TITLE OF TASK : CONSTRUCTION OF CO2 CYLINDER HOUSE SUB-CONTRACTOR : GTC GLOBAL INC.
Revision
Revised by : Authorized Environmental Person(VPCI) : Authorized Safety Person(VPCI) :
Date
WEEK DATE
SAFETY IN-CHARGE (VPCI) SIGNATURE PERMIT No. REMARKS
1ST
2ND
3RD
4TH
Proper man-handling
Improper body posture should be exercised to YES
prevent ergonomic stress
Follow the proper body
positioning in concreting
works using the pump
Crete
Use tagline to hold the Ensure only authorized / Wear proper personal
nozzle of the pump Crete certified operator to protective equipment
to avoid unnecessary operate the pump Crete. such as, hand gloves,
Hit by the nozzle of Pump Crete YES
movement or accident long sleeve, safety shoes,
hard hat including safety
goggles
Provide appropriate
resting shelter and
drinking station intend to
Heat stress / Heat stroke YES
the workers involved
with this task
Safety awareness
regarding heat stroke /
heat stress should be
discuss prior to start the
work
Install warning tape / Safety briefing and Wear proper personal
rebar cap on protruding vigilant monitoring protective equipment
objects such as, hand gloves,
Struck against by sharp objects safety shoes, hard hat YES
Provide planks or any Provide safe access way
hard plate platform for when installing rebar’s including safety goggles
the access when
installing rebar’s
Proper man-handling
should be established in
installation of rebar
Ensure proper and
Improper body positioning YES
appropriate positioning
should be established
Rebar Works (Storage ,Fabrication,
5 and initiated to prevent
Installation of Rebar) ergonomic stress
Unauthorized person
should not allow on
working area
Provide planks or any Provide safe access way
hard plate platform for when installing rebar’s
the access when
installing rebar’s
Provide appropriate
resting shelter and
drinking station intended
Heat stroke / Heat stress to the workers involved YES
with the tasks
Safety awareness
regarding heat stroke /
heat stress should be
discuss prior to start the
work
Follow proper use of
hand tools
Wear proper personal
Proper man-handling protective equipment
Hit by hand tools should be established such as, hand gloves,
YES
during carpentry works long sleeve, safety shoes,
hard hat including safety
Unauthorized personnel goggles
should not allow to work
on working area
Barricade and signage Ensure the area is free Wear proper personal
should be put in place to from any obstruction protective equipment
prior to start the work
warn the public such as, hand gloves,
All materials should be long sleeve, safety shoes, YES
slip / tripping hazard
properly segregated hard hat including safety
goggles
Maintain good
housekeeping on
working area
Safety briefing and Wear proper personal
protective equipment
vigilant monitoring
such as, hand gloves,
long sleeve, safety shoes, YES
Personal injury (Eye, head, foot, body) Unauthorized personnel
hard hat including safety
should not be allow to
work on working area goggles
Proper man-handling
should be exercised to
prevent ergonomic stress
Improper body posture YES
Follow the proper body
positioning in concreting
works using the pump
Crete
Use tagline to hold the Ensure only authorized / Wear proper personal
nozzle of the pump Crete certified operator to protective equipment
to avoid unnecessary operate the pump Crete. such as, hand gloves,
Hit by the nozzle of Pump Crete YES
movement or accident long sleeve, safety shoes,
hard hat including safety
goggles
Proper segregation of
material should be
maintain on working
area
slip / tripping hazard YES
Maintain good
housekeeping on
working area
Provide appropriate
resting shelter and
drinking station intended
to the workers involved
with the tasks
Safety awareness
regarding heat stroke / YES
heat stroke / heat stress heat stress should be
discuss prior to start the
work
Standby first aider on
working area for possible
emergency
Provide appropriate
resting shelter and
drinking station intended
to the workers involved
with the tasks
Provide eye wash station Unauthorized personnel Use / wear appropriate
for possible eye injury should not allow to work eye protection in in
Eye injury on working area applying grout coating YES
such as, safety goggles /
rubber goggles
Unauthorized personnel Use / wear appropriate
10 Grouting should not allow to work personal protective
on working area equipment on applying
grout coating such as; YES
Skin irritation rubber/chemical gloves,
long sleeve, safety shoes,
hard hat including safety
goggles
Use proper platform in Follow the proper use of
high risk work ladder (ladder safety) YES
Fall Hazard
Use body harness in
working at height
Assign personnel to
continuous monitoring
on working area
Follow the proper body
positioning in painting
works
Improper body posture YES
Proper man-handling
should be exercised to
prevent ergonomic stress
Maintain good
housekeeping on
working area
Unauthorized person
should not allow to work
on working area
Use of radio
Communication for
proper interaction of
operator and rigger
Unauthorized personnel
Use canvass to carry the
should not be allow to
materials for the erection Wear proper personal
work on working area
of steel structure protective equipment such
as, hand gloves, long YES
Hit by falling objects
Ensure the area is sleeve, safety shoes, hard
barricaded and install hat including safety
goggles
signage to warn the public
Unauthorized person
should not allow to work
on working area
Hit / struck by the materials that being Use tagline to control the
movement of the YES
lift
materials being lift and
to avoid accident
Use of radio
Communication for
proper interaction of
operator and rigger
Inspect the equipment
prior to start the lifting
works
Only authorized /
certified operator should
operate the equipment
Collapse of equipment YES
Place the equipment on
the firm and stable
ground prior to start the
work
Proper segregation of
material should be
maintain on working
area
slip / tripping hazard YES
Maintain good
housekeeping on
working area
Provide appropriate
resting shelter and
drinking station intended
to the workers involved
with the tasks
Safety awareness
regarding heat stroke /
YES
heat stroke / heat stress heat stress should be
discuss prior to start the
work
Standby first aider on
working area for possible
emergency
Provide appropriate
resting shelter and
drinking station intended
to the workers involved
with the tasks
Good adequate lighting
must be provided
ensuring a safe working
environment for those
persons who have to
Poor illumination work during the hours of YES
darkness prior to start
the work
AREA 2 CO2
CYLINDER HOUSE
Tools and Exact location of
Spine board, First aid kit, snake catcher
Equipment needed Emergency First Aid