Professional Documents
Culture Documents
Project 1 X 79Mw STG For M/S JSW Steel LTD., Bellary: Relay Setting Calculation (Generator)
Project 1 X 79Mw STG For M/S JSW Steel LTD., Bellary: Relay Setting Calculation (Generator)
Project 1 X 79Mw STG For M/S JSW Steel LTD., Bellary: Relay Setting Calculation (Generator)
Project
1 X 79MW STG
for
M/s JSW STEEL LTD., BELLARY
7 Rated Frequency 50 Hz
12 CT secondary current 1A
13 CT Ratio 6000
16 PT ratio 100
This protection is provided to protect the generator against earth faults near to
generator neutral point. This protection is based on 3rd Harmonic voltage
measurement at the neutral point of generator.
Settings:
VN 3rd Harmonic VN3H< Enabled
100% ST. EF VN3H< 0.5 V
VN3H < Delay 1 Sec
ELECTRICAL MACHINES ENGINEERING
Zc 0.138 Ohms
Zc is set to 90% of the Transformer impedance
Zc (Ref. to sec.) 8.28 Ohms
Settings:
Z based Pole Slip
Pole Slip mode Generating
Pslip Za forward 13 Ohms
Pslip Zb Reverse 36 Ohms
Lens Angle 90 degree
Pslip Timer T1 15 msec
Pslip Timer T2 15 msec
Blinder Angle 80 degree
Pslip Zc 8.5 Ohms
Zone 1 Slip count 1
Zone 2 slip count 2
Pslip Reset time 30 sec
Settings:
Dead mach I> 0.95 A
Dead mach V< 80 V
Dead mach tpu 1 sec
Dead mach tDO 0.5 sec
Action : To Trip 86A1 & 86A2
ELECTRICAL MACHINES ENGINEERING
Settings:
CB Fail 1 Status Enabled
CB Fail 1 Timer 200 ms
CB Fail Non I Reset CB Open & I<
CBF Ext Reset CB Open & I<
Under Current
I< Current Set 100 mA
IN< Current Set 100 mA
ISEF< Current 100 mA
I< CT Source IA-1 IB-1 IC-1
Settings:
V< Measur't Mode Phase-Phase
V< Operate Mode Any Phase
V<1 Function DT
V<1 Voltage Set 99 V
V<1 Time Delay 5 sec
V<1 Poledead Inh Enabled
V<2 Status Enabled
V<2 Voltage Set (Shall be used in PSL for 40G with UV) 88 V
V<2 Time Delay 0 sec
V<2 Poledead Inh Enabled
Settings:
V> Measur't Mode Phase-Phase
V> Operate Mode Any Phase
V>1 Function DT
V>1 Voltage Set 121 V
V>1 Time Delay 0.5 sec
V>2 Status Enabled
V>2 Voltage Set 126 V
V>2 Time Delay 2 sec
ELECTRICAL MACHINES ENGINEERING
CTR/PTR 60
Diameter of circle(Xb1) [=(Xd*Zbase*CTR/PTR)] 160.23 Ohms
Offset (-Xa1) [=(0.5*Xd'*Zbase*CTR/PTR)] 8.93 Ohms
Settings:
FFail Alm Status Enabled
FFail Alm Angle 15 degree
FFail Alm Delay 2 sec
FFail1 Status Enabled
FFail1 -Xa1 9 Ohms
FFail1 Xb1 160 Ohms
FFail1 TimeDelay 1 sec
FFail1 DO Timer 2 sec
FFail2 Status Enabled
FFail2 -Xa2 [=Xa1] 9 Ohms
FFail2 Xb2 [=(KV^2/MVA) Ref. to sec.] 74 Ohms
FFail2 TimeDelay 0 sec
FFail2 DO Timer 0 sec
Loss of excitation stage-2 shall be used with U/V interlock for 86A Tripping
Settings:
VTS Status Blocking
VTS Reset Mode Auto
VTS Time Delay 5 sec
VTS I> Inhibit 12.5 A
VTS I2> Inhibit 250 mA
CT Supervision
CTS1 Status Disabled
CTS2 Status Disabled
Action: Alarm
11 Generator NPS Thermal protection (46T)
ELECTRICAL MACHINES ENGINEERING
Settings:
F<1 Status Enabled
F<1 Setting 48.5 Hz
F<1 Time Delay 2 sec
F<2 Status Enabled
F<2 Setting 47.5 Hz
F<2 Time Delay 1.5 sec
F<3 Status Disabled
F<4 Status Disabled
Settings:
F>1 Status Enabled
F>1 Setting 51 Hz
F>1 Time Delay 1 sec
F>2 Status Enabled
F>2 Setting 51.5 Hz
F>2 Time Delay 1.5 sec
Settings:
ELECTRICAL MACHINES ENGINEERING
Settings:
I>1 Function DT
I>1 Direction Non-Directional
I>1 Current Set (105% of Rated current) 0.91 A
I>1 Time Delay 10 sec
I>1 tRESET 0 sec
Action: Alarm
16 Rotor Earth Fault protection (64R)
Settings:
Settings:
Backup Function Under Impedance
Vector Rotation None
Z<1 Setting 7.5 Ohms
Z<1 Time Delay 1 Sec
Z<1 Treset 0 Sec
Z< Stage2 Disabled
ELECTRICAL MACHINES ENGINEERING
NOTE: This function is alternative for 51V. If 51V is realized in GPR-1, then
21G can only be realized in GPR-2 numerical relay.