FOUNDATION ENGINEERING 2019

Chapter 3:
Pre-Design Analysis

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
Chapter 3 |1
FOUNDATION ENGINEERING 2019
This chapter presents the different design criteria used in the analysis and design of the building,
along with the design loads to be considered and the different load combination used throughout
the design and analysis. It also presents seismic analysis and frame analysis both with analysis
flowchart and using modern tool software such as Excel and STAAD).

DESIGN CRITERIA

Design Codes, Standards, and Specifications

The design shall be in accordance with all the applicable local and international codes, standards,
and specifications.

 National Structural Code of the Philippines (NSCP) 2015


 National Building Code of the Philippines
 American Concrete Institute (ACI) Publications
 American Society of Civil Engineers (ASCE) 7
 International Building Code (IBC)
 Uniform Building Code (UBC)

Materials and Specifications

The material specification and specified design data for structural design and detailing of
concrete and steel members shall be in accordance with the following material strengths
specified.

 Concrete
o 28 MPa for beams, columns, and slabs.
o 28 MPa for footings and slab on fill.
 Reinforcing steel
o Grade 40 for 10mm diameter and smaller (Fy=276Mpa)
DESIGN PROJECT Submitted by: October 2019
PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
Chapter 3 |2
FOUNDATION ENGINEERING 2019
o Grade 60 for 25mm diameter and larger (Fy=414Mpa)
 Structural Steel
o Modulus of Elasticity, Es = 200,000 Mpa
o Minimum Yield Strength, Fy = 50 ksi

Computer Software and Programs

 AutoCAD
AutoCAD is a commercial computer-aided design (CAD) and drafting software
application. Developed and marketed by Autodesk, AutoCAD was first released
in December 1982 as a desktop app running on microcomputers with
internal graphics controllers. Before AutoCAD was introduced, most commercial
CAD programs ran on mainframe computers or minicomputers, with each CAD
operator (user) working at a separate graphics terminal.[3] Since 2010, AutoCAD
was released as a mobile- and web app as well, marketed as AutoCAD 360.
AutoCAD is used in the industry, by architects, project managers, engineers,
graphic designers, city planners and other professionals. It was supported by 750
training centers worldwide in 1994.

 STAAD Pro (Structural Analysis and Designing Program)


STAAD.Pro is one of the most widely used structural analysis and
design software products worldwide. It supports over 90 international steel,
concrete, timber & aluminum design codes. It can make use of various forms of
analysis from the traditional static analysis to more recent analysis methods
like p-delta analysis, geometric non-linear analysis, Pushover analysis (Static-Non
Linear Analysis) or a buckling analysis. It can also make use of various forms of
dynamic analysis methods from time history analysis to response spectrum
analysis. The response spectrum analysis feature is supported for both user
defined spectra as well as a number of international code specified spectra.
DESIGN PROJECT Submitted by: October 2019
PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
Chapter 3 |3
FOUNDATION ENGINEERING 2019

 Microsoft Office Excel


Microsoft Excel is a spreadsheet program included in the Microsoft Office suite
of applications. Spreadsheets present tables of values arranged in rows and
columns that can be manipulated mathematically using both basic and complex
arithmetic operations and functions.

 Microsoft Office Word


A powerful word processor from Microsoft. The program enables you to perform
word processing functions.

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
Chapter 3 |4
FOUNDATION ENGINEERING 2019
DESIGN DEVELOPMENT FLOWCHART

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
Chapter 3 |5
FOUNDATION ENGINEERING 2019

DESIGN LOADS

Load Calculations

Dead Load kPa

Cement Finish (25mm) on stone-concrete fill 1.53

Plaster on tile or concrete 0.24

Windows, glass, frame, and sash 0.38

CHB:

100mm w/ full grout 2.98

150mm w/ full grout 3.11

Partition Loads 1

Live Load kPa

Exit Facilities 4.8

Other offices 2.4

Restrooms 2.4

Retail stores/ Dining Rooms and Restaurants 4.8

Corridors above ground floor 3.8

Sidewalks and driveways 12

Self Weight Calculation


Concrete 23.6 kN/m
Slab Thickness 200 Mm

Gravity Loads

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
Chapter 3 |6
FOUNDATION ENGINEERING 2019

GROUND FLOOR

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
Chapter 3 |7
FOUNDATION ENGINEERING 2019

PANEL DEAD LOADS FACTORED


S1 5.96 7.152
S2 5.96 7.152
S3 5.96 7.152
S4 4.96 5.952
S5 4.96 5.952
S6 4.96 5.952
S7 4.96 5.952
S8 4.96 5.952
S9 4.96 5.952
S10 4.96 5.952
S11 4.96 5.952
S12 4.96 5.952
S13 4.96 5.952
S14 4.96 5.952
S15 5.96 7.152
S16 5.96 7.152
S17 5.96 7.152
S18 5.96 7.152
S19 5.96 7.152
S20 5.96 7.152
S21 4.96 5.952
S22 4.96 5.952
S23 4.96 5.952
S24 4.96 5.952
S25 4.96 5.952
S26 4.96 5.952
S27 4.96 5.952
S28 4.96 5.952
S29 4.96 5.952
S30 4.96 5.952
S31 4.96 5.952
S32 5.96 7.152
S33 5.96 7.152
S34 5.96 7.152
S35 5.96 7.152
S36 5.96 7.152
S37 5.96 7.152
S38 4.96 5.952
S39 4.96 5.952
S40 4.96 5.952
DESIGN PROJECT Submitted by: October 2019
PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
Chapter 3 |8
FOUNDATION ENGINEERING 2019
S41 4.96 5.952
S42 4.96 5.952
S43 4.96 5.952
S44 4.96 5.952
S45 4.96 5.952
S46 4.96 5.952
S47 4.96 5.952
S48 4.96 5.952
S49 5.96 7.152
S50 5.96 7.152
S51 5.96 7.152
S52 5.96 7.152
S53 5.96 7.152
S54 5.96 7.152
S55 4.96 5.952
S56 4.96 5.952
S57 4.96 5.952
S58 4.96 5.952
S59 4.96 5.952
S60 4.96 5.952
S61 4.96 5.952
S62 4.96 5.952
S63 4.96 5.952
S64 4.96 5.952
S65 4.96 5.952
S66 5.96 7.152
S67 5.96 7.152
S68 5.96 7.152
S69 5.96 7.152
S70 5.96 7.152
S71 5.96 7.152
S72 5.96 7.152
S73 5.96 7.152
S74 4.96 5.952
S75 4.96 5.952
S76 4.96 5.952
S77 4.96 5.952
S78 4.96 5.952
S79 4.96 5.952
S80 4.96 5.952
S81 5.96 7.152

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
Chapter 3 |9
FOUNDATION ENGINEERING 2019
S82 5.96 7.152
S83 5.96 7.152
S84 5.96 7.152
S85 5.96 7.152
S86 5.96 7.152
S87 5.96 7.152
S88 5.96 7.152
S89 5.96 7.152
S90 5.96 7.152
S91 5.96 7.152
S92 4.96 5.952
S93 4.96 5.952
S94 4.96 5.952
S95 4.96 5.952
S96 4.96 5.952
S97 5.96 7.152
S98 5.96 7.152
S99 5.96 7.152
S100 5.96 7.152
S101 5.96 7.152
S102 5.96 7.152

SECOND FLOOR
PANEL DEAD LOADS LIVE LOADS FACTORED
S1 6.87 3.8 14.324
S2 6.87 3.8 14.324
S3 6.87 3.8 14.324
S4 6.87 12 27.444
S5 6.87 12 27.444
S6 6.87 12 27.444
S7 6.87 12 27.444
S8 6.87 12 27.444
S9 6.87 12 27.444
S10 6.87 12 27.444
S11 6.87 12 27.444
S12 6.87 12 27.444
S13 6.87 12 27.444
S14 6.87 12 27.444
S15 6.87 3.8 14.324
S16 6.87 3.8 14.324

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 10
FOUNDATION ENGINEERING 2019
S17 6.87 3.8 14.324
S18 6.87 3.8 14.324
S19 7.87 3.8 15.524
S20 6.87 3.8 14.324
S21 6.87 12 27.444
S22 6.87 12 27.444
S23 6.87 12 27.444
S24 6.87 12 27.444
S25 6.87 12 27.444
S26 6.87 12 27.444
S27 6.87 12 27.444
S28 6.87 12 27.444
S29 6.87 12 27.444
S30 6.87 12 27.444
S31 6.87 12 27.444
S32 6.87 3.8 14.324
S33 7.87 3.8 15.524
S34 6.87 3.8 14.324
S35 6.87 3.8 14.324
S36 6.87 7.9 20.884
S37 6.87 12 27.444
S38 6.87 12 27.444
S39 6.87 12 27.444
S40 6.87 12 27.444
S41 6.87 12 27.444
S42 6.87 12 27.444
S43 6.87 12 27.444
S44 6.87 12 27.444
S45 6.87 12 27.444
S46 6.87 12 27.444
S47 6.87 12 27.444
S48 6.87 12 27.444
S49 6.87 12 27.444
S50 6.87 12 27.444
S51 6.87 3.8 14.324
S52 6.87 3.8 14.324
S53 6.87 7.9 20.884
S54 6.87 12 27.444
S55 6.87 12 27.444
S56 6.87 12 27.444
S64 6.87 12 27.444

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 11
FOUNDATION ENGINEERING 2019
S65 6.87 12 27.444
S66 6.87 12 27.444
S67 6.87 12 27.444
S68 6.87 3.8 14.324
S69 7.87 3.8 15.524
S70 7.87 3.8 15.524
S71 7.87 3.8 15.524
S72 6.87 3.8 14.324
S73 6.87 3.8 14.324
S81 6.87 7.9 20.884
S82 6.87 7.9 20.884
S83 7.87 7.9 22.084
S84 7.87 7.9 22.084
S85 7.87 3.8 15.524
S86 7.87 2.4 13.284
S87 7.87 2.4 13.284
S88 7.87 2.4 13.284
S89 7.87 3.8 15.524
S90 6.87 3.8 14.324
S91 6.87 3.8 14.324
S92 6.87 3.8 14.324
S93 7.87 3.1 14.404
S94 7.87 3.1 14.404
S95 7.87 3.1 14.404
S96 6.87 3.8 14.324
S97 6.87 3.8 14.324
S98 7.87 3.8 15.524
S99 7.87 3.8 15.524
S100 7.87 2.4 13.284
S101 7.87 2.4 13.284
S102 7.87 2.4 13.284

THIRD FLOOR
PANEL DEAD LOADS LIVE LOADS FACTORED
S1 6.87 8.244
S2 6.87 8.244
S3 6.87 8.244
S4 6.87 8.244
S5 6.87 8.244
S6 6.87 8.244

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 12
FOUNDATION ENGINEERING 2019
S7 6.87 8.244
S8 6.87 8.244
S9 6.87 8.244
S10 6.87 8.244
S11 6.87 8.244
S12 6.87 8.244
S13 6.87 8.244
S14 6.87 8.244
S15 6.87 8.244
S16 6.87 8.244
S17 6.87 8.244
S18 6.87 12 27.444
S19 7.87 3.8 15.524
S20 6.87 12 27.444
S21 6.87 12 27.444
S22 6.87 12 27.444
S23 6.87 12 27.444
S24 6.87 12 27.444
S25 6.87 12 27.444
S26 6.87 12 27.444
S27 6.87 12 27.444
S28 6.87 12 27.444
S29 6.87 12 27.444
S30 6.87 12 27.444
S31 6.87 12 27.444
S32 6.87 12 27.444
S33 7.87 3.8 15.524
S34 6.87 12 27.444
S35 6.87 12 27.444
S36 6.87 12 27.444
S37 6.87 12 27.444
S38 6.87 12 27.444
S39 6.87 12 27.444
S40 6.87 12 27.444
S41 6.87 12 27.444
S42 6.87 12 27.444
S43 6.87 12 27.444
S44 6.87 12 27.444
S45 6.87 12 27.444
S46 6.87 12 27.444
S47 6.87 12 27.444

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 13
FOUNDATION ENGINEERING 2019
S48 6.87 12 27.444
S49 6.87 12 27.444
S50 6.87 12 27.444
S51 6.87 12 27.444
S52 6.87 12 27.444
S53 6.87 12 27.444
S54 6.87 12 27.444
S55 6.87 12 27.444
S56 6.87 12 27.444
S57 6.87 12 27.444
S58 6.87 12 27.444
S59 6.87 12 27.444
S60 6.87 12 27.444
S61 6.87 12 27.444
S62 6.87 12 27.444
S63 6.87 12 27.444
S64 6.87 12 27.444
S65 6.87 12 27.444
S66 6.87 12 27.444
S67 6.87 12 27.444
S68 6.87 12 27.444
S69 6.87 12 27.444
S70 6.87 12 27.444
S71 6.87 12 27.444
S72 7.87 12 28.644
S73 7.87 12 28.644
S74 6.87 12 27.444
S75 6.87 12 27.444
S76 6.87 12 27.444
S77 6.87 12 27.444
S78 6.87 12 27.444
S79 6.87 12 27.444
S80 6.87 12 27.444
S81 7.87 12 28.644
S82 7.87 12 28.644
S83 6.87 12 27.444
S84 6.87 12 27.444
S85 6.87 12 27.444
S86 6.87 12 27.444
S87 6.87 12 27.444
S88 7.87 12 28.644

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 14
FOUNDATION ENGINEERING 2019
S89 7.87 3.8 15.524
S90 7.87 3.8 15.524
S91 7.87 12 28.644
S92 6.87 12 27.444
S93 6.87 12 27.444
S94 6.87 12 27.444
S95 6.87 12 27.444
S96 6.87 12 27.444
S97 7.87 12 28.644
S98 7.87 3.8 15.524
S99 7.87 3.8 15.524
S100 7.87 12 28.644
S101 6.87 12 27.444
S102 6.87 12 27.444

FOURTH TO FIFTH FLOOR


PANEL DEAD LOADS LIVE LOADS FACTORED
S18 6.87 12 27.444
S19 7.87 3.8 15.524
S20 6.87 12 27.444
S21 6.87 12 27.444
S22 6.87 12 27.444
S23 6.87 12 27.444
S24 6.87 12 27.444
S25 6.87 12 27.444
S26 6.87 12 27.444
S27 6.87 12 27.444
S28 6.87 12 27.444
S29 6.87 12 27.444
S30 6.87 12 27.444
S31 6.87 12 27.444
S32 6.87 12 27.444
S33 7.87 3.8 15.524
S34 6.87 12 27.444
S35 6.87 12 27.444
S36 6.87 12 27.444
S37 6.87 12 27.444
S38 6.87 12 27.444
S39 6.87 12 27.444
S40 6.87 12 27.444

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 15
FOUNDATION ENGINEERING 2019
S41 6.87 12 27.444
S42 6.87 12 27.444
S43 6.87 12 27.444
S44 6.87 12 27.444
S45 6.87 12 27.444
S46 6.87 12 27.444
S47 6.87 12 27.444
S48 6.87 12 27.444
S49 6.87 12 27.444
S50 6.87 12 27.444
S51 6.87 12 27.444
S52 6.87 12 27.444
S53 6.87 12 27.444
S54 6.87 12 27.444
S55 6.87 12 27.444
S56 6.87 12 27.444
S57 6.87 12 27.444
S58 6.87 12 27.444
S59 6.87 12 27.444
S60 6.87 12 27.444
S61 6.87 12 27.444
S62 6.87 12 27.444
S63 6.87 12 27.444
S64 6.87 12 27.444
S65 6.87 12 27.444
S66 6.87 12 27.444
S67 6.87 12 27.444
S68 6.87 12 27.444
S69 6.87 12 27.444
S70 6.87 12 27.444
S71 6.87 12 27.444
S72 7.87 12 28.644
S73 7.87 12 28.644
S74 6.87 12 27.444
S75 6.87 12 27.444
S76 6.87 12 27.444
S77 6.87 12 27.444
S78 6.87 12 27.444
S79 6.87 12 27.444
S80 6.87 12 27.444
S81 7.87 12 28.644

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 16
FOUNDATION ENGINEERING 2019
S82 7.87 12 28.644
S83 6.87 12 27.444
S84 6.87 12 27.444
S85 6.87 12 27.444
S86 6.87 12 27.444
S87 6.87 12 27.444
S88 7.87 12 28.644
S89 7.87 3.8 15.524
S90 7.87 3.8 15.524
S91 7.87 12 28.644
S92 6.87 12 27.444
S93 6.87 12 27.444
S94 6.87 12 27.444
S95 6.87 12 27.444
S96 6.87 12 27.444
S97 7.87 12 28.644
S98 7.87 3.8 15.524
S99 7.87 3.8 15.524
S100 7.87 12 28.644
S101 6.87 12 27.444
S102 6.87 12 27.444

SIXTH FLOOR
PANE
L DEAD LOADS LIVE LOADS FACTORED
S18 6.87 12 27.444
S19 7.87 3.8 15.524
S20 6.87 12 27.444
S21 6.87 12 27.444
S22 6.87 12 27.444
S23 6.87 12 27.444
S24 6.87 12 27.444
S25 6.87 12 27.444
S26 6.87 12 27.444
S27 6.87 12 27.444
DESIGN PROJECT Submitted by: October 2019
PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 17
FOUNDATION ENGINEERING 2019
S28 6.87 12 27.444
S29 6.87 12 27.444
S30 6.87 12 27.444
S31 6.87 12 27.444
S32 6.87 12 27.444
S33 7.87 3.8 15.524
S34 6.87 12 27.444
S35 6.87 12 27.444
S36 6.87 12 27.444
S37 6.87 12 27.444
S38 6.87 12 27.444
S39 6.87 12 27.444
S40 6.87 12 27.444
S41 6.87 12 27.444
S42 6.87 12 27.444
S43 6.87 12 27.444
S44 6.87 12 27.444
S45 6.87 12 27.444
S46 6.87 12 27.444
S47 6.87 12 27.444
S48 6.87 12 27.444
S49 6.87 12 27.444
S50 6.87 12 27.444
S51 6.87 12 27.444
S52 6.87 12 27.444
S53 6.87 12 27.444
S54 6.87 12 27.444
S55 6.87 12 27.444
S56 6.87 12 27.444
S57 6.87 12 27.444
S58 6.87 12 27.444
S59 6.87 12 27.444
S60 6.87 12 27.444
S61 6.87 12 27.444
S62 6.87 12 27.444
S63 6.87 12 27.444
S64 6.87 12 27.444
S65 6.87 12 27.444
S66 6.87 12 27.444
S67 6.87 12 27.444
S68 6.87 12 27.444

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 18
FOUNDATION ENGINEERING 2019
S69 6.87 12 27.444
S70 6.87 12 27.444
S71 6.87 12 27.444
S72 7.87 12 28.644
S73 7.87 12 28.644
S74 6.87 12 27.444
S75 6.87 12 27.444
S76 6.87 12 27.444
S77 6.87 12 27.444
S78 6.87 12 27.444
S79 6.87 12 27.444
S80 6.87 12 27.444
S81 7.87 12 28.644
S82 7.87 12 28.644
S83 6.87 12 27.444
S84 6.87 12 27.444
S85 6.87 12 27.444
S86 6.87 12 27.444
S87 6.87 12 27.444
S88 7.87 12 28.644
S89 7.87 3.8 15.524
S90 7.87 3.8 15.524
S91 7.87 12 28.644
S92 6.87 12 27.444
S93 6.87 12 27.444
S94 6.87 12 27.444
S95 6.87 12 27.444
S96 6.87 12 27.444
S97 7.87 12 28.644
S98 7.87 3.8 15.524
S99 7.87 3.8 15.524
S100 7.87 12 28.644
S101 6.87 12 27.444
S102 6.87 12 27.444

Table of Summary of Loads

Columns

COLUMN LOAD CALCULATIONS

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 19
FOUNDATION ENGINEERING 2019
Tributary Area Dead Load Live Load
Column Designation
kPa kPa

GROUND FLOOR

Ground A1,18 9.90 26.5419 37.62

Ground A2,17 21.40 57.3734 81.32

Ground A3,16 23.50 63.0035 89.3

Ground A4-15 24.00 64.344 288

Ground B1,18 16.89 120.2679844 399.799125

Ground B2,17 36.51 259.9732188 1329.66225

Ground B3,16 40.10 285.4846094 1460.143125

Ground B4-15 40.95 291.55875 1460.61

Ground C1,18 17.61 236.0570231 912.178575

Ground C2 38.07 510.2646763 2885.34595

Ground C17 38.07 510.2646763 3342.12895

Ground C3 41.80 560.3373781 3670.094875

Ground C16 41.80 560.3373781 3670.094875

Ground C4-15 42.69 572.25945 2723.622

Ground D1 18.04 466.6246988 1940.63445

Ground D18 18.04 466.6246988 1940.63445

Ground D2 39.00 104.5630215 616.2237

Ground D17 39.00 104.5630215 616.2237

Ground D3 42.83 767.6098448 2851.4106

Ground D16 42.83 767.6098448 2851.4106

Ground D4,11-15 43.74 586.3347 2624.4

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 20
FOUNDATION ENGINEERING 2019
Ground D5 43.74 586.3347 2624.4

Ground D6,10 34.74 562.2057 2516.4

Ground D7-9 25.74 538.0767 2408.4

Ground E1 14.85 384.05325 1597.23

Ground E18 14.85 384.05325 1597.23

Ground E2,17 32.10 86.0601 507.18

Ground E3,16 35.25 94.50525 2961.75

Ground E4 36.00 482.58 2296.8

Ground E5 36.00 482.58 2160

Ground E11-15 36.00 482.58 2296.8

Ground E6 18.00 434.322 1944

Ground E10 18.00 434.322 2012.4

Ground E7-9 386.064 1728

Ground F1 16.81 451.4255113 1847.86455

Ground F18 16.81 451.4255113 1847.86455

Ground F2 36.33 133.7178465 225.2243

Ground F17 36.33 133.7178465 661.1423

Ground F3 39.89 754.8529573 2968.75775

Ground F16 39.89 754.8529573 3447.45275

Ground F4-5 40.74 749.8197 3063.648

Ground F13-15 40.74 749.8197 3063.648

Ground F11-12 40.74 586.8597 2599.212

Ground F6 31.74 716.6907 2997.624

Ground F10 31.74 716.6907 2457.012

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 21
FOUNDATION ENGINEERING 2019
Ground F7-8 22.74 520.6017 2010.096

Ground F9 22.74 520.6017 2041.932

Ground G1 9.38025 241.1995163 989.5446

Ground G18 9.38 241.1995163 989.5446

Ground G2,17 20.28 54.3612965 48.6636

Ground G3,16 22.27 411.2580273 1627.011

Ground G4,15 45.48 791.5794 2392.248

Ground G7 45.48 609.6594 2292.192

Ground G12 45.48 609.6594 2355.864

Ground G8 22.74 304.8297 1200.672

Ground G9-11 22.74 304.8297 1232.508

Ground H1,18 10.77 227.0494463 1162.755

Ground H2,17 23.27 111.939855 2420.7228

Ground H3,16 32.11 193.1798504 2266.9938

Ground H4-15 39.20 222.7910355 728.8164

Ground I1,18 5.38 134.7045077 623.1375

Ground I2,17 11.64 31.19678625 753.4026

Ground I3,16 12.79 34.28147783 780.6771

Ground I4-15 13.07 35.0336994 156.8088

COLUMN LOAD CALCULATIONS


Tributary Area Dead Load Live Load
Column 2
Designation m
  kPa kPa
SECOND FLOOR
2n
B1,18
d 6.99 74.9808675 335.61
DESIGN PROJECT Submitted by: October 2019
PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 22
FOUNDATION ENGINEERING 2019
2n
B2,17
d 15.11 162.079855 1015.644
2n
B3,16
d 16.60 177.9848875 1115.31
2n
B4-15
d 16.95 181.7718 813.6
2n
C1,18
d 17.61 188.8456185 845.262
2n
C2,C17
d 38.07 408.211741 2557.9848
2n
C3,C16
d 41.80 448.2699025 2809.002
2n
C4-15
d 42.69 457.80756 2049.12
2n
D1
d 39.00 418.252086 1872.072
2n
D18
d 39.00 418.252086 1872.072
2n
D3,16
d 60.87 652.785966 2337.4656
2n
D4-15
d 43.74 469.06776 2099.52
2n
E1
d 32.10 344.2404 1540.8
2n
E18
d 32.10 344.2404 1540.8
2n
E3,16
d 50.10 537.2724 2404.8
2n
E4-15
d 36.00 386.064 1728
2n
F1
d 36.33 389.565386 1743.672
2n
F18
d 36.33 389.565386 1743.672
2n
F3,16
d 56.70 608.013266 2721.432
2n
F4-6,13-15
d 40.74 599.85576 2419.956
2n
F7-12
d 40.74 436.89576 1955.52
2n
G1
d 20.15 216.051066 967.032
2n G18 20.15 216.051066 967.032

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 23
FOUNDATION ENGINEERING 2019
d
2n
G3,16
d 32.78 351.562211 1573.572
2n
G4,15
d 45.48 669.64752 1564.512
2n
G7,12
d 45.48 487.72752 2183.04
2n
G8-11
d 22.74 243.86376 1091.52
2n
H1,18
d 21.53 198.18513 1033.56
2n
H3,16
d 44.61 410.6235744 2141.4528
2n
H4-15
d 39.20 360.8170488 1881.7056
2n
I1,18
d 5.38 49.5462825 258.39
2n
I2,17
d 11.64 107.100045 558.54
2n
I3,16
d 12.79 117.6899373 613.7676
2n
I4-15
d 13.07 120.2723496 627.2352

COLUMN LOAD CALCULATIONS


Tributary Area Dead Load Live Load
Column 2
Designation m
  kPa kPa
THIRD FLOOR
3r
B1,18
d 6.99 56.23565063 251.7075
3r
B2,17
d 15.11 121.5598913 761.733
3r
B3,16
d 16.60 133.4886656 836.4825
3r
B4-15
d 16.95 136.32885 610.2
3r
C1,18
d 17.61 141.6342139 633.9465
3r
C2,C17
d 38.07 306.1588058 1918.4886
3r C3,C16 41.80 336.2024269 2106.7515
DESIGN PROJECT Submitted by: October 2019
PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 24
FOUNDATION ENGINEERING 2019
d
3r
C4-15
d 42.69 343.35567 1536.84
3r
D1
d 39.00 313.6890645 1404.054
3r
D18
d 39.00 313.6890645 1404.054
3r
D3,16
d 60.87 489.5894745 1607.0076
3r
D4-15
d 43.74 351.80082 1574.64
3r
E1
d 32.10 258.1803 1155.6
3r
E18
d 32.10 258.1803 1155.6
3r
E3,16
d 50.10 402.9543 1803.6
3r
E4-15
d 36.00 289.548 1296
3r
F1
d 36.33 292.1740395 1307.754
3r
F18
d 36.33 292.1740395 1307.754
3r
F3,16
d 56.70 456.0099495 2041.074
3r
F4-6,13-15
d 40.74 449.89182 1931.076
3r
F7-12
d 40.74 327.67182 1466.64
3r
G1
d 20.15 162.0382995 725.274
3r
G18
d 20.15 162.0382995 725.274
3r
G3,16
d 32.78 263.6716583 1180.179
3r
G4,15
d 45.48 502.23564 1173.384
3r
G7,12
d 45.48 365.79564 1637.28
3r
G8-11
d 22.74 182.89782 818.64
3r
H1,18
d 21.53 148.6388475 775.17

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 25
FOUNDATION ENGINEERING 2019
3r
H3,16
d 44.61 307.9676808 1606.0896
3r
H4-15
d 39.20 270.6127866 1411.2792
3r
I1,18
d 5.38 37.15971188 193.7925
3r
I2,17
d 11.64 80.32503375 418.905
3r
I3,16
d 12.79 88.26745298 460.3257
3r
I4-15
d 13.07 90.2042622 470.4264

COLUMN LOAD CALCULATIONS


Tributary Area Dead Load Live Load
Column 2
Designation m
  kPa kPa
FOURTH FLOOR
4t
B1,18
h 6.99 37.49043375 167.805
4t
B2,17
h 15.11 81.0399275 507.822
4t
B3,16
h 16.60 88.99244375 557.655
4t
B4-15
h 16.95 90.8859 406.8
4t
C1,18
h 17.61 94.42280925 422.631
4t
C2,C17
h 38.07 204.1058705 1278.9924
4t
C3,C16
h 41.80 224.1349513 1404.501
4t
C4-15
h 42.69 228.90378 1024.56
4t
D1
h 39.00 209.126043 936.036
4t
D18
h 39.00 209.126043 936.036
4t
D3,16
h 60.87 326.392983 876.5496
4t
D4-15
h 43.74 234.53388 1049.76
DESIGN PROJECT Submitted by: October 2019
PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 26
FOUNDATION ENGINEERING 2019
4t
E1
h 32.10 172.1202 770.4
4t
E18
h 32.10 172.1202 770.4
4t
E3,16
h 50.10 268.6362 1202.4
4t
E4-15
h 36.00 193.032 864
4t
F1
h 36.33 194.782693 871.836
4t
F18
h 36.33 194.782693 871.836
4t
F3,16
h 56.70 304.006633 1360.716
4t
F4-6,13-15
h 40.74 299.92788 1287.384
4t
F7-12
h 40.74 218.44788 977.76
4t
G1
h 20.15 108.025533 483.516
4t
G18
h 20.15 108.025533 483.516
4t
G3,16
h 32.78 175.7811055 786.786
4t
G4,15
h 45.48 334.82376 782.256
4t
G7,12
h 45.48 243.86376 1091.52
4t
G8-11
h 22.74 121.93188 545.76
4t H1,18 21.53 99.092565 516.78
h
4t
H3,16
h 44.61 205.3117872 1070.7264
4t
H4-15
h 39.20 180.4085244 940.8528
4t
I1,18
h 5.38 24.77314125 129.195
4t
I2,17
h 11.64 53.5500225 279.27
4t
I3,16
h 12.79 58.84496865 306.8838
4t I4-15 13.07 60.1361748 313.6176

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 27
FOUNDATION ENGINEERING 2019
h

COLUMN LOAD CALCULATIONS


Tributary Area Dead Load Live Load
Column 2
Designation m
kPa kPa
FIFTH FLOOR
5t
B1,18
h 6.99 18.74521688 83.9025
5t
B2,17
h 15.11 40.51996375 253.911
5t
B3,16
h 16.60 44.49622188 278.8275
5t
B4-15
h 16.95 45.44295 203.4
5t
C1,18
h 17.61 47.21140463 211.3155
5t
C2,C17
h 38.07 102.0529353 639.4962
5t
C3,C16
h 41.80 112.0674756 702.2505
5t
C4-15
h 42.69 114.45189 512.28
5t
D1
h 39.00 104.5630215 468.018
5t
D18
h 39.00 104.5630215 468.018
5t
D3,16
h 60.87 163.1964915 146.0916
5t
D4-15
h 43.74 117.26694 524.88
5t
E1
h 32.10 86.0601 385.2
5t
E18
h 32.10 86.0601 385.2
5t
E3,16
h 50.10 134.3181 601.2
5t
E4-15
h 36.00 96.516 432
5t
F1
h 36.33 97.3913465 435.918

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 28
FOUNDATION ENGINEERING 2019
5t
F18
h 36.33 97.3913465 435.918
5t
F3,16
h 56.70 152.0033165 680.358
5t
F4-6,13-15
h 40.74 149.96394 643.692
5t
F7-12
h 40.74 109.22394 488.88
5t
G1
h 20.15 54.0127665 241.758
5t
G18
h 20.15 54.0127665 241.758
5t
G3,16
h 32.78 87.89055275 393.393
5t
G4,15
h 45.48 167.41188 391.128
5t
G7,12
h 45.48 121.93188 545.76
5t
G8-11
h 22.74 60.96594 272.88
5t
H1,18
h 21.53 49.5462825 258.39
5t
H3,16
h 44.61 102.6558936 535.3632
5t
H4-15
h 39.20 90.2042622 470.4264
5t
I1,18
h 5.38 12.38657063 64.5975
5t
I2,17
h 11.64 26.77501125 139.635
5t
I3,16
h 12.79 29.42248433 153.4419
5t
I4-15
h 13.07 30.0680874 156.8088

Slabs

SLAB LOAD CALCULATIONS


DEAD LOADS LIVE LOADS FACTORED
PANEL
kPa kPa kPa
SECOND FLOOR
S1 6.87 3.8 14.324

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 29
FOUNDATION ENGINEERING 2019
S2 6.87 3.8 14.324
S3 6.87 3.8 14.324
S4 6.87 12 27.444
S5 6.87 12 27.444
S6 6.87 12 27.444
S7 6.87 12 27.444
S8 6.87 12 27.444
S9 6.87 12 27.444
S10 6.87 12 27.444
S11 6.87 12 27.444
S12 6.87 12 27.444
S13 6.87 12 27.444
S14 6.87 12 27.444
S15 6.87 3.8 14.324
S16 6.87 3.8 14.324
S17 6.87 3.8 14.324
S18 6.87 3.8 14.324
S19 7.87 3.8 15.524
S20 6.87 3.8 14.324
S21 6.87 12 27.444
S22 6.87 12 27.444
S23 6.87 12 27.444
S24 6.87 12 27.444
S25 6.87 12 27.444
S26 6.87 12 27.444
S27 6.87 12 27.444
S28 6.87 12 27.444
S29 6.87 12 27.444
S30 6.87 12 27.444
S31 6.87 12 27.444
S32 6.87 3.8 14.324
S33 7.87 3.8 15.524
S34 6.87 3.8 14.324
S35 6.87 3.8 14.324
S36 6.87 7.9 20.884
S37 6.87 12 27.444
S38 6.87 12 27.444
S39 6.87 12 27.444
S40 6.87 12 27.444
S41 6.87 12 27.444
S42 6.87 12 27.444

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 30
FOUNDATION ENGINEERING 2019
S43 6.87 12 27.444
S44 6.87 12 27.444
S45 6.87 12 27.444
S46 6.87 12 27.444
S47 6.87 12 27.444
S48 6.87 12 27.444
S49 6.87 12 27.444
S50 6.87 12 27.444
S51 6.87 3.8 14.324
S52 6.87 3.8 14.324
S53 6.87 7.9 20.884
S54 6.87 12 27.444
S55 6.87 12 27.444
S56 6.87 12 27.444
S64 6.87 12 27.444
S65 6.87 12 27.444
S66 6.87 12 27.444
S67 6.87 12 27.444
S68 6.87 3.8 14.324
S69 7.87 3.8 15.524
S70 7.87 3.8 15.524
S71 7.87 3.8 15.524
S72 6.87 12 27.444
S73 6.87 12 27.444
S81 6.87 7.9 20.884
S82 6.87 7.9 20.884
S83 7.87 7.9 22.084
S84 7.87 7.9 22.084
S85 7.87 3.8 15.524
S86 7.87 2.4 13.284
S87 7.87 2.4 13.284
S88 7.87 2.4 13.284
S89 7.87 3.8 15.524
S90 6.87 3.8 14.324
S91 6.87 3.8 14.324
S92 6.87 3.8 14.324
S93 7.87 3.10 14.404
S94 7.87 3.10 14.404
S95 6.87 3.10 13.204
S96 6.87 3.8 14.324
S97 7.87 3.8 15.524

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 31
FOUNDATION ENGINEERING 2019
S98 6.87 3.8 14.324
S99 7.87 3.8 15.524
S100 7.87 2.4 13.284
S101 7.87 2.4 13.284
S102 7.87 2.4 13.284

SLAB LOAD CALCULATIONS


DEAD LOADS LIVE LOADS FACTORED
PANEL
kPa kPa kPa
SECOND FLOOR
S1 6.87 3.8 14.324
S2 6.87 3.8 14.324
S3 6.87 3.8 14.324
S4 6.87 12 27.444
S5 6.87 12 27.444
S6 6.87 12 27.444
S7 6.87 12 27.444
S8 6.87 12 27.444
S9 6.87 12 27.444
S10 6.87 12 27.444
S11 6.87 12 27.444
S12 6.87 12 27.444
S13 6.87 12 27.444
S14 6.87 12 27.444
S15 6.87 3.8 14.324
S16 6.87 3.8 14.324
S17 6.87 3.8 14.324
S18 6.87 3.8 14.324
S19 7.87 3.8 15.524
S20 6.87 3.8 14.324
S21 6.87 12 27.444
S22 6.87 12 27.444
S23 6.87 12 27.444
S24 6.87 12 27.444
S25 6.87 12 27.444
S26 6.87 12 27.444
S27 6.87 12 27.444
S28 6.87 12 27.444
S29 6.87 12 27.444
S30 6.87 12 27.444

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 32
FOUNDATION ENGINEERING 2019
S31 6.87 12 27.444
S32 6.87 3.8 14.324
S33 6.87 3.8 14.324
S34 6.87 3.8 14.324
S35 6.87 3.8 14.324
S36 6.87 7.9 20.884
S37 6.87 12 27.444
S38 6.87 12 27.444
S39 6.87 12 27.444
S40 6.87 12 27.444
S41 6.87 12 27.444
S42 6.87 12 27.444
S43 6.87 12 27.444
S44 6.87 12 27.444
S45 6.87 12 27.444
S46 6.87 12 27.444
S47 6.87 12 27.444
S48 6.87 12 27.444
S49 6.87 12 27.444
S50 6.87 12 27.444
S51 6.87 3.8 14.324
S52 6.87 3.8 14.324
S53 6.87 7.9 20.884
S54 6.87 12 27.444
S55 6.87 12 27.444
S56 6.87 12 27.444
S64 6.87 12 27.444
S65 6.87 12 27.444
S66 6.87 12 27.444
S67 6.87 12 27.444
S68 6.87 3.8 14.324
S69 6.87 3.8 14.324
S70 6.87 3.8 14.324
S71 6.87 3.8 14.324
S72 6.87 12 27.444
S73 6.87 12 27.444
S81 6.87 7.9 20.884
S82 6.87 7.9 20.884
S83 6.87 7.9 20.884
S84 6.87 7.9 20.884
S85 6.87 3.8 14.324

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 33
FOUNDATION ENGINEERING 2019
S86 6.87 2.4 12.084
S87 6.87 2.4 12.084
S88 6.87 2.4 12.084
S89 6.87 3.8 14.324
S90 6.87 3.8 14.324
S91 6.87 3.8 14.324
S92 6.87 3.8 14.324
S93 6.87 3.10 13.204
S94 6.87 3.10 13.204
S95 6.87 3.10 13.204
S96 6.87 3.8 14.324
S97 6.87 3.8 14.324
S98 6.87 3.8 14.324
S99 6.87 3.8 14.324
S100 6.87 2.4 12.084
S101 6.87 2.4 12.084
S102 6.87 2.4 12.084

SLAB LOAD CALCULATIONS


DEAD LOADS LIVE LOADS FACTORED
PANEL
kPa kPa kPa
FOURTH TO FIFTH FLOOR
S18 6.87 3.8 14.324
S19 7.87 3.8 15.524
S20 6.87 3.8 14.324
S21 6.87 12 27.444
S22 6.87 12 27.444
S23 6.87 12 27.444
S24 6.87 12 27.444
S25 6.87 12 27.444
S26 6.87 12 27.444
S27 6.87 12 27.444
S28 6.87 12 27.444
S29 6.87 12 27.444
S30 6.87 12 27.444
S31 6.87 12 27.444
S32 6.87 3.8 14.324
S33 7.87 3.8 15.524
S34 6.87 3.8 14.324
S35 6.87 12 27.444

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 34
FOUNDATION ENGINEERING 2019
S36 6.87 12 27.444
S37 6.87 12 27.444
S38 6.87 12 27.444
S39 6.87 12 27.444
S40 6.87 12 27.444
S41 6.87 12 27.444
S42 6.87 12 27.444
S43 6.87 12 27.444
S44 6.87 12 27.444
S45 6.87 12 27.444
S46 6.87 12 27.444
S47 6.87 12 27.444
S48 6.87 12 27.444
S49 6.87 12 27.444
S50 6.87 12 27.444
S51 6.87 12 27.444
S52 6.87 12 27.444
S53 6.87 12 27.444
S54 6.87 12 27.444
S55 6.87 12 27.444
S56 6.87 12 27.444
S57 6.87 12 27.444
S58 6.87 12 27.444
S59 6.87 12 27.444
S60 6.87 12 27.444
S61 6.87 12 27.444
S62 6.87 12 27.444
S63 6.87 12 27.444
S64 6.87 12 27.444
S65 6.87 12 27.444
S66 6.87 12 27.444
S67 6.87 12 27.444
S68 6.87 12 27.444
S69 6.87 12 27.444
S70 6.87 12 27.444
S71 6.87 12 27.444
S72 7.87 12 28.644
S73 7.87 12 28.644
S74 6.87 12 27.444
S75 6.87 12 27.444
S76 6.87 12 27.444

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 35
FOUNDATION ENGINEERING 2019
S77 6.87 12 27.444
S78 6.87 12 27.444
S79 6.87 12 27.444
S80 6.87 12 27.444
S81 7.87 12 28.644
S82 7.87 12 28.644
S83 6.87 12 27.444
S84 6.87 12 27.444
S85 6.87 12 27.444
S86 6.87 12 27.444
S87 6.87 12 27.444
S88 7.87 12 28.644
S89 7.87 3.8 15.524
S90 7.87 3.8 15.524
S91 7.87 3.8 15.524
S92 6.87 12 27.444
S93 6.87 12 27.444
S94 6.87 12 27.444
S95 6.87 12 27.444
S96 6.87 12 27.444
S97 7.87 3.8 15.524
S98 7.87 3.8 15.524
S99 7.87 3.8 15.524
S100 7.87 12 28.644
S101 6.87 12 27.444
S102 6.87 12 27.444

SLAB LOAD CALCULATIONS


DEAD LOADS LIVE LOADS FACTORED
PANEL
kPa kPa kPa
ROOF DECK
S18 6.87 3.8 14.324
S19 7.87 3.8 15.524
S20 6.87 3.8 14.324
S21 6.87 12 27.444
S22 6.87 12 27.444
S23 6.87 12 27.444
S24 6.87 12 27.444
S25 6.87 12 27.444
S26 6.87 12 27.444

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 36
FOUNDATION ENGINEERING 2019
S27 6.87 12 27.444
S28 6.87 12 27.444
S29 6.87 12 27.444
S30 6.87 12 27.444
S31 6.87 12 27.444
S32 6.87 3.8 14.324
S33 7.87 3.8 15.524
S34 6.87 3.8 14.324
S35 6.87 12 27.444
S36 6.87 12 27.444
S37 6.87 12 27.444
S38 6.87 12 27.444
S39 6.87 12 27.444
S40 6.87 12 27.444
S41 6.87 12 27.444
S42 6.87 12 27.444
S43 6.87 12 27.444
S44 6.87 12 27.444
S45 6.87 12 27.444
S46 6.87 12 27.444
S47 6.87 12 27.444
S48 6.87 12 27.444
S49 6.87 12 27.444
S50 6.87 12 27.444
S51 6.87 12 27.444
S52 6.87 12 27.444
S53 6.87 12 27.444
S54 6.87 12 27.444
S55 6.87 12 27.444
S56 6.87 12 27.444
S57 6.87 12 27.444
S58 6.87 12 27.444
S59 6.87 12 27.444
S60 6.87 12 27.444
S61 6.87 12 27.444
S62 6.87 12 27.444
S63 6.87 12 27.444
S64 6.87 12 27.444
S65 6.87 12 27.444
S66 6.87 12 27.444
S67 6.87 12 27.444

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 37
FOUNDATION ENGINEERING 2019
S68 6.87 12 27.444
S69 6.87 12 27.444
S70 6.87 12 27.444
S71 6.87 12 27.444
S72 7.87 12 28.644
S73 7.87 12 28.644
S74 6.87 12 27.444
S75 6.87 12 27.444
S76 6.87 12 27.444
S77 6.87 12 27.444
S78 6.87 12 27.444
S79 6.87 12 27.444
S80 6.87 12 27.444
S81 7.87 12 28.644
S82 7.87 12 28.644
S83 6.87 12 27.444
S84 6.87 12 27.444
S85 6.87 12 27.444
S86 6.87 12 27.444
S87 6.87 12 27.444
S88 7.87 12 28.644
S89 7.87 3.8 15.524
S90 7.87 3.8 15.524
S91 7.87 3.8 15.524
S92 6.87 12 27.444
S93 6.87 12 27.444
S94 6.87 12 27.444
S95 6.87 12 27.444
S96 6.87 12 27.444
S97 7.87 3.8 15.524
S98 7.87 3.8 15.524
S99 7.87 3.8 15.524
S100 7.87 12 28.644
S101 6.87 12 27.444
S102 6.87 12 27.444

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 38
FOUNDATION ENGINEERING 2019

SEISMIC ANALYSIS

Design Flow Chart

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 39
FOUNDATION ENGINEERING 2019

Self Weight Calculation

Weight per Floor (2nd)


Beams
Beam Sizes Volume Unit Weight (kN/m3) No. of Beams Weight (kN)
l (m) h (m) d (m) (m3)
4.95 0.70 0.60 2.079 23.6 10 490.64
5.75 0.70 0.60 2.415 23.6 10 569.94
4.95 0.55 0.40 1.089 23.6 4 102.80
5.75 0.55 0.40 1.265 23.6 4 119.42
6.00 0.55 0.40 1.320 23.6 127 3956.30
8.00 0.65 0.50 2.600 23.6 18 1104.48
5.65 0.55 0.40 1.243 23.6 18 528.03
8.58 0.65 0.50 2.789 23.6 18 1184.55
7.58 0.65 0.50 2.464 23.6 18 1046.49
4.95 0.55 0.40 1.089 23.6 7 179.90
5.75 0.55 0.40 1.265 23.6 7 208.98
4.35 0.60 0.40 1.044 23.6 14 344.94
6.00 0.70 0.60 2.520 23.6 27 1605.74
6.03 0.60 0.40 1.448 23.6 27 922.39
6.03 0.60 0.40 1.447 23.6 21 716.89
  Total 13081.50
Columns
Column Sizes Volume
Unit Weight (kN/m3) No. of Columns Weight (kN)
h (m) b (m) d (m) (m3)
2 0.60 0.60 0.72 23.6 158 2684.736
2 0.65 0.65 0.845 23.6 158 3150.836
  Total 5835.572
Exterior Wall
Wall Sizes
Area (m2) Load (kPa) No. of Walls Weight (kN)
l (m) h (m) t (m)
4.95 4.00 0.15 19.800 3.11 2 123.16
5.75 4.00 0.15 23.000 3.11 2 143.06
4.95 2.00 0.15 9.900 3.11 2 61.58
5.75 2.00 0.15 11.500 3.11 2 71.53
8.00 2.00 0.15 16.000 3.11 2 99.52
DESIGN PROJECT Submitted by: October 2019
PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 40
FOUNDATION ENGINEERING 2019
5.65 2.00 0.15 11.300 3.11 2 70.29
6.00 2.00 0.15 12.000 3.11 17 634.44
7.58 2.00 0.15 15.160 3.11 2 94.30
8.58 2.00 0.15 17.160 3.11 2 106.74
6.00 1.20 0.15 1.080 3.11 7 23.51
  Total 1428.11
Interior Wall
Wall Sizes Area (m2) Load (kPa) No. of Walls Weight (kN)
l (m) h (m) t (m)
4.95 2.00 0.10 9.900 2.98 3 88.51
5.75 2.00 0.10 11.500 2.98 3 102.81
6.00 2.00 0.10 12.000 2.98 4 143.04
8.00 2.00 0.10 16.000 2.98 2 95.36
8.58 2.00 0.10 17.160 2.98 2 102.27
7.58 4.00 0.10 30.320 2.98 2 180.71
4.95 4.00 0.10 19.800 2.98 2 118.01
5.75 4.00 0.10 23.000 2.98 2 137.08
5.60 4.00 0.10 22.400 2.98 8 534.02
3.40 4.00 0.10 13.600 2.98 8 324.22
6.00 4.00 0.10 24.000 2.98 2 143.04
  Total 1969.06
Slabs
Slab Sizes
Volume
Dimension Unit Weight (kN/m3) No. of Slabs Weight (kN)
(m3)
(m2) t (m)
4.95 7.58 0.2 7.504 23.6 2 354.20
4.95 6.00 0.2 5.940 23.6 4 560.74
4.95 8.58 0.2 8.494 23.6 2 400.93
4.95 5.65 0.2 5.594 23.6 2 264.01
4.95 8.00 0.2 7.920 23.6 2 373.82
5.75 7.58 0.2 8.717 23.6 2 411.44
5.75 6.00 0.2 6.900 23.6 4 651.36
5.75 8.58 0.2 9.867 23.6 2 465.72
5.75 5.65 0.2 6.498 23.6 2 306.68
5.75 8.00 0.2 9.200 23.6 2 434.24
6.00 7.58 0.2 9.096 23.6 9 1931.99
6.00 6.00 0.2 7.200 23.6 26 4417.92
6.00 8.58 0.2 10.296 23.6 13 3158.81
6.00 5.65 0.2 6.780 23.6 13 2080.10
DESIGN PROJECT Submitted by: October 2019
PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 41
FOUNDATION ENGINEERING 2019

6.00 8.00 0.2 9.600 23.6 13 2945.28


6.00 4.52 0.2 5.428 23.6 2 256.22
6.00 3.01 0.2 3.616 23.6 2 170.69
6.00 6.03 0.2 7.233 23.6 6 1024.12
6.00 6.03 0.2 7.238 23.6 6 1024.87
6.00 4.85 0.2 5.820 23.6 2 274.70
6.00 4.25 0.2 5.100 23.6 2 240.72
  Total 21748.58
 
  2nd Floor Weight 44062.83

Weight per Floor (3rd)


Beams
Beam Sizes Volume
Unit Weight (kN/m3) No. of Beams Weight (kN)
l (m) h (m) d (m) (m3)
4.95 0.55 0.40 1.089 23.6 7 179.90
5.75 0.55 0.40 1.265 23.6 7 208.98
6.00 0.55 0.40 1.320 23.6 127 3956.30
8.00 0.65 0.50 2.600 23.6 18 1104.48
5.65 0.55 0.40 1.243 23.6 18 528.03
8.58 0.65 0.50 2.789 23.6 16 1052.94
7.58 0.65 0.50 2.464 23.6 12 697.66
10.70 0.70 0.60 4.494 23.6 10 1060.58
4.35 0.70 0.60 1.827 23.6 24 1034.81
4.35 0.55 0.40 0.957 23.6 4 90.34
6.00 0.70 0.60 2.520 23.6 33 1962.58
6.03 0.60 0.40 1.448 23.6 18 614.92
6.01 0.70 0.60 2.523 23.6 15 893.27
  Total 13384.80
Columns
Column Sizes Volume
Unit Weight (kN/m3) No. of Columns Weight (kN)
h (m) b (m) d (m) (m3)
2 0.60 0.60 0.720 23.6 130 2208.96
2 0.60 0.60 0.720 23.6 158 2684.74
  Total 4893.70
Exterior Wall
Wall Sizes
Area (m2) Load (kPa) No. of Walls Weight (kN)
l (m) h (m) t (m)
DESIGN PROJECT Submitted by: October 2019
PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 42
FOUNDATION ENGINEERING 2019

6.00 4.00 0.15 24.000 3.11 11 821.04


4.95 2.00 0.15 9.900 3.11 2 61.58
5.75 2.00 0.15 11.500 3.11 2 71.53
4.95 1.20 0.15 5.940 3.11 2 36.95
5.75 1.20 0.15 6.900 3.11 2 42.92
6.00 1.20 0.15 7.200 3.11 17 380.66
5.65 1.20 0.15 6.780 3.11 2 42.17
8.58 1.20 0.15 10.296 3.11 2 64.04
7.58 1.20 0.15 9.096 3.11 2 56.58
4.35 1.20 0.15 5.220 3.11 4 64.94
  Total 1642.40
Interior Wall
Wall Sizes
Area (m2) Load (kPa) No. of Walls Weight (kN)
l (m) h (m) t (m)
6.00 1.20 0.10 7.200 2.98 4 128.74
4.95 2.00 0.10 9.900 2.98 2 59.00
5.75 2.00 0.10 1.150 2.98 2 6.85
7.58 2.00 0.10 1.516 2.98 2 9.04
5.60 4.00 0.10 22.400 2.98 8 534.02
3.40 4.00 0.10 13.600 2.98 8 324.22
6.00 1.20 0.10 0.720 2.98 2 6.44
  Total 939.57
Slabs
Slab Sizes
Volume
Dimension Unit Weight (kN/m3) No. of Slabs Weight (kN)
(m3)
(m2) t (m)
4.95 7.58 0.2 7.504 23.6 2 354.20
4.95 6.00 0.2 5.940 23.6 4 560.74
4.95 8.58 0.2 8.494 23.6 2 400.93
4.95 5.65 0.2 5.594 23.6 2 264.01
4.95 4.35 0.2 4.307 23.6 4 406.53
5.75 6.00 0.2 6.900 23.6 4 651.36
5.75 8.58 0.2 9.867 23.6 2 465.72
5.75 5.65 0.2 6.498 23.6 2 306.68
5.75 4.35 0.2 5.003 23.6 4 472.24
6.00 7.58 0.2 9.096 23.6 9 1931.99
6.00 6.00 0.2 7.200 23.6 26 4417.92
6.00 8.58 0.2 10.296 23.6 13 3158.81
6.00 5.65 0.2 6.780 23.6 13 2080.10
DESIGN PROJECT Submitted by: October 2019
PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 43
FOUNDATION ENGINEERING 2019
6.00 8.00 0.2 9.600 23.6 13 2945.28
6.00 1.51 0.2 1.809 23.6 2 85.41
6.00 6.01 0.2 7.210 23.6 12 2041.76
6.00 3.00 0.2 3.605 23.6 2 170.15
6.00 6.03 0.2 7.238 23.6 6 1024.87
6.00 4.85 0.2 5.820 23.6 2 274.70
6.00 4.25 0.2 5.100 23.6 2 240.72
  Total 22254.12
 
  3rd Floor Weight 43114.59

Weight per Floor (4th)


Beams
Beam Sizes Volume
Unit Weight (kN/m3) No. of Beams Weight (kN)
l (m) h (m) d (m) (m3)
4.95 0.55 0.40 1.089 23.6 6 154.20
5.75 0.55 0.40 1.265 23.6 6 179.12
6.00 0.55 0.40 1.320 23.6 114 3551.33
8.00 0.65 0.50 2.600 23.6 16 981.76
5.65 0.55 0.40 1.243 23.6 18 528.03
8.58 0.65 0.50 2.789 23.6 16 1052.94
7.58 0.65 0.50 2.464 23.6 12 697.66
6.00 0.70 0.60 2.520 23.6 39 2319.41
10.70 0.70 0.60 4.494 23.6 10 1060.58
4.35 0.70 0.60 1.827 23.6 28 1207.28
4.35 0.55 0.40 0.957 23.6 4 90.34
6.01 0.70 0.60 2.523 23.6 39 2322.50
  Total 14145.16
Columns
Column Sizes Volume
Unit Weight (kN/m3) No. of Columns Weight (kN)
h (m) b (m) d (m) (m3)
4 0.60 0.60 1.440 23.6 130 4417.92
  Total 4417.92
Exterior Wall
Wall Sizes
Area (m2) Load (kPa) No. of Walls Weight (kN)
l (m) h (m) t (m)
6.00 4.00 0.15 24.000 3.11 11 821.04
4.95 2.00 0.15 9.900 3.11 2 61.58

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 44
FOUNDATION ENGINEERING 2019

5.75 2.00 0.15 11.500 3.11 2 71.53


4.95 1.20 0.15 5.940 3.11 2 36.95
5.75 1.20 0.15 6.900 3.11 2 42.92
6.00 1.20 0.15 7.200 3.11 17 380.66
5.65 1.20 0.15 6.780 3.11 2 42.17
8.58 1.20 0.15 10.296 3.11 2 64.04
7.58 1.20 1.15 9.096 3.11 2 56.58
4.35 1.20 0.15 5.220 3.11 4 64.94
  Total 1642.40
Interior Wall
Wall Sizes
Area (m2) Load (kPa) No. of Walls Weight (kN)
l (m) h (m) t (m)
5.60 4.00 0.10 22.400 2.98 8 534.02
3.40 4.00 0.10 13.600 2.98 8 324.22
  Total 858.24
Slabs
Slab Sizes
Volume
Dimension Unit Weight (kN/m3) No. of Slabs Weight (kN)
(m3)
(m2) t (m)
4.95 7.58 0.2 7.504 23.6 2 354.20
4.95 6.00 0.2 5.940 23.6 4 560.74
4.95 8.58 0.2 8.494 23.6 2 400.93
4.95 5.65 0.2 5.594 23.6 2 264.01
4.95 4.35 0.2 4.307 23.6 4 406.53
5.75 6.00 0.2 6.900 23.6 4 651.36
5.75 8.58 0.2 9.867 23.6 2 465.72
5.75 5.65 0.2 6.498 23.6 2 306.68
5.75 4.35 0.2 5.003 23.6 4 472.24
6.00 7.58 0.2 9.096 23.6 9 1931.99
6.00 6.00 0.2 7.200 23.6 26 4417.92
6.00 8.58 0.2 10.296 23.6 13 3158.81
6.00 5.65 0.2 6.780 23.6 13 2080.10
6.00 4.85 0.2 5.820 23.6 2 274.70
6.00 4.25 0.2 5.100 23.6 2 240.72
6.00 6.01 0.2 7.210 23.6 24 4083.52
6.00 3.00 0.2 3.605 23.6 4 340.29
  Total 20410.47
 
  4th Floor Weight 41474.19
DESIGN PROJECT Submitted by: October 2019
PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 45
FOUNDATION ENGINEERING 2019

Weight per Floor (5th)


Beams
Beam Sizes Volume
Unit Weight (kN/m3) No. of Beams Weight (kN)
l (m) h (m) d (m) (m3)
4.95 0.55 0.40 1.089 23.6 6 154.20
5.75 0.55 0.40 1.265 23.6 6 179.12
6.00 0.55 0.40 1.320 23.6 114 3551.33
8.00 0.65 0.50 2.600 23.6 16 981.76
5.65 0.55 0.40 1.243 23.6 18 528.03
8.58 0.65 0.50 2.789 23.6 16 1052.94
7.58 0.65 0.50 2.464 23.6 12 697.66
6.00 0.70 0.60 2.520 23.6 39 2319.41
10.70 0.70 0.60 4.494 23.6 10 1060.58
4.35 0.70 0.60 1.827 23.6 28 1207.28
4.35 0.55 0.40 0.957 23.6 4 90.34
6.01 0.70 0.60 2.523 23.6 39 2322.50
  Total 14145.16
Columns
Column Sizes Volume
Unit Weight (kN/m3) No. of Columns Weight (kN)
h (m) b (m) d (m) (m3)
4 0.60 0.60 1.440 23.6 130 4417.92
  Total 4417.92
Exterior Wall
Wall Sizes
Area (m2) Load (kPa) No. of Walls Weight (kN)
l (m) h (m) t (m)
6.00 4.00 0.15 24.000 3.11 11 821.04
4.95 2.00 0.15 9.900 3.11 2 61.58
5.75 2.00 0.15 11.500 3.11 2 71.53
4.95 1.20 0.15 5.940 3.11 2 36.95
5.75 1.20 0.15 6.900 3.11 2 42.92
6.00 1.20 0.15 7.200 3.11 17 380.66
5.65 1.20 0.15 6.780 3.11 2 42.17
8.58 1.20 0.15 10.296 3.11 2 64.04
7.58 1.20 1.15 9.096 3.11 2 56.58
4.35 1.20 0.15 5.220 3.11 4 64.94
  Total 1642.40
Interior Wall

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 46
FOUNDATION ENGINEERING 2019

Wall Sizes
Area (m2) Load (kPa) No. of Walls Weight (kN)
l (m) h (m) t (m)
5.60 4.00 0.10 22.400 2.98 8 534.02
3.40 4.00 0.10 13.600 2.98 8 324.22
  Total 858.24
Slabs
Slab Sizes Volume Unit Weight (kN/m3) No. of Slabs Weight (kN)
Dimension t (m) (m3)
(m2)
4.95 7.58 0.2 7.504 23.6 2 354.20
4.95 6.00 0.2 5.940 23.6 4 560.74
4.95 8.58 0.2 8.494 23.6 2 400.93
4.95 5.65 0.2 5.594 23.6 2 264.01
4.95 4.35 0.2 4.307 23.6 4 406.53
5.75 6.00 0.2 6.900 23.6 4 651.36
5.75 8.58 0.2 9.867 23.6 2 465.72
5.75 5.65 0.2 6.498 23.6 2 306.68
5.75 4.35 0.2 5.003 23.6 4 472.24
6.00 7.58 0.2 9.096 23.6 9 1931.99
6.00 6.00 0.2 7.200 23.6 26 4417.92
6.00 8.58 0.2 10.296 23.6 13 3158.81
6.00 5.65 0.2 6.780 23.6 13 2080.10
6.00 4.85 0.2 5.820 23.6 2 274.70
6.00 4.25 0.2 5.100 23.6 2 240.72
6.00 6.01 0.2 7.210 23.6 24 4083.52
6.00 3.00 0.2 3.605 23.6 4 340.29
  Total 20410.47
 
  5th Floor Weight 41474.19

Self Weight (kN)


2nd Floor Weight 44062.83
3rd Floor Weight 43114.59
DESIGN PROJECT Submitted by: October 2019
PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 47
FOUNDATION ENGINEERING 2019

4th Floor Weight 41474.19


5th Floor Weight 41474.19
Roof Deck Weight 33931.72
Self Weight 204057.51

Static

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 48
FOUNDATION ENGINEERING 2019
Occupancy Category V. Miscellaneous Structures
Importance Factor, I 1.00
Zone 4
Zone Factor, Z 0.40
Seismic Source Type A
Distance on Nearest Fault 9.60
Near Source Factor, Na 1.00
Near Source Factor, Nv 1.232
Soil Profile Type SD
Seismic Coefficient, Ca 0.44
Seismic Coefficient, Cv 0.79
Height above base to Lvl n, hn 20
Numerical Coefficient, Ct 0.0731
Numerical Coefficient, R 8.5
Structure Period, T 0.6913
Total Weight Of Structure, W 204057.51
Actual Base Shear, Vact 27380.06
Maximum Base Shear, Vmax 26407.44
Minimum Base Shear, Vmin 9876.38
Minimum Base Shear, Vmin' 9464.43
Base Shear, V 26407.44
Actual Ft 1277.95
Maximum Ft 6601.86
Ft 1277.95

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 49
FOUNDATION ENGINEERING 2019
Floor Level hf wx hx wx x hx
Roof Deck 4 33931.72 20 678634.3
5th Floor 4 41474.19 16 663587
4th Floor 4 41474.19 12 497690.3
3rd Floor 4 43114.59 8 344916.7
2nd 4 44062.83 4 176251.3

Σwxhx wxhx/Σwxhx Ft Storey Shear


0.287425419 7222.85 7222.85
0.28105237 7062.70 14285.56
2361080 0.210789277 5297.03 19582.59
0.14608433 3671.02 23253.61
0.074648605 1875.88 25129.49

Floor Level Storey Shear


Roof Deck 7222.85
5th Floor 14285.56
4th Floor 19582.59
3rd Floor 23253.61
2nd Floor 25129.49

Storey Shear
30000

25000

20000
Storey Shear

15000

10000

5000

0
Roof Deck 5th Floor 4th Floor 3rd Floor 2nd Floor
Floor Level

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 50
FOUNDATION ENGINEERING 2019
Dynamic
T/Ts g's
0.0 0.44
0.2 1.10
1.0 1.10
1.1 1.00
1.2 0.92
1.3 0.85
1.4 0.79
1.5 0.73
1.6 0.69
1.7 0.65
1.8 0.61
1.9 0.58
2.0 0.55
2.1 0.52
2.2 0.50
2.3 0.48
2.4 0.46
2.5 0.44
2.6 0.42
2.7 0.41
2.8 0.39
2.9 0.38
3.0 0.37
3.1 0.35
3.2 0.34
3.3 0.33
3.4 0.32
3.5 0.31
3.6 0.31
3.7 0.30
3.8 0.29
3.9 0.28
4.0 0.28
4.1 0.27
4.2 0.26
4.3 0.26
4.4 0.25
4.5 0.24
4.6 0.24
4.7 0.23
4.8 0.23
4.9 0.22
5.0 0.22

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 51
FOUNDATION ENGINEERING 2019
WIND ANALYSIS

Design Flow Chart

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 52
FOUNDATION ENGINEERING 2019
Wind Load Calculation

Basic Wind Speed, V 260


V (m/s) 72.22

Structure Type
Building
Main Wind Force Resisting System 0.85

Surface Roughness Category


Surface Roughness is B since the structure
is located in an urban area

Exposure Category B

Topographic Factor, Kzt 1.0

Height of the Structure, h 20 B 50.5


Natural Frequency, na or n1 1.0 L 99.4
gQ, gV 3.4

Building is Rigid

Terrain Exposure Constants


Exposure α zg â b̂ ā b̄ c l (m) ɛ̄ zmi n (m)
B 7.0 365.76 0.14 0.84 0.25 0.45 0.30 97.54 0.333 9.14
C 9.5 274.32 0.11 1.00 0.15 0.65 0.20 152.4 0.200 4.57
D 11.5 213.36 0.09 1.07 0.11 0.80 0.15 198.12 0.125 2.13

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 53
FOUNDATION ENGINEERING 2019
Exposure B
Turbulence Intensity Factor, c 0.30
Intensity of Turbulence, Iz 0.267
Peak Factor, gR 4.191
Integral Length Scale, L z 122.893
Mean Hourly Wind Speed, Vz 38.649
Reduced Frequency, N1 3.203
Rn 0.07
R h: η 2.398
Resonant Response Factor, R 0.3018
R B: η 6.054
0.8322 R L: η 39.893
Background Response Factor, Q
Gust-Effect Factor, Gf 1.2135
Velocity Pressure Exposure Rh 0.3308
0.8761
Coefficient, Kz RB 0.1515
Velocity Pressure, qz 2381.21 RL 0.0248

Surface L/B Cp
Windward Wall All Values 0.8
Leeward Wall (Perpendicular to
1.33 -0.334
15m)
Leeward Wall (Perpendicular to
0.75 -0.5
20m)
Sidewall All Values -0.7

Floor Kz Velocity Pressure Windward Wall


2 0.553083 1503.18 593.62
3 0.674215 1832.40 1246.03
4 0.757025 2057.46 1399.07
5 0.821878 2233.72 1518.93
Roof 0.875983 2380.77 1618.92

Floor Kz Velocity Pressure Leeward Wall ( to 15m)


2 0.553083 1503.18
3 0.674215 1832.40
4 0.757025 2057.46 -247.3616609
5 0.821878 2233.72
Roof 0.875983 2380.77

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 54
FOUNDATION ENGINEERING 2019

Floor Kz Velocity Pressure Leeward Wall ( to 20m)


2 0.553083 1503.18
3 0.674215 1832.40
4 0.757025 2057.46 -583.2878433
5 0.821878 2233.72
Roof 0.875983 2380.77

Floor Kz Velocity Pressure Sidewall


2 0.553083 1503.18
3 0.674215 1832.40
4 0.757025 2057.46 -988.0181835
5 0.821878 2233.72
Roof 0.875983 2380.77

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 55
FOUNDATION ENGINEERING 2019

DESIGN PROJECT Submitted by: October 2019


PROPOSED 5-STOREY PARKING Areniego | Garin | Monte | Vergara
BUILDING WITH ROOF DECK AND Submitted to:
PUBLIC TRANSIT TERMINAL IN Engr. Arnulfo P. Delima
LAWTON, MANILA
C h a p t e r 3 | 56