8.

Conslusion

8-1. Stress Analysis


Stress(kgf/㎠) Allowance(kgf/㎠) Result
Item Position
Long Term Short Term Long Term Short Term Long Term Short Term
3mH 778.5 1,435.6 1,600.0 2,400.0 OK OK
Brace
2mH 945.3 1,490.8 1,600.0 2,400.0 OK OK
(Internal STAY)
1mH 1,501.3 2,177.0 1,600.0 2,400.0 OK OK
F1, F2 417.1 621.4 1,600.0 2,400.0 OK OK
Panel Flange
F3 970.9 1,432.7 1,600.0 2,400.0 OK OK
(Steel)
F4 1,509.8 2,040.3 1,600.0 2,400.0 OK OK
F1, F2 24.6 36.7 212.0 318.0 OK OK
Panel Surface
F3 56.7 83.6 212.0 318.0 OK OK
(GRP)
F4 96.8 130.8 212.0 318.0 OK OK
Material (A) 567.6 731.5 1,600.0 2,400.0 OK OK
Skid Base Material (B) 283.8 365.7 1,600.0 2,400.0 OK OK
Material (C) 1,026.4 1,322.7 1,600.0 2,400.0 OK OK

8-2. Deflection Analysis


Stress(kgf/㎠) Allowance(kgf/㎠) Result
Item Position
Long Term Short Term Long Term Short Term Long Term Short Term
Material (A) 0.035 0.045 0.250 0.250 OK OK
Skid Base Material (B) 0.017 0.022 0.250 0.250 OK OK
Material (C) 0.134 0.172 0.175 0.175 OK OK
* for Material C, the length of both sides supporting point has to be maximum 700mm.