PRO WI 001 Image Marked
PRO WI 001 Image Marked
Pa geNo 1Of2
ME"OR' AL RE€loNAL iospI A
Procurement Section lss ueN 001
1.0 Purpose
2,0 Scope
This work instruction covers the procedure and timeline of the preparation of contracts
3.4 Contract
Revised lmplementing Rules arid Regulations of Republic Act 9184 otherwise known as
Government Procurement Reform Act (GPRA)
5.4 Winningbidder.
6.1 Upon receipt of the Notice of Award ( NOA ) of the winning bidder, the
Procurement Staff shall prepare the Contract within three ( 3 ) working days.
CORAZON LOCSIN MON'TEL[BANO Page No. 2Of2
MEMORl ALR EGIONAL l]OSPITAL
Procurement Sectiion Issue No, 001
6.3 After counterchecking, the BAC secretariat shall forward the contract to the end-
user for evaluation. Any corrections and additional provisions to the contract shall
be incorporated by the staff of the procurement section.
6.4 Upon approval of the end-user, the procurement staff shall forward the contract
to the legal office for review.
6.4.1 Once reviewed by the legal office, corrections shall be noted and the draft
contract shall be returned to the BAC Secretariat for revision.
6.4.2 Revised/ Corrected contract shall be returned to the legal office for final
review.
6.5 Draft contract shall be returned to the BAG secretariat for finalization and printing
within a day.
6.6 Finalized contract shall be forwarded to the legal office for approval by
countersigning.
6.7 Finalized contract shall be forwar.ded End-user, Finance officer and the Head of
the Procuring Entity ( HOPE ) for approval and signature. This process shall take
one to two working days, dependling on the availability of the concerned persons.
6.7.1 The winning bidder/ Contractor shall be the last to sign the contract.
6.8 The contract shall be forwarded to the winding bidder for Notarization. This
process shall take a day.
6.9 The winning bidder shall return tlie completely signed and notarized contract to
the Procurement Section for filing and transmittal to Commission on Audit ( COA
), Budget Section, Materials Management Section and Finance Division.
Jere -
UZ-u -0
azareno
02.-02-16
\
Maria chrisDtina . Pabicon Dr.J
\02-03
i sM.Drilon
Administrative Assistant Ill Supervising Admi trative officerV Medica Center Chief
CORAZoN LOcsiN MormEL[BA a MEMORIAL REchoNAL HOSPITth
ement S stem - Control Of Documents
Document Review, rtyprowl, lssuance & Retrieval Record {DfIAIRR)
At ISstJE Nu"BER a. DOcumENT TypE
I Manual I standard operating procedure
I Revision I Policy I Form/ Checklist
.g%£e#Naloal¥fuMRHPRO".Ooi q± Work-Instruction E= Others (speefty)
• Describe changes:
1). New document will`replace previous document with same code i[Wl on Pre-Bid Conference)
a..,Doc# DOOuMENT_TJTL`E :
Mark `&X'' ]fflbsoiete{fortx=}
Doc# i DOCURENTCODE:
1) Contract preparation 1) CLMMRH,PRO.Wl.001
sue ATUEE ,
.\
System
9an Mi3ut` Lopea>, Au
ft'( cfa . ollo3l"`V
OL
2 „V
DRAHan FORM
cLMrmll-Dc.F.oo5
Issued: 7/1 77i4
Issue No. : 00 1 Page 1
CORAZON Lo¢slT\i Mo NTEHBAnro MEMo tAL REo ionAL MOsptTAL
- Oontrot Of Dociments
t2.
13.
14.
15+
16.
17-
18.
t9.
20.
1.
22.
23.
24.
26-
26.
27.
g
29.
sO.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
DDFFORM
cnAqu-mF.oo6
heed: 7/22/I 5
Issuel No.: 001 Page 1