Inspection and Test Plan for Instrument Cable Installation Rev. No. B
Page 04 OF 06
Inspection Mode
Item
Activity References Documents Acceptance Criteria VPCI Frequency Verifying Documents Remarks
No. Sub-con AES
Site QC
2.0 Instrument Cable Installation, Termination and Testing.
-0-WD040-EJ241-00001
Design Criteria for I&C
ANSI/NETA ATS-2009 0-WD792-CJ250-
2.10 Cable continuity and insulation -3-WD700- H W W V Each Cable 01504_F02 Check for Note 1.
resistance test (after cable pulling) EE200-30004 Specification Instrument Cable Test
for Cables TABLE 100.1
-IFC
Drawing
-0-WD040-EJ241-00001
Design Criteria for I&C
0-WD792-CJ250-
Check the cable number, type, size, -3-WD700- 01504_F01 Check for
2.11 As per Drawing H W W V Each Cable
cable ID EE200-30004 Specification Instrument Cable
for Cables Installation
-IFC
Drawing
Note 1. Instrument Cable Rated 300/500V shall Apply 500V dc and 600V and Thermocouple Cable shall Apply H HOLD POINT
100V dc.. Test Voltage must considered Manufacturer's Recommendation.
W WITNESS POINT
LEGEND SW SPOT WITNESS
R REVIEW
V SURVEILLANCE
Masinloc Power Plant Expansion Project Doc. No. 0-WD792-CJ250-01504
Inspection and Test Plan for Instrument Cable Installation Rev. No. B
Page 03 OF 06
Inspection Mode
Item
Activity References Documents Acceptance Criteria VPCI Frequency Verifying Documents Remarks
No. Sub-con AES
Site QC
2.0 Instrument Cable Installation, Termination and Testing.
-0-WD040-EJ241-00001
Design Criteria for I&C 0-WD792-CJ250-
Check Cable bending radius does not
01504_F01 Check for
2.4 exceed to cable manufacturer -3-WD700- As per Drawing H W W V Each Cable
Instrument Cable
recommended values. EE200-30004 Specification Installation
for Cables
-IFC
Drawing
-0-WD040-EJ241-00001
Design Criteria for I&C 0-WD792-CJ250-
Cable laying, tray, conduit trunking 01504_F01 Check for
2.5 installation. -3-WD700- As per Drawing H W W V Each Cable Instrument Cable
EE200-30004 Specification Installation
for Cables
-IFC
Drawing
-0-WD040-EJ241-00001
Design Criteria for I&C 0-WD792-CJ250-
Cable laying, dressing and segregation 01504_F01 Check for
2.6 -3-WD700- As per Drawing H W W V Each Cable
(Prior to tray cover installation) Instrument Cable
EE200-30004 Specification Installation
for Cables
-IFC
-0-WD040-EJ241-00001
Drawing
Design Criteria for I&C 0-WD792-CJ250-
Cable entry and fire seal installation 01504_F01 Check for
2.7 -3-WD700- As per Drawing H W W V Each Cable
must be check Instrument Cable
EE200-30004 Specification Installation
for Cables
-IFC
-0-WD040-EJ241-00001
Drawing
Design Criteria for I&C 0-WD792-CJ250-
Check Flexible Conduit Connector if
01504_F01 Check for
2.8 properly installed and cable -3-WD700- As per Drawing H W W V Each Cable
Instrument Cable
termination. EE200-30004 Specification Installation
for Cables
-IFC
-0-WD040-EJ241-00001
Drawing
Design Criteria for I&C 0-WD792-CJ250-
Check duct bank and cable tray free 01504_F01 Check for
2.9 -3-WD700- As per Drawing H W W V Each Cable
from sharp edges. Instrument Cable
EE200-30004 Specification Installation
for Cables
-IFC
Note: Drawing
H HOLD POINT
W WITNESS POINT
LEGEND SW SPOT WITNESS
R REVIEW
V SURVEILLANCE
Masinloc Power Plant Expansion Project Doc. No. 0-WD792-CJ250-01504
Inspection and Test Plan for Instrument Cable Installation Rev. No. B
Page 02 OF 06
Inspection Mode
Item Activity References Documents Acceptance Criteria VPCI Frequency Verifying Documents Remarks
No. Sub-con AES
Site QC
1.0 Preparation of work
-0-WD040-EJ241-00001
Design Criteria for I&C
-0-WD040-EE241-00010
1.2 Material Receiving Inspection Design Criteria for Electrical As per Drawing H R R R All Items -
-3-
WD700-EE200-30004
Specification for Cables
-Vendor Drawing
-0-WD040-EJ241-00001
Design Criteria for I&C 0-WD792-CJ250-
01504_F01 Check for
2.2 Physical check of cable route. -3-WD700- As per Drawing H W W V Each Cable Instrument Cable
EE200-30004 Specification Installation
for Cables
-IFC
-0-WD040-EJ241-00001
Drawing
Design Criteria for I&C 0-WD792-CJ250-
Support installation for tray, conduit 01504_F01 Check for
2.3 and trunking. -3-WD700- As per Drawing H W W V Each Cable Instrument Cable
EE200-30004 Specification Installation
for Cables
-IFC
Drawing
Note 1. Instrument Cable Rated 300/500V shall Apply 500V dc and 600V and Thermocouple Cable shall Apply H HOLD POINT
100V dc.. Test Voltage must considered Manufacturer's Recommendation.
W WITNESS POINT
LEGEND SW SPOT WITNESS
R REVIEW
V SURVEILLANCE
TOTAL 06 PAGES
Inspection and Test Plan for Instrument Cable
Installation (Including Cover)
TITLE : Inspection and Test Plan for Instrument Cable Installation For Approval
For Construction
B 2nd Issue 26-Aug-17 E. Villanueva R. Samson C.H Kim K.C Jung J.H Lee H.S Woo
A 1st Issue 22-Aug-17 E. Villanueva R. Samson C.H Kim K.C Jung J.H Lee H.S Woo
Contractor