• Location- Saket District Centre, South Delhi SITE PLAN AND ITS ORGANIZATION

• ARCHITECTS- TEVATIA CHAUHAN & SHARMA ARCHITECTS •Linear organization.


(P) LTD. •Organization of spaces in a linear fashion
• DVELOPERS- SELECTINFRASTRUCTURE(P) LTD. along the 20 m wide corridor
• Completed in 2007 •L shaped planning with a public plaza in front
• Plot area 15884 sq. meters which compliment each other
• Landscaped Plaza of 8992 sq. meters.
CIRCULATION PATTERN
•Major parking in the basement.
•Entrance to the basement in the front.
•Linear pedestrian circulation.

SERVICES
•2 entries and 5 fire exits are provided.
•3 level basement parking is provided.
•The placement of the entry to the basement
is such that it also acts as drop-off without
hindering the entry to the basement.
•3 escalators are provided.
•Service corridors are also provided at the
rear side of citywalk.
•A 20 m wide service lance is provided at the
rear side which also acts as surface parking.

MULTIPLEX
•There are 6 screens.
•2 of the 6, are gold class.
•Other 4 screens are above the gold class
screens.
•The main entry is through the bridge on the
first floor which connects mall and multiplex
building.
•The ground floor entry can also be used for
gold class entry.

PUBLIC PLAZA
•A frontage of over 250m overlooking a public
plaza with pedestrian pathways extending
into 4 acres of green space.
•Special features – open air theatres, water
bodies, fountain and breathtaking
landscaping.

SHEET NO. MADHU SAGAR – 2BV14AT028

CONTEXTUAL STUDY AND SERVICES ANALYSIS 1 2BV14AT028

V SEM – B.ARCH

CASE STUDY OF : PRESTIGE TECH PARK III B. V. B. C. E. T.


SPECIFICA TIONS PROPOSED AREA STATEMENT
RETAIL (56%) 1. Type of the Construction : RCC Frame •BASEMENTS =41578.5(3L VLS)+6075(3L VLS =47653.5 SQ.M
OFFICE (11%) structure •GROUND FLOOR =9622.345+ 1756.46(MULTIPLEX) =11378.81 SQM
HOTEL (11%) 2. External Finish Cladding : Granite, Texture •FIRST FLOOR =10803.323+2012.72 (MULTIPLEX) =12816.043 SQ.M
MULTIPLEX (9%) paint, Composite metal •SECOND FLOOR =6568.06 SQ.M
RECREATIONAL SPACES (9%) 3. Internal Wall Finish : Plaster with desired •THIRD FLOOR =2921.226 SQM
SERVICES (4%) paint finish, ceramic tiles for the toilet. •FOURTH FLOOR =2776.216 SQM

Built-up space / open space activities ratio = 4 acres / 2 4. Flooring : Marble, Granite Slabs, Vitrified •FIFTH FLOOR =2467.621 SQM
acres = 3:1 Tiles •SIXTH FLOOR =2268.241 SQM
5. Doors : Shutters of ply with TW frames and •SEVENTH FLOOR =1948.80 SQM
BUILT : OPEN fire proof door wherever required. •FOYERLVL AREA IN MULTIPLEX= 825.29 SQ.M
6. Windows : Aluminium Sections •TOTAL WITHOUT BASMENTS =43970.307 SQM
7. Electrification : Adequate provision for •TOTAL WITH BASEMENTS =91623.807 SQM
BUILT AREA
electric outlet, TV and
OPEN AREA
Telephone Points.

SHEET NO. MADHU SAGAR – 2BV14AT028

2 2BV14AT028

V SEM – B.ARCH

CASE STUDY OF : PRESTIGE TECH PARK III B. V. B. C. E. T.