JQ International Construction Inc.

ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for CONCRETE POURING for 8th FL Along GL


SUBMITTAL DESCRIPTION
A-E/1 & GL E/1-2', 12 FL Along GL C-E/1 & 15th FL
Along GL A-B/1 RC WALL
4000psi = 6 m³
(see attached keyplan)

SUBMITTED DATE & TIME Monday, February 10, 2020 01:00pm

REQUESTED DATE & TIME Monday, February 10, 2020 03:30pm JQ-BH-STR-0202
X x x x
ACTUAL DATE & TIME Monday, February 10, 2020 03:30pm

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 8th, 12th & 15th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR XU
ARCHITECTURAL JAYSON BIDES
a) FORMWORKS RON JASON
b) REBARS JAYSON BIDES
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)


B
NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
SOGECOA Philippines International Construction
ALC - MANAGEMENT and Trading Company, Inc

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST

SUBMITTAL DESCRIPTION SUBMITTAL NO.-REV. #

SUBMITTED DATE & TIME

REQUESTED DATE & TIME SOG-BH-STR-0001-FND-0

ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL FOUNDATION


LOCATION AS SHOWN IN DRAWING
SEGMENT 1

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY SOGECOA PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR

ARCHITECTURAL

STRUCTURAL

ELECTRICAL

FIRE PROTECTION

MECHANICAL

PLUMBING

SANITARY

SAFETY

PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by SOGECOA: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Request for Concrete Pouring of COLUMNS
( 8 numbers )- ( C1(3), C2(2)
SUBMITTAL DESCRIPTION C4,C2A,C3 @ Segment 3 ( 1st lift )- SUBMITTAL NO.-REV. #
Volume of Concrete : 34 cu.m
/ 12,000 psi
SUBMITTED DATE & TIME Saturday, March 24, 2018 1; 00 pm

REQUESTED DATE & TIME Monday, March 26, 2018 5:00:00 PM JQ-BH-STR-0007

ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL / SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL FOUNDATION


LOCATION AS SHOWN IN DRAWING
SEGMENT 3

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY SOGECOA PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR

ARCHITECTURAL

STRUCTURAL

ELECTRICAL

FIRE PROTECTION

MECHANICAL

PLUMBING

SANITARY

SAFETY

PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by SOGECOA: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT:BANHAO TOWER

ADDRESS:SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Request for Concrete Poruing of Ground Beam @ Gridline
( 6,5,A&D ), STP ( Wall 1- 6 ) & 6 Columns ( C1(2),C2(2),C4& C2A ) -
@ 0.00 elevation ( finished )-of
SUBMITTAL DESCRIPTION
Segment 1

( see attached )
SUBMITTED DATE & TIME Tuesday, April 17, 2018 1:00:00 PM

REQUESTED DATE & TIME Tuesday, April 17, 2018 5:00:00 PM JQ-BH-STR-0008

ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL / SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL FOUNDATION


LOCATION AS SHOWN IN DRAWING
SEGMENT 1

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY SOGECOA PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR

ARCHITECTURAL

STRUCTURAL

a) FORMWORKS

b) REBARS

ELECTRICAL

FIRE PROTECTION

MECHANICAL

PLUMBING

SANITARY

SAFETY

PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION: DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by SOGECOA: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT:BANHAO TOWER

ADDRESS:SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST

Request for Concrete Pouring for Columns , C5 ( along Gridline 3 ),


SUBMITTAL DESCRIPTION C6 (2) ( along Gridline 2' ) and C1 (along Gridline 1) of Segment 3
Volume of Concrete : 7 cu.m 12,000 psi SCC

SUBMITTED DATE & TIME Saturday, April 21, 2018 1:00:00 PM

REQUESTED DATE & TIME Saturday, April 21, 2018 5:00:00 PM JQ-BH-STR-0009

ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL / SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL FOUNDATION


LOCATION AS SHOWN IN DRAWING
SEGMENT 1

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY SOGECOA PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR

ARCHITECTURAL

STRUCTURAL

a) FORMWORKS

b) REBARS

ELECTRICAL

FIRE PROTECTION

MECHANICAL

PLUMBING

SANITARY

SAFETY

PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION: DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by SOGECOA: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT:BANHAO TOWER

ADDRESS:SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Request for Inspection of Concrete Pouring for Columns , C3( along
Gridline 3')& ( C2 , C2A ) ( along Gridline 4 ), C6 ( along Gridline B-A )
SUBMITTAL DESCRIPTION of Segment 2 prior for concrete pouring.
( 1ST LIFT )
( see attached )

SUBMITTED DATE & TIME Monday, April 23, 2018 1:00:00 PM

REQUESTED DATE & TIME Monday, April 23, 2018 7:00:00 PM JQ-BH-STR-0010

ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL / SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL FOUNDATION


LOCATION AS SHOWN IN DRAWING
SEGMENT 2

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY SOGECOA PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR

ARCHITECTURAL

STRUCTURAL

a) FORMWORKS

b) REBARS

ELECTRICAL

FIRE PROTECTION

MECHANICAL

PLUMBING

SANITARY

SAFETY

PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION: DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by SOGECOA: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT:BANHAO TOWER

ADDRESS:SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST

Request for Inspection of Concrete Pouring of STP TOP SLAB and 6


Columns ( C1(2),C2(along Gridline 6 ) & C2A,C4,C2 (along Gridline 5)
SUBMITTAL DESCRIPTION
) @ Segment 1 ( see
attached )

SUBMITTED DATE & TIME Saturday, April 28, 2018 1:00:00 PM

REQUESTED DATE & TIME Saturday, April 28, 2018 5:00:00 PM JQ-BH-STR-0011

ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL / SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL FOUNDATION


LOCATION
SEGMENT 2

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY SOGECOA PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR

ARCHITECTURAL

STRUCTURAL

a) FORMWORKS

b) REBARS

ELECTRICAL

FIRE PROTECTION

MECHANICAL

PLUMBING

SANITARY

SAFETY

PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION: DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by SOGECOA: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT:BANHAO TOWER

ADDRESS:SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Request for Inspection of Concrete Pouring for Cistern and Fire
Tank & Elevator Shear Wall ( 1st lift - 1.90 mts ) @ Segment-2
SUBMITTAL DESCRIPTION

( see attached )

SUBMITTED DATE & TIME Monday, April 30, 2018 1:00:00 PM

REQUESTED DATE & TIME Monday, April 30, 2018 5:00:00 PM JQ-BH-STR-0012

ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL / SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL FOUNDATION


LOCATION
SEGMENT 2

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY SOGECOA PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR

ARCHITECTURAL

STRUCTURAL

a) FORMWORKS

b) REBARS

ELECTRICAL

FIRE PROTECTION

MECHANICAL

PLUMBING

SANITARY

SAFETY

PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION: DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by SOGECOA: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT:BANHAO TOWER

ADDRESS:SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Request for Inspection of Concrete Pouring for 8 numbers
( COLUMNS ) C1 (3), C2A,C4,C2(2) & C3 @ Segment-3
SUBMITTAL DESCRIPTION
( see
attached )

SUBMITTED DATE & TIME Wednesday, May 09, 2018 9:00:00 AM

REQUESTED DATE & TIME Wednesday, May 09, 2018 5:00:00 PM JQ-BH-STR-0013

ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL GF-2F


LOCATION
SEGMENT 3

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY SOGECOA PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR

ARCHITECTURAL

STRUCTURAL

a) FORMWORKS

b) REBARS

ELECTRICAL

FIRE PROTECTION

MECHANICAL

PLUMBING

SANITARY

SAFETY

PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION: DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by SOGECOA: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Request for Inspection of Concrete Pouring for COLUMNS
( 6 numbers ) - C1(2), C2(2) and C2A,C4 of Segment 1 -
Volume of Concrete:
2nd lift / el. 4.30 mts
SUBMITTAL DESCRIPTION Columns ( 6 numbers )= 23 cu.m
( 12,000 psi ) SCC
( see
attached )
SUBMITTED DATE & TIME Wednesday, May 16, 2018 1:00:00 PM

REQUESTED DATE & TIME Wednesday, May 16, 2018 5:00:00 PM JQ-BH-STR-0014

ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL GF
LOCATION
SEGMENT 1

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY SOGECOA PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU

ARCHITECTURAL

STRUCTURAL A. TABLIZO JR

a) FORMWORKS
C. CIERVO
b) REBARS

ELECTRICAL J.GARCIA / VYC

FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG

PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by SOGECOA: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST

SUBMITTAL DESCRIPTION

SUBMITTED DATE & TIME

REQUESTED DATE & TIME

ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL GF
LOCATION
SEGMENT 2

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY SOGECOA PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU

ARCHITECTURAL

STRUCTURAL A. TABLIZO JR

a) FORMWORKS
C. CIERVO
b) REBARS

ELECTRICAL J.GARCIA / VYC

FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG

PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by SOGECOA: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST

Request for Inspection for ( Beams and Slab )- Volume of Concrete:


SUBMITTAL DESCRIPTION
LOWER-Second Flr ( 2nd F ) along Gridline 6-5 / and Beam / Slab ( lower )
Gridline A-D @ Segment 1 =_____________________
( see attached )
SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-BH-STR-0016

ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2F
LOCATION
SEGMENT 1
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY SOGECOA PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU

ARCHITECTURAL

STRUCTURAL A. TABLIZO JR

a) FORMWORKS
C. CIERVO
b) REBARS

ELECTRICAL J.GARCIA / VYC

FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG

PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by SOGECOA: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST

Request for Inspection for Concrete Pouring of


COLUMNS ( 6 numbers ), C2A&C2 along Gridline 4, Volume of Concrete:
SUBMITTAL DESCRIPTION
C3 along Gridline 3'- 2nd lift 3.65 mts - of Segment 2- COLUMNS ( 6 numbers )
C6(2) along Gridline 2' and C5 along Gridline 3 @ =_____________________
Segment 3
( see attached )

SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-BH-STR-0017

ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2F
LOCATION
SEGMENT 1
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY SOGECOA PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU

ARCHITECTURAL

STRUCTURAL A. TABLIZO JR

a) FORMWORKS
C. CIERVO
b) REBARS

ELECTRICAL J.GARCIA / VYC

FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG

PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by SOGECOA: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA


`

CONCRETE POURING REQUEST

Request for Inspection for Concrete Pouring of Ground Beam ( GB-


3(3) along Gridline D , GB-3(2) along Gridline A, ( GB-5 & GB-6 ) Volume of Concrete: ________17 cu.m ( 10,000
SUBMITTAL DESCRIPTION along Gridline 4-3' & GB-7 along Gridline 3-2' @ Segment 1 and 2 PCD )_____________

(see attached)

SUBMITTED DATE & TIME

REQUESTED DATE & TIME

ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL Foundation


LOCATION
SEGMENT 1&2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY SOGECOA PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU

ARCHITECTURAL

STRUCTURAL A. TABLIZO JR

a) FORMWORKS
C. CIERVO
b) REBARS

ELECTRICAL VYC

FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG

PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by SOGECOA: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Request for Inspection for ( Beams and Slab )-
LOWER-Second Flr ( 2nd F ) along Gridline 6-5 / and Volume of Concrete:
SUBMITTAL DESCRIPTION Gridline A-D @ Segment 1 Beam / Slab ( lower )= 45 cu.m ( 10,000
( see attached- WIR for Transformer Concrete PCD )
Pod )
SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-BH-STR-0019

ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2F
LOCATION
SEGMENT 1
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY SOGECOA PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU

ARCHITECTURAL

STRUCTURAL A. TABLIZO JR

a) FORMWORKS
C. CIERVO
b) REBARS

ELECTRICAL J.GARCIA / VYC

FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG

PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by SOGECOA: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST

Request for Inspection of Concrete POURING of ELEVATOR SHEAR Volume of Concrete:


SUBMITTAL DESCRIPTION WALL ( frm GF to Ramp Beam level) @ Segment-2 Elevator SW:
(see attached )

SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-BH-STR-0020

ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL GF-2F


LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY SOGECOA PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU

ARCHITECTURAL

STRUCTURAL A. TABLIZO JR

a) FORMWORKS
C. CIERVO
b) REBARS

ELECTRICAL J.GARCIA / VYC

FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG

PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by SOGECOA: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete:
Request for CONCRETE POURING of MEZZANINE ( BEAMs and
SUBMITTAL DESCRIPTION SLAB ) along Gridline A-B & 4-3 of Segment-2
(see attached )

SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-BH-STR-0021

ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL GF
LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY SOGECOA PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL

STRUCTURAL SUN ZHI GUI


a) FORMWORKS E. BATTALON
b) REBARS C. CIERVO
ELECTRICAL C. CLAVERIA / VYC
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved

Received by SOGECOA: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete:
Request for Inspection for COncrete Pouring of 3 Columns &
( C2A,C2 along Gridline 4 ) and C6 at Cistern
SUBMITTAL DESCRIPTION
( see
attached )

SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-BH-STR-0022

ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL GF
LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY SOGECOA PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU

ARCHITECTURAL

STRUCTURAL A. TABLIZO JR

a) FORMWORKS
C. CIERVO
b) REBARS

ELECTRICAL

FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG

PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by SOGECOA: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete:
Request for CONCRETE POURING of ( TOP SLAB and
BEAMS ( lower ) ) @ 2nd Floor of Segment - 3
SUBMITTAL DESCRIPTION in ELEVATION 6.10 mts
( see
attached documents )
SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-BH-STR-0023


ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2F
LOCATION
SEGMENT 3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY SOGECOA PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR/QC SUN ZHI GUI/ EDGARDO


ARCHITECTURAL

STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS C. CIERVO
ELECTRICAL C. CLAVERIA / VYC
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved

Received by SOGECOA: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete:
Request for Concrete Pouring of RAMP 1 from Ground Floor to 2nd
Floor ( Slab and Beams ) along gridline 5 - 2' @ Segment - 2
SUBMITTAL DESCRIPTION

( see attached documents )

SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-BH-STR-0024


ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL GF
LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY SOGECOA PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL

STRUCTURAL SUN ZHI GUI


a) FORMWORKS E. BATTALON
b) REBARS C. CIERVO
ELECTRICAL C. CLAVERIA / VYC
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved

Received by SOGECOA: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete:
Request for Concrete Pouring of ELEVATOR Shear Wall- ( frorm
RAB-3 Elevation: 3.87 mts to 2F Elevation: 6.10 mts )
SUBMITTAL DESCRIPTION @ Segment-2

( see attached documents )

SUBMITTED DATE & TIME Tuesday, June 26, 2018 1:00:00 PM

REQUESTED DATE & TIME Tuesday, June 26, 2018 6:00:00 PM JQ-BH-STR-0025
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL GF-2F


LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY SOGECOA PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL

STRUCTURAL SUN ZHI GUI


a) FORMWORKS E. BATTALON
b) REBARS C. CIERVO
ELECTRICAL C. CLAVERIA / VYC
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by SOGECOA: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Request for Concrete Pouring for 8 COLUMNS( C3(2) along Gridline- Volume of Concrete:
3' & 2'),( C2A,C4,C2 - along Gridline -2 ) and ( C1(3) along Gridline -1 )
of Segment-2 and 3 ( 2nd
SUBMITTAL DESCRIPTION
Flr- 3rd Flr-)

( see attached documents )


SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-BH-STR-0026


ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2F-3F


LOCATION
SEGMENT ,2-3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY SOGECOA PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR SUN ZHI GUI


ARCHITECTURAL

STRUCTURAL A. Tablizo Jr
a) FORMWORKS E. BATALON
b) REBARS C. CIERVO
ELECTRICAL C. CLAVERIA / VYC
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by SOGECOA: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Request for Concrete Pouring for 3 COLUMNS ( C1(2) & C2 )- along
Gridline Line 6 of Segment -1 Volume of Concrete:
SUBMITTAL DESCRIPTION ( 2nd Flr- 3rd Flr-) 13.0 m³ ( 12,000 psi ) SCC

( see attached documents )

SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-BH-STR-0027


ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2F-3F


LOCATION
SEGMENT ,2-3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY SOGECOA PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR SUN ZHI GUI


ARCHITECTURAL

STRUCTURAL A. Tablizo Jr
a) FORMWORKS E. BATALON
b) REBARS C. CIERVO
ELECTRICAL C. CLAVERIA / VYC
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by SOGECOA: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete:
Request for Concrete Pouring of ELEVATOR SHEAR WALL ( from
Elevation : 6.10 mts to Elevation : 7.75 mts ) 1.65 mts ( ht )- along
SUBMITTAL DESCRIPTION
Gridline 4-3 and Gridline B'-C @ Segment 2
( see attached )

SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-BH-STR-0028


ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2F
LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR/QC SUN ZHI GUI/EDGARDO


ARCHITECTURAL

STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS C. CIERVO
ELECTRICAL C. CLAVERIA / VYC
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete:
Request for Concrete Pouring for 6 number ( COLUMNS ),-
( C2A,C4,C2 )- along Gridline-5, ( C2A ) along Gridline-4, ( C3 ) along
SUBMITTAL DESCRIPTION Gridline-3' and ( C2 ) along Gridline-3 @ Segment 1 & 2

( see attached )

SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-BH-STR-0029


ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2F
LOCATION
SEGMENT 1&2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR/QC SUN ZHI GUI/EDGARDO


ARCHITECTURAL

STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS C. CIERVO
ELECTRICAL C. CLAVERIA / VYC
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete:
Request for Concrete Pouring for RAMP-2 ( TOP SLAB & BEAMS )-
along Gridline 4-3 & Gridline A-B of Segment-2
SUBMITTAL DESCRIPTION
( see
attached )

SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-BH-STR-0030


ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2F
LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR/QC SUN ZHI GUI/EDGARDO


ARCHITECTURAL

STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS C. CIERVO
ELECTRICAL C. CLAVERIA / VYC
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete:
Request for Concrete Pouring of 2nd Floor (U)-upper )( TOP SLAB &
BEAMS ), @ Elevation: 7.75 and 7.85 mts- along Gridline 5-3 &
SUBMITTAL DESCRIPTION
Gridline A-D of Segment 1&2
( see attached )

SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-BH-STR-0031


ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2F
LOCATION
SEGMENT 1&2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR/QC SUN ZHI GUI/EDGARDO


ARCHITECTURAL

STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS C. CIERVO
ELECTRICAL C. CLAVERIA / VYC
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Request for Inspection for Formworks and Lay-out of COLUMN (C-2)
along Gridline -3 ( 2nd floor- ( lower ) to 3rd floor - (lower ) ) @ Volume of Concrete:
SUBMITTAL DESCRIPTION Segment -3 & ( C2A,C3 )-along Gridline-D ( Grnd-2ndlift to Elevation 8.0 m³ ( 12,000 psi ) SCC
7.75 mts ) of Segment-2
(see attached)

SUBMITTED DATE & TIME July 20,2018 1:00:00 PM

REQUESTED DATE & TIME July 20,2018 6;00 PM JQ-BH-STR-0032


ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2F-3F


LOCATION
SEGMENT ,2-3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR/QC

ARCHITECTURAL

STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS C. CIERVO
ELECTRICAL C. CLAVERIA / VYC
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Request for Concrete Pouring of ELEVATOR SHEAR WALL ( from Volume of Concrete:
Elevation :7.75 mts to Elevation : ____ mts ) _____ mts ( ht )- along ____ m³
SUBMITTAL DESCRIPTION Gridline 4-3 and Gridline B'-C @ Segment 2 prior for Concrete
Pouring ( 12,000 psi ) SCC
( see attached )

SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-BH-STR-0033


ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2F-3F


LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR/QC

ARCHITECTURAL

STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS C. CIERVO
ELECTRICAL C. CLAVERIA / VYC
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Request for Concrete Pouring for RAMP-3 Volume of Concrete:
( TOP SLAB & BEAMS )- along Gridline 4-2' & ____ m³
SUBMITTAL DESCRIPTION Gridline C-D @
Segment-2 ( 10,000 psi ) PCD
( see attached )

SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-BH-STR-0034


ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2F-3F


LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR/QC

ARCHITECTURAL

STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS C. CIERVO
ELECTRICAL C. CLAVERIA / VYC
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST

Request for Concrete Pouring for 3rd Floor (L)-lower )( TOP SLAB & Volume of Concrete:
SUBMITTAL DESCRIPTION
BEAMS ), @ Elevation: 9.50 mts- along Gridline 3-1 & Gridline A-E of ____ m³
Segment 3, ( 10,000 psi ) PCD
( see attached )

SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-BH-STR-0035


ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 3F
LOCATION
SEGMENT 3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR/QC

ARCHITECTURAL

STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS C. CIERVO
ELECTRICAL C. CLAVERIA / VYC
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST

Request for Concrete Pouring of 6 Columns;( C2A, C4, C2 along Volume of Concrete:
Gridline 5 ),( C2A,C2 along Gridline 4 ),(C5 along Gridline 3) of
SUBMITTAL DESCRIPTION
Segment 1 & 2,including RC wall @ Genset Room ____ m³ ( 12,000
( see attached ) psi ) SCC

SUBMITTED DATE & TIME August , 2018


REQUESTED DATE & TIME August , 2018 JQ-BH-STR-0036
ACTUAL DATE & TIME August , 2018

++++
DEPARTMENT ARCHITECTURAL STRUCTURAL
++++
ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________
++++
++++
++++
++++
++++
++++
DRAWING NO. ++++
++++
++++
++++
++++
++++
FLOOR LEVEL 2F-3F ++++
LOCATION ++++
SEGMENT ,1&2 ++++
++++
++++
CONTRACTOR'S REPRESENTATIVE ++++
++++
++++
MR. LIU GEN BAO ++++
++++
+
PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR/QC

ARCHITECTURAL

STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS C. CIERVO
ELECTRICAL C. CLAVERIA / VYC
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST

Request for Concrete Pouring @ 3rd Floor (L)-Lower ( TOP SLAB & Volume of Concrete:
BEAMS ) in el.10.50 mts (Segment-1)
SUBMITTAL DESCRIPTION
along Gridline (B-D&6-5). ____ m³ ( 10,000
( see attached ) psi )PCD

SUBMITTED DATE & TIME August , 2018

REQUESTED DATE & TIME August , 2018 JQ-BH-STR-0037


ACTUAL DATE & TIME August , 2018

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 3F
LOCATION
SEGMENT ,1 & 3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR/QC

ARCHITECTURAL

STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS C. CIERVO
ELECTRICAL C. CLAVERIA / VYC
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Request for Concrete Pouring of 3rd Floor (U)-upper ) & (L)-lower )
( TOP SLAB & BEAMS )@ Elevation: 11.15 mts- along Gridline (6-4 & Volume of Concrete:
A-E) of Segment-1,& @ Elevation: 11.25 mts-of Elevator Lobby of
SUBMITTAL DESCRIPTION
Segment-2 & @ Elevation: 9.50 mts -along Gridline (3-2 & A-B ) of ____ m³ ( 10,000
Segment-3. psi )PCD
( see attached )

SUBMITTED DATE & TIME August , 2018


REQUESTED DATE & TIME August , 2018 JQ-BH-STR-0038
ACTUAL DATE & TIME August , 2018

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 3F
LOCATION
SEGMENT .1-2-3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR/QC

ARCHITECTURAL

STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS C. CIERVO
ELECTRICAL C. CLAVERIA / VYC
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Request forConcrete Pouring for RAMP-4
( TOP SLAB & Volume of Concrete:
BEAMS )- along Gridline 4-3 & Gridline A-B
SUBMITTAL DESCRIPTION
@ Segment-2,prior for pouring of ____ m³ ( 10,000
concrete psi )PCD
( see attached )
SUBMITTED DATE & TIME August , 2018
REQUESTED DATE & TIME August , 2018 JQ-BH-STR-0039
ACTUAL DATE & TIME August , 2018

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 3F
LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR/QC

ARCHITECTURAL

STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS C. CIERVO
ELECTRICAL C. CLAVERIA / VYC
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST

Request for Concrete Pouring for Elevator Shear Wall @ el. 9.50 Volume of Concrete:
mts to el. 11.25 mts ( lower 3rd flr to upper 3rd flr ), along Gridline (4-
SUBMITTAL DESCRIPTION
3 & B'-C) of Segment-2 ____ m³ ( 12,000
( see attached ) psi )SCC

SUBMITTED DATE & TIME August , 2018


REQUESTED DATE & TIME August , 2018 JQ-BH-STR-0040
ACTUAL DATE & TIME August , 2018

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 3F
LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR/QC

ARCHITECTURAL

STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS C. CIERVO
ELECTRICAL C. CLAVERIA / VYC
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY R. NABAUNAG
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete:
Request for Conrete Pouring for 4th Floor ( Lower )- TOP SLAB &
BEAMS- @ el. 12.90 mts ( Segment-3 ) , RAMP-5 ( Beams & Slab ) 12,000
( Segment-2 ), 8 COLUMNS ( C1(3),C2A,C4 & C2 ) w/ ht: 2.8 mts psi SCC= 59 cu.m
(Segment-3) & C3 ( 2 ) w/ ht : 2.7 mts ( Segment-2 ) & Elevator Shear
SUBMITTAL DESCRIPTION
Wall w/ ht : 1.65 mts -3rd flr upper to 4th flr lower
( Segment-2) 10,000 psi PCD
w/ Intergral WP= 120 cu.m
( see attached )
SUBMITTED DATE & TIME Saturday, September 01, 2018 8:00:00 AM

REQUESTED DATE & TIME Saturday, September 01, 2018 6:00:00 PM JQ-BH-STR-0041
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL ,3-4


LOCATION
SEGMENT ,2-3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
C.E/ QC J. ANSELMO
STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS MARK/RICHARD
ELECTRICAL VYC/ E. CRUZ
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY M.BINUYA
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete:
Request for Concrete Pouring of 9 COLUMNS ( C1(2),C2- 12,000
along Gridline-6 ),( C2A,C4,C2 - along Gridline-5 ), ( C2-along
psi SCC= 34 cu.m
SUBMITTAL DESCRIPTION Gridline-4 ) ,( C2,C5 )along Gridline -3= from 3rd Flr Upper to
4th Flr Upper @ Segment-1 and 2
( see attached )

SUBMITTED DATE & TIME Saturday, September 08, 2018 8:00:00 AM

REQUESTED DATE & TIME Saturday, September 08, 2018 9:00:00 AM JQ-BH-STR-0042
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL
LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
C.E/ QC J. ANSELMO
STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS MARK/RICHARD
ELECTRICAL VYC/ E. CRUZ
FIRE PROTECTION

MECHANICAL
D. IBARRETA /GREENLINE
PLUMBING

SANITARY

SAFETY M.BINUYA
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST

Request for Conrete Pouring for 4th Floor (Upper ) & 4th Flr Volume of Concrete: in (cu.m)
( Lower)- TOP SLAB & BEAMS & Elevator Lobby- @ el. 14.55
& 14.65 mts ( Segment-1-2 ) & el. 12.90 & 13.00 mts 12,000 psi SCC=
( Segment- 2-3 ) & , RAMP-6 ( Beams & Slab ) ( Segment-2 ),,
SUBMITTAL DESCRIPTION including 3 COLUMNS- ( C2(2) & C5 ) along Gridline 4 & 3.
( Segment-2) 10,000 psi PCD w/
Intergral WP=
( see 10,000
attached ) psi PCD w/o Intergral WP=

SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-BH-STR-0043


ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 4
LOCATION
SEGMENT ,1-2-3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
C.E/ QC J. ANSELMO
STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS MARK/RICHARD
ELECTRICAL VYC/ E. CRUZ
FIRE PROTECTION

MECHANICAL
D. IBARRETA /GREENLINE
PLUMBING

SANITARY

SAFETY M.BINUYA
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :


Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST

Volume of Concrete: in (cu.m)

Request for Concrete Pouring for Elevator Shear Wall ( from 12,000 psi SCC=
SUBMITTAL DESCRIPTION
el. 12.90 mts to el. 14.65 ms\ts ) ht: of 1.75 mts of Segment-
2 , and Elevator Lobby and 4th Floor Upper ( Segment-1 & 10,000 psi PCD w/
2 ) ( see attached ) Intergral WP=
10,000
psi PCD w/o Intergral WP=

SUBMITTED DATE & TIME Friday, September 14, 2018 3:00:00 PM

REQUESTED DATE & TIME Friday, September 14, 2018 5:00:00 PM JQ-BH-STR-0044
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL ,3-4


LOCATION
SEGMENT ,1-2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
C.E/ QC J. ANSELMO
STRUCTURAL A.TABLIZO JR.
a) FORMWORKS E. BATALLON
b) REBARS MARK/RICHARD
ELECTRICAL MARK JOEL/ VYC
MECHANICAL Danilo Ibarreta
FIRE PROTECTION

PLUMBING D. Ibarreta/ Greenline


SANITARY

SAFETY M.BINUYA
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :


Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST

Request for Conrete Pouring for 9 COLUMNS Volume of Concrete: in (cu.m)


( C1(3),C2A,C4 & C2 ) w/ ht: 2.8 mts (Segment-3) & C3 ( 2 ) w/
ht : 2.7 mts ( Segment-2 )& C2A w/ ht: 2.8 mts ( Segment-1 )
12,000 psi SCC=
SUBMITTAL DESCRIPTION -4th flr upper to 5th flr lower
( Segment-2)

( see attached )

SUBMITTED DATE & TIME Friday, September 21, 2018 4:00:00 PM

REQUESTED DATE & TIME Saturday, September 22, 2018 12:00 NN JQ-BH-STR-0045
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL ,4-5


LOCATION
SEGMENT ,2,3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
C.E/ QC J. ANSELMO
STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS MARK / RICHARD
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY M.BINUYA
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST

Volume of Concrete: in (cu.m)


Request for Conrete Pouring for 5th Floor ( Lower )- TOP
SLAB & BEAMS- @ el. 16.30 mts ( Segment-3 ) , RAMP-7 12,000 psi SCC=
( Beams & Slab ) ( Segment-2 ), & Elevator Shear Wall w/ ht :
SUBMITTAL DESCRIPTION 1.75 mts -4th flr upper to 5th flr lower
( Segment-2) 10,000 psi PCD w/
Intergral WP=
( see attached ) 10,000
psi PCD w/o Intergral WP=
SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-BH-STR-0046


ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL ,4-5


LOCATION
SEGMENT 1,2,3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
C.E/ QC J. ANSELMO
STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS MARK / RICHARD
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY M.BINUYA
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST

Volume of Concrete: in (cu.m)


Request for Concrete Pouring of 9 COLUMNS- ( C1(2),C2-
along Gridline-6,( C2A,C4,C2-along Gridline-5 ),C2-along
12,000 psi SCC=
SUBMITTAL DESCRIPTION Gridline-4 & C2,C5-along Gridline-3 of Segment-1 &2
( see
attached )

SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-BH-STR-0047


ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL ,4-5


LOCATION
SEGMENT ,1
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY M.BINUYA
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :
Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)
Request for Concrete Pouring @ 5th Floor (U)-Upper ( TOPS
SLAB & BEAMS ) in el.17.95 mts (Segment-1) 12,000 psi SCC= 7
SUBMITTAL DESCRIPTION
along Gridline (A-E & 4-6) &
RAMP-8( Beams and Slab ) in ( Segment-2 ) along Gridline 10,000 psi PCD w/
( A-B & 3-4) Intergral WP= 80
( see attached )
10,000 psi PCD w/o Intergral WP= 10
SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-BH-STR-0048


ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 5
LOCATION
SEGMENT 1
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY M.BINUYA
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)
Request for Concrete Pouring for 6 COLUMNS-
12,000 psi SCC= 20
SUBMITTAL DESCRIPTION
( C1(3)-along Gridline-1,( C2A,C4,C2-along Gridline-2 )
of Segment-3
( see attached )

SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-BH-STR-0049


ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL ,5-6


LOCATION
SEGMENT 3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY C. TUNILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)
Request for Concrete Pouring for 6th Floor (L)-Lower
SUBMITTAL DESCRIPTION
( TOPS SLAB & BEAMS ) in el. 19.70 mts ( Segment-
3 ) along Gridline ( A-E & 2'-1 ) ( see
10,000 psi PCD w/ Intergral WP=
attached )

SUBMITTED DATE & TIME Monday, October 15, 2018 4:00:00 PM

REQUESTED DATE & TIME Thursday, October 18, 2018 5:00:00 PM JQ-BH-STR-0050
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 6
LOCATION
SEGMENT 3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY C.TUNILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST

Request for Concrete Pouring for 9 COLUMNS- ( C1(2),C2- Volume of Concrete: in (cu.m)
along Gridline-6,( C2A,C4,C2-along Gridline-5 ),C2-along
SUBMITTAL DESCRIPTION
Gridline-4 ( @ 5th ( F ) upper to 6th ( F )upper & C2,C5-along 12,000 psi SCC=
Gridline-3 @ 5th ( F) Lower to 6th (F) lower of Segment-1 &2
( see
attached )

SUBMITTED DATE & TIME Monday, October 15, 2018 4:00:00 PM

REQUESTED DATE & TIME Thursday, October 18, 2018 5:00:00 PM JQ-BH-STR-0051
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL ,5-6


LOCATION
SEGMENT ,1-2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL
D. IBARRETA / GREENLINE
PLUMBING

SANITARY

SAFETY C.TUNILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)
Request for Concrete Pouring @6th Floor (U)-Upper (
TOPS SLAB & BEAMS ) in el.21.35 mts (Segment-1)
along
SUBMITTAL DESCRIPTION Gridline (A-E & 4-6) & RAMP-10( Beams and Slab ) in (
10,000 psi PCD w/ Intergral WP=
Segment-2 ) along Gridline ( A-B & 3-4)
10,000 psi PCD w/o Intergral WP=
( see attached )
SUBMITTED DATE & TIME Monday, October 22, 2018 8:00:00 AM

REQUESTED DATE & TIME Wednesday, October 24, 2018 5:00:00 PM JQ-BH-STR-0052
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 6
LOCATION
SEGMENT ,1-2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TUNILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)
Request for Inspection of Formworks and Lay-out of RAMP-
7 ( TOPS Slab and BEAMS )-along Gridline 4-3/C-E @ 12,000 psi SCC=
SUBMITTAL DESCRIPTION
Segment-2 & remaining (slab & beams ) 4th Floor ( Upper )@
el.14.55 mts and 5th Floor ( Lower )@ el.16.30 mts & Elevator 10,000 psi PCD w/
Shear Wall ht : 1.75 mts - @ Segment-2 Intergral WP=
( see attached ) 10,000
psi PCD w/o Intergral WP=
SUBMITTED DATE & TIME Saturday, October 27, 2018 1:00:00 PM

REQUESTED DATE & TIME Monday, October 29, 2018 5:00:00 PM JQ-BH-STR-0053
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 6
LOCATION
SEGMENT ,1-2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TUNILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST

Request for Inspection of Formworks and Lay-out of 6 Volume of Concrete: in (cu.m)


COLUMNS- ( C1 )(3) along Gridline -1, ( C2A,C4,C2 ) along
SUBMITTAL DESCRIPTION
Gridline-2 from ( 6th Flr (lower)-7th Flr (lower ) of Segment-3 12,000 psi SCC= 21
prior for Pouring of Concrete
( see attached )

SUBMITTED DATE & TIME Saturday, October 27, 2018 1:00:00 PM

REQUESTED DATE & TIME Monday, November 05, 2018 5:00:00 PM JQ-BH-STR-0054
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL ,5-6-7


LOCATION
SEGMENT ,2-3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TUNILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST

Request for Concrete Pouring @ 7th Floor (L)-Lower ( Volume of Concrete: in (cu.m)
TOPS SLAB & BEAMS ) in el.23.10 mts (Segment-3)
SUBMITTAL DESCRIPTION
along
Gridline (A-E & 2'-1). 10,000 psi
( see attached PCD w/ Intergral WP= 87
)

SUBMITTED DATE & TIME Wednesday, October 31, 2018 1:00:00 PM

REQUESTED DATE & TIME Tuesday, November 06, 2018 5:00:00 PM JQ-BH-STR-0055
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 7
LOCATION
SEGMENT 3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)
Request for Concrete pouring for 2 Columns ( C2A
-along gridline 4 ( 4th F upper to 5th F upper ) - C5
along gridline 3 ( 5th F lower to 5th F upper ) and @
SUBMITTAL DESCRIPTION 12,000psi
Elevator Lobby & portion of 5th Floor Upper ( TOP
SCC WP= 10,000 psi
Slab and Beams ) including C3 GLD/line 2' and 3',
PCD w/ Intergral WP=
C2A GLD/line 4 see attached

SUBMITTED DATE & TIME Friday, November 09, 2018 10:30am

REQUESTED DATE & TIME Friday, November 09, 2018 6:30pm JQ-BH-STR-0056
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL
LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST

Volume of Concrete: in (cu.m)


Request for Concrete Pouring for Elevator Shear
SUBMITTAL DESCRIPTION Wall ( From el.16.30 to el. 17.95 mts )/ 5tyh Floor
12,000psi
Loweer to 5th Floor Upper of Segment-2
SCC WP=

SUBMITTED DATE & TIME Friday, November 09, 2018 10:30am

REQUESTED DATE & TIME Friday, November 09, 2018 6:30pm JQ-BH-STR-0057
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 5
LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring for Ramp 10, including


SUBMITTAL DESCRIPTION
the C5 and C2 GDLA line 4, partialblockout for 6th 10,000psi
lower floor and 6th floor upper beam and slab. PCD with integral waterproofing WP=
see attached 12,000psi SCC WP=

SUBMITTED DATE & TIME Tuesday, November 13, 2018 10:30am

REQUESTED DATE & TIME Tuesday, November 13, 2018 6:30pm JQ-BH-STR-0058
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 6L to 6U
LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)
Request for Inspection of Formworks and layout for 6
SUBMITTAL DESCRIPTION
columns at 6th to 7th floor upper, C1 GLA,C line 6, C2
GLB line 6, C2 GLAline 5, C4 and C2A line5,
12,000psi SCC WP=
see attached

SUBMITTED DATE & TIME Tuesday, November 13, 2018 10:30am

REQUESTED DATE & TIME Tuesday, November 13, 2018 6:30pm JQ-BH-STR-0059
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 6U to 7U
LOCATION
SEGMENT 1
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)
Request for Concrete Pouring for 6 columns at 7th to
SUBMITTAL DESCRIPTION
8th floor lower, C1@ GL/A-1,B'-1,E-1, C2@GL/A-2,C-
4@GL/B'2, C-2A@GL/D-2,
12,000psi SCC WP=
see attached

SUBMITTED DATE & TIME Friday, November 16, 2018 1:30m

REQUESTED DATE & TIME Friday, November 16, 2018 6:30pm JQ-BH-STR-0060
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 6U to 7U
LOCATION
SEGMENT 1
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL A.TABLIZO JR
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring for Slab and Beams at


SUBMITTAL DESCRIPTION 8th floor lower, see
attached 10,000psi WP=

SUBMITTED DATE & TIME Monday, November 19, 2018 3:30m

REQUESTED DATE & TIME Monday, November 19, 2018 6:30pm JQ-BH-STR-0061
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 8U
LOCATION
SEGMENT 3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL EL DELA CRUZ
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)


Request for Concrete Pouring for Ramp 9, and @
Shear wall Elevator Lobby from 5th floor Upper to 6th
SUBMITTAL DESCRIPTION floor lower ( including a partial blockout at slab and
10,000psi WP=
beams at 5th floor upper and 6th floor lower )
12,000psi PCD w/out WP=
see attached

SUBMITTED DATE & TIME Tuesday, November 20, 2018 3:30m

REQUESTED DATE & TIME Tuesday, November 20, 2018 6:30pm JQ-BH-STR-0062
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 5U to 6L
LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL EL DELA CRUZ
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring for Shear wall Elevator


SUBMITTAL DESCRIPTION Lobby from 6th floor lower to 6th floor upper
12,000psi
see attached
SCD w/out WP=

SUBMITTED DATE & TIME Friday, November 23, 2018 3:30m

REQUESTED DATE & TIME Friday, November 23, 2018 6:30pm JQ-BH-STR-0063
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 6L to 6U
LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL EL DELA CRUZ
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring for a portion of 6th


SUBMITTAL DESCRIPTION floor upper Elevator Lobby and Slab and Beams
10,000psi
see attached
PCD w/out WP= 10,000psi w/ WP

SUBMITTED DATE & TIME Saturday, November 24, 2018 3:30am

REQUESTED DATE & TIME Saturday, November 24, 2018 6:30pm JQ-BH-STR-0064
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 6U
LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL EL DELA CRUZ
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring for Columns C2


SUBMITTAL DESCRIPTION
GLA/4-3, C5, C3 GLA/4, C3 GLA/3 at 6th floor Lower
to 6th Floor Upper 12,000psi
see attached SCC w/out WP=

SUBMITTED DATE & TIME Monday, November 26, 2018 3:30Pm

REQUESTED DATE & TIME Monday, November 26, 2018 6:30pm JQ-BH-STR-0065
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 7L
LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL EL DELA CRUZ
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring for 6 Columns C2A


SUBMITTAL DESCRIPTION
GLD/2, C2GLA/2, C4 GLB/2, C1 GLA/1 C1 GLB/1, C1
GLE/1, C3 at 8th to 9th FLower 12,000psi
see attached SCC w/out WP=

SUBMITTED DATE & TIME Monday, November 26, 2018 3:30Pm

REQUESTED DATE & TIME Monday, November 26, 2018 6:30pm JQ-BH-STR-0066
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 7L
LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL EL DELA CRUZ
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring Shearwall at from mid


6th upper at to bottom beam 7th lower, Ramp 11 and
SUBMITTAL DESCRIPTION 12,000psi
ramp 12, and 7th floor upper beam & Slab
SCC w/out WP= 10,000psi w/out WP
see attached
= 10,000psi w/ WP

SUBMITTED DATE & TIME Wednesday, December 05, 2018 2:00Pm

REQUESTED DATE & TIME Wednesday, December 05, 2018 6:30pm JQ-BH-STR-0067
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 6-7u


LOCATION
SEGMENT 1,2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL EL DELA CRUZ
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring for 9th floor Slab and


SUBMITTAL DESCRIPTION Beams see
attached
10,000psi w/ WP=70m3

SUBMITTED DATE & TIME Tuesday, December 11, 2018 2:00Pm

REQUESTED DATE & TIME Tuesday, December 11, 2018 6:30pm JQ-BH-STR-0068
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 9L
LOCATION
SEGMENT 3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL EL DELA CRUZ
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring for 6th to 7th floor lower


SUBMITTAL DESCRIPTION columns and 7th upper to 8th upper columns.
see attached
12,000psi w/ WP=

SUBMITTED DATE & TIME Thursday, December 13, 2018 3:00Pm

REQUESTED DATE & TIME Thursday, December 13, 2018 6:30pm JQ-BH-STR-0069
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 9L
LOCATION
SEGMENT 3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL EL DELA CRUZ
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request Concrete Pouring for Ramp 13 and 14, A


portion of Slab and beams at 8th floor Lower and
SUBMITTAL DESCRIPTION Beams and Slab at 8th floor Upper, Elevator Lobby slab
12,000psi = 32m3 ,
and beams and Elevator Shearwall
10,000psi w/out WP= 24m3, 10,000psi
see attached
w/ WP= 151m3

SUBMITTED DATE & TIME Wednesday, December 19, 2018 3:00Pm

REQUESTED DATE & TIME Wednesday, December 19, 2018 6:30pm JQ-BH-STR-0070
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 8L, 8U


LOCATION
SEGMENT 1,2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL EL DELA CRUZ
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring for columns at 8th floor


SUBMITTAL DESCRIPTION upper and 9th floor lower
see attached
12,000psi = 35m3 ,

SUBMITTED DATE & TIME Wednesday, December 19, 2018 3:00Pm

REQUESTED DATE & TIME Wednesday, December 19, 2018 6:30pm JQ-BH-STR-0071
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 8L, 8U


LOCATION
SEGMENT 1,2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL EL DELA CRUZ
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring for Ramp 15, Shearwall


SUBMITTAL DESCRIPTION
and including a portion of 9th floor and columns C2A,
C3 lower, C5
12,000psi = 35m3 , 10,000psi w/out
see attached
WP=15m3, 10,000psi w/ WP= 57m3

SUBMITTED DATE & TIME Saturday, January 12, 2019 3:00Pm

REQUESTED DATE & TIME Saturday, January 12, 2019 6:30pm JQ-BH-STR-0072
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 8L, 8U


LOCATION
SEGMENT 1,2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL EL DELA CRUZ
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring for 10floor Lower Beam


SUBMITTAL DESCRIPTION
and Slab, including 8th upper columns C1 GLC/6, C2A
GLC/5, C2 GLA/3
12,000psi = 12m3 ,, 10,000psi w/ WP= 71m3
see attached

SUBMITTED DATE & TIME Tuesday, January 15, 2019 3:00Pm

REQUESTED DATE & TIME Tuesday, January 15, 2019 6:30pm JQ-BH-STR-0073
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 8L, 8U


LOCATION
SEGMENT 1,2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DAVID/DU
STRUCTURAL EL DELA CRUZ
a) FORMWORKS E. BATALON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring for Ramp 16, and 9th


SUBMITTAL DESCRIPTION
Floor Upper Beam and Slab, including columns C2, C5,
see
12,000psi = 5m3 ,, 10,000psi w/ WP= 105m3,
attached
10,000psi w/out WP=12m3

SUBMITTED DATE & TIME Thursday, January 17, 2019 11:30Pm

REQUESTED DATE & TIME Thursday, January 17, 2019 6:30pm JQ-BH-STR-0074
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 9U
LOCATION
SEGMENT 1,2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
STRUCTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring @ 9th floor Lobby to 10


SUBMITTAL DESCRIPTION
floor Lower Beam Slab Including Ramp 17 and Elevator
Shearwall, Columns C2A GLE/4, C3 GLE/3', C3 GLE/2'
12,000psi = 45m3 ,, 10,000psi w/ WP= 74m3,
see attached
10,000psi w/out WP=16m3

SUBMITTED DATE & TIME Wednesday, January 23, 2019 3:30Pm

REQUESTED DATE & TIME Wednesday, January 23, 2019 6:30pm JQ-BH-STR-0075
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 9 to 10
LOCATION
SEGMENT 2,3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
STRUCTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)


Request for Inspection of Formworks for COLUMNS at
9th floor upper to 10th floor upper and columns at 8th
SUBMITTAL DESCRIPTION
floor upper to 9th floor lower, C1 GLC/6,C1 GLA/6, C2A
GLD/5, C2 GLB/6, C4 GLB/5, C2 GLA/5, C2 GLA/4, C2
GLA/3 see 12,000psi = 35m3
attached

SUBMITTED DATE & TIME Thursday, January 24, 2019 2:30Pm

REQUESTED DATE & TIME Thursday, January 24, 2019 6:30pm JQ-BH-STR-0076
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 9 to 10
LOCATION
SEGMENT 2,3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
STRUCTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring at 10th floor upper Beam


SUBMITTAL DESCRIPTION and Slab including Ramp 18 and 2 columns
see attached 12,000psi = 5m3 ,, 10,000psi w/ WP= 86m3,
10,000psi w/out WP=13m3

SUBMITTED DATE & TIME Saturday, January 26, 2019 2:30Pm

REQUESTED DATE & TIME Saturday, January 26, 2019 6:30pm JQ-BH-STR-0077
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 9 to 10
LOCATION
SEGMENT 2,3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
STRUCTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring at 10th floor upper Beam


SUBMITTAL DESCRIPTION and Slab Elevator Lobby including columns 5
see attached 12,000psi = 5m3 ,, 10,000psi w/ WP= 15m3,
10,000psi w/out WP=15m3

SUBMITTED DATE & TIME Thursday, January 31, 2019 2:30Pm

REQUESTED DATE & TIME Thursday, January 31, 2019 6:30pm JQ-BH-STR-0078
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 10U


LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
STRUCTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring at 10th Lower to 11th


SUBMITTAL DESCRIPTION floor Columns
see attached
12,000psi = 25m3 ,,

SUBMITTED DATE & TIME Friday, February 01, 2019 2:30Pm

REQUESTED DATE & TIME Friday, February 01, 2019 6:30pm JQ-BH-STR-0079
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 10L


LOCATION
SEGMENT 3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
STRUCTURAL

a) FORMWORKS RON JASON


b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring at 10th and 11th floor


SUBMITTAL DESCRIPTION Columns see
attached
12,000psi = 35m3 ,,

SUBMITTED DATE & TIME Thursday, February 07, 2019 2:30Pm

REQUESTED DATE & TIME Thursday, February 07, 2019 6:30pm JQ-BH-STR-0080
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 10U and 11th


LOCATION
SEGMENT 1,3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
STRUCTURAL

a) FORMWORKS RON JASON


b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring at 10th and 11th floor


SUBMITTAL DESCRIPTION Elevator Shearwall
see attached
12,000psi = 35m3 ,,

SUBMITTED DATE & TIME Friday, February 08, 2019 2:30Pm

REQUESTED DATE & TIME Friday, February 08, 2019 6:30pm JQ-BH-STR-0081
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 10U to 11th


LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
STRUCTURAL

a) FORMWORKS RON JASON


b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring at 11th floor Slab and


SUBMITTAL DESCRIPTION Beams including C3, Lower EB1 and EB2
see attached
10,000psi = 100m3 , 12,000psi = 6m3

SUBMITTED DATE & TIME Monday, February 11, 2019 2:30Pm

REQUESTED DATE & TIME Monday, February 11, 2019 6:30pm JQ-BH-STR-0081
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 10U to 11th


LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
STRUCTURAL

a) FORMWORKS RON JASON


b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring at 11th floor Slab and


SUBMITTAL DESCRIPTION
Beams including C3, swimming pool and kiddie pool
area see
10,000psi = 122m3 , 12,000psi = 32m3
attached

SUBMITTED DATE & TIME Monday, February 18, 2019 2:30Pm

REQUESTED DATE & TIME Monday, February 18, 2019 6:30pm JQ-BH-STR-0083
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 11th


LOCATION
SEGMENT 2,3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
STRUCTURAL

a) FORMWORKS RON JASON


b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring at 11th floor to 12 floor


SUBMITTAL DESCRIPTION Columns, C1,C4,C2,C2A, section 1
see attached
12,000psi = 40 m3

SUBMITTED DATE & TIME Thursday, February 28, 2019 2:30Pm

REQUESTED DATE & TIME Thursday, February 28, 2019 6:30pm JQ-BH-STR-0084
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 11th


LOCATION
SEGMENT 1
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
STRUCTURAL

a) FORMWORKS RON JASON


b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring at 11th floor to 12 floor


SUBMITTAL DESCRIPTION Columns, C1,C4,C2,C2A & C3, section 1
see attached
10,000psi = 39 m3

SUBMITTED DATE & TIME Tuesday, March 05, 2019 5:18Pm

REQUESTED DATE & TIME Tuesday, March 05, 2019 6:30pm JQ-BH-STR-0085
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 11th


LOCATION
SEGMENT 1
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
STRUCTURAL

a) FORMWORKS RON JASON


b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring at Slab 12th floor Section


SUBMITTAL DESCRIPTION
2,3, including Stair 4, C2A,C3, at 11th to 12th floor
section 2
10,000psi = 21 m3,
see attached
8,000psi = 138 m3

SUBMITTED DATE & TIME Wednesday, March 06, 2019 5:18Pm

REQUESTED DATE & TIME Wednesday, March 06, 2019 6:30pm JQ-BH-STR-0086
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 11th-12th


LOCATION
SEGMENT 2,3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
STRUCTURAL

a) FORMWORKS RON JASON


b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request For Concrete pouring For columns at 12th to


SUBMITTAL DESCRIPTION
15th Floor, C1 GLC-6, C2B GLB-6, C1 GLA-6,
C2A GL5-D, C4 GLB-5, C2 GLA-5, C2A GLD-4, C2
GLA-4, C2 GLA-3 (see detail) 10,000psi = 27 m3,

SUBMITTED DATE & TIME Saturday, March 09, 2019 2:00Pm

REQUESTED DATE & TIME Saturday, March 09, 2019 6:30pm JQ-BH-STR-0087
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 12th-15th


LOCATION
SEGMENT 1,2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring For columns at 12th to


SUBMITTAL DESCRIPTION
15th Floor, C2 GL2-A, C1 GL1-A, C1 GL1-B, C1 GL1-E,
C2A GL2-E, C4 GL2-B, C3 GL2'-E, C3 GL3'-E including
the Elevator Shearwall (see detail) 10,000psi = 52 m3,

SUBMITTED DATE & TIME Wednesday, March 13, 2019 2:00Pm

REQUESTED DATE & TIME Wednesday, March 13, 2019 6:30pm JQ-BH-STR-0088
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 12th-15th


LOCATION
SEGMENT 2,3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring at 15th Floor slab and


SUBMITTAL DESCRIPTION beams at section 1 & 2, including stair 4 (see detail)
10,000psi = 7 m3, 8,000PSI
= 117m3

SUBMITTED DATE & TIME Friday, March 15, 2019 2:00Pm

REQUESTED DATE & TIME Friday, March 15, 2019 6:30pm JQ-BH-STR-0089
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 15th


LOCATION
SEGMENT 1,2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring at 15th to 16th floor


SUBMITTAL DESCRIPTION columns section 1 & 2, including stair 3 from 11th to
12th floor (see detail) 10,000psi = 29 m3,

SUBMITTED DATE & TIME Friday, March 22, 2019 2:00Pm

REQUESTED DATE & TIME Friday, March 22, 2019 6:30pm JQ-BH-STR-0090
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 15th


LOCATION
SEGMENT 1,2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring at 15th to 16th floor


SUBMITTAL DESCRIPTION columns section 2 & 3, (see detail)
10,000psi = 29 m3,

SUBMITTED DATE & TIME Tuesday, March 26, 2019 10:30am

REQUESTED DATE & TIME Tuesday, March 26, 2019 6:30pm JQ-BH-STR-0091
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 15th TO 16th


LOCATION
SEGMENT 2,3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring at 15th to 16th floor


SUBMITTAL DESCRIPTION Elevator Shearwall section 2 (see detail)
10,000psi = 32 m3,

SUBMITTED DATE & TIME Wednesday, March 27, 2019 10:30am

REQUESTED DATE & TIME Wednesday, March 27, 2019 6:30pm JQ-BH-STR-0092
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 15th TO 16th


LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring at 16th floor Slab and
Beams, section 2 (see detail)
8,000psi = 108 m3,

SUBMITTED DATE & TIME Monday, April 01, 2019 2:00pm

REQUESTED DATE & TIME Monday, April 01, 2019 6:30pm JQ-BH-STR-0094
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 16th


LOCATION
SEGMENT 2,3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring at 16th to 17th floor


SUBMITTAL DESCRIPTION Column, section 1,2, including Stair 3 (see detail)
10,000psi = 21 m3,

SUBMITTED DATE & TIME Thursday, April 04, 2019 2:00pm

REQUESTED DATE & TIME Thursday, April 04, 2019 6:30pm JQ-BH-STR-0095
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 16th to 17th


LOCATION
SEGMENT 1,2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring at 16th to 17th floor


SUBMITTAL DESCRIPTION Elevator Shearwall section 2, including C3 (see detail)
10,000psi = 35 m3,

SUBMITTED DATE & TIME Thursday, April 11, 2019 2:00pm

REQUESTED DATE & TIME Thursday, April 11, 2019 6:30pm JQ-BH-STR-0096
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 16th to 17th


LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring at 16th to 17th floor For
Columns section 2,3 (see detail)
10,000psi = 27 m3,

SUBMITTED DATE & TIME Saturday, April 13, 2019 2:00pm

REQUESTED DATE & TIME Saturday, April 13, 2019 6:30pm JQ-BH-STR-0097
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 16th to 17th


LOCATION
SEGMENT 2,3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring at 17th floor For Beam


SUBMITTAL DESCRIPTION and Slab including Stair 3 fo 16th floor and Stair 2 of
2nd floor (see detail) 8,000psi = m3,

SUBMITTED DATE & TIME Friday, April 26, 2019 2:00pm

REQUESTED DATE & TIME Friday, April 26, 2019 6:30pm JQ-BH-STR-0098
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 17th


LOCATION
SEGMENT 1,2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring at 17th floor For Beam


SUBMITTAL DESCRIPTION and Slab including Stair 3 at section 2,3 (see detail)
8,000psi = m3,

SUBMITTED DATE & TIME Thursday, May 02, 2019 2:00pm

REQUESTED DATE & TIME Thursday, May 02, 2019 6:30pm JQ-BH-STR-0099
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 17th


LOCATION
SEGMENT 2,3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring at 17th to 18th floor


SUBMITTAL DESCRIPTION Elevator Shearwall and Column, section 2,3 (see detail)
10,000psi = 58 m3,

SUBMITTED DATE & TIME Tuesday, May 07, 2019 2:00pm

REQUESTED DATE & TIME Tuesday, May 07, 2019 6:30pm JQ-BH-STR-0100
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 17th-18th


LOCATION
SEGMENT 2,3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring at 18th floor Beam and


SUBMITTAL DESCRIPTION Slab including stair 4, section 1,2 (see detail)
8,000psi = 100 m3,

SUBMITTED DATE & TIME Friday, May 10, 2019 2:00pm

REQUESTED DATE & TIME Friday, May 10, 2019 6:30pm JQ-BH-STR-0101
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 18th


LOCATION
SEGMENT 1,2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring at 18th to 19th floor for
Columns, section 1,2 (see detail)
8,000psi = 20 m3,

SUBMITTED DATE & TIME Tuesday, May 14, 2019 2:00pm

REQUESTED DATE & TIME Tuesday, May 14, 2019 6:30pm JQ-BH-STR-0102
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 18th


LOCATION
SEGMENT 1,2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring at Beams and Slab,


SUBMITTAL DESCRIPTION including Stair 4, at 18th Floor, section 2,3 (see
detail) 8,000psi = 130 m3,

SUBMITTED DATE & TIME Thursday, May 16, 2019 2:00pm

REQUESTED DATE & TIME Thursday, May 16, 2019 6:30pm JQ-BH-STR-0103
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 18th


LOCATION
SEGMENT 2,3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring for Columns, at 18th to


SUBMITTAL DESCRIPTION 19th Floor, section 2,3 (see
detail) 8,000psi = 24 m3,

SUBMITTED DATE & TIME Monday, May 20, 2019 2:00pm

REQUESTED DATE & TIME Monday, May 20, 2019 6:30pm JQ-BH-STR-0104
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 18th to 19th


LOCATION
SEGMENT 2,3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Inspection of Formworks and Layout for


SUBMITTAL DESCRIPTION
Elevator Shearwall and Column C2A GLD-4, C3 GLD-3'
at 18th to 19th floor, section 1,2 (see detail),
8,000psi = 38 m3,

SUBMITTED DATE & TIME Thursday, May 23, 2019 2:00pm

REQUESTED DATE & TIME Thursday, May 23, 2019 6:30pm JQ-BH-STR-0105
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 18th to 19th


LOCATION
SEGMENT 1,2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring for Stair 2 at 3rd to 6th


SUBMITTAL DESCRIPTION floor, section 2 (see
detail), 6,000psi = 7 m3,

SUBMITTED DATE & TIME Wednesday, May 29, 2019 2:00pm

REQUESTED DATE & TIME Wednesday, May 29, 2019 6:30pm JQ-BH-STR-0106
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 3rd to 6th


LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring for Beams and slab @


SUBMITTAL DESCRIPTION
19th Floor, including Stair 3 and Stair 4, section 1,2
(see detail),
8,000psi = 118 m3,

SUBMITTED DATE & TIME Friday, May 31, 2019 2:00pm

REQUESTED DATE & TIME Friday, May 31, 2019 6:30pm JQ-BH-STR-0107
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 19th


LOCATION
SEGMENT 1,2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete pouring for Stair 1 @ 9 to 11 floor


SUBMITTAL DESCRIPTION and Stair 2 @ 7th floor, section 2 (see
detail), 6,000psi = 8 m3,

SUBMITTED DATE & TIME Saturday, June 01, 2019 2:00pm

REQUESTED DATE & TIME Saturday, June 01, 2019 6:30pm JQ-BH-STR-0108
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 7th-11th


LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete pouring for Column @ 19 to 20th


SUBMITTAL DESCRIPTION floor , section 1 (see
detail), 8,000psi = 26 m3,

SUBMITTED DATE & TIME Monday, June 03, 2019 2:00pm

REQUESTED DATE & TIME Monday, June 03, 2019 6:30pm JQ-BH-STR-0109
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 19th


LOCATION
SEGMENT 1
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS J. ANSELMO
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring for Slab and Beams, at


SUBMITTAL DESCRIPTION 19th Floor, section 2,3 (see
detail) 6,000psi = 108 m3,

SUBMITTED DATE & TIME Tuesday, June 04, 2019 2:00pm

REQUESTED DATE & TIME Tuesday, June 04, 2019 6:30pm JQ-BH-STR-0110
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 19th


LOCATION
SEGMENT 2,3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS LYMAR
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring for Stair 1 @ 11-10th


SUBMITTAL DESCRIPTION floor and Stair 2 @ 7th-8th floor, section 2 (see
detail), 6,000psi = 8 m3,

SUBMITTED DATE & TIME Tuesday, June 04, 2019 2:00pm

REQUESTED DATE & TIME Tuesday, June 04, 2019 6:30pm JQ-BH-STR-0111
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 6th-10th


LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS LYMAR
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring for Colum @ 19-20th


SUBMITTAL DESCRIPTION floor , section 2,3 (see detail),
8,000psi = 27 m3,

SUBMITTED DATE & TIME Friday, June 07, 2019 2:00pm

REQUESTED DATE & TIME Friday, June 07, 2019 6:30pm JQ-BH-STR-0112
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 6th-10th


LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS LYMAR
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring for Elevator Shearwall @


SUBMITTAL DESCRIPTION 19-20th floor , section 2 (see detail),
8,000psi = 32 m3,

SUBMITTED DATE & TIME Friday, June 07, 2019 2:00pm

REQUESTED DATE & TIME Friday, June 07, 2019 6:30pm JQ-BH-STR-0113
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 19th-20th


LOCATION
SEGMENT 2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS LYMAR
ELECTRICAL MARK JOEL / E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring for Stair 6 @ 3rd-7th


SUBMITTAL DESCRIPTION floor and Stair 3 @ 18th-19th (see detail),
6,000psi = 6 m3,

SUBMITTED DATE & TIME Tuesday, June 11, 2019 2:00pm

REQUESTED DATE & TIME Tuesday, June 11, 2019 4:00pm JQ-BH-STR-0114
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 3rd-7th and 18th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS LYMAR
ELECTRICAL E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring for Slab-Area 1 @ 21st
floor
6,000psi = 124 m3,

SUBMITTED DATE & TIME Saturday, June 29, 2019 4:30pm

REQUESTED DATE & TIME Saturday, June 29, 2019 11:00pm JQ-BH-STR-0117
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 21st


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

Volume of Concrete: in (cu.m)

Request for Concrete Pouring of 8 COLUMNS ( C1(2),-


along Gridline-6 ),( C2 (3) - along Gridline-6,5 & 4 ),
SUBMITTAL DESCRIPTION ( C2A(2)-along Gridline-5&4) ,( C4 (1) )along Gridline 5 =
from 21st Flr to 22nd Flr : ht= 2.9 mts 8,000psi = 21 m3,

SUBMITTED DATE & TIME Tuesday, July 02, 2019 4:30pm

REQUESTED DATE & TIME Tuesday, July 02, 2019 11:00pm JQ-BH-STR-0118
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 21st to 22nd


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR DU
ARCHITECTURAL DEVINE
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL E. CRUZ
FIRE PROTECTION

MECHANICAL GREENLINE
PLUMBING

SANITARY

SAFETY C.TONILON
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring for Slab-Area 2 @ 21st
floor
6,000psi = 120 m3,

SUBMITTED DATE & TIME Thursday, July 04, 2019 4:30pm

REQUESTED DATE & TIME Friday, July 05, 2019 11:00pm JQ-BH-STR-0119
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 21st


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY M.EROY
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring for SHEARWALL & 5


SUBMITTAL DESCRIPTION
COLUMNS at 21st to 22nd Floor (2.9m high), C2-2sets @
Gridline A3 & A2, C4-1 set @ Gridline B'2, C2A-1 set @
6,000psi = 120 m3,
Gridline D2, and C3-1 set @ Grid D2'

SUBMITTED DATE & TIME Wednesday, July 10, 2019 4:30pm

REQUESTED DATE & TIME Wednesday, July 10, 2019 11:00pm JQ-BH-STR-0120
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 21st


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY M.EROY
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring for 22nd BEAM/SLAB @


SUBMITTAL DESCRIPTION
GL A-E/3"-6', 21st-22nd Floor Stair 4 @ GL C-D/3'-4, and
21st-22nd Floor Columns @ GL D/4,D/3',D/1,B'/1, and GL
6000psi = 124 m³, 8000psi = 16 m³
A/1

SUBMITTED DATE & TIME Friday, July 12, 2019 10:00am

REQUESTED DATE & TIME Friday, July 12, 2019 3:00pm JQ-BH-STR-0121
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 21st - 22nd


LOCATION
SEGMENT A-E / 1-6'
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS ROSE MALYN
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY M.EROY
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring for 22nd COLUMNS at GL
A/6, B/6 , C/6, A/5, B/5, D/5, A/4 and GL D/4
8000psi = 23 m³

SUBMITTED DATE & TIME Monday, July 15, 2019 02:00pm

REQUESTED DATE & TIME Monday, July 15, 2019 04:00pm JQ-BH-STR-0122
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 22nd


LOCATION
SEGMENT A-D / 4-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS ROSE MALYN
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY M.EROY
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring for 22nd BEAMS/SLABS
@ GL A-E/1-3"
6000psi = 120 m³

SUBMITTED DATE & TIME Wednesday, July 17, 2019 01:30pm

REQUESTED DATE & TIME Wednesday, July 17, 2019 03:30pm JQ-BH-STR-0123
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 22nd


LOCATION
SEGMENT A-3 / 1-3"
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS ROSE MALYN
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY M.EROY
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring for 22nd SHEAR WALL @


SUBMITTAL DESCRIPTION GL B-B"/3-4, COLUMN GL D/3', D/2' and A/3, and STAIR
3 @ GL C-D/3-3' 8000psi = 44 m³

SUBMITTED DATE & TIME Monday, July 22, 2019 11:00am

REQUESTED DATE & TIME Monday, July 22, 2019 03:30pm JQ-BH-STR-0124
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 21st - 22nd


LOCATION
SEGMENT A-3 / 2'-4
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS ROSE MALYN
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY M.EROY
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring for 22nd COLUMN @ GL
D/2, E/1, B'/1, B'/2, A/1 and A/2
8000psi = 18 m³

SUBMITTED DATE & TIME Wednesday, July 24, 2019 02:00pm

REQUESTED DATE & TIME Wednesday, July 24, 2019 03:30pm JQ-BH-STR-0125
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 22nd-2rd


LOCATION
SEGMENT A-3 / 1-2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS ROSE MALYN
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY M.EROY
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring for 23rd COLUMN @ GL
D/2', A/3, A/2, B'/2, D/2, A/1, B'/1, E/1
8000psi = 23 m³

SUBMITTED DATE & TIME Tuesday, August 06, 2019 01:00pm

REQUESTED DATE & TIME Tuesday, August 06, 2019 01:00pm JQ-BH-STR-0126
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 23rd


LOCATION
SEGMENT A-E / 1-3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring of 8 COLUMNS along


SUBMITTAL DESCRIPTION
GRIDLINE A/6, B/6, C/6, A/5, B/5, D/5, A/4, D/4 from 23rd
Flr to 25th Flr : ht=2.9 mts
8,000psi = 23 m3,

SUBMITTED DATE & TIME Monday, July 29, 2019 1:00pm

REQUESTED DATE & TIME Monday, July 29, 2019 1:30pm JQ-BH-STR-0127
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 23rd to 25th


LOCATION
SEGMENT A-E / 4-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring of 23rd BEAMS/SLABS @
GL A-E/1-3"
6000psi = 119 m³

SUBMITTED DATE & TIME Wednesday, July 31, 2019 1:00pm

REQUESTED DATE & TIME Wednesday, July 31, 2019 3:30pm JQ-BH-STR-0128
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 23rd


LOCATION
SEGMENT A-E / 1-3"
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
6000psi = 119 m³

SUBMITTED DATE & TIME Tuesday, August 06, 2019 1:00pm

REQUESTED DATE & TIME Tuesday, August 06, 2019 1:30pm JQ-BH-STR-0129
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL x ELECTRICAL x MECHANICAL x SURVEY OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 23rd


LOCATION
SEGMENT A-E / 1-3"
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring for 23rd floor
SHEARWALL and COLUMN @ GL B-C/3-4 and D/3'
8000psi = 36 m³

SUBMITTED DATE & TIME Saturday, August 10, 2019 10:00am

REQUESTED DATE & TIME Saturday, August 10, 2019 02:00pm JQ-BH-STR-0130
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 23rd


LOCATION
SEGMENT B-C / 3-4
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring for 25th BEAM/SLAB @
GL A-E/3-6'
6000psi = 124 m³

SUBMITTED DATE & TIME Saturday, August 10, 2019 10:00am

REQUESTED DATE & TIME Saturday, August 10, 2019 02:00pm JQ-BH-STR-0130A
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 25th


LOCATION
SEGMENT A-E / 3-6'
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS ROSE MALYN
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY M.EROY
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring for 25th COLUMNS @ GL


SUBMITTAL DESCRIPTION A/6, B/6, C/6, A/5, B/5, D/5 and A/4, GF STAIR 1 @ GL
B/3-4 6000psi = 23 m³

SUBMITTED DATE & TIME Wednesday, August 14, 2019 01:00Pm

REQUESTED DATE & TIME Wednesday, August 14, 2019 03:30pm JQ-BH-STR-0131
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL GF / 25TH


LOCATION
SEGMENT A-D / 3-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS ROSE MALYN
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY M.EROY
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring of 25TH BEAMS/SLABS
@ GL A-E/1-3"
6000psi = 117 m³

SUBMITTED DATE & TIME Thursday, August 15, 2019 01:00Pm

REQUESTED DATE & TIME Thursday, August 15, 2019 03:30pm JQ-BH-STR-0132
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 25TH


LOCATION
SEGMENT A-E / 1-3"
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS ROSE MALYN
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY M.EROY
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for CONCRETE POURING for 25th COLUMN @


SUBMITTAL DESCRIPTION GL D/2', A/3, A/2, B'/2, D/2, A/1, B'/1, E/1 & STAIR 3 @
23rd-25th FL 6000psi = 25 m³

SUBMITTED DATE & TIME Monday, August 19, 2019 02:00PM

REQUESTED DATE & TIME Monday, August 19, 2019 02:00PM JQ-BH-STR-0133
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 25TH


LOCATION
SEGMENT A-E / 1-3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS ROSE MALYN
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY M.EROY
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring for 25th floor


SUBMITTAL DESCRIPTION SHEARWALL and COLUMN @ GL B-C/3-4, D/4 and D/3',
26th BEAM/SLAB @ GL A-E/3-6' 6000psi = 160 m³

SUBMITTED DATE & TIME Thursday, August 22, 2019 01:00pm

REQUESTED DATE & TIME Thursday, August 22, 2019 03:30pm JQ-BH-STR-0134
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 25th - 26th


LOCATION
SEGMENT A-E / 3-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring for RC WALL @ 4th Fl
PARAPET along Gridline D-E/1-3
4000psi = 6 m³

SUBMITTED DATE & TIME Tuesday, August 27, 2019 05:00pm

REQUESTED DATE & TIME Tuesday, August 27, 2019 09:00pm JQ-BH-STR-0135
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 4TH


LOCATION
SEGMENT D-E / 1-3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring for 26th BEAMS & SLABS
@ GL A-E/1-3'
6000psi = 117 m³

SUBMITTED DATE & TIME Tuesday, August 27, 2019 01:00pm

REQUESTED DATE & TIME Tuesday, August 27, 2019 03:30pm JQ-BH-STR-0136
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 26th


LOCATION
SEGMENT A-E / 1-3'
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring for 26th Floor Columns @


SUBMITTAL DESCRIPTION GL A/6, B/6, C/6, A/5, B/5, D/5, A/4, D/4 and 25th Floor
Stair 3 @ GL C-D/3-3' 6000psi = 26 m³

SUBMITTED DATE & TIME Friday, August 30, 2019 01:00pm

REQUESTED DATE & TIME Friday, August 30, 2019 03:30pm JQ-BH-STR-0137
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 25th - 26th


LOCATION
SEGMENT A-D / 3-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring for RC WALL @ 2nd Fl
along GL E/1-2' and GL A/3-4
4000psi = 8.5 m³

SUBMITTED DATE & TIME Monday, September 02, 2019 01:00pm

REQUESTED DATE & TIME Monday, September 02, 2019 01:00pm JQ-BH-STR-0138
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2nd


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR.XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring for 26th floor


SUBMITTAL DESCRIPTION SHEARWALL and COLUMN @ GL B-C/3-4 and D/3', 27th
BEAM/SLAB @ GL A-E/3-6' 6000psi = 160 m³

SUBMITTED DATE & TIME Wednesday, September 04, 2019 01:00pm

REQUESTED DATE & TIME Wednesday, September 04, 2019 03:30pm JQ-BH-STR-0139
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 26th - 27th


LOCATION
SEGMENT A-E / 3-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING for 25th COLUMN @
GL D/2', A/3, A/2, B'/2, D/2, A/1, B'/1, and E/1
6000psi = 23 m³

SUBMITTED DATE & TIME Thursday, September 05, 2019 10:00AM

REQUESTED DATE & TIME Thursday, September 05, 2019 02:00PM JQ-BH-STR-0140
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 26TH


LOCATION
SEGMENT A-E / 1-3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS ROSE MALYN
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY M.EROY
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING for 2nd Floor RC
Wall @ GL A/1-3 and 4th Floor RC Wall @ GL A-C/1
4000psi = 6.00 m³

SUBMITTED DATE & TIME Saturday, September 07, 2019 10:00AM

REQUESTED DATE & TIME Saturday, September 07, 2019 01:00PM JQ-BH-STR-0141
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2nd & 4th


LOCATION
SEGMENT A-C / 1-3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS ROSE MALYN
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY M.EROY
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring for 27th BEAMS & SLABS
@ GL A-E/1-3'
6000psi = 117 m³

SUBMITTED DATE & TIME Monday, September 09, 2019 01:00pm

REQUESTED DATE & TIME Monday, September 09, 2019 03:30pm JQ-BH-STR-0142
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 26th


LOCATION
SEGMENT A-E / 1-3'
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring for 27th Floor Columns @
GL A/6, B/6, C/6, A/5, B/5, D/5, A/4, and D/4
6000psi = 23 m³

SUBMITTED DATE & TIME Monday, September 09, 2019 01:00pm

REQUESTED DATE & TIME Monday, September 09, 2019 03:30pm JQ-BH-STR-0143
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 27th


LOCATION
SEGMENT A-D / 3-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING for 2nd Floor RC
Wall @ GL A/3-4 and 4th Floor RC Wall @ GL A/1-3
4000psi = 6.00 m³

SUBMITTED DATE & TIME Thursday, September 12, 2019 1:00PM

REQUESTED DATE & TIME Thursday, September 12, 2019 03:30PM JQ-BH-STR-0144
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2nd & 4th


LOCATION
SEGMENT A / 1-4
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS ROSE MALYN
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY M.EROY
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING for 5th Floor RC Wall
@ GL E/1-2'
4000psi = 6.00 m³

SUBMITTED DATE & TIME Tuesday, September 17, 2019 1:00PM

REQUESTED DATE & TIME Tuesday, September 17, 2019 03:30PM JQ-BH-STR-0145
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 5TH


LOCATION
SEGMENT E/1-2'
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS ROSE MALYN
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY M.EROY
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring for 27th floor


SUBMITTAL DESCRIPTION
SHEARWALL and COLUMN @ GL B-C/3-4 and D/3', 28th
BEAM/SLAB @ GL A-E/3-6', Stair 3 (26th floor) and Stair
6000psi = 163 m³
4 (27th Floor)

SUBMITTED DATE & TIME Wednesday, September 18, 2019 01:00pm

REQUESTED DATE & TIME Wednesday, September 18, 2019 03:30pm JQ-BH-STR-0146
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 26th - 28th


LOCATION
SEGMENT A-E / 3-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING for 27th Floor
COLUMN @ GL D/2', A/3, A/2, B'/2, D/2, A/1, B'/1, and E/1
6000psi = 23 m³

SUBMITTED DATE & TIME Wednesday, September 18, 2019 01:00PM

REQUESTED DATE & TIME Wednesday, September 18, 2019 03:30PM JQ-BH-STR-0147
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 27TH


LOCATION
SEGMENT A-E / 1-3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS ROSE MALYN
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY M.EROY
PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring for 28th Floor Columns @
GL A/6, B/6, C/6, A/5, B/5, D/5, and A/4
6000psi = 21 m³

SUBMITTED DATE & TIME Saturday, September 21, 2019 01:00pm

REQUESTED DATE & TIME Saturday, September 21, 2019 03:30pm JQ-BH-STR-0148
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 28th


LOCATION
SEGMENT A-D / 4-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING of RC WALL for 2ND
Floor @ GL D/2'-3' and 3RD Floor @ GL A/3-4
4000psi = 6 m³

SUBMITTED DATE & TIME Monday, September 23, 2019 01:00pm

REQUESTED DATE & TIME Monday, September 23, 2019 03:30pm JQ-BH-STR-0149
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL MECHANICAL
x SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2ND, 3RD


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring for 28th Floor BEAMS &
SLABS @ GL A-E/1-3'
6000psi = 122 m³

SUBMITTED DATE & TIME Monday, September 23, 2019 01:00pm

REQUESTED DATE & TIME Monday, September 23, 2019 03:30pm JQ-BH-STR-0150
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 28th


LOCATION
SEGMENT A-E / 1-3'
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring for 28th FL 6 COLUMNS


SUBMITTAL DESCRIPTION @ GL D/2', A/3, A/2, B'/2, D/2, B'/1 and 27th - 28th FL
STAIR 3 6000psi = 19 m³

SUBMITTED DATE & TIME Friday, September 27, 2019 01:00pm

REQUESTED DATE & TIME Friday, September 27, 2019 03:30pm JQ-BH-STR-0151
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 28th


LOCATION
SEGMENT A-E / 1-3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING of RC WALL for 2ND
Floor @ GL A/4-5 and 5TH Floor @ GL A-E/1
4000psi = 9 m³

SUBMITTED DATE & TIME Saturday, September 28, 2019 01:00pm

REQUESTED DATE & TIME Saturday, September 28, 2019 03:30pm JQ-BH-STR-0152
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2ND,5TH


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring of 28th floor


SUBMITTAL DESCRIPTION
SHEARWALL and COLUMN @ GL B-C/3-4, D/4 and D/3',
29th BEAM/SLAB @ GL A-E/3-6' and Stair 4 (28th Floor)
6000psi = 166 m³

SUBMITTED DATE & TIME Wednesday, October 02, 2019 01:00pm

REQUESTED DATE & TIME Wednesday, October 02, 2019 03:30pm JQ-BH-STR-0153
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 28th-29th


LOCATION
SEGMENT A-E / 3-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING of RC WALL for
Upper 2ND Floor @ GL D/3'-4 and 4TH Floor @ GL A/3-4
4000psi = 9 m³

SUBMITTED DATE & TIME Thursday, October 03, 2019 01:00pm

REQUESTED DATE & TIME Thursday, October 03, 2019 03:30pm JQ-BH-STR-0154
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 28th-29th


LOCATION
SEGMENT A-E / 3-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring for 29th Floor BEAMS &


SUBMITTAL DESCRIPTION SLABS @ GL A-E/1-3' and 28th Floor COLUMN @ GL
D/2', E/1 and A/1 6000psi = 131 m³

SUBMITTED DATE & TIME Saturday, October 05, 2019 01:00pm

REQUESTED DATE & TIME Saturday, October 05, 2019 03:30pm JQ-BH-STR-0155
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 28th-29th


LOCATION
SEGMENT A-E / 1-3'
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING of RC WALL for
Upper 2ND Floor @ GL D/4-5 and 5TH Floor @ GL A/1-3
4000psi = 8 m³

SUBMITTED DATE & TIME Saturday, October 05, 2019 01:00pm

REQUESTED DATE & TIME Saturday, October 05, 2019 03:30pm JQ-BH-STR-0156
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2ND, 5TH


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring for 29th Floor Columns @
GL A/6, B/6, C/6, A/5, B/5, D/5, A/4 and D/4
6000psi = 23 m³

SUBMITTED DATE & TIME Monday, October 07, 2019 01:00pm

REQUESTED DATE & TIME Monday, October 07, 2019 03:30pm JQ-BH-STR-0157
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 29th


LOCATION
SEGMENT A-D / 4-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MICHAEL DU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING of 29th FL 8
COLUMNS @ GL D/2', A/3, A/2, B'/2, D/2, A/1, B'/1, E/1
6000psi = 23 m³

SUBMITTED DATE & TIME Wednesday, October 09, 2019 01:00pm

REQUESTED DATE & TIME Wednesday, October 09, 2019 03:30pm JQ-BH-STR-0158
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 29th


LOCATION
SEGMENT A-E / 1-3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING of RC WALL for 3RD
Floor @ GL A/1-3 and GL E/1-2'
4000psi = 9 m³

SUBMITTED DATE & TIME Thursday, October 10, 2019 01:00pm

REQUESTED DATE & TIME Thursday, October 10, 2019 03:30pm JQ-BH-STR-0159
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 3RD


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for CONCRETE POURING of 28th Floor Stair 3


SUBMITTAL DESCRIPTION and Stair Along Unit E @ GL C-D/3-3', B/3 and 29th Floor
Columns @ GL D/3' and D/1 6000psi = 12 m³

SUBMITTED DATE & TIME Saturday, October 12, 2019 01:00pm

REQUESTED DATE & TIME Saturday, October 12, 2019 03:30pm JQ-BH-STR-0160
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 28th - 29th


LOCATION
SEGMENT B-D/3-3'
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring of 29th floor


SUBMITTAL DESCRIPTION SHEARWALL @ GL B-C/3-4, 30th BEAM/SLAB @ GL A-
E/3-6' and Stair 4 (29th Floor) 6000psi = 155 m³

SUBMITTED DATE & TIME Monday, October 14, 2019 01:00pm

REQUESTED DATE & TIME Monday, October 14, 2019 03:30pm JQ-BH-STR-0161
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 29th-30th


LOCATION
SEGMENT A-E / 3-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING of RC WALL for 3RD
Floor @ GL E/1-2' and 5TH Floor @ GL A/3-4
4000psi = 7 m³

SUBMITTED DATE & TIME Monday, October 14, 2019 01:00pm

REQUESTED DATE & TIME Monday, October 14, 2019 03:30pm JQ-BH-STR-0162
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 3rd, 5th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring for 30th Floor BEAMS &
SLABS @ GL A-E/1-3'
6000psi = 117 m³

SUBMITTED DATE & TIME Thursday, October 17, 2019 01:00pm

REQUESTED DATE & TIME Thursday, October 17, 2019 03:30pm JQ-BH-STR-0163
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 30th


LOCATION
SEGMENT A-E / 1-3'
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring for 3rd Floor RC Wall @
GL A-E/1, A/4-5 and D/4-5
4000psi = 8 m³

SUBMITTED DATE & TIME Monday, October 21, 2019 01:00pm

REQUESTED DATE & TIME Monday, October 21, 2019 03:30pm JQ-BH-STR-0164
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 3rd


LOCATION
SEGMENT A-E / 1-5
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for CONCRETE POURING for 30th FL 8


SUBMITTAL DESCRIPTION COLUMNS @ GL D/2', A/3, A/2, B'/2, D/2, A/1, B'/1,
E/1 6000psi = 23 m³

SUBMITTED DATE & TIME Tuesday, October 22, 2019 01:00pm

REQUESTED DATE & TIME Tuesday, October 22, 2019 03:30pm JQ-BH-STR-0165
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X STRUCTURAL xELECTRICAL x


MECHANICAL SURVEY x OTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 30TH


LOCATION
SEGMENT A-E / 1-3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring of 30th floor


SUBMITTAL DESCRIPTION SHEARWALL @ GL B-C/3-4, 31ST BEAM/SLAB @ GL A-
E/3-6' and Stair 4 (30th Floor) 6000psi = 160 m³

SUBMITTED DATE & TIME Friday, October 25, 2019 01:00pm

REQUESTED DATE & TIME Friday, October 25, 2019 03:30pm JQ-BH-STR-0166
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 30th-31ST


LOCATION
SEGMENT A-E / 3-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring for 31ST Floor BEAMS &
SLABS @ GL A-E/1-3'
6000psi = 117 m³

SUBMITTED DATE & TIME Monday, October 28, 2019 01:00pm

REQUESTED DATE & TIME Monday, October 28, 2019 03:30pm JQ-BH-STR-0167
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 31ST


LOCATION
SEGMENT A-E / 1-3'
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for CONCRETE POURING of RC WALL for 3rd


SUBMITTAL DESCRIPTION Floor Lower @ GL D/2'-3', 3rd Floor Upper @ GL D/3'-4,
and 5th Floor @ GL D/4-6 4000psi = 6 m³

SUBMITTED DATE & TIME Tuesday, October 29, 2019 10:00am

REQUESTED DATE & TIME Tuesday, October 29, 2019 10:00am JQ-BH-STR-0168
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 3rd, 5th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING of RC WALL for 2RD
Floor @ GL A/5-6
4000psi = 6 m³

SUBMITTED DATE & TIME Wednesday, October 30, 2019 01:00pm

REQUESTED DATE & TIME Wednesday, October 30, 2019 03:30pm JQ-BH-STR-0169
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2ND


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING of RC WALL for 5th
Floor @ GL A-B'/6
4000psi = 6 m³

SUBMITTED DATE & TIME Tuesday, November 05, 2019 01:00pm

REQUESTED DATE & TIME Tuesday, November 05, 2019 03:30pm JQ-BH-STR-0170
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 5TH


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring of 8 Columns at 31st FL
along GL A/6, B/6, C/6, A/5, B/5, D/5, A/4 and D/4
6000psi = 23 m³

SUBMITTED DATE & TIME Wednesday, November 06, 2019 01:00pm

REQUESTED DATE & TIME Wednesday, November 06, 2019 03:30pm JQ-BH-STR-0171
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 31st


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING of RC WALL for 5th
Floor @ GL A/4-5 and 6th Floor @ GL A/1-2'
4000psi = 7 m³

SUBMITTED DATE & TIME Friday, November 08, 2019 01:00pm

REQUESTED DATE & TIME Friday, November 08, 2019 03:30pm JQ-BH-STR-0172
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 5TH - 6TH


LOCATION
SEGMENT A/1-5
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Inspection of FORMWORKS of RC WALL
for 4th Floor @ GL D/3-3' and 6th Floor @ GL A/3-4
4000psi = 7 m³

SUBMITTED DATE & TIME Saturday, November 09, 2019 01:00pm

REQUESTED DATE & TIME Saturday, November 09, 2019 03:30pm JQ-BH-STR-0173
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 4TH,6TH


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING of RC WALL for 2nd
FL along GL A-D/6 and D/5-6
4000psi = 6 m³

SUBMITTED DATE & TIME Monday, November 11, 2019 01:00pm

REQUESTED DATE & TIME Monday, November 11, 2019 03:30pm JQ-BH-STR-0174
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2ND


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING of 29TH and 30TH
Floor Stair 3 @ GL D/3-3'
6000psi = 6 m³

SUBMITTED DATE & TIME Monday, November 11, 2019 01:00pm

REQUESTED DATE & TIME Monday, November 11, 2019 03:30pm JQ-BH-STR-0175
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 29TH & 30TH


LOCATION
SEGMENT D/3-3'
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING of 31ST Floor
Columns @ GL A-E/1-3'
6000psi = 27 m³

SUBMITTED DATE & TIME Tuesday, November 12, 2019 01:00pm

REQUESTED DATE & TIME Tuesday, November 12, 2019 03:30pm JQ-BH-STR-0176
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 31ST


LOCATION
SEGMENT A-E/1-3'
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring of 31ST floor


SUBMITTAL DESCRIPTION SHEARWALL @ GL B-C/3-4, 32ND BEAM/SLAB @ GL A-
E/3-6' and Stair 4 (31ST Floor) 6000psi = 160 m³

SUBMITTED DATE & TIME Wednesday, November 13, 2019 01:00pm

REQUESTED DATE & TIME Wednesday, November 13, 2019 03:30pm JQ-BH-STR-0177
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 31ST-32ND


LOCATION
SEGMENT A-E / 3-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Inspection of FORMWORKS of RC WALL
for 3rd FL along GL A/5-6 and 6th FL along GL A-E/1
4000psi = 7 m³

SUBMITTED DATE & TIME Wednesday, November 13, 2019 01:00pm

REQUESTED DATE & TIME Wednesday, November 13, 2019 03:30pm JQ-BH-STR-0178
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 3RD,6TH


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING of RC WALL for 6th
FL along GL E/1-2'
4000psi = 6 m³

SUBMITTED DATE & TIME Friday, November 15, 2019 01:00pm

REQUESTED DATE & TIME Friday, November 15, 2019 04:00pm JQ-BH-STR-0179
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 6TH


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING of RC WALL for 4th
FL along GL D/2'-4 and 6th FL along GL A/4-5
4000psi = 6 m³

SUBMITTED DATE & TIME Tuesday, November 19, 2019 01:00pm

REQUESTED DATE & TIME Tuesday, November 19, 2019 03:30pm JQ-BH-STR-0180
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 4th,6TH


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring for 32ND Floor BEAMS &


SUBMITTAL DESCRIPTION SLABS @ GL A-E/1-3' and Stair 3 @ GL D/3-3' (31ST
Floor) 6000psi = 119 m³

SUBMITTED DATE & TIME Wednesday, November 20, 2019 01:00pm

REQUESTED DATE & TIME Wednesday, November 20, 2019 03:30pm JQ-BH-STR-0181
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 31ST-32ND


LOCATION
SEGMENT A-E / 1-3'
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Inspection of FORMWORKS of RC WALL
for 4th FL along GL A/5-6 and GL D/4-6
4000psi = 7 m³

SUBMITTED DATE & TIME Thursday, November 21, 2019 01:00pm

REQUESTED DATE & TIME Thursday, November 21, 2019 03:30pm JQ-BH-STR-0182
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 4TH,6TH


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Inspection of FORMWORKS of RC WALL
for 6th Floor Upper along GL A-D/6
4000psi = 7 m³

SUBMITTED DATE & TIME Monday, November 25, 2019 01:00pm

REQUESTED DATE & TIME Monday, November 25, 2019 03:30pm JQ-BH-STR-0183
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 6TH


LOCATION
SEGMENT A-D/6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring of 32ND floor


SUBMITTAL DESCRIPTION
SHEARWALL @ GL B-C/3-4, 32ND Floor COLUMNS @
GL A-D/3'-6, 33RD BEAM/SLAB @ GL A-E/3-6' and Stair
6000psi = 183 m³
4 (32ND Floor)

SUBMITTED DATE & TIME Tuesday, November 26, 2019 01:00pm

REQUESTED DATE & TIME Tuesday, November 26, 2019 03:30pm JQ-BH-STR-0184
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 32ND-33RD


LOCATION
SEGMENT A-E / 3-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for concrete pouring of RC WALL for 4th Floor
Upper along GL A/4-5
4000psi = 7 m³

SUBMITTED DATE & TIME Friday, November 29, 2019 01:00pm

REQUESTED DATE & TIME Friday, November 29, 2019 03:30pm JQ-BH-STR-0185
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 4TH


LOCATION
SEGMENT A/4-5
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for concrete pouring of RC WALL for 3rd Floor
Upper along GL A-B/6 and 7th Floor A/1-2'
4000psi = 7 m³

SUBMITTED DATE & TIME Tuesday, December 03, 2019 01:00pm

REQUESTED DATE & TIME Tuesday, December 03, 2019 03:30pm JQ-BH-STR-0186
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 3rd,7th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for CONCRETE POURING for 32ND Floor


SUBMITTAL DESCRIPTION Columns @ GL A-E/1-3, 33RD Floor BEAM & SLAB @
GL A-E/1-3 6000psi = 140 m³

SUBMITTED DATE & TIME Wednesday, December 04, 2019 01:00pm

REQUESTED DATE & TIME Wednesday, December 04, 2019 03:30pm JQ-BH-STR-0187
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 32ND,33RD


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for CONCRETE POURING of RC WALL for 4th


SUBMITTAL DESCRIPTION FL along GL D/4-5, 5th FL Lower along GL D/3-3', 5th FL
along D/3'-4, 6th FL along GL D/2'-3 4000psi = 7 m³

SUBMITTED DATE & TIME Thursday, December 05, 2019 01:00pm

REQUESTED DATE & TIME Thursday, December 05, 2019 03:30pm JQ-BH-STR-0188
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 4TH,5TH,6TH


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING of DROPWALL at
15th FL Balcony along GL A/2-3'
4000psi = 1.5 m³

SUBMITTED DATE & TIME Friday, December 06, 2019 01:00pm

REQUESTED DATE & TIME Friday, December 06, 2019 03:30pm JQ-BH-STR-0189
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 15TH


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring for 33rd floor


SUBMITTAL DESCRIPTION SHEARWALL @ GL B-C/3-4, 33rd Floor Columns @ GL
A-D/3'-6, 35th Floor BEAM/SLAB @ GL A-E/3-6' 6000psi = 184 m³

SUBMITTED DATE & TIME Wednesday, December 11, 2019 01:00pm

REQUESTED DATE & TIME Wednesday, December 11, 2019 03:30pm JQ-BH-STR-0190
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 33rd-35th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for CONCRETE POURING for 33rd Floor


SUBMITTAL DESCRIPTION Columns @ GL A-E/1-3, 35th Floor BEAM & SLAB @ GL
A-E/1-3 6000psi = 140 m³

SUBMITTED DATE & TIME Monday, December 16, 2019 01:00pm

REQUESTED DATE & TIME Monday, December 16, 2019 03:30pm JQ-BH-STR-0191
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 33rd-35th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING of RC WALL for 3rd
FL along GL B-C/6'
4000psi = 7 m³

SUBMITTED DATE & TIME Tuesday, December 17, 2019 01:00pm

REQUESTED DATE & TIME Tuesday, December 17, 2019 03:30pm JQ-BH-STR-0192
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 3RD


LOCATION
SEGMENT B-C/6'
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING of RC WALL for 7TH
FL along GL A-E/1 and 12th Floor GL D/2'-3'
4000psi = 6 m³

SUBMITTED DATE & TIME Thursday, December 19, 2019 01:00pm

REQUESTED DATE & TIME Thursday, December 19, 2019 03:30pm JQ-BH-STR-0193
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 7th & 12th


LOCATION
SEGMENT A-E/1-3'
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR XU
ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring of 35TH floor


SUBMITTAL DESCRIPTION
SHEARWALL @ GL B-C/3-4, 35TH Floor COLUMNS @
GL A-D/3'-6, 36TH BEAM/SLAB @ GL A-E/3-6' and Stair
6000psi = 187 m³
4 (35TH Floor)

SUBMITTED DATE & TIME Friday, January 10, 2020 9:00AM

REQUESTED DATE & TIME Friday, January 10, 2020 9:00AM JQ-BH-STR-0194
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 35TH-36TH


LOCATION
SEGMENT A-E / 3-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL DIVINE JULIAN
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring of RC WALL at 6th FL GL
A/5-6 and 7th FL GL E/1-2'
4000psi = 7 m³

SUBMITTED DATE & TIME Friday, January 10, 2020 01:00pm

REQUESTED DATE & TIME Friday, January 10, 2020 03:30pm JQ-BH-STR-0195
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 6TH,7TH


LOCATION
SEGMENT A/5-6, E/1-2'
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR XU
ARCHITECTURAL R.MAMBURAM
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring of RC WALL at 15th FL
BALCONY along GL A/1 and GL C-E/1
4000psi = 2 m³

SUBMITTED DATE & TIME Tuesday, January 14, 2020 01:00pm

REQUESTED DATE & TIME Tuesday, January 14, 2020 03:30pm JQ-BH-STR-0196
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 15TH FL


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR XU
ARCHITECTURAL R.MAMBURAM
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for CONCRETE POURING for 35th Floor


SUBMITTAL DESCRIPTION Columns @ GL A-E/1-3, 36th Floor BEAM & SLAB @ GL
A-E/1-3, 33rd Floor STAIR 3 6000psi = 143 m³

SUBMITTED DATE & TIME Saturday, January 18, 2020 01:00pm

REQUESTED DATE & TIME Saturday, January 18, 2020 03:30pm JQ-BH-STR-0197
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 33RD,35TH,36TH


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL R.MAMBURAM
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for CONCRETE POURING for RC WALL at 12th


SUBMITTAL DESCRIPTION FL along GL -B/1, GL A/4, GL A/6, C-D/6, 7th FL along
GL A/3-4, 8th FL along GL A/1-2' 4000psi = 7 m³

SUBMITTED DATE & TIME Wednesday, January 22, 2020 01:00pm

REQUESTED DATE & TIME Wednesday, January 22, 2020 01:00pm JQ-BH-STR-0198
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 7TH, 8TH, 12TH


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR XU
ARCHITECTURAL R.MAMBURAM
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring of 36TH floor


SUBMITTAL DESCRIPTION
SHEARWALL @ GL B-C/3-4, 36TH Floor COLUMNS @
GL A-D/3'-6, 37TH LOWER BEAM/SLAB @ GL A-E/3-6'
6000psi = 176 m³
and Stair 4 (36TH Floor)

SUBMITTED DATE & TIME Monday, January 27, 2020 9:00AM

REQUESTED DATE & TIME Monday, January 27, 2020 9:00AM JQ-BH-STR-0199
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 36TH-37L


LOCATION
SEGMENT A-E / 3-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL R. MAMBURAM
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for CONCRETE POURING for 36th Floor


SUBMITTAL DESCRIPTION Columns @ GL A-E/1-3, 37th Floor BEAM & SLAB @ GL
A-E/1-3 6000psi = 143 m³

SUBMITTED DATE & TIME Saturday, February 01, 2020 01:00pm

REQUESTED DATE & TIME Saturday, February 01, 2020 03:30pm JQ-BH-STR-0200
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 36TH-37TH


LOCATION
SEGMENT A-E / 1-3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL R.MAMBURAM
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for CONCRETE POURING for 29th FL RC WALL


SUBMITTAL DESCRIPTION along GL A/1-3 (see attached
keyplan) 4000psi = 6 m³

SUBMITTED DATE & TIME Friday, January 31, 2020 01:00pm

REQUESTED DATE & TIME Friday, January 31, 2020 03:30pm JQ-BH-STR-0201
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 29th


LOCATION
SEGMENT A/1-3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR XU
ARCHITECTURAL R.MAMBURAM
a) FORMWORKS RON JASON
b) REBARS R. MAMBURAM
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring of 37TH floor LOWER


SHEARWALL @ GL B-C/3-4, 37TH Floor LOWER
SUBMITTAL DESCRIPTION COLUMNS @ GL A-D/3'-6, 37TH UPPER BEAM/SLAB @
GL A-E/3-6', Stair 4 (37TH Floor LOWER) and Stair 3 6000psi = 183 m³
(35th Floor)

SUBMITTED DATE & TIME Tuesday, February 11, 2020 1:00PM

REQUESTED DATE & TIME Tuesday, February 11, 2020 3:30PM JQ-BH-STR-0203
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 37TH(L)-37TH(U)


LOCATION
SEGMENT A-E / 3-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL JAYSON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring of 37TH Floor Lower
Columns @ GL A/1, A/2, A/3, B/1, B/2, D/1, D/2, and D/2'
6000psi = 24 m³

SUBMITTED DATE & TIME Monday, February 17, 2020 1:00PM

REQUESTED DATE & TIME Monday, February 17, 2020 3:30PM JQ-BH-STR-0204
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 37TH(L)-37TH(U)


LOCATION
SEGMENT A-E / 1-3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL JAYSON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for CONCRETE POURING for 37th Floor (L)


SUBMITTAL DESCRIPTION Columns @ GL A-E/1-3, 37th (U) Floor BEAM & SLAB @
GL A-E/1-3 6000psi = 127 m³

SUBMITTED DATE & TIME Monday, February 17, 2020 01:00pm

REQUESTED DATE & TIME Monday, February 17, 2020 03:30pm JQ-BH-STR-0205
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 37TH(L)-37TH(U)


LOCATION
SEGMENT A-E / 1-3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL JASON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING for 7th Floor (U) RC
Wall Along GL A-D/6 & GL D/4-6
4000psi = 6 m³

SUBMITTED DATE & TIME Wednesday, February 19, 2020 01:00pm

REQUESTED DATE & TIME Wednesday, February 19, 2020 03:30pm JQ-BH-STR-0206
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 7TH(U)


LOCATION
SEGMENT A-E / 6 & D/4-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL JASON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for CONCRETE POURING for 7th Floor (U) RC
Wall Along GL A/4-6 & GL A-B/6
4000psi = 6 m³

SUBMITTED DATE & TIME Monday, February 24, 2020 01:00pm

REQUESTED DATE & TIME Monday, February 24, 2020 03:30pm JQ-BH-STR-0207
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 7TH(U)


LOCATION
SEGMENT A-E / 6 & D/4-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL JASON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring of 37TH floor Upper


SUBMITTAL DESCRIPTION
SHEARWALL @ GL B-C/3-4, 37TH Floor Upper
COLUMNS @ GL A-D/3'-6, 38TH Lower BEAM/SLAB @
6000psi = 176 m³
GL A-E/3-6', Stair 4 (37TH Floor Upper)

SUBMITTED DATE & TIME Wednesday, February 26, 2020 01:00pm

REQUESTED DATE & TIME Wednesday, February 26, 2020 03:30pm JQ-BH-STR-0208
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 38t


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL JASON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring of RC Wall @ 12th, 15th,


SUBMITTAL DESCRIPTION 16th and 29th Fl (please see
attached key plan) 4000psi = 6 m³

SUBMITTED DATE & TIME Friday, February 28, 2020 01:00pm

REQUESTED DATE & TIME Friday, February 28, 2020 03:30pm JQ-BH-STR-0209
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL
LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL JASON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring of RC Wall @ 9th FL
along GL A/1-3
4000psi = 6 m³

SUBMITTED DATE & TIME Saturday, February 29, 2020 10:00am

REQUESTED DATE & TIME Saturday, February 29, 2020 10:30am JQ-BH-STR-0210
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL
LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL JASON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring of RC Wall @ 16th FL
along GL A/4-6
4000psi = 6m³

SUBMITTED DATE & TIME Monday, March 02, 2020 010:00am

REQUESTED DATE & TIME Monday, March 02, 2020 10:30am JQ-BH-STR-0211
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL
LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL JASON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Concrete Pouring of RC Wall @ 9th FL
along GL A-E/1 & GL E/1-2'
4000psi = 6m³

SUBMITTED DATE & TIME Monday, March 09, 2020 01:30pm

REQUESTED DATE & TIME Monday, March 09, 2020 3:30pm JQ-BH-STR-0212
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL
LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL JASON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring of 38TH floor LOWER


SHEARWALL @ GL B-C/3-4, 38TH Floor LOWER
SUBMITTAL DESCRIPTION COLUMNS @ GL A-D/3'-6, 38TH UPPER BEAM/SLAB @
GL A-E/3-6', Stair 4 (38TH Floor Lower) and Stair 3 (36th 6000psi = 183 m³
Floor)

SUBMITTED DATE & TIME Tuesday, March 10, 2020 1:00PM

REQUESTED DATE & TIME Wednesday, March 11, 2020 3:30PM JQ-BH-STR-0213
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 38TH(L)-38TH(U)


LOCATION
SEGMENT A-E / 3-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL JAYSON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of Stair 2 @ 2nd Fl. & 10th Fl. Along
GL A/3-4
6000psi = 6 m³

SUBMITTED DATE & TIME Tuesday, March 10, 2020 1:00PM

REQUESTED DATE & TIME Wednesday, March 11, 2020 3:30PM JQ-BH-STR-0213
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL
LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL JAYSON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring for RC Wall @ 29th Fl. Along GL A-
E/6 & GL B-D/1
4000psi = 6 m³

SUBMITTED DATE & TIME Friday, March 13, 2020 1:00PM

REQUESTED DATE & TIME Friday, March 13, 2020 1:30PM JQ-BH-STR-0215
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 29th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL JAYSON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for CONCRETE POURING for 38th Floor (L)


SUBMITTAL DESCRIPTION Columns @ GL A-E/1-3, 38th (U) Floor BEAM & SLAB @
GL A-E/1-3 6000psi = 127 m³

SUBMITTED DATE & TIME Saturday, March 14, 2020 01:00pm

REQUESTED DATE & TIME Saturday, March 14, 2020 03:30pm JQ-BH-STR-0216
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 38TH(L)-38TH(U)


LOCATION
SEGMENT A-E / 1-3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL JASON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring for RC Wall @ 10th Fl. Along GL
A/1-3 & 30th Floor Along GL A'-B"/6'
4000psi = 6 m³

SUBMITTED DATE & TIME Wednesday, June 17, 2020 1:00PM

REQUESTED DATE & TIME Wednesday, June 17, 2020 1:30PM JQ-BH-STR-0217
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 10TH & 30TH


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. CAO
PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL JAYSON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring for RC Wall @ 29th Fl. Along GL
D/2"-2'
4000psi = 6 m³

SUBMITTED DATE & TIME Thursday, June 18, 2020 1:00PM

REQUESTED DATE & TIME Thursday, June 18, 2020 1:30PM JQ-BH-STR-0218
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 29TH


LOCATION
SEGMENT D / 2"-2'
CONTRACTOR'S REPRESENTATIVE

MR. CAO
PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL JAYSON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Pouring of RC Wall @ 10th Fl. Along GL A-


SUBMITTAL DESCRIPTION C/1, 16th Fl. Along GL A-C/6', 30th Fl. Along GL B"-C/6'
and GL D/5-6 4000psi = 6 m³

SUBMITTED DATE & TIME Wednesday, June 24, 2020 1:30PM

REQUESTED DATE & TIME Wednesday, June 24, 2020 1:30PM JQ-BH-STR-0220
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 10th, 16th, 30th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. CAO
PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL JAYSON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring of 38TH floor UPPER


SUBMITTAL DESCRIPTION
SHEARWALL @ GL B-C/3-4, 38TH Floor UPPER
COLUMNS @ GL A-D/3'-6, 39TH LOWER BEAM/SLAB @
6000psi = 183 m³
GL A-E/3-6', Stair 4 (38TH Floor Upper)

SUBMITTED DATE & TIME Monday, June 29, 2020 1:00PM

REQUESTED DATE & TIME Monday, June 29, 2020 3:30PM JQ-BH-STR-0221
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 38TH(U)-39TH(L)


LOCATION
SEGMENT A-E / 3-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL JAYSON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for CONCRETE POURING for 38rd Floor Upper


SUBMITTAL DESCRIPTION Columns @ GL A-E/1-3, 39th Floor Lower BEAM & SLAB
@ GL A-E/1-3 6000psi = 140 m³

SUBMITTED DATE & TIME Monday, July 06, 2020 01:00pm

REQUESTED DATE & TIME Monday, April 06, 2020 03:30pm JQ-BH-STR-0222
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 38th (U) - 39th (L)


LOCATION
SEGMENT A-E/1-3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL JASON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL

FIRE PROTECTION

MECHANICAL RHUSTY DE VERA


PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall @ 9th Fl. Along GL A-
D/4-6' and GL A/3-4
4000psi = 12 m³

SUBMITTED DATE & TIME Tuesday, July 07, 2020 1:30PM

REQUESTED DATE & TIME Tuesday, July 07, 2020 1:30PM JQ-BH-STR-0223
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 9TH


LOCATION
SEGMENT A-D/3-6'
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL JAYSON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall @ 10th Fl. Along GL C-
E/1 and GL D/1-2
4000psi = 3 m³

SUBMITTED DATE & TIME Friday, July 10, 2020 10:30PM

REQUESTED DATE & TIME Friday, July 10, 2020 10:30PM JQ-BH-STR-0224
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 10TH


LOCATION
SEGMENT C-E/1, D/1-2
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL JAYSON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring of 39TH floor LOWER


SHEARWALL @ GL B-C/3-4, 39TH Floor LOWER
SUBMITTAL DESCRIPTION COLUMNS @ GL A-E/1-6', 39TH UPPER BEAM/SLAB @
GL A-E/1-6', Stair 4, Stair 7, Stair 8, Stair 9, and Stair 10 6000psi = 310 m³
(39th Floor Lower)

SUBMITTED DATE & TIME Monday, July 20, 2020 1:00PM

REQUESTED DATE & TIME Tuesday, July 21, 2020 1:30PM JQ-BH-STR-0225
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 39TH(L)-39TH(U)


LOCATION
SEGMENT A-E / 1-6'
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL JAYSON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall @ 9th Fl. Along GL D/2'-
4 and 11TH Fl. GL D/1-2, GL A-D/1
4000psi = 6 m³

SUBMITTED DATE & TIME Tuesday, July 28, 2020 1:30PM

REQUESTED DATE & TIME Tuesday, July 28, 2020 1:30PM JQ-BH-STR-0226
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 9TH AND 10TH


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL JAYSON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall @ 30th Floor Along GL
D/4-5, D/3'-4, D/1-2, B-C/1
4000psi = 6 m³

SUBMITTED DATE & TIME Tuesday, August 04, 2020 1:30PM

REQUESTED DATE & TIME Tuesday, August 04, 2020 1:30PM JQ-BH-STR-0227
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 30TH


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL JAYSON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring of 39TH floor Upper


SUBMITTAL DESCRIPTION
SHEARWALL @ GL B-C/3-4, 39TH Floor Upper
COLUMNS @ GL A-E/1-6', 40TH Lower BEAM/SLAB @
6000psi = 320 m³
GL A-E/1-6', Stair 4 39th Floor Upper

SUBMITTED DATE & TIME Friday, August 07, 2020 9:00PM

REQUESTED DATE & TIME Saturday, August 08, 2020 3:30PM JQ-BH-STR-0228
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 39TH(U)-40TH(L)


LOCATION
SEGMENT A-E / 1-6'
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL JAYSON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall @ 10TH Floor along GL
A'/3-4
4000psi = 6 m³

SUBMITTED DATE & TIME Saturday, August 22, 2020 1:30PM

REQUESTED DATE & TIME Saturday, August 22, 2020 1:30PM JQ-BH-STR-0229
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 10th


LOCATION
SEGMENT A'/3-4
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL JAYSON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring of 40TH floor LOWER


SHEARWALL @ GL B-C/3-4, 40TH Floor LOWER
SUBMITTAL DESCRIPTION COLUMNS @ GL A-E/1-6', 40TH UPPER BEAM/SLAB @
GL A-E/1-6', Stair 4, Stair 7, Stair 8, Stair 9, and Stair 10 6000psi = 304 m³
(40th Floor Lower)

SUBMITTED DATE & TIME Monday, August 24, 2020 10:00am

REQUESTED DATE & TIME Tuesday, August 25, 2020 1:30pm JQ-BH-STR-0230
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 40th(L)-40th(U)


LOCATION
SEGMENT A-E/1-6'
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL JAYSON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Pouring of RC Wall @ 10TH Floor along GL


SUBMITTAL DESCRIPTION D/1-2', 16th Floor GL A-C/6' and 29th Floor GL D/1-2, A-
B/1, B-C/1 4000psi = 6 m³

SUBMITTED DATE & TIME Tuesday, September 08, 2020 1:30PM

REQUESTED DATE & TIME Tuesday, September 08, 2020 1:30PM JQ-BH-STR-0231
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 10th/16th/29th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL JAYSON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Concrete Pouring of 40TH floor Upper


SUBMITTAL DESCRIPTION
SHEARWALL @ GL B-C/3-4, 40TH Floor Upper
COLUMNS @ GL A-E/1-6', Roofdeck BEAM/SLAB @ GL
6000psi = 330 m³
A-E/1-6', Stair 4 40th Floor Upper

SUBMITTED DATE & TIME Monday, September 14, 2020 1:30pm

REQUESTED DATE & TIME Monday, September 14, 2020 3:30pm JQ-BH-STR-0232
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 40TH(U)-RD


LOCATION
SEGMENT A-E / 1-6'
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL JAYSON BIDES
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall @ 10TH Floor along GL
A'/1-3
4000psi = 6 m³

SUBMITTED DATE & TIME Friday, September 18, 2020 1:30PM

REQUESTED DATE & TIME Friday, September 18, 2020 1:30PM JQ-BH-STR-0233
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 10th


LOCATION
SEGMENT A'/1-3
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL RON JASON
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of Stair 11 @ 37TH Floor Lower
along GL B/3'
6000psi = 3 m³

SUBMITTED DATE & TIME Wednesday, September 23, 2020 1:30PM

REQUESTED DATE & TIME Wednesday, September 23, 2020 3:30PM JQ-BH-STR-0234
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 37TH (L)


LOCATION
SEGMENT B/3'
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR F. ANDOJAR
ARCHITECTURAL RON JASON
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST

SUBMITTAL DESCRIPTION Request for Pouring of Zocalo @ 37th Floor Upper

SUBMITTED DATE & TIME Thursday, September 24, 2020 1:30PM

REQUESTED DATE & TIME Thursday, September 24, 2020 3:30PM JQ-BH-STR-0235
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 37TH (U)


LOCATION
SEGMENT A-E/1-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR F. ANDOJAR
ARCHITECTURAL RON JASON
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Pouring of Stair 11 @ 38TH Floor Lower


SUBMITTAL DESCRIPTION along GL B/3', Stair 10 @ 37th Floor Lower along GL
D/5-6 and Stair 9 @ 37th Floor Lower along GL A/5-6 6000psi = 6 m³

SUBMITTED DATE & TIME Tuesday, September 29, 2020 1:30PM

REQUESTED DATE & TIME Tuesday, September 29, 2020 3:30PM JQ-BH-STR-0236
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 37TH(L)-38TH(L)


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR F. ANDOJAR
ARCHITECTURAL RON JASON
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall @ 10TH Floor along GL
D/3-4, A-D/1
4000psi = 6 m³

SUBMITTED DATE & TIME Monday, October 05, 2020 1:30pm

REQUESTED DATE & TIME Monday, October 05, 2020 3:30pm JQ-BH-STR-0237
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 10th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL RON JASON
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Pouring of Stair 3 @ 37TH Floor Lower


SUBMITTAL DESCRIPTION along GL D/3-3', Stair 11 @ 39TH and 40TH Floor Lower
along B/3'-3" 6000psi = 6 m³

SUBMITTED DATE & TIME Tuesday, October 06, 2020 1:30PM

REQUESTED DATE & TIME Tuesday, October 06, 2020 3:30PM JQ-BH-STR-0238
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 37TH(L)-40TH(L)


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR F. ANDOJAR
ARCHITECTURAL RON JASON
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Pouring of RC Wall @ 30TH Floor along GL


SUBMITTAL DESCRIPTION C-D/6-6', D/4'-4", D/1-1', A-A'/1-1' and 29TH Floor along
GL D/3'-4, D/2-2A, B/1 4000psi = 6 m³

SUBMITTED DATE & TIME Friday, October 09, 2020 1:30pm

REQUESTED DATE & TIME Friday, October 09, 2020 3:30pm JQ-BH-STR-0239
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 29TH-30TH


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL RON JASON
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of Stair 3 @ 37TH Floor Upper,
38TH Floor Lower and 38TH Floor Upper along GL D/3-3'
6000psi = 6 m³

SUBMITTED DATE & TIME Tuesday, October 13, 2020 1:30PM

REQUESTED DATE & TIME Tuesday, October 13, 2020 3:30PM JQ-BH-STR-0240
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 37TH(U)-38TH(U)


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR F. ANDOJAR
ARCHITECTURAL RON JASON
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Pouring of RC Wall @ 30TH Floor along GL


SUBMITTAL DESCRIPTION D/2'-3' and A-A'/1, 29TH Floor GL D/2-2",31ST Floor GL
A-C/6' and D/4'-6 4000psi = 6 m³

SUBMITTED DATE & TIME Wednesday, October 14, 2020 1:30pm

REQUESTED DATE & TIME Wednesday, October 14, 2020 3:30pm JQ-BH-STR-0241
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 29TH-31ST


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL RON JASON
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall @ 31ST Floor along GL
A/1-6, GL D/1'-2' and GL B'-C'/1
4000psi = 6 m³

SUBMITTED DATE & TIME Friday, October 23, 2020 10:30Am

REQUESTED DATE & TIME Friday, October 23, 2020 10:30Am JQ-BH-STR-0242
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 31ST


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION Request for Pouring of WF-1 Along GL B-C'/1'


4000psi = 3 m³

SUBMITTED DATE & TIME Saturday, October 24, 2020 10:30Am

REQUESTED DATE & TIME Saturday, October 24, 2020 10:30Am JQ-BH-STR-0243
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL
LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR FERGUS ANDOJAR


ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of Stair 3 @ 39TH Floor Lower,
39TH Floor Upper and 40TH Floor Lower along GL D/3-3'
6000psi = 6 m³

SUBMITTED DATE & TIME Monday, October 26, 2020 1:30PM

REQUESTED DATE & TIME Monday, October 26, 2020 3:30PM JQ-BH-STR-0244
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 39TH(L)-40TH(L)


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR F. ANDOJAR
ARCHITECTURAL RON JASON
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall @ 10th Floor along GL
A/1-5 and 11th Floor GL A/2'-4
4000psi = 10 m³

SUBMITTED DATE & TIME Friday, October 30, 2020 10:30Am

REQUESTED DATE & TIME Friday, October 30, 2020 10:30Am JQ-BH-STR-0245
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 10th-11th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall @ 31st Floor along GL
D/4-6, A-D/6', A/5-6, A/1'-2' and 29th-31st Floor GL D/2-2'
4000psi = 6 m³

SUBMITTED DATE & TIME Wednesday, November 04, 2020 1:30pm

REQUESTED DATE & TIME Wednesday, November 04, 2020 3:30pm JQ-BH-STR-0246
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 29th-31st


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall @ 32nd Floor along GL
D/4'-6, A-D/6' and A/3"-6
4000psi = 6 m³

SUBMITTED DATE & TIME Friday, November 06, 2020 2:00pm

REQUESTED DATE & TIME Friday, November 06, 2020 2:00pm JQ-BH-STR-0247
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 32nd


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall @ Ground floor Marker
along GL B'-D/1'
4000psi = 6 m³

SUBMITTED DATE & TIME Saturday, November 07, 2020 2:00pm

REQUESTED DATE & TIME Saturday, November 07, 2020 3:00pm JQ-BH-STR-0248
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL GF
LOCATION
SEGMENT B'-D/1'
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Pouring of RC Wall @ 17th Floor along GL


SUBMITTAL DESCRIPTION A'-C/6', C/1, A'/1 and 32nd Floor along GL D/1'-2", B'-C/1
and A/1'-3' 4000psi = 6 m³

SUBMITTED DATE & TIME Tuesday, November 10, 2020 1:30pm

REQUESTED DATE & TIME Tuesday, November 10, 2020 1:30pm JQ-BH-STR-0249
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 17th and 32nd


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall @ 32nd Floor along GL
D/2, B'/1, A/2" and D/5'
4000psi = 6 m³

SUBMITTED DATE & TIME Saturday, November 14, 2020 1:30pm

REQUESTED DATE & TIME Saturday, November 14, 2020 1:30pm JQ-BH-STR-0240
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 32nd


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall @ 32nd Floor along GL
D/2'-3', A/5' and 31st floor GL A/4'-5' and A'/1
4000psi = 6 m³

SUBMITTED DATE & TIME Friday, November 20, 2020 1:30pm

REQUESTED DATE & TIME Friday, November 20, 2020 1:30pm JQ-BH-STR-0251
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 31st - 32nd


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Pouring of RC Wall @ 31st Floor along GL


SUBMITTAL DESCRIPTION A/5-6, A/2', 32nd Floor along GL D/4'-6, E/1-2, D/1, A/1',
A/2', 33rd Floor along GL D/4'-6, E/1-2, D/1, A/1', A/2' 4000psi = 6 m³

SUBMITTED DATE & TIME Tuesday, November 24, 2020 10:00pm

REQUESTED DATE & TIME Tuesday, November 24, 2020 10:00pm JQ-BH-STR-0252
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 31st - 33rd


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Pouring of RC Wall @ 11th Floor along GL


SUBMITTAL DESCRIPTION B-B"/2-2", 15th Floor along GL E/1', 17th Floor along GL
D/3', A'/1 and 19th Floor along GL A'/1, C/1 4000psi = 6 m³

SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-BH-STR-0253


ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 11TH-19TH


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Pouring of Helipad and Roof over stair slab


and beams along GL A'-E/2'-4', Roofdeck Columns
SUBMITTAL DESCRIPTION along GL A'-E/3-4', A'-C/1, A'-C/6', Stair 3 along GL C'-
D/3-3', Stair 5 A'-B"/ 2'-3 and MR Slab along GL B'-B"/3'- 6000psi = 111 m³
3"

SUBMITTED DATE & TIME Wednesday, December 16, 2020 10:00AM

REQUESTED DATE & TIME Wednesday, December 16, 2020 10:00AM JQ-BH-STR-0254
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL RD-HELIPAD


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of Swimming pool stair @ 11th
Floor along GL A-B'/1'-2
4000psi = 3 m³

SUBMITTED DATE & TIME Friday, December 18, 2020 10:00AM

REQUESTED DATE & TIME Friday, December 18, 2020 10:00AM JQ-BH-STR-0255
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 11TH


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall and Balcony Zocalo @
20th Floor along GL A-E/1-6 (See attached file)
4000psi = 6 m³

SUBMITTED DATE & TIME Friday, January 08, 2021 1:30PM

REQUESTED DATE & TIME Friday, January 08, 2021 1:30PM JQ-BH-STR-0256
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 20th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall @ 19th and 20th Floor
along GL A-C/1 (See attached file)
4000psi = 4 m³

SUBMITTED DATE & TIME Saturday, January 09, 2021 1:30PM

REQUESTED DATE & TIME Saturday, January 09, 2021 1:30PM JQ-BH-STR-0257
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 19th-20th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall @ 10th and Zocalo @
20th Floor Balcony (See attached file)
4000psi = 6 m³

SUBMITTED DATE & TIME Monday, January 11, 2021 1:30PM

REQUESTED DATE & TIME Monday, January 11, 2021 1:30PM JQ-BH-STR-0258
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 10th & 20th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall @ 21st Floor (See
attached file)
4000psi = 6 m³

SUBMITTED DATE & TIME Tuesday, January 12, 2021 1:30PM

REQUESTED DATE & TIME Tuesday, January 12, 2021 1:30PM JQ-BH-STR-0259
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 21st


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall @ 10th and 21st Floor
(See attached file)
4000psi = 6 m³

SUBMITTED DATE & TIME Friday, January 15, 2021 1:30PM

REQUESTED DATE & TIME Friday, January 15, 2021 1:30PM JQ-BH-STR-0260
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 10th and 21st


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of Zocalo for parapet wall @
Roofdeck along GL A-E/1-6 (See attached file)
4000psi = 6 m³

SUBMITTED DATE & TIME Saturday, January 16, 2021 10:00AM

REQUESTED DATE & TIME Saturday, January 16, 2021 10:00AM JQ-BH-STR-0261
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL RD
LOCATION
SEGMENT A-E/1-6
CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall @ 11th, 21st and 28th
Floor (See attached files)
4000psi = 6 m³

SUBMITTED DATE & TIME Monday, January 18, 2021 1:30PM

REQUESTED DATE & TIME Monday, January 18, 2021 1:30PM JQ-BH-STR-0262
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 11th, 21st & 28th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of zocalo @ 21st Floor balcony
(See attached files)
4000psi = 1 m³

SUBMITTED DATE & TIME Wednesday, January 20, 2021 1:30PM

REQUESTED DATE & TIME Wednesday, January 20, 2021 1:30PM JQ-BH-STR-0263
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 21st


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall @ 2nd-10th Floor along
GL A/3 (See attached files)
4000psi = 3 m³

SUBMITTED DATE & TIME Wednesday, January 20, 2021 1:30PM

REQUESTED DATE & TIME Wednesday, January 20, 2021 1:30PM JQ-BH-STR-0264
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2nd-10th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall @ 18th Floor and
Concrete pad at Roof deck (See attached key plan)
4000psi = 5 m³

SUBMITTED DATE & TIME Friday, January 22, 2021 1:30PM

REQUESTED DATE & TIME Friday, January 22, 2021 1:30PM JQ-BH-STR-0265
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 18TH & RD


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall @ 11th Floor, 19th Floor
and 28th Floor (See attached key plan)
4000psi = 5 m³

SUBMITTED DATE & TIME Tuesday, January 26, 2021 1:30PM

REQUESTED DATE & TIME Tuesday, January 26, 2021 1:30PM JQ-BH-STR-0266
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 11th, 19th & 28th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall @ 17th Floor, 22nd Floor
and 28th Floor (See attached key plan)
4000psi = 5 m³

SUBMITTED DATE & TIME Friday, January 29, 2021 1:30PM

REQUESTED DATE & TIME Friday, January 29, 2021 1:30PM JQ-BH-STR-0267
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 17th, 22nd, 28th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall/Drop wall @ 16th Floor
(See attached key plan)
4000psi = 5 m³

SUBMITTED DATE & TIME Friday, January 29, 2021 1:30PM

REQUESTED DATE & TIME Friday, January 29, 2021 1:30PM JQ-BH-STR-0268
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 16th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall/Drop wall @ 11th Floor
(See attached key plan)
4000psi = 5 m³

SUBMITTED DATE & TIME Monday, February 01, 2021 1:30PM

REQUESTED DATE & TIME Monday, February 01, 2021 1:30PM JQ-BH-STR-0269
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 11th Floor


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall/Drop wall @ 10th Floor
(See attached key plan)
4000psi = 5 m³

SUBMITTED DATE & TIME Tuesday, February 02, 2021 1:30PM

REQUESTED DATE & TIME Tuesday, February 02, 2021 1:30PM JQ-BH-STR-0270
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 10th Floor


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

Request for Pouring of RC wall @ 10th Floor, 19th Floor,


SUBMITTAL DESCRIPTION 23rd Floor, 25th Floor and 33rd Floorr (See attached key
plan) 4000psi = 5 m³

SUBMITTED DATE & TIME Saturday, February 06, 2021 1:30PM

REQUESTED DATE & TIME Saturday, February 06, 2021 1:30PM JQ-BH-STR-0271
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL
LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of Slab on grade @ Ground floor
Along GL A-D/2-4
3000psi = 40 m³

SUBMITTED DATE & TIME Monday, February 08, 2021 1:30PM

REQUESTED DATE & TIME Monday, February 08, 2021 1:30PM JQ-BH-STR-0272
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL Ground


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall/Drop wall @ 2nd Floor
Lower (See attached key plan)
4000psi = 3 m³

SUBMITTED DATE & TIME Tuesday, February 09, 2021 1:30PM

REQUESTED DATE & TIME Tuesday, February 09, 2021 1:30PM JQ-BH-STR-0273
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2nd Floor


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall @ 22nd-27th Floor (See
attached key plan)
4000psi = 6 m³

SUBMITTED DATE & TIME Thursday, February 11, 2021 1:30PM

REQUESTED DATE & TIME Thursday, February 11, 2021 1:30PM JQ-BH-STR-0274
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 22nd-27th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of Slab and Low wall @
Transformer room 2nd Floor (See attached key plan)
6000psi = 20 m³

SUBMITTED DATE & TIME Monday, February 15, 2021 1:30PM

REQUESTED DATE & TIME Monday, February 15, 2021 1:30PM JQ-BH-STR-0275
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 2nd Floor


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall @ 11th Floor (See
attached key plan)
6000psi = 6 m³

SUBMITTED DATE & TIME Wednesday, February 17, 2021 1:30PM

REQUESTED DATE & TIME Wednesday, February 17, 2021 1:30PM JQ-BH-STR-0276
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 11TH Floor


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall @ 11th Floor (See
attached key plan)
6000psi = 6 m³

SUBMITTED DATE & TIME Friday, February 19, 2021 1:30PM

REQUESTED DATE & TIME Friday, February 19, 2021 1:30PM JQ-BH-STR-0277
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS_ ___________

DRAWING NO.

FLOOR LEVEL 11TH Floor


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall/Drop wall @ 11th Floor
(See attached key plan)
6000psi = 3 m³

SUBMITTED DATE & TIME Friday, February 26, 2021 1:30PM

REQUESTED DATE & TIME Friday, February 26, 2021 1:30PM JQ-BH-STR-0278
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS____________

DRAWING NO.

FLOOR LEVEL 11TH Floor


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall/Drop wall @ 35-39th
Floor Lower (See attached key plan)
6000psi = 6 m³

SUBMITTED DATE & TIME Friday, February 26, 2021 1:30PM

REQUESTED DATE & TIME Friday, February 26, 2021 1:30PM JQ-BH-STR-0279
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS____________

DRAWING NO.

FLOOR LEVEL 35th-37th (L)


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall/Drop wall @ 11th Floor
(See attached key plan)
6000psi = 3 m³

SUBMITTED DATE & TIME Thursday, March 04, 2021 1:30PM

REQUESTED DATE & TIME Saturday, March 06, 2021 1:30PM JQ-BH-STR-0280
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS____________

DRAWING NO.

FLOOR LEVEL 11th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall/Drop wall @ 39th Floor
Upper to 40th Floor (Upper) (See attached key plan)
6000psi = 6 m³

SUBMITTED DATE & TIME Monday, March 08, 2021 1:30PM

REQUESTED DATE & TIME Monday, March 08, 2021 1:30PM JQ-BH-STR-0281
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS____________

DRAWING NO.

FLOOR LEVEL 39th (U)-40th (U)


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall @ 11th Floor (See
attached key plan)
6000psi = 6 m³

SUBMITTED DATE & TIME Wednesday, March 17, 2021 1:30PM

REQUESTED DATE & TIME Wednesday, March 17, 2021 1:30PM JQ-BH-STR-0282
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS____________

DRAWING NO.

FLOOR LEVEL 11TH


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall @ 28th Floor (See
attached key plan)
6000psi = 3 m³

SUBMITTED DATE & TIME Thursday, March 25, 2021 1:30PM

REQUESTED DATE & TIME Thursday, March 25, 2021 1:30PM JQ-BH-STR-0283
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS____________

DRAWING NO.

FLOOR LEVEL 28th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall @ transformer vault
room (See attached key plan)
6000psi = 3 m³

SUBMITTED DATE & TIME Tuesday, March 30, 2021 1:30PM

REQUESTED DATE & TIME Tuesday, March 30, 2021 1:30PM JQ-BH-STR-0284
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS____________

DRAWING NO.

FLOOR LEVEL 2nd


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of curb @ 2nd-4th Floor (See
attached key plan)
6000psi = 3 m³

SUBMITTED DATE & TIME Tuesday, March 30, 2021 1:30PM

REQUESTED DATE & TIME Tuesday, March 30, 2021 1:30PM JQ-BH-STR-0285
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS____________

DRAWING NO.

FLOOR LEVEL 2nd-4th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall @ 2nd Floor
Transformer vault room (See attached key plan)
4000psi = 6 m³

SUBMITTED DATE & TIME Monday, April 05, 2021 1:30PM

REQUESTED DATE & TIME Monday, April 05, 2021 1:30PM JQ-BH-STR-0286
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS____________

DRAWING NO.

FLOOR LEVEL 2nd


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of pedestal @ Ground Floor Pump
room (See attached key plan)
4000psi = 2 m³

SUBMITTED DATE & TIME Wednesday, May 12, 2021 1:30PM

REQUESTED DATE & TIME Wednesday, May 12, 2021 1:30PM JQ-BH-STR-0287
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS____________

DRAWING NO.

FLOOR LEVEL Ground Floor


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall @ 33rd & 35th Floor
(See attached key plan)
4000psi = 6 m³

SUBMITTED DATE & TIME Wednesday, April 14, 2021 1:30PM

REQUESTED DATE & TIME Wednesday, April 14, 2021 1:30PM JQ-BH-STR-0288
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL x
MECHANICAL SURVEY xOTHERS____________

DRAWING NO.

FLOOR LEVEL 33rd, 35th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC wall @ 5th-10th & 40th Lower
Floor (See attached key plan)
4000psi = 6 m³

SUBMITTED DATE & TIME Friday, April 16, 2021 1:30PM

REQUESTED DATE & TIME Friday, April 16, 2021 1:30PM JQ-BH-STR-0289
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL MECHANICAL x SURVEY x
OTHERS____________

DRAWING NO.

FLOOR LEVEL 5th-10th & 40th (L)


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of 3rd Floor RC Wall/Drop wall and
Roof deck Zocalo (See attached files)
4000psi = 6 m³

SUBMITTED DATE & TIME Monday, April 19, 2021 1:30PM

REQUESTED DATE & TIME Monday, April 19, 2021 1:30PM JQ-BH-STR-0290
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL MECHANICAL x SURVEY x
OTHERS____________

DRAWING NO.

FLOOR LEVEL 3rd, RD


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of 2ND Floor Transformer room RC
Wall (See attached files)
4000psi = 6 m³

SUBMITTED DATE & TIME Wednesday, April 21, 2021 1:30PM

REQUESTED DATE & TIME Wednesday, April 21, 2021 1:30PM JQ-BH-STR-0291
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL MECHANICAL x SURVEY x
OTHERS____________

DRAWING NO.

FLOOR LEVEL 2nd


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall/Drop wall @ 30th-36th
Floor (See attached files)
4000psi = 6 m³

SUBMITTED DATE & TIME Thursday, April 22, 2021 1:30PM

REQUESTED DATE & TIME Thursday, April 22, 2021 1:30PM JQ-BH-STR-0292
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL MECHANICAL x SURVEY x
OTHERS____________

DRAWING NO.

FLOOR LEVEL 30th-36th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of Zocalo @ Roof Over stair (See
attached files)
4000psi = 6 m³

SUBMITTED DATE & TIME Thursday, April 22, 2021 1:30PM

REQUESTED DATE & TIME Thursday, April 22, 2021 1:30PM JQ-BH-STR-0293
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL MECHANICAL x SURVEY x
OTHERS____________

DRAWING NO.

FLOOR LEVEL ROS


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall/Drop wall @ 3rd Floor
Genset Room (See attached files)
4000psi = 6 m³

SUBMITTED DATE & TIME Thursday, April 22, 2021 1:30PM

REQUESTED DATE & TIME Thursday, April 22, 2021 1:30PM JQ-BH-STR-0294
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL MECHANICAL x SURVEY x
OTHERS____________

DRAWING NO.

FLOOR LEVEL 3rd


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall/Drop wall @ 4th Floor
and 40th Floor Lower (See attached files)
4000psi = 6 m³

SUBMITTED DATE & TIME Friday, April 30, 2021 1:30PM

REQUESTED DATE & TIME Friday, April 30, 2021 1:30PM JQ-BH-STR-0295
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL MECHANICAL x SURVEY x
OTHERS____________

DRAWING NO.

FLOOR LEVEL 4th & 40th L


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall/Drop wall @ 36th Floor
(See attached files)
4000psi = 6 m³

SUBMITTED DATE & TIME Tuesday, May 04, 2021 1:30PM

REQUESTED DATE & TIME Tuesday, May 04, 2021 1:30PM JQ-BH-STR-0296
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL MECHANICAL x SURVEY x
OTHERS____________

DRAWING NO.

FLOOR LEVEL 36th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall/Drop wall @ 4th-5th Floor
(See attached files)
4000psi = 6 m³

SUBMITTED DATE & TIME Tuesday, May 04, 2021 1:30PM

REQUESTED DATE & TIME Tuesday, May 04, 2021 1:30PM JQ-BH-STR-0297
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL MECHANICAL x SURVEY x
OTHERS____________

DRAWING NO.

FLOOR LEVEL 4th-5th


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall/Drop wall @ 37th Lower
Floor (See attached files)
4000psi = 6 m³

SUBMITTED DATE & TIME Friday, May 07, 2021 1:30PM

REQUESTED DATE & TIME Friday, May 07, 2021 1:30PM JQ-BH-STR-0298
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL MECHANICAL x SURVEY x
OTHERS____________

DRAWING NO.

FLOOR LEVEL 37th Lower


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall/Drop wall @ 38th Lower
Floor (See attached files)
4000psi = 6 m³

SUBMITTED DATE & TIME Wednesday, May 12, 2021 1:30PM

REQUESTED DATE & TIME Wednesday, May 12, 2021 1:30PM JQ-BH-STR-0299
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL MECHANICAL x SURVEY x
OTHERS____________

DRAWING NO.

FLOOR LEVEL 38th Lower


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall/Drop wall @ 38th-39th
Lower Floor (See attached files)
4000psi = 6 m³

SUBMITTED DATE & TIME Monday, May 17, 2021 1:30PM

REQUESTED DATE & TIME Monday, May 17, 2021 1:30PM JQ-BH-STR-0300
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL MECHANICAL x SURVEY x
OTHERS____________

DRAWING NO.

FLOOR LEVEL 38th-39th Lower


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall/Drop wall @ 39th Upper
and 40th Lower Floor (See attached files)
4000psi = 6 m³

SUBMITTED DATE & TIME Wednesday, May 19, 2021 1:30PM

REQUESTED DATE & TIME Wednesday, May 19, 2021 1:30PM JQ-BH-STR-0301
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL MECHANICAL x SURVEY x
OTHERS____________

DRAWING NO.

FLOOR LEVEL 39U-40L


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall/Drop wall @ 39th Upper
and 39th Lower Floor (See attached files)
4000psi = 6 m³

SUBMITTED DATE & TIME Friday, May 21, 2021 1:30PM

REQUESTED DATE & TIME Friday, May 21, 2021 1:30PM JQ-BH-STR-0302
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL MECHANICAL x SURVEY x
OTHERS____________

DRAWING NO.

FLOOR LEVEL 39L-39U


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
ALC - MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA

CONCRETE POURING REQUEST


Volume of Concrete: in (cu.m)

SUBMITTAL DESCRIPTION
Request for Pouring of RC Wall/Drop wall @ 40th Upper
and 38th Lower Floor (See attached files)
4000psi = 6 m³

SUBMITTED DATE & TIME Saturday, May 22, 2021 1:30PM

REQUESTED DATE & TIME Saturday, May 22, 2021 1:30PM JQ-BH-STR-0303
ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL X
STRUCTURAL x
ELECTRICAL MECHANICAL x SURVEY x
OTHERS____________

DRAWING NO.

FLOOR LEVEL 38L-40U


LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU GEN BAO


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY ALC

DEPARTMENTS SIGNATURE SIGNATURE

SURVEYOR MR. XU
ARCHITECTURAL MA. CRISTINA LABRADOR
a) FORMWORKS RON JASON
b) REBARS RON JASON
ELECTRICAL RHUSTY DE VERA
FIRE PROTECTION

MECHANICAL
RHUSTY DE VERA
PLUMBING

SANITARY

SAFETY MARVIN EROY


PROJECT MANAGEMENT TEAM RECOMMENDATION (ALC)

PROJECT MANAGEMENT TEAM REPRESENTATIVE (ALC)

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by ALC :

Signature : Signature :

Date : Date :
JQ International Construction Inc.
MANAGEMENT

PROJECT :BANHAO TOWER

ADDRESS :SAN FERNANDO ST. CORNER MADRID ST. BINONDO MANILA


Volume of Concrete: in (cu.m)
STRUCTURAL PRECAST

DESCRIPTION
____ psi = ___ m³

SUBMITTED DATE & TIME

REQUESTED DATE & TIME JQ-PROJECT?-SP-0000


ACTUAL DATE & TIME

DEPARTMENT ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SURVEY OTHERS___________

DRAWING NO.

FLOOR LEVEL
LOCATION
SEGMENT

CONTRACTOR'S REPRESENTATIVE

MR. LIU ADEN


PM- SOGECOA

PRE-INSPECTION CHECKLIST BY JQ PRE-INSPECTION CHECKLIST BY MANAGEMENT

DEPARTMENTS NAME SIGNATURE SIGNATURE

SURVEYOR

QA/QC

ARCHITECTURAL

STRUCTURAL:

a) FORMWORKS

b) REBARS

ELECTRICAL

FIRE PROTECTION

MECHANICAL

PLUMBING

SANITARY

SAFETY

PROJECT MANAGEMENT TEAM RECOMMENDATION ( )

PROJECT MANAGEMENT TEAM REPRESENTATIVE ( )

NAME : SIGNATURE :

POSITION : DATE :

APPROVAL STATUS
A Approved B Approved with comments C Resubmit D Disapproved E Noted

Received by JQ: Received by :

Signature : Signature :

Date : Date :

You might also like