Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

Downhole Completion Equipment

PARVEEN PXD SLIDING SLEEVE

Description / Application

The Model PXD Series Sliding Sleeves are high performance sliding
sleeves which allow communication between the tubing and annulus
for circulation or selective-zone production. When desired, the sleeve
can be shifted open or closed using standard wireline methods and a
B-type Shifting Tool. The tool is designed such that, any lock profile
and compatible sealbores can be specified to accept a wide range of
wireline locks and accessories. The sleeve is available in Model PXD,
downshift-to-open or Model PXU, upshift –to-open versions.

Benefits of Design Principle

Designed to permit shifting of sleeve – even when outside of sleeve


is packed with sand, as packing is retained in the polished bore and
does not move when the sleeve is shifted.

Compression, tensile and burst strength of Parveen Sliding Side Door


Circulation Equipment are equal to or greater than N-80 tubing.
Models are also available in strengths equal to or greater than P-110
tubing.

Two position collet lock helps to keep sleeve in full open or full closed
position.
Equalizing ports in the inner sleeve are designed to allow pressure
differential between the tubing and casing annulus to equalize while
shifting into the full open or closed position.

Any number of the Parveen Sliding Side Door Circulation Equipment


may be run in a single tubing string and all opened or all closed on a
single trip of wireline. Individual sleeves may
also be opened or closed selectively as desired.

The use of stationary V-Packing is designed to permit greater


clearance between the inner sleeve and outer housing. This design
permit the inner sleeve to be shifted many times with ease and
minimizes the possibility of malfunction.
Downhole Completion Equipment

Assembly

1). Place bottom sub (2) in vise


2). Install O-Ring (7) on bottom sub (2)
3). Install V-packing, O-ring, end packing into the lower end of the nipple
(housing) (4) as shown in the diagram.
4). Install V-packing, O-ring, stopper in the upper end of the nipple (housing) (4)
as shown in the diagram..
5). Install nipple (housing) (4) on to bottom sub (2)
6). Install closing sleeve (3) in nipple (4).
7). Install O-ring (7) on to top sub (1)
8). Install top sub (1) in to nipple (4)
9). Install O-Ring (3) on to sub (1)
10). Install top sub (1) in middle housing (8)

Disassembly

1). Place bottom sub (2) in vise


2). Remove top sub (1) from middle housing (4)
3). Remove O-ring (7) from top sub (1)
4). Remove middle housing (4) from bottom sub (2)
5). Remove closing sleeve (2) from middle housing (8)
6). Remove V-packing set & O-ring from upper and lower end of the middle housing (4).
7). Remove O-ring (7) from bottom sub (2)
8). Clean and inspect all parts.
9). Replace any worn or damaged parts.

You might also like