Professional Documents
Culture Documents
Siemens Aeration Competence Center
Siemens Aeration Competence Center
Siemens
Short introduction
Helsingør History
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Siemens Turbomachinery Solutions (then HV-Turbo A/S) was acquired in beginning 2007 by
Siemens together with the KK&K Group (Kuehnle, Kopp & Kausch).
The KK&K Group was renamed to “Pre-defined Compressors and Fans” (abbreviated to “PCF”)
and integrated with the Oil & Gas Division of Siemens.
The HV-Turbo Group was renamed to “Municipal and Industrial Application” (abbreviated to
“MIA”) and included in the PCF Group as E O C&S PCF MIA.
First and only gas The first s-type KK&K acquires HV-
turbine is produced aeration turbo Turbo from NTR
compressor is Holding
launched
A series of
turbo-chargers Closing of
is launched shipyard
KK&K group incl.
The first WWTP HV-Turbo acquired
installations in by Siemens AG
Helsingør Ship Germany & USA
Yard founded
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Business area and products
Applications within Waste Water Aeration (Biochemical), Flue Gas
Desulphurization, Sulphur Recovery, Fermentation and other industrial
applications.
Product Portfolio:
9 Basic compressor types with various customization possibilities
New product development: Direct Drive and Compact versions
Reference list of more than 7,500 units installed
Services, e. g. spare parts, maintenance and repair, installations,
modernization and upgrades
Numbers
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Business area and products
Steam turbines used as generator drives for power
generation up to 10 MW and as mechanical drives for
e. g. pumps and compressors
Single stage turbo compressors and blowers for
industrial applications and processes
Services, e. g. spare parts, maintenance and repair,
installations, modernization and upgrades
Extended workbench for Power Fans
Management
Volker Neumann (CEO)
Dr. Klaus Jacoby (CEO)
Frank Langner (CFO)
Employees
600 (2011) Thereof approx. 300 in manufacturing
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Siemens Applications
Aeration-Processes
Biological Waste Water Treatment and floatation
Flue gas Desulphurization (FGD)
Fermentation (e.g. Enzymes for Bio fuel production,
Yeast)
Marine applications
Siemens Solutions
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
3.500
1.000 1.300
500
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Siemens Turbomachinery Equipment
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Largest in Largest in Largest in S.
world Europe America
Changi WRP (SIN) Tillmann WRP (US) Seine Aval WWTP (FR) Xiaoshan Dong Pian (CN) La Farfana Santiago (CI) Shaoxing WRP (CN)
2.4 mio m3/day 5 x KA100SV, 2006 1.7 mio m3/day 9 x KA44SV, 2005 760.000 m3/day; 50% of 700.000 m3/day
10 x KA80SV, 2002 15 x KA22SV, 2004 population of Santiago 8 x KA44SV, 2003
6 x KA66SV, 2001
Largest in
China
Sulaibiya WRP (KU) Nashville Central (US) Southside WWTP, Dallas (US) Baix Llobrigat, Barcelona (ES) As Samra WWTP (JO) Pudong Bailonggong (CN)
375.000 m3/day 7x KA66SV, 1992 4x KA66SV, 2003 420.000 m3/day 267.000 m3/day 2.0 mill m3/day
5 x KA66SV, 2003 5 x KA66S, 2002 10x KA22SV, 2005 12 x KA22SV, 2007
Largest in
Italy
Milano South WWT (IT) Orange Country, CA (US) Al Ansab WWTP (OM) Berlin-Ruhrleben (DE) Manukau (NZ) Ulun Pandan (SI)
1.050.000 P.E. capacity 4x KA66SV, 1995 220.000 m3/day; 900.000 247.500 m3/day 300.000 m3/day 6x KA44SV, 2003
50% population of Milano P.E. 2x KA100SV, 2005 5 x KA44SV, 1999
4x KA66SV, 2003 3x KA80SV, 2005
Short introduction
Siemens Turbomachinery Solutions
A comprehensive product portfolio for your aeration needs
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Siemens Turbocompressors (STC) for Aeration
3,0
Integrally geared
Differential Pressure [barg]
dual-one stage STC-GO
GO(100)
GO(10)
GO(22)
GO(44)
GO(66)
GO(80)
GO(2)
GO(5)
1,25
10 kW
1,0
Direct drive, GO(5-c)
GO(2-c) one stage GO(10-c)
0,75
DO(1) DO(2) DO(5) DO(10)
0,5
0,25
1.000 10.000 100.000
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Your challenges Our answers
Design Support:
Mechanical, Civil, Electrical Plans, 3D Modeling,
Technical Specifications, Design Solutions, On-
Design time documentation
Energy Savings
By most efficient Dual-Point-Control and correct
Operation selection of compressor technology
Other operational savings:
Maintenance Savings. Extended lifetime
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Siemens
Turbocompressors (STC)
Level of customizing
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
STC-GO(GL) STC-GO(GK) STC-GO(GK-c) STC-DO
Bearings/Lubrication Sleeve, Forced Lube/Oil Ceramic Ball/Oil Ceramic Ball/Oil Air foil/none
Impeller Design Job Specific & Optimized Job Specific & Optimized Job Specific & Optimized Standard 13 types available
Standard;
Capacity Control IGV or VD Inlet Guide Vanes IGV or VD Inlet Guide Vanes IGV or VD Variable diffuser (VD)
Dual-Point Control Optional w/ VD & IGV Optional w/ VD & IGV Optional w/ VD & IGV Standard w/ VD & VFD
Controller Specifiable (PLC) Specifiable (PLC) Limited Selection (PLC) Limited Selection (PLC)
Lead Time 30-40 weeks 30-40 weeks 16-20 weeks 12-16 weeks
Process Control MCP or DCS MCP or DCS MCP or DCS MCP or DCS
Starter SSRVS/VFD (stand alone) Optional VFD Optional VFD VFD included
Enclosure Design Optional & Specifiable Optional Standard Upgrade Optional Standard Upgrade Standard IGV Inlet guide vanes
VD Variable diffuser
Ambient temperature Not limited Not limited <45 degree C <45 degree C VFD Variable frequency drive
Optional Material None MCP Master control panel
SS impeller & guide vanes None None
SS Stainless steel
© Siemens AG 2007. Alle Rechte vorbehalten.
Page 13
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Siemens Turbomachinery Solutions
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
More extensive process changes
with structural changes to plant
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
In the secondary treatment phase Electricity consumption for waste water treatment plant
waste water is treated by means of (activated sludge)
bacterial breakdown of the dissolved
biological waste. Lighting & Building
Chlorination 8% Wastewater pumping
0,3% 14%
In order to foster this bacterial break- Belt Press
Screens, Grid
4%
down, the oxygen level of the water 1.4%
needs to be increased. Aeration is the Anaerobic Clarifier
digesting 3%
process by which the area of contact 14 %
between water and air is increased,
either by natural or mechanical
means, resulting in air being suspended Return sludge
in water. pumping & Gravity
thickening
1% Aeration
54.3 %
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Retention time
Technology Type OTE kgO2/kW.hr 10,000 m3 water Limitations
Facultative 7-50 days Space
Lagoon Aerobic 3-6 days Retention time
Aerated 2-3 days
Combination Systems Turbine 0,91 – 1,52 4-12 hours Possibly inhomogeneous quality
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Dual point control
Decision criteria's:
e f f i c i e n c y - %
• Design point
single–stage efficiency
• Turndown capability
Speed controlled
(VFD) for maximum
flexibility
direct drive • Efficiency over
Speed controlled
whole turndown
(VFD) range
i s e n t ro p i c
multi- stage
Usual operating
range of WWTP
positive disp
% c a p a c i t y
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Air flow = f(n)
Diff. pressure = f(n²)
Impeller speed = n
Single Point speed control
limits the turndown range as the
pressure drops much faster than the
flow by reduced speed. In order to
reach a decent turndown, it is necessary
to design the compressor for a much
higher value with the result of overall
lower efficiency.
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
© Siemens AG 2007. Alle Rechte vorbehalten.
Page 21
Siemens Turbomachinery Solutions
Direct drive: Dual-Point vs. Single Point Control
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
© Siemens AG 2007. Alle Rechte vorbehalten.
Page 22
Siemens Turbomachinery Solutions
Qualified Performance test, based on ISO and ASME-PTC-10
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Performance test Based on Performance Data Sheet (PDS)
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Siemens Turbomachinery Solutions
The fully customizable integrally geared STC-GO-series
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Integrally geared STC-GO
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Integrally geared STC-GO
Cone diffuser
Well proven design with over 7.000
installed references in over 2.300
Inlet filter and WWT and Power plants
silencer
Silencer hood for noise reduction and several upgrade and customization options available
depending on project and plant requirement
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
© Siemens AG 2007. Alle Rechte vorbehalten.
Page 27
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Siemens Turbomachinery Solutions
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
© Siemens AG 2007. Alle Rechte vorbehalten.
Page 29
Siemens Turbomachinery Solutions
ABC solution for two aeration lines with 12 zones
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
© Siemens AG 2007. Alle Rechte vorbehalten.
Page 30
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Siemens Turbomachinery Solutions
Pay-as-you benefit
Financial Solutions
Short introduction
Siemens Turbomachinery Solutions
“Pay as you benefit” solution
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
“Pay as you benefit” shows our confidence in
the achievable energy savings for your plant
With our partner Siemens Financial Services
(SFS) we take over the initial investments in
our products, allowing you to:
save liquidity in turbulent times
free investments for other purposes
put energy savings back into your facility
increase effluent quality & stability
save the environment w.o. putting pressure
on your credit line
Payback via the agreed energy savings over
the payback time
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Where is it possible with Siemens Financial
Services
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
The “Pay as you benefit” concept
Customer
Baseline
Reduced operational costs after
installation of Siemens blowers
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Siemens Turbomachinery Solutions
Evolution of Automation Solutions for WWTP
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Manual Control
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Constant Pressure Aeration Control
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Semi-Automatic Aeration Control
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
Fully-Automatic Aeration Control
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
6800 m3h
sp
627 mBar
pv PID 8500 m3h PID 2 ppm sp
cv
Valve position
1.85 ppm
pv
cv pv
cv
Vane Position PID 634 mBar sp
PID
Set point O2
O2 NH4
PID
FT
For internal use only / Copyright © Siemens AG 2010. All rights reserved.
© Siemens AG 2007. Alle Rechte vorbehalten.
Page 41