Professional Documents
Culture Documents
Packet - Ii: Signature Not Verified Signature Not Verified Signature Not Verified
Packet - Ii: Signature Not Verified Signature Not Verified Signature Not Verified
Packet - Ii: Signature Not Verified Signature Not Verified Signature Not Verified
Signature Not
Verified
Digitally signed by
SHYAM LAL SHARMA
Date: 2021.07.27
12:38:19 IST
Reason: IREPS-CRIS
Location: New Delhi
Packet II
Financial Bid*
Total A
B On Ground Stationary Hydrogen Storage and filling Cost of B Taxes Cost of B with Quantity Total Cost with
station at site as per RDSO specification no. Taxes Taxes (4 x 5)
R2/347/Fuel Cell-1 complete with Design, 01 no.
Development, Supply, Installation, Commissioning, Hydrogen
Inspection and third party safety audit certification filling
station
Total B
C Cost of Hydrogen (60 tonne) Cost of Taxes Cost of Hydrogen Quantity Total Cost with
Technical Specification of Hydrogen as per Fuel Hydrogen per tonne with Taxes
per tonne Taxes (4 x 5)
Cell requirement
60 Tonne
Total C
Total D
Grand Total cost (A+B+C+D) inclusive of taxes etc (in figures)_______________________
Grand Total cost (A+B+C+D) inclusive of taxes etc (in words)________________________