Site Supervision, Management with full Authorities.
● Preparing Site Work Report, Progress Report.
● Representative of the company in Almutmrat and international
exhibitions
● Coordination with vendors, clients and other technical
agencies.