Professional Documents
Culture Documents
RC Beam Analysis & Design Bs8110: C:/Program Files (x86) /Tekla/Structural/Tedds/Data/Bitma 1 T 7/28/2021
RC Beam Analysis & Design Bs8110: C:/Program Files (x86) /Tekla/Structural/Tedds/Data/Bitma 1 T 7/28/2021
(x86)\Tekla\Structural\Tedds\Data\Bitma
Section Sheet no./rev.
1
ps\Tedds.bmp Calc. by Date Chk'd by Date App'd by Date
TICEC T 7/28/2021
220.200
0.0
mm A 5780
1 B 5830
2 C
0.0
91.5
174.8
274.288 274.3
mm A 5780
1 B 5830
2 C
0.0
-166.8
-324.300 -324.3
mm A 5780
1 B 5830
2 C
C:\Program Files Project Job Ref.
(x86)\Tekla\Structural\Tedds\Data\Bitma
Section Sheet no./rev.
2
ps\Tedds.bmp Calc. by Date Chk'd by Date App'd by Date
TICEC T 7/28/2021
00
274274
-380-380
175175
00
193193
193193
-324-324
-324-324
297297
-167-167
-167-167
193
193
621
621
167
167
230
500
1039
200
C:\Program Files Project Job Ref.
(x86)\Tekla\Structural\Tedds\Data\Bitma
Section Sheet no./rev.
3
ps\Tedds.bmp Calc. by Date Chk'd by Date App'd by Date
300200
TICEC T 7/28/2021
500
405 230 405
C25/30
30
26000
20
460
460
30
30
30
300200
500
3 fxbars
16
2 fxshear
12 legs at 20
3 fxbars
16
405 230 405
193
1.863
0.561
4.382
PASS - Design shear stress is less than maximum allowable
1.302
748
C:\Program Files Project Job Ref.
(x86)\Tekla\Structural\Tedds\Data\Bitma
Section Sheet no./rev.
4
ps\Tedds.bmp Calc. by Date Chk'd by Date App'd by Date
TICEC T 7/28/2021
1131
PASS - Area of shear reinforcement provided exceeds minimum required
337
PASS - Longitudinal spacing of shear reinforcement provided is less than maximum
300200
500
3 fxbars
16
2
2 f
fx
xshear
12
bars
25 legs at 15
2 fxbars
25
405 230 405
982
446
982
421
1963
433
274
4913
1039
433
0
1.000
0.047
0.156
K' > K - No compression reinforcement is required
409
53
1675
1963
276
3984
PASS - Area of reinforcement provided is greater than area of reinforcement required
324
C:\Program Files Project Job Ref.
(x86)\Tekla\Structural\Tedds\Data\Bitma
Section Sheet no./rev.
5
ps\Tedds.bmp Calc. by Date Chk'd by Date App'd by Date
TICEC T 7/28/2021
3.256
0.842
4.382
PASS - Design shear stress is less than maximum allowable
2.414
1387
1508
PASS - Area of shear reinforcement provided exceeds minimum required
325
PASS - Longitudinal spacing of shear reinforcement provided is less than maximum
96
25
PASS - Satisfies the minimum spacing criteria
261.7
180
PASS - Satisfies the maximum spacing criteria
20.8
261.7
1.328
1.043
28.8
13.3
PASS - Actual span to depth ratio is within the allowable limit
300200
500
3f
3 fx
xbars
25
bars
25
2 fxshear
12 legs at 15
3 fxbars
25
405 230 405
C:\Program Files Project Job Ref.
(x86)\Tekla\Structural\Tedds\Data\Bitma
Section Sheet no./rev.
6
ps\Tedds.bmp Calc. by Date Chk'd by Date App'd by Date
TICEC T 7/28/2021
1473
446
1473
421
2945
433
380
433
1.000
0.294
1473
4600
PASS - Area of reinforcement provided is greater than area of reinforcement required
2675
2945
276
PASS - Area of reinforcement provided is greater than area of reinforcement required
324
3.256
0.964
4.382
PASS - Design shear stress is less than maximum allowable
2.292
1317
1508
PASS - Area of shear reinforcement provided exceeds minimum required
325
C:\Program Files Project Job Ref.
(x86)\Tekla\Structural\Tedds\Data\Bitma
Section Sheet no./rev.
7
ps\Tedds.bmp Calc. by Date Chk'd by Date App'd by Date
TICEC T 7/28/2021
2.019
1161
1508
PASS - Area of shear reinforcement provided exceeds minimum required
325
13.27
79.57
36
220.2 220.2
25
PASS - Satisfies the minimum spacing criteria
278.6
169
PASS - Satisfies the maximum spacing criteria
;
ANALYSIS
Tedds calculation version 1.0.27
13.27
X
Z 1.5 m 4.285.78
m m
C:\Program Files Project Job Ref.
(x86)\Tekla\Structural\Tedds\Data\Bitma
Section Sheet no./rev.
8
ps\Tedds.bmp Calc. by Date Chk'd by Date App'd by Date
TICEC T 7/28/2021
1X 2 3
Z
(x86)\Tekla\Structural\Tedds\Data\Bitma
Section Sheet no./rev.
9
ps\Tedds.bmp Calc. by Date Chk'd by Date App'd by Date
TICEC T 7/28/2021
-378.3
274.7 175.4
193.1 296.8
-167.1
-324
C:\Program Files Project Job Ref.
(x86)\Tekla\Structural\Tedds\Data\Bitma
Section Sheet no./rev.
10
ps\Tedds.bmp Calc. by Date Chk'd by Date App'd by Date
TICEC T 7/28/2021