Professional Documents
Culture Documents
OLD CCTV West City Central
OLD CCTV West City Central
OLD CCTV West City Central
Location : West City Central School - Vamenta Boulevard, Masterson Ave, Cagayan de Oro, 9000
Subject : Project Quotation
Date : 27-Oct-20
ITEM UNIT DESCRIPTION QTY UNIT Material Cost Labor Cost Units Cost TOTAL AMOUNT
I CCTV Installation
1.1 Old DVR 4ch Program Setup and Installation 1 pc 1,200.00 1,200.00 1,200.00
1.2 Bullet Camera Wiring and Installation 4 pc 5,600.00 5,600.00 5,600.00
1.3 Electrical Flexible Hose 4 roll 400.00 350.00 750.00 3,000.00
1.4 PVC Pipe Concrete Clamp 100 pc 5.00 5.00 500.00
1.5 Steel Cable with clip (35meters) 1 pc 1,650.00 500.00 2,150.00 2,150.00
1.6 Porcelain Screw Insulator 2 pc 50.00 50.00 100.00
1.7 Consumables 150.00 150.00 150.00
sub total 12,700.00
Approved by;
______________
Owner