ISGEC/EHS/SP/OCP-20/F-32 Rev-03

13.03.2018
Isgec Heavy Engineering Ltd
EPC POWER PLANTS • BOILER • SUGAR MACHINERY

CRANE INSPECTION CHECKLIST


Name of Site with Project Code : COFMOW- BANGALORE
Inspected By : SUSIL KUMAR SAHOO
Capacity, Make &Type with Identification Number : 100 TON, DEMAG AC 435 TIRE MOUNTED
TELESCOPIC CRANE
Observations
S. No. Activities Measures
OK NOT OK

1 Hook & Hook Latch

2 Over-Hoist Limit Switch

3 Boom-Limit Switch

4 Boom Angle Indicator

5 Boom-Limit Cut Off Switch

6 Condition of Boom

7 Condition of Ropes

8 Size and Condition of the Sling

9 Stability of Crane

10 Swing Brake & Lock

11 Hoist Brake & Lock

12 Boom Brake & Lock

13 Main Clutch

14 Leakage in Hydraulic Cylinders

15 Out Riggers Fully Extendible

16 Tire Pressure

17 Condition of Battery and Lamps

18 Guards of Moving & Rotating Parts

19 Load Chart Provided

20 Reverse Horn

21 Load Test Details

22 Operators Fitness

23 Fire Extinguisher in operators cabin

24 Automatic Safe Load Indicator (ASLI) with Valid


Calibration Certificate – except hydra

25 Valid Pollution Under Control Certificate (PUC)

26
Date : 30-06-2021

Accepted / Not accepted (Please tick the ( √ ) right mark)

Name & Signature of EHS Engineer Name & Signature of Site Engineer