Modeling and Simulation - Review-2 (Group-7)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 13

modeling and simulation of manufacturing

systems (Project component) review - 2


Local Aviation
Dept. Reports
Government kaggle.com
NGO
data.gov/ Reports (CC0: Public
Reports
Domain)
openflights.org

DATA COLLECTION
METHODOLOGY

For Secondary
Mendeley data - We intend to
Research & Elsevier contact known
Enquiries
Journals Research operating staff and
Gate use triangular
distribution.
Number of
Check-In TIme
Gates

Number of
Boarding Time
Runways
DATA POINTS
IN OUR MODEL
Number of Time Spent at
Planes Security

Number of Check-In Plane Security


Desks Time
A well-known airport is chosen
Assumptions made To obtain uniformity in the data Miami
1 International Airport is considered when
for preliminary collecting data. It'd also a very busy
airport ensuring data without lapses.
simulation
Primary Variables
2 The model has 5 gates, 2 runways, and 3
check-in desks

Limiting Time Frame


The time frame is restricted to only one
Note for #4: Some of the minor data 3 day and the data is analysed for pone day
which require enquiry with official over a course of one or two weeks
authority is kept constant for the
preliminary testing. However, a Secondary Variables
mean is assumed from referencing Delay at Identification check = 2 min
journals across various simulations 4 Delay at check-in = 2 min
for proper results. Passenger Security = 15 min
Boarding Delay = 10 min
Plane Securrity = 20 min
SAMPLE DATA
Data Correlation - Seats and Passengers
Data Correlation And Analysis - Scatter Plot
Data Correlation and Analysis - Box and Whisker Chart
Time Frame Analysis Below: First two weeks of 2007-2009
FLOWCHART FOR AIPORT SIMULATION
ARENA MODEL
ARENA SUB-MODEL
To perform a discrete
simulation of passenger flow
with even the secondary
parameters.

Iteration of the
Objective number of runways
and planes into the
reaffirmation model as well

Understand how the


variants for the
model affect time
spent at the airport
by simulating
unorthodox
REVISED TIMELINE

18th March 10th April 29th April 22nd May 30th May

Problem Data Collection Preliminary Final Project Report


Identify a problem
and Analysis Testing Simulations Documentation
and form a thesis Choosing of Time Developing a basic
and Validation
Interpretation of the
statement. Frame and variants logic flowchart Refinement of the results and conclusion
Well defined
Data Methodology Developing the ARENA model by in the form of a project
objective and scope
Data Collection Model acquiring more report.
Details of industry
Data Analysis and Obtaining Preliminary data variations
and their
Verification for Results Final simulation
acceptance in
correlation Making of Assumptions and simulation of
model
for the model exceptions and
what if scenarios