Professional Documents
Culture Documents
Removal of The Air Intake Cowl
Removal of The Air Intake Cowl
** ON A/C 001-250
TASK 71-11-00-000-041-A
Removal of the Air Intake Cowl
C. Referenced Information
REFERENCE DESIGNATION
(Ref. 30-21-51-000-041-A). Removal of the Engine Air-Intake Anti-ice Valve
(Ref. 71-13-00-010-040-B). Opening of the Fan Cowl Doors
Air Intake Cowl SHEET 1
5
(36 PLCS)
A
10
(36 PLCS)
15
INDEX
PIN
ENGINE
FLANGE 20
60 (4 PLCS)
(36 PLCS)
55
(36 PLCS)
50 25
(36 PLCS)
INTERPHONE
RECEPTACLE
ECU
45 COOLING
DUCT
SWIRL NOZZLE
DUCT ASSY
40
ECU 30
35
30
C1M-051-00
N_MM_711100_4_RAM0_01_00
3. Job Set-up
Subtask 71-11-00-941-050-A
A. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this
procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
Subtask 71-11-00-010-050-A
B. Get Access
(1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-040) :
(a) FOR 1000EM1 (ENGINE-1)
437AL, 438AR
(b) FOR 1000EM2 (ENGINE-2)
447AL, 448AR
(2) Put the ACCESS PLATFORM 1M(3 FT) in position.
4. Procedure
(Ref. Fig. Air Intake Cowl SHEET 1)
Subtask 71-11-00-020-056-A
A. Removal of the Hardware
(1) Disconnect the electrical connector (45) for the interphone jack (4001VC-A) from the fan case
receptacle.
(2) Install the COVER - PROTECTION on the electrical connector and the receptacle.
(3) Remove the anti-ice valve (40) (Ref. AMM TASK 30-21-51-000-041) .
(4) Remove the clamps (30) and the preformed hose (35) that attach the ECU and the ECU cooling air
duct.
(5) Remove filler plugs from the hoist points on the air intake cowl. Keep the plugs for the installation
after the air intake cowl is removed.
Subtask 71-11-00-480-050-A
B. Installation of the Tooling
(1) Install the PAD - UNIVERSAL ATTACH (20) in the hoist points of the air intake cowl (25).
(2) Attach the SLING INLET COWL (RSE1112) (15) to the universal attach pads (20).
(3) Lift the sling until it supports the air intake cowl (25) weight.
Subtask 71-11-00-020-050-A
C. Disengagement of the Air Intake Cowl
(1) Remove the bolts (50), washers (5) and (55), spacers (60), and nuts (10) that attach the air intake
cowl (25) to the engine flange.
(2) Pull the air intake cowl (25) forward to disengage the index pin from the engine flange.
Subtask 71-11-00-480-056-A
End of document