GUJARAT TECHNOLOGICAL UNIVERSITY


Centre for Industrial Design (Open Design School)

DESIGN ENGINEERING

CONTINUOUS ASSESSMENT CARD


COLLEGE NAME: V.V.P. Engineering college

COLLEGE CODE:

SUBJECT NAME: Design Engineering – 2A

SUBJECT CODE: 3150001 SEMESTER: 5th

BRANCH: B.E. Civil Engineering ACADEMIC YEAR: 2020-21

TEAM NAME: TEAM ID: 257254

PROJECT TITLE/DOMAIN: Effect of Natural Admixtures in Concrete

SR. NO. TEAM MEMBER’S NAME ENROLLMENT NO.


1. Helaiya Prashant 190473106004
2. Parmar Darshin 190473106006
3. Vyas Hiren 190473106009
4. Pandya Het 190473106005
5. Bagada Bhavesh 190473106002

INTERNAL GUIDE NAME: Prof. J.G. Bhanderi


INTERNAL GUIDE SIGN:

Head of Department College Sea

1
190283106007

MONTHLY ASSESSMENT - I (Observation, Empathy and Define Phase)


(DATE :03/08/20)
1. Why students/team have taken above mentioned domain? (Please specify the reason)
(Note: For more content or information, one may attach additional pages to this
card.)

2. How frequently student team has gone for observation on field, mention with date, place,
time etc.? Which are the key observations that they have noticed?

Due to this pandemic we have not done any site observation but through
online medium, we have seen many demolition sites, where demolition of
existing structure was on progress. Which machinery used and where they
dump debris.

3. A. How many interactions/interviews team members have done?

As mentioned earlier due to this pandemic no interaction were possible but


we have read and got information through literature.

B. Who are the user and various stakeholders on domain? Describe their persona (Name,
age, occupation/education, roles and responsibility etc.)

Everyone would like to use recycled concrete at low cost. But precisely,
Contractor and private companies can use recycled material.

C. List out the questions asked by team while having observation and interview?

1) Recycling process start to end. 2) Size of Aggregate produced by recycling. 3) Cost of


production of recycled aggregate/ton. 4) Which material recycled i.e. Concrete waste and
masonry waste. 5) Machinery cost and initial cost 6) Performance of recycled conc.
190283106007

4. What is something special/random/unusual (i.e. activity, environment, interaction,


object or user) team have observed at the domain? Please elaborate the conditions with
photographs if available.

Recycling of demolished debris saves energy. Ultimately the Overall Cost


of Recycled concrete decreases as compared to traditional concrete.

5. Enlist any five major problems observed by your team in the respective domain. Mention
any one for which you have empathize user the most and which might become your
problem statement. Give reasons of selection of particular problem/issue based on
empathy.

When material is recycled and ready, there is some portion of hydrated


paste stuck on the aggregate. So if such aggregate is used in manufacturing
of new concrete, cement could not create good bond between aggregates.
Which lead to less strength of concrete.

Due to Segregation, lower strength, bleeding, honey comb, moisture/water


content absorption by cement paste on recycled aggregates.

6. Define your “PROBLEM DEFINITION” for the project as per below format. Which
might be refine till end of Ideation phase if you wish.

User/ Needs Because


Problem/Need Insights
Stakeholder way to

-Contractor Decreases the Recycled


-Construction cost of Aggregates
Industries/Comp Aggregates
anies
190283106007

SUGESTIONS BY INTERNAL GUIDE:

AEIOU CANVAS SUGGESTIONS:

EMPATHY CANVAS SUGGESTIONS:

MIND MAPPING SUGGESTIONS:

GENERAL SUGESTIONS:

Overall Mark (Out of 05):

GUIDE SIGNATURE:
Date:

You might also like