Date : June 17, 2021

Project : Propose 2-Storey Residence


with Penthouse

Location : 8333 Dr. A santos avenue, Parañaque City

Owner : Mr. Simeon N. Tan

Subject : Additional Hosebibb Ground floor (Labor only)

1.0 GROUND FLOOR WATERLINE QTY UNIT LABOR COST TOTAL COST
1.1 PPR Pipes
2.0 20 mm Ø 7.00 pc/s 258.49 1,809.44
1.2 PPR Tee -
1.0 20mm Ø 2.00 pc/s 36.60 73.21
1.3 Teflon Tape - -
1.0 20mm Ø 2.00 pc/s 8.00 16.00
1.4 PPR Elbow 90° - -
2.0 20 mm Ø 6.00 pc/s 16.65 99.89
1.5 PPR End Cap - -
2.0 20mm Ø 2.00 pc/s 24.28 48.56
1.6 PPR Coupling - -
6.0 20mm Ø 7.00 pc/s 212.40 1,486.80
1.7 Hosebibb - -
6.0 20mm Ø 2.00 pc/s 212.40 424.80
1.8 PPR Wall mounted Elbow - -
1.0 20mm Ø 2.00 pc/s 205.20 410.40
1.9 Gate Valves - -
20mm Ø 2.00 pc/s 300.00 600.00
1.9 Chippong works - -
1.00 lot 3,000.00 3,000.00
SUB-TOTAL FOR GROUND FLOOR WATERLINE SYSTEM 7,969.10
GRAND TOTAL FOR WATERLINE SYSTEM 7,969.10

VERY TRULY YOURS,

PAUL ISLES
MANAGING PARTNER