Professional Documents
Culture Documents
New Marpol Requirement On Designated Fuel Oil Sampling Points
New Marpol Requirement On Designated Fuel Oil Sampling Points
12/2021 – STATUTORY
The 0.50% global sulphur limit for fuel oil used or carried for use has been in force since
1 January 2020. Three months later the so-called carriage ban took effect which prohibits
carriage of fuel exceeding the global sulphur limit in the fuel oil tanks. To follow up on the
new requirement and enable PSC to take representative samples of the fuel oil being used
onboard, in-use sampling points needs to be designated. This statutory news summarizes
the sampling point requirement.
1)
MEPC.182(59) - 2009 GUIDELINES FOR THE SAMPLING OF FUEL OIL FOR DETERMINATION OF COMPLIANCE WITH THE REVISED
MARPOL ANNEX VI
2)
MEPC.1/Circ.864/Rev.1 - 2019 GUIDELINES FOR ON BOARD SAMPLING FOR THE VERIFICATION OF THE SULPHUR CONTENT OF THE
FUEL OIL USED ON BOARD SHIPS
3)
MEPC.1/Circ.889 - 2020 GUIDELINES FOR ON BOARD SAMPLING OF FUEL OIL INTENDED TO BE USED OR CARRIED FOR USE ON
BOARD A SHIP
DNV AS, Veritasveien 1, 1363 Høvik, Norway, Phone: +47 67 57 99 00, www.dnv.com/maritime DNV GL Disclaimer of Liability Page 1/2
the piping system, e.g. additional drainage. Please see the Recommendations
annex to this newsletter for practical advice on fitting of addi- We recommend designating existing sampling points as far as
tional sampling points in addition to the IMO guidelines 2). practicable and feasible. In case fitting and designating new
sampling points, utilizing existing connections (e.g. manom-
Early compliance eters) and existing drip trays/drainage should be considered.
As for many new environmental requirements we observe
that many ship managers seek to comply ahead of the Test out the newly launched DNV Compliance Planner where
required deadlines and to document the same towards third the sampling point requirement is visible.
parties. This is also the case with this regulation, and DNV will
therefore offer early compliance upon request, documented References
by a Statement of Compliance before EIF of the MARPOL • MEPC.324(75) - Procedures for sampling and verification
Amendments (1 April 2022) and a new IAPP certificate if of the sulphur content of fuel oil and the Energy Efficiency
confirmation is done on or after EIF. For vessels given a State- Design Index (EEDI)
ment of Compliance this will also automatically be shown • MEPC.1Circ.864/rev.1 - 2019 Guidelines for on board sam-
on the first IAPP certificate issued after EIF. Confirmation of pling for the verification of the sulphur content of the fuel
early compliance may be done as part of an annual survey or oil used on board ships
ordered as a remote survey.
Appendix
Fitting of new sampling points. • Sampling valves shall be so located that any drip or spray
• Existing sampling points should be designated as far as cannot reach a hot surface, electrical equipment or other
possible. If not, new designated sampling points to be fit- source of ignition.
ted and verified. • Sampling valves shall be made of ductile material, such as
• Different fuel oil grades to be used shall be taken into nodular cast iron or steel (DNV GL Rules Pt.4 Ch.6 Sec.2 1.5).
account and the sampling point location to be downstream • Pressure ratings of flanges/valves - shall not be lower than
of the in use fuel oil service tank and as close to the con- the maximum working pressure of the FO system, and not
sumer as safely feasible, considering FO temperature, pres- lower than 14 bar (DNV GL Rules Pt.4 Ch.6 Sec.5 4.3.8)
sure and flow-rate. • Pipe thickness - shall not be less than as required by DNV
• The sampling points shall be provided with a shut-off valve GL Rules Pt.4 Ch.6 Sec.9.
and preferably also with a self-closing valve. • Drip trays shall be arranged below the sampling points to
• Sampling valves shall be provided with caps to prevent ensure suitable drainage to a drain tank.
leakage when not in use. • The installation shall be subjected to a function test.
• Sampling valves shall be easily accessible in a well-lit and • The sampling point to be designated and clearly marked
ventilated location. both in the ER and on the relevant piping diagram.
DNV AS, Veritasveien 1, 1363 Høvik, Norway, Phone: +47 67 57 99 00, www.dnv.com/maritime DNV GL Disclaimer of Liability Page 2/2